CN103086259A - 井字架吊具 - Google Patents

井字架吊具 Download PDF

Info

Publication number
CN103086259A
CN103086259A CN2013100429188A CN201310042918A CN103086259A CN 103086259 A CN103086259 A CN 103086259A CN 2013100429188 A CN2013100429188 A CN 2013100429188A CN 201310042918 A CN201310042918 A CN 201310042918A CN 103086259 A CN103086259 A CN 103086259A
Authority
CN
China
Prior art keywords
cabinet frame
derrick
well cabinet
beams
cross beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100429188A
Other languages
English (en)
Inventor
雷山霖
包连栋
张旭岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Changzhi Iron and Steel Co Ltd
Original Assignee
Shougang Changzhi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Changzhi Iron and Steel Co Ltd filed Critical Shougang Changzhi Iron and Steel Co Ltd
Priority to CN2013100429188A priority Critical patent/CN103086259A/zh
Publication of CN103086259A publication Critical patent/CN103086259A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Blast Furnaces (AREA)

Abstract

本发明的井字架吊具,包括井字架和设置在井字架两端的吊环,所述井字架由两根平行的横梁和固定在两根横梁上部,分别连接两根横梁的两根中心纵梁组成;所述两根横梁每一端各通过一根边纵梁连接,边纵梁的两端上部各固定有一个吊环。所述吊环的环孔方向与横梁方向平行。所述边纵梁的长度比两根横梁之间的距离长一倍。所述中心纵梁的长度是横梁长度的一半。所述中心纵梁之间的距离,是横梁长度的1/4~1/3。本发明的井字架吊具,在高炉炉顶设备大中修时,用它上下运输上密封阀至气密箱之间的设备设,即减轻了劳动强度、也提高了工作效率并且安全系数高。

Description

井字架吊具
技术领域
本发明属于吊装设备领域,具体涉及一种用于高炉炉顶设备拆装用井字架吊具。
背景技术
高炉炉顶设备气密箱至上密封阀之间的设备拆除安装时,目前主要采用倒链移动,仅凭倒链上下吊装水平移位时,不仅倒链需要的多、而且吊装麻烦费时。
发明内容
本发明的目的是提供一种井字架吊具,用于高炉炉顶设备拆装时的设备运输。
本发明的井字架吊具,包括井字架和设置在井字架两端的吊环,所述井字架由两根平行的横梁和固定在两根横梁上部,分别连接两根横梁的两根中心纵梁组成;所述两根横梁每一端各通过一根边纵梁连接,边纵梁的两端上部各固定有一个吊环。
作为优化,所述吊环的环孔方向与横梁方向平行。所述边纵梁的长度比两根横梁之间的距离长一倍。所述中心纵梁的长度是横梁长度的一半。所述中心纵梁之间的距离,是横梁长度的1/4~1/3。
本发明的井字架吊具,在高炉炉顶设备大中修时,用它上下运输上密封阀至气密箱之间的设备设,即减轻了劳动强度、也提高了工作效率并且安全系数高。
附图说明
图1为本发明井字架吊具的俯视结构示意图。
图2为本发明井字架吊具的主视结构示意图。
图3为本发明井字架吊具的右视结构示意图。
具体实施方式
井字架吊具,如图1、图2、图3所示,井字架由两根平行的横梁1和固定在两根横梁1上部,分别连接两根横梁1的两根中心纵梁2组成;两根横梁1每一端各通过一根边纵梁3连接,边纵梁3的两端上部各固定有一个吊环4。吊环4的环孔方向与横梁1方向平行,边纵梁3的长度比两根横梁1之间的距离长一倍,中心纵梁2的长度是横梁1长度的一半。
此外,实际使用时,环孔方向可以根据需要设置,纵梁的长度大于两根横梁之间的距离即可。中心纵梁的长度与两根横梁之间的距离接近,中心纵梁之间的距离,是横梁长度的1/4~1/3。
拆装高炉炉顶设备时采用该井字架吊具运输,运输气密箱的两套传动、膨胀器时,用现场的四个手拉葫芦小车10T电动倒链,将井字型吊具放置布料器上。可将拆下来的膨胀器和气密箱传动放在上面,分别用四台手拉葫芦小车10T电动倒链水平移置32.9M平台上方落下。并用40T行车运往炉台下。
运输下密封时,用现场的四个手拉葫芦小车电动10T倒链,将井字型吊具放置下气密与布料器之间。打起倒链与下密封法兰可靠接触,用四条M27的螺栓固定住箱体与吊具;卸下法兰螺栓,同步落下四个倒链约100mm,水平移至32.9M平台上方落下。并用40T行车、运往炉台下。
运输节流阀时,用现场的四个手拉葫芦小车电动10T倒链,将井字型吊具放置节流阀与布料器之间。在上气密和节流阀上各焊四个吊环,用四个5T倒链拉挂在上密封阀的吊环上然后拉紧节流阀的四个吊环。拆除节流阀上部螺栓,同时下落四个倒链至井字架上,用四条M27的螺栓固定住箱体与吊具。水平移至32.9M平台上方落下。并用40T行车、运往炉台下。安装时也可用井字架将设备移到安装位置。

Claims (5)

1.一种井字架吊具,包括井字架和设置在井字架两端的吊环, 其特征在于所述井字架由两根平行的横梁和固定在两根横梁上部,分别连接两根横梁的两根中心纵梁组成;所述两根横梁每一端各通过一根边纵梁连接,边纵梁的两端上部各固定有一个吊环。
2.根据权利1所述的井字架吊具,其特征在于所述吊环的环孔方向与横梁方向平行。
3.根据权利1所述的井字架吊具,其特征在于所述边纵梁的长度比两根横梁之间的距离长一倍。
4.根据权利1所述的井字架吊具,其特征在于所述中心纵梁的长度是横梁长度的一半。
5.根据权利1所述的井字架吊具,其特征在于所述中心纵梁之间的距离,是横梁长度的1/4~1/3。
CN2013100429188A 2013-02-04 2013-02-04 井字架吊具 Pending CN103086259A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100429188A CN103086259A (zh) 2013-02-04 2013-02-04 井字架吊具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100429188A CN103086259A (zh) 2013-02-04 2013-02-04 井字架吊具

Publications (1)

Publication Number Publication Date
CN103086259A true CN103086259A (zh) 2013-05-08

Family

ID=48199476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100429188A Pending CN103086259A (zh) 2013-02-04 2013-02-04 井字架吊具

Country Status (1)

Country Link
CN (1) CN103086259A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108358040A (zh) * 2018-03-30 2018-08-03 安徽泽加业粉体工程有限公司 一种吊机吊具
CN108706439A (zh) * 2018-06-11 2018-10-26 北京中车赛德铁道电气科技有限公司 一种动车组高压电气箱焊接制造用吊装装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020037214A1 (en) * 2000-09-25 2002-03-28 Cichon David E. Method and apparatus for extracting and installing heat exchanger bundles
CN2818421Y (zh) * 2005-06-13 2006-09-20 刘建康 用于叠合楼板施工的上支承构架
JP2010173836A (ja) * 2009-01-30 2010-08-12 Mimaki Engineering Co Ltd 搬送装置
CN201647803U (zh) * 2010-04-19 2010-11-24 山东奥克特化工有限公司 一种组合式袋装物料吊装货架
CN101891109A (zh) * 2010-07-16 2010-11-24 北京卫星制造厂 一种双自由度调节自动水平式吊具及调节方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020037214A1 (en) * 2000-09-25 2002-03-28 Cichon David E. Method and apparatus for extracting and installing heat exchanger bundles
CN2818421Y (zh) * 2005-06-13 2006-09-20 刘建康 用于叠合楼板施工的上支承构架
JP2010173836A (ja) * 2009-01-30 2010-08-12 Mimaki Engineering Co Ltd 搬送装置
CN201647803U (zh) * 2010-04-19 2010-11-24 山东奥克特化工有限公司 一种组合式袋装物料吊装货架
CN101891109A (zh) * 2010-07-16 2010-11-24 北京卫星制造厂 一种双自由度调节自动水平式吊具及调节方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108358040A (zh) * 2018-03-30 2018-08-03 安徽泽加业粉体工程有限公司 一种吊机吊具
CN108706439A (zh) * 2018-06-11 2018-10-26 北京中车赛德铁道电气科技有限公司 一种动车组高压电气箱焊接制造用吊装装置
CN108706439B (zh) * 2018-06-11 2019-11-26 北京中车赛德铁道电气科技有限公司 一种动车组高压电气箱焊接制造用吊装装置

Similar Documents

Publication Publication Date Title
CN101967961B (zh) 一种修井作业管杆专用液压升降装置
CN203159047U (zh) 一种液压式可调整跨距和高度的门架吊装
CN204847764U (zh) 预制构件生产用吊装架
CN105071604A (zh) 更换振动电机的装置及方法
CN106276615A (zh) 一种起重机可移动驾驶室
CN204689550U (zh) 剪式升降的吊挂吊钩的支架
CN202785364U (zh) 可移动双门式桅杆吊装装置
CN103863938A (zh) 用于搬运风洞实验车的安全吊装装置
CN104675179A (zh) 自升式钢塔安装用吊架装置及钢塔施工方法
CN204454235U (zh) 一种新型多吊点平衡梁装置
CN103086259A (zh) 井字架吊具
CN203065095U (zh) 一种渣罐举升装置
CN204822911U (zh) 一种链条传动式全驱动起重机主梁输送装置
CN203330385U (zh) 一种钢模覆砂浇铸的开模起吊及翻转装置
CN205662256U (zh) 一种高起升花架侧挂半门式起重机
CN205328483U (zh) 一种可移动可拆卸小型电动葫芦
CN104401900A (zh) 一种盖板吊装装置
CN204040599U (zh) 一种抱杆倒装提拉液压提升装置
CN204689351U (zh) 一种h型钢结构构件吊具
CN204162315U (zh) 一种双轮式起重机
CN102730577A (zh) 一种用于起重机的可拆式人字架
CN203728491U (zh) 汽车加工的重型零件顶升装置
CN208103826U (zh) 变压器器身顶起装置
CN204906129U (zh) 更换振动电机的装置
CN203545603U (zh) 一种叉车用吊挂装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130508