CN103077447B - 一种基于贝叶斯网络的地铁施工安全管理决策方法 - Google Patents
一种基于贝叶斯网络的地铁施工安全管理决策方法 Download PDFInfo
- Publication number
- CN103077447B CN103077447B CN201310026806.3A CN201310026806A CN103077447B CN 103077447 B CN103077447 B CN 103077447B CN 201310026806 A CN201310026806 A CN 201310026806A CN 103077447 B CN103077447 B CN 103077447B
- Authority
- CN
- China
- Prior art keywords
- risk
- bayesian network
- safety management
- subway work
- decision making
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310026806.3A CN103077447B (zh) | 2013-01-24 | 2013-01-24 | 一种基于贝叶斯网络的地铁施工安全管理决策方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310026806.3A CN103077447B (zh) | 2013-01-24 | 2013-01-24 | 一种基于贝叶斯网络的地铁施工安全管理决策方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103077447A CN103077447A (zh) | 2013-05-01 |
CN103077447B true CN103077447B (zh) | 2016-08-03 |
Family
ID=48153969
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310026806.3A Active CN103077447B (zh) | 2013-01-24 | 2013-01-24 | 一种基于贝叶斯网络的地铁施工安全管理决策方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103077447B (zh) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104299169B (zh) * | 2014-09-26 | 2018-02-02 | 华中科技大学 | 一种污水处理系统信息安全在线风险分析方法及系统 |
CN105005688A (zh) * | 2015-06-30 | 2015-10-28 | 北京师范大学 | 基于贝叶斯网络模型的水质污染判断方法 |
CN105117771B (zh) * | 2015-07-28 | 2017-10-20 | 北京理工大学 | 一种基于关联规则有向无环图的农机故障识别方法 |
CN106481344B (zh) * | 2016-10-25 | 2018-07-06 | 华中科技大学 | 一种土压平衡盾构机隧道掘进参数智能控制方法 |
CN106401597B (zh) * | 2016-10-27 | 2018-07-24 | 华中科技大学 | 一种适用于盾构机的失效预测与诊断控制方法 |
CN106779296A (zh) * | 2016-11-22 | 2017-05-31 | 华中科技大学 | 一种基于多传感器的隧道施工周围建筑物安全预警方法 |
CN110287589B (zh) * | 2019-06-24 | 2022-10-14 | 大连海事大学 | 一种基于智能寻优算法的隧道逆向可靠度设计方法 |
CN110807580B (zh) * | 2019-10-25 | 2022-03-04 | 上海建科工程咨询有限公司 | 基于复杂网络的超高层施工机械关键安全风险分析方法 |
CN112149962B (zh) * | 2020-08-28 | 2023-08-22 | 中国地质大学(武汉) | 一种施工事故致因行为的风险定量评估方法及系统 |
CN112598243A (zh) * | 2020-12-15 | 2021-04-02 | 重庆电子工程职业学院 | 一种管廊运维安全动态评价方法 |
CN112784346B (zh) * | 2021-02-07 | 2022-12-06 | 殿汇空间(上海)信息科技有限公司 | 建筑结构自主设计方法、系统及终端、存储介质 |
CN114444933A (zh) * | 2022-01-26 | 2022-05-06 | 四川省第六建筑有限公司 | 一种基于建筑工程的危险源分析方法、设备和介质 |
CN115630752B (zh) * | 2022-11-30 | 2023-03-31 | 中国矿业大学(北京) | 基于动态模糊综合贝叶斯网络的pba车站施工风险评估方法 |
CN116644954B (zh) * | 2023-05-06 | 2024-02-09 | 长电新能有限责任公司 | 抽蓄工程施工安全风险智能化决策方法 |
CN116822965B (zh) * | 2023-08-28 | 2023-11-21 | 中铁七局集团电务工程有限公司武汉分公司 | 一种地铁施工风险预警方法及系统 |
CN117454552B (zh) * | 2023-09-26 | 2024-05-31 | 哈尔滨工业大学 | 一种基于贝叶斯网络的复杂路网震害分析方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101783750A (zh) * | 2009-12-29 | 2010-07-21 | 北京航空航天大学 | 一种基于贝叶斯网络失败风险模型的Web Service测试方法 |
-
2013
- 2013-01-24 CN CN201310026806.3A patent/CN103077447B/zh active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101783750A (zh) * | 2009-12-29 | 2010-07-21 | 北京航空航天大学 | 一种基于贝叶斯网络失败风险模型的Web Service测试方法 |
Non-Patent Citations (3)
Title |
---|
基于知识集成的地铁施工安全风险识别专家系统研究;吴贤国 等;《施工技术》;20120731;第41卷(第368期);第104-108页 * |
基于贝叶斯网的关联规则表示及应用;刘玉梅;《黑龙江科技信息》;20081215(第35期);第50页第2栏第18-25行,第51页第1栏39-56行 * |
基于贝叶斯网络的复杂工程安全管理决策支持方法研究;张立茂 等;《中国安全科学学报》;20110630;第21卷(第6期);第142-145页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103077447A (zh) | 2013-05-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103077447B (zh) | 一种基于贝叶斯网络的地铁施工安全管理决策方法 | |
CN110866974B (zh) | 一种基于三维展示的水工监测系统 | |
Guo et al. | Comprehensive risk evaluation of long-distance oil and gas transportation pipelines using a fuzzy Petri net model | |
CN111985804B (zh) | 基于数据挖掘和数据融合盾构近接既有隧道安全评价方法 | |
Sun et al. | Tunnel collapse risk assessment based on multistate fuzzy Bayesian networks | |
Zhou et al. | Risk assessment methodology for a deep foundation pit construction project in Shanghai, China | |
CN105608842B (zh) | 一种核反应堆燃料破损在线监测报警装置 | |
CN112541666B (zh) | 考虑地震易损性模型不确定性的盾构隧道风险评估方法 | |
Wang et al. | Knowledge representation using non-parametric Bayesian networks for tunneling risk analysis | |
CN111126853A (zh) | 基于模糊fmea的水利工程风险预警分析方法及系统 | |
CN103606109A (zh) | 一种基于评估对象的电网运行安全风险综合评估方法 | |
Zheng et al. | Cyber security risk assessment for industrial automation platform | |
Zhang et al. | Reliability evaluation for ventilation system of gas tunnel based on Bayesian network | |
Liu et al. | A dynamic quantitative risk assessment method for drilling well control by integrating multi types of risk factors | |
Li et al. | Emergency decision-making system for the large-scale infrastructure: A case study of the south-to-north water diversion project | |
Yu et al. | Pipeline failure assessment based on fuzzy Bayesian network and AHP | |
Zhang et al. | Simulation-based analysis of tunnel boring machine performance in tunneling excavation | |
Lei et al. | Failure risk assessment of discharge system of the hanjiang-to-weihe river water transfer project | |
Sun et al. | A forward-backward coupled source term estimation for nuclear power plant accident: A case study of loss of coolant accident scenario | |
CN211236974U (zh) | 一种基于三维展示的水工监测系统 | |
Chen et al. | Risk Assessment and Prediction of Underground Utility Tunnels Based on Bayesian Network: A Case Study in Beijing, China | |
Yue et al. | Exploration and application of the value of big data based on data-driven techniques for the hydraulic internet of things | |
Wu et al. | The medium-voltage distribution detwork fault fiagnosis based on data association analysis | |
Shen et al. | Scenario mapping for critical infrastructure failure under typhoon rainfall: A dependency and causality approach | |
CN105389638A (zh) | 基于不确定理论的退役铀尾矿库环境稳定性分析及预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Limao Inventor after: Wu Xianguo Inventor after: Teng Jiaying Inventor after: Ding Baojun Inventor after: Di Haizhou Inventor after: Zhang Qingying Inventor after: Liu Qian Inventor after: Wang Yanhong Inventor after: Jiang Zhou Inventor before: Wu Xianguo Inventor before: Zhang Limao Inventor before: Cao Jing Inventor before: Yan Dai Inventor before: Ding Baojun Inventor before: Zhou Geqian Inventor before: Jiang Xue |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: WU XIANGUO ZHANG LIMAO CAO JING YAN YI DING BAOJUN ZHOU GEQIAN JIANG XUE TO: ZHANG LIMAO WU XIANGUO TENG JIAYING DING BAOJUN ZHAI HAIZHOU ZHANG QINGYING LIU QIAN WANG YANHONG JIANG ZHOU |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |