CN103089019B - Multiaspect frame type wall erection equipment - Google Patents

Multiaspect frame type wall erection equipment Download PDF

Info

Publication number
CN103089019B
CN103089019B CN201210585314.3A CN201210585314A CN103089019B CN 103089019 B CN103089019 B CN 103089019B CN 201210585314 A CN201210585314 A CN 201210585314A CN 103089019 B CN103089019 B CN 103089019B
Authority
CN
China
Prior art keywords
wall
right angle
frame type
erection equipment
bearing part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210585314.3A
Other languages
Chinese (zh)
Other versions
CN103089019A (en
Inventor
杨智华
马全涛
钟伟国
田栋
徐海萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rizhao elephant Housing Construction Co., Ltd.
Original Assignee
SHANDONG BEIXIN ANYFUN HOUSE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG BEIXIN ANYFUN HOUSE CO Ltd filed Critical SHANDONG BEIXIN ANYFUN HOUSE CO Ltd
Priority to CN201210585314.3A priority Critical patent/CN103089019B/en
Publication of CN103089019A publication Critical patent/CN103089019A/en
Application granted granted Critical
Publication of CN103089019B publication Critical patent/CN103089019B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention discloses a kind of multiaspect frame type wall erection equipment, comprise two parallel sliding rails and be positioned at the body of wall bookbinding right angle calibration platform inside two sliding rails, described sliding rail is provided with two drivings, two drivings are provided with body of wall lifting gear, described body of wall bookbinding right angle calibration platform comprises the bearing part that two have variable relative displacement, two bearing parts are equipped with the right angle fixator that two have variable relative displacement, the corner of these four corresponding bodies of wall of right angle fixators difference.Because the present invention adopts said structure, body of wall bookbinding right angle calibration platform can carry out calibration location, right angle to the corner of one side body of wall quickly and easily, avoids workman and with the naked eye need judge the inconvenience that angle is brought and the problem that precision is low, error is high; Body of wall to be sling upset by body of wall lifting gear again in installation process simultaneously, solve in prior art the problem needing manually to lift body of wall and overturn, reduce labour intensity, thus substantially increase production efficiency.

Description

Multiaspect frame type wall erection equipment
Technical field
The invention belongs to constructional engineering machinery technical field, be specifically related to a kind of multiaspect frame type wall erection equipment.
Background technology
In prior art, multiaspect body of wall total framework needs that the body of wall of one side one side is first independently bound, inner-outer wall is installed, and then the assembling carrying out multiple body of wall is formed.In the process that any body of wall is bound in the total framework of multiaspect body of wall, at each main joist of one side body of wall 90 degree of link position places, need workman to utilize naked eyes to judge angle, this just result in, and accuracy is not high, error is larger problem occurs.In addition, carrying out in binding stable subprocess to body of wall, needing workman first to bind one of them surface of body of wall, after this surface has been bound, need manually body of wall to be lifted upset, the nail on another surface could have been bound like this, after the nail bookbinding of two sides, need again this body of wall two sides to be overturn, carry out the installation of inner, external wall, all need people to squat down on the ground in whole process and carry out, and need manually to overturn body of wall, waste time and energy, labour intensity is large, and production efficiency is not high.
Summary of the invention
Technical problem to be solved by this invention is for above-mentioned the deficiencies in the prior art, there is provided a kind of multiaspect frame type wall erection equipment, it had both been convenient to 90 degree of right angles calibrations when body of wall main joist is bound, and improved precision, also can overturn body of wall simultaneously, reduce labor strength.
The technical solution adopted in the present invention is: a kind of multiaspect frame type wall erection equipment, comprise two parallel sliding rails and be positioned at the body of wall bookbinding right angle calibration platform inside two sliding rails, described sliding rail is provided with two drivings, two drivings are provided with body of wall lifting gear, described body of wall bookbinding right angle calibration platform comprises the bearing part that two have variable relative displacement, two bearing parts are equipped with the right angle fixator that two have variable relative displacement, the corner of these four corresponding bodies of wall of right angle fixators difference.
As preferably, below described bearing part, be provided with at least two support members be parallel to each other, support member is provided with the lower floor's slide-bar for described bearing part slide anteroposterior.
As preferably, be also provided with between two bearing parts at least one to be slidably connected on described lower floor slide-bar and height a little less than the reinforcement of the height of bearing part.
As preferably, described bearing part is provided with the upper strata slide-bar horizontally slipped for described right angle fixator.
As preferably, described bearing part and described right angle fixator are equipped with for fastening tie down screw.
As preferably, described bearing part and support member are equipped with graduation mark.
As preferably, the body of wall lifting gear of described driving is provided with can the interspersed screw rod that moves around of all around.
As preferably, between two drivings, be provided with connecting rod and the tie down screw for locking this connecting rod.
As preferably, inside two sliding rails, be also provided with several roller tray.
As preferably, described roller tray arranges along the length direction uniform intervals of sliding rail.
Beneficial effect of the present invention is: because the present invention adopts said structure, body of wall bookbinding right angle calibration platform can carry out calibration location, right angle to the corner of one side body of wall quickly and easily, avoids workman and with the naked eye need judge the inconvenience that angle is brought and the problem that precision is low, error is high; Body of wall to be sling upset by body of wall lifting gear again in installation process simultaneously, solve in prior art the problem needing manually to lift body of wall and overturn, reduce labour intensity, thus substantially increase production efficiency.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is body of wall of the present invention bookbinding right angle calibration platform structural representation;
Fig. 3 is bridge crane structure schematic diagram of the present invention.
In figure: 1, sliding rail; 2, drive a vehicle; 3, body of wall lifting gear; 4, body of wall bookbinding right angle calibration platform; 5, roller tray; 6, connecting rod; 31, interspersed screw rod; 41, bearing part; 42, right angle fixator; 43, support member; 44, lower floor's slide-bar; 45, reinforcement; 46, upper strata slide-bar; 47, tie down screw.
Detailed description of the invention
Below in conjunction with the accompanying drawings and the specific embodiments the present invention is described in further detail.
As shown in figures 1 and 3, a kind of multiaspect frame type wall erection equipment, comprise two parallel sliding rails 1 and be positioned at the body of wall bookbinding right angle calibration platform 4 inside two sliding rails 1, described sliding rail 1 is provided with two drivings 2, two drivings 2 are provided with body of wall lifting gear 3, and the body of wall lifting gear 3 of described driving 2 is provided with can all around moves around under the transfer of driving 2 interspersed screw rod 31.
As shown in Figure 2, described body of wall bookbinding right angle calibration platform 4 comprises the bearing part 41 that two have variable relative displacement, be parallel to each other between two bearing parts 41, at least two support members be parallel to each other 43 are provided with below bearing part 41, in the present embodiment, support member 43 has three, and it is all perpendicular with bearing part 41, support member 43 is provided with the lower floor's slide-bar 44 for described bearing part 41 slide anteroposterior, bearing part 41 can slidably reciprocate on lower floor's slide-bar 44, thus realize the object of control two bearing part 41 relative displacements, described bearing part 41 is provided with the tie down screw 47 for its position on lower floor's slide-bar 44 fastening.Also be provided with between two bearing parts 41 at least one to be slidably connected on described lower floor slide-bar 44 and height a little less than the reinforcement 45 of the height of bearing part 41, two reinforcements 45 are provided with altogether in the present embodiment, it can play the effect of supplemental support body of wall, in order to avoid body of wall is affected by gravity, middle " under pendant ", affect " straight, flat " of body of wall, reinforcement 45 also can move along lower floor's slide-bar 44, better to play the effect of supplemental support body of wall simultaneously.Described bearing part 41 and support member 43 are equipped with graduation mark, are convenient for people to regulate the distance between bearing part 41 and between right angle fixator 42 accurately and fast.
Two bearing parts 41 are equipped with the right angle fixator 42 that two have variable relative displacement, on bearing part 41, be provided with the upper strata slide-bar 46 horizontally slipped for described right angle fixator 42 simultaneously, right angle fixator 42 can slidably reciprocate on upper strata slide-bar 46, thus realize the object controlling two right angle fixators, 42 relative displacements on same bearing part 41, the corner of these four corresponding bodies of wall of right angle fixators 42 difference, one of them of these four right angle fixators 42 is fixing, its excess-three can move around, to adapt to the length of body of wall or wide, and lower floor's slide-bar 44 is the relative displacements in order to control between bearing part 41, wide or long to adapt to body of wall, the right angle fixator 42 that can move around is provided with the tie down screw 47 for its position on upper strata slide-bar 46 fastening.
In addition, between two drivings 2, connecting rod 6 and the tie down screw 47 for locking this connecting rod 6 are set, the effect of connecting rod 6 avoids two drivings 2 when slinging body of wall, affect by body of wall gravity is drop-down, be separated each other, can not ensure interspersed screw rod 31 in two drivings 2 simultaneously level, insert on body of wall both sides socket smoothly in, affect normal operation.The pulley that can slidably reciprocate on sliding rail 1 is provided with below two drivings 2.
Meanwhile, the roller tray 5 that several length direction uniform intervals along sliding rail 1 arranges also is provided with inside two sliding rails 1.
The present invention gives the process of installing body of wall as follows:
First, along the axis of body of wall, (each body of wall has two axis, one is the centre position of length direction, one is the centre position of width) on be arranged with two sockets, then the length and width number of body of wall has been measured, three moveable right angle fixators 42 are moved along slide-bar on platform, moves to corresponding scale place.Now, tighten the tie down screw 47 on each moveable right angle fixator 42, its position fixed, this completes the location of body of wall, determine angle work.At this moment, binding is carried out to a surface of body of wall, after binding terminates, again the interspersed screw rod 31 in driving 2 is inserted body of wall both sides along in two sockets of axis, body of wall is sling, the half of half or width that the height sling is greater than body of wall length (specifically will see that those two sockets on body of wall have been arranged on the axis of length direction, still be arranged on axis in the width direction), then artificial being carried out in the air by body of wall is turned to another side, being declined by body of wall is placed on platform again, carries out binding to this surface of body of wall.
When the two sides of body of wall all installs nail, reserves after angle connects, by whole body of wall, slide along roller tray 5, two drivings 2 are simultaneously moved along ground sliding rail 1 to the end of roller tray 5, there is workman on each roller tray 5 side, and each workman only carries out a fraction of installation in interior wall (or exterior wall), when this body of wall is sent to the end of roller tray 5 to rolling across the body of wall come, each one does his duty for all workmans, just the interior wall of body of wall (or exterior wall) is over to installation.At this time, the end of roller tray 5 has also been arrived in driving 2, again body of wall is sling by driving 2, overturn, put down, then body of wall will move to the front end of roller tray 5 again along roller tray 5, and in the process that this process body of wall returns, each one does his duty again for workpeople, body of wall is installed exterior wall (or interior wall), now, single body of wall, between its each keel, 90 degree of connections, binding, interior wall installation, exterior walls are installed and are just all completed.
And then carry out 90 degree of location of next body of wall by aforesaid operations step, binding, interior wall are installed, exterior wall is installed, go round and begin again can complete all bodies of wall 90 degree location, binding, inner-outer wall installation work, finally multiple body of wall is assembled.
Because the present invention adopts said structure, body of wall bookbinding right angle calibration platform 4 can carry out calibration location, right angle to the corner of one side body of wall quickly and easily, avoids workman and with the naked eye need judge the inconvenience that angle is brought and the problem that precision is low, error is high; Body of wall to be sling upset by body of wall lifting gear 3 again in installation process simultaneously, solve in prior art the problem needing manually to lift body of wall and overturn, reduce labour intensity, thus substantially increase production efficiency.
The above, be only present pre-ferred embodiments, therefore can not limit scope of the invention process with this, and the equivalence namely done according to the present patent application the scope of the claims and description changes and modifies, and all should still remain within the scope of the patent.

Claims (10)

1. a multiaspect frame type wall erection equipment, it is characterized in that: comprise two parallel sliding rails (1) and be positioned at body of wall bookbinding right angle calibration platform (4) of two sliding rails (1) inner side, described sliding rail (1) is provided with two drivings (2), two drivings (2) are provided with body of wall lifting gear (3), described body of wall bookbinding right angle calibration platform (4) comprises the bearing part (41) that two have variable relative displacement, two bearing parts (41) are equipped with the right angle fixator (42) that two have variable relative displacement, the corner of these four corresponding bodies of wall of right angle fixators (42) difference.
2. multiaspect frame type wall erection equipment according to claim 1, it is characterized in that: described bearing part (41) below is provided with at least two support members be parallel to each other (43), and support member (43) is provided with the lower floor's slide-bar (44) for described bearing part (41) slide anteroposterior.
3. multiaspect frame type wall erection equipment according to claim 2, is characterized in that: be also provided with at least one between two bearing parts (41) and be slidably connected at the reinforcement (45) of the upper and height of described lower floor slide-bar (44) a little less than the height of bearing part (41).
4. the multiaspect frame type wall erection equipment according to claim 1,2 or 3, is characterized in that: described bearing part (41) is provided with the upper strata slide-bar (46) horizontally slipped for described right angle fixator (42).
5. multiaspect frame type wall erection equipment according to claim 4, is characterized in that: described bearing part (41) and described right angle fixator (42) are equipped with for fastening tie down screw (47).
6. multiaspect frame type wall erection equipment according to claim 2, is characterized in that: described bearing part (41) and support member (43) are equipped with graduation mark.
7. multiaspect frame type wall erection equipment according to claim 1, is characterized in that: the body of wall lifting gear (3) of described driving (2) is provided with can the interspersed screw rod (31) that moves around of all around.
8. the multiaspect frame type wall erection equipment according to claim 1 or 7, is characterized in that: be provided with connecting rod (6) and the tie down screw (47) for locking this connecting rod (6) between two drivings (2).
9. multiaspect frame type wall erection equipment according to claim 1, is characterized in that: two sliding rails (1) inner side is also provided with multiple roller tray (5).
10. multiaspect frame type wall erection equipment according to claim 9, is characterized in that: described roller tray (5) arranges along the length direction uniform intervals of sliding rail (1).
CN201210585314.3A 2012-12-30 2012-12-30 Multiaspect frame type wall erection equipment Active CN103089019B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210585314.3A CN103089019B (en) 2012-12-30 2012-12-30 Multiaspect frame type wall erection equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210585314.3A CN103089019B (en) 2012-12-30 2012-12-30 Multiaspect frame type wall erection equipment

Publications (2)

Publication Number Publication Date
CN103089019A CN103089019A (en) 2013-05-08
CN103089019B true CN103089019B (en) 2016-02-03

Family

ID=48202105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210585314.3A Active CN103089019B (en) 2012-12-30 2012-12-30 Multiaspect frame type wall erection equipment

Country Status (1)

Country Link
CN (1) CN103089019B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023070256A1 (en) * 2021-10-25 2023-05-04 广州建筑湾区智造科技有限公司 Construction method for fully-prefabricated assembly type multistory and high-rise concrete workshops

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61244506A (en) * 1985-04-23 1986-10-30 株式会社 長谷川工務店 Manufacture of panel for synthetic wall
CN2411320Y (en) * 1999-07-30 2000-12-20 方昕 Frame assembling machine
CN1730259A (en) * 2005-08-03 2006-02-08 周正华 Light weight wall board production technology and equipment complex thereof
EP1892069A2 (en) * 2006-08-23 2008-02-27 BIT Technologies Limited Production line for making a prefabricated panels for building walls
CN101446119A (en) * 2008-12-31 2009-06-03 安徽建工集团有限公司 Curtain-wall rotary support
CN202248940U (en) * 2011-09-05 2012-05-30 沈阳远大铝业工程有限公司 Turnover device for unitized curtain wall
CN203008394U (en) * 2012-12-30 2013-06-19 山东北新大象房屋有限公司 Multifaceted frame type wall installation device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61244506A (en) * 1985-04-23 1986-10-30 株式会社 長谷川工務店 Manufacture of panel for synthetic wall
CN2411320Y (en) * 1999-07-30 2000-12-20 方昕 Frame assembling machine
CN1730259A (en) * 2005-08-03 2006-02-08 周正华 Light weight wall board production technology and equipment complex thereof
EP1892069A2 (en) * 2006-08-23 2008-02-27 BIT Technologies Limited Production line for making a prefabricated panels for building walls
CN101446119A (en) * 2008-12-31 2009-06-03 安徽建工集团有限公司 Curtain-wall rotary support
CN202248940U (en) * 2011-09-05 2012-05-30 沈阳远大铝业工程有限公司 Turnover device for unitized curtain wall
CN203008394U (en) * 2012-12-30 2013-06-19 山东北新大象房屋有限公司 Multifaceted frame type wall installation device

Also Published As

Publication number Publication date
CN103089019A (en) 2013-05-08

Similar Documents

Publication Publication Date Title
CN104175318A (en) Parallel-connection platform moving mechanism of construction robot for curtain wall installation
AU2013241731B2 (en) Crane, in particular an overhead crane or gantry crane, having at least one crane girder
CN103846649A (en) Two-stage parallel robot device applied to precision assembly
CN203032706U (en) Trolley with telescopic handles
CN103089019B (en) Multiaspect frame type wall erection equipment
CN208560696U (en) Multiple-spindle trolley device
CN204267053U (en) A kind ofly automatically carry the splash guard chassis turning waterproof coiled sheet
CN203008394U (en) Multifaceted frame type wall installation device
CN204019539U (en) Construction robot parallel connection platform travel mechanism installed by curtain wall
CN109812021A (en) A kind of installation method of large span welding ball grid
CN202881858U (en) Jig frame used for vertical assembly construction of truss arc bridge
CN204040501U (en) Construction robot Three Degree Of Freedom travel mechanism installed by curtain wall
CN110723642A (en) Device and method for horizontally lifting equipment in closed workshop in place
CN110282579A (en) The Lift-on/Lift-off System and hanging method of prefabricated pipe trench in height-limited small space
CN202655984U (en) Cylinder drive type conveying manipulator
CN103539018B (en) A kind of integrated hoisting transportation equipment for Construction of Ballastless Track
CN205397851U (en) Hanger
CN104196252A (en) Curtain wall installation construction robot moving mechanism with three degrees of freedom
CN211256714U (en) Beam replacement construction system of double-T-shaped beam bridge
CN112935673A (en) Steel case roof beam welding position device
CN209539398U (en) A kind of evacuation platform of Fast Installation
CN208073002U (en) Mobile reinforcement crotch device
CN107620324B (en) Steel cap installation method
CN207684746U (en) A kind of movable type chain explosion-proof electric block
CN106753446A (en) A kind of combination loose tool and its construction method for the construction of coke oven flue top arch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
CB03 Change of inventor or designer information

Inventor after: Yang Zhihua

Inventor after: Ma Quantao

Inventor after: Zhong Weiguo

Inventor after: Tian Dong

Inventor after: Xu Haimeng

Inventor before: Yang Zhihua

COR Change of bibliographic data
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160524

Address after: 276800 middle of Qingdao Road, Shandong, Rizhao City

Patentee after: Rizhao elephant Housing Construction Co., Ltd.

Address before: 276800 Shandong Rizhao City Donggang District Beijing North Road Dragon Court

Patentee before: Shandong Beixin ANYFUN House Co., Ltd.