CN103075117B - One penetrates riser pipe shoe soon - Google Patents

One penetrates riser pipe shoe soon Download PDF

Info

Publication number
CN103075117B
CN103075117B CN201310003629.7A CN201310003629A CN103075117B CN 103075117 B CN103075117 B CN 103075117B CN 201310003629 A CN201310003629 A CN 201310003629A CN 103075117 B CN103075117 B CN 103075117B
Authority
CN
China
Prior art keywords
pipe shoe
wedge structure
main body
cone angle
intervals
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310003629.7A
Other languages
Chinese (zh)
Other versions
CN103075117A (en
Inventor
刘书杰
谢仁军
杨进
周建良
王平双
吴怡
魏倩
周波
文敏
周长所
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Original Assignee
China University of Petroleum Beijing
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing, China National Offshore Oil Corp CNOOC, CNOOC Research Institute Co Ltd filed Critical China University of Petroleum Beijing
Priority to CN201310003629.7A priority Critical patent/CN103075117B/en
Publication of CN103075117A publication Critical patent/CN103075117A/en
Application granted granted Critical
Publication of CN103075117B publication Critical patent/CN103075117B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to one and penetrate riser pipe shoe soon, it is characterized in that: it comprises pipe shoe main body and wedge structure integrated with it, arrange in cone angle bottom described wedge structure, the angle of described cone angle is α; In described wedge structure lower end, lozenges peripheral region is arranged at intervals with some pipe shoe teeth; From described pipe shoe main body middle and upper part to described wedge structure bottom, be also arranged at intervals with some reinforcing ribs along described pipe shoe main body and wedge structure peripheral, axial.The present invention is owing to adopting pipe shoe main body and wedge structure integrated with it, and arrange in cone angle bottom wedge structure, like this after forming soil plug in pipe shoe, pipe shoe place is equivalent to a wedge structure, in piling process, there is good guidance quality, and can effectively improve pipe shoe penetration capacity.The present invention can be widely used in various oil exploration and development fields and building trade foundation construction.

Description

One penetrates riser pipe shoe soon
Technical field
The present invention relates to a kind of offshore drilling equipment, particularly about a kind of be applied in offshore oil exploration development process be connected with riser pipe use penetrate riser pipe shoe soon.
Background technology
At sea in petroleum exploration and development process, require that riser piling operating squeezes into the following projected depth of mud line conduit within the time short as far as possible.Because different waters seafloor soil character varies, soil layer Strength Changes is very large, and arrived darker high strength soil layer especially, in riser pipe piling process, pile penetration is very little, and piling timeliness is very low.Therefore, how to improve pipe shoe penetration capacity, increase piling pile penetration, save the piling time, improve marine guidance piling timeliness and become problem demanding prompt solution.
Summary of the invention
For the problems referred to above, the object of this invention is to provide one and penetrate riser pipe shoe soon, it can effectively improve pipe shoe penetration capacity, increases piling pile penetration, saves the piling time, improve marine guidance piling timeliness.
For achieving the above object, the present invention takes following technical scheme: one penetrates riser pipe shoe soon, it is characterized in that: it comprises pipe shoe main body and wedge structure integrated with it, arrange in cone angle bottom described wedge structure, the angle of described cone angle is α; In described wedge structure lower end, lozenges peripheral region is arranged at intervals with some pipe shoe teeth; From described pipe shoe main body middle and upper part to described wedge structure bottom, be also arranged at intervals with some reinforcing ribs along described pipe shoe main body and wedge structure peripheral, axial.
The angle [alpha] of described cone angle is less than 90 °.
The angle [alpha] of described cone angle is determined according to seafloor soil soil strength size, the stratum that intensity is larger, and described angle of taper α is less.
Described wedge structure lower end lozenges peripheral region is arranged at intervals with 20 ~ 40 described pipe shoe teeth.
10 ~ 20 described reinforcing ribs are arranged at intervals with in described pipe shoe main body and wedge structure peripheral, axial.
The present invention is owing to taking above technical scheme, it has the following advantages: 1, the present invention is owing to adopting pipe shoe main body and wedge structure integrated with it, and arrange in cone angle bottom wedge structure, like this after forming soil plug in pipe shoe, pipe shoe place is equivalent to a wedge structure, in piling process, there is good guidance quality, and can effectively improve pipe shoe penetration capacity.2, the present invention is arranged at intervals with some pipe shoe teeth owing to adopting at wedge structure lower end lozenges peripheral region, along with the increase of riser pipe driving depth, stratum can become more and more harder, this wedge structure pipe shoe with some pipe shoe teeth has splits native effect, more easily make the pipe shoe bottom soil body squeeze to both sides, greatly improve its pile penetration.3, owing to can run into the obstructions such as the hard objects of larger stone or larger volume in piling process, the wedge structure pipe shoe that the present invention adopts can have the good property passed through when not damaging riser pipe main body.The present invention can be widely used in various oil exploration and development fields and building trade foundation construction.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present invention;
Fig. 2 is the front view of Fig. 1;
Fig. 3 is the lateral view of Fig. 1;
Fig. 4 is that of the present invention penetrating soon in riser pipe shoe penetration process splits native schematic diagram.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described in detail.
As shown in FIG. 1 to 3, the present invention includes pipe shoe main body 1 and wedge structure integrated with it 2, arrange in cone angle 3 bottom wedge structure 2, the angle of this cone angle 3 is α, like this in piling process, riser pipe shoe is made to have good guidance quality and fast penetration capacity by the wedge structure 2 bottom pipe shoe main body 1.In wedge structure 2 lower end, lozenges peripheral region is arranged at intervals with some pipe shoe teeth 4, effectively can be improved of the present inventionly penetrate riser pipe shoe penetration capacity soon by cone angle 3 and pipe shoe tooth 4.From pipe shoe main body 1 middle and upper part to wedge structure 2 bottom, be also arranged at intervals with some reinforcing ribs 5, to improve the bulk strength of pipe shoe main body 1 and wedge structure 2 along pipe shoe main body 1 and wedge structure 2 peripheral, axial.
In above-described embodiment, the angle [alpha] of cone angle 3 is less than 90 °, and the concrete angle of α needs to determine according to seafloor soil soil strength size, and the stratum that intensity is larger, cone angle 3 angle [alpha] is less.
In the various embodiments described above, wedge structure 2 lower end lozenges peripheral region is arranged at intervals with 20 ~ 40 pipe shoe teeth 4.
In the various embodiments described above, be arranged at intervals with 10 ~ 20 reinforcing ribs 5 in pipe shoe main body 1 and wedge structure 2 peripheral, axial.
The present invention in use, as shown in Figure 4, by wedge structure 2 integrated with pipe shoe main body 1, makes the present invention by having good guidance quality and penetration capability during stratum.Along with the increase of riser pipe driving depth, soil plug is slowly produced in riser pipe, the soil plug appearance profile formed is identical with the profile of wedge structure 2, then enter along with under riser pipe, soil plug with wedge structure is equivalent to the chock of a high strength, play the effect on a stratum of riving, the ability making riser pipe shoe pierce through stratum strengthens greatly.Greatly can improve riser pipe piling efficiency like this, shorten the riser pipe piling construction time, improve the development benefit of oil gas field.
The various embodiments described above are only for illustration of the present invention; the connection of each parts and structure all can change to some extent; on the basis of technical solution of the present invention; all improvement of carrying out the connection of individual part and structure according to the principle of the invention and equivalents, all should not get rid of outside protection scope of the present invention.

Claims (3)

1. penetrate a riser pipe shoe soon, it is characterized in that: it comprises pipe shoe main body and wedge structure integrated with it, arrange in cone angle bottom described wedge structure, the angle of described cone angle is α, and the angle [alpha] of described cone angle is less than 90 °; In described wedge structure lower end, lozenges peripheral region is arranged at intervals with some pipe shoe teeth; From described pipe shoe main body middle and upper part to described wedge structure bottom, be also arranged at intervals with some reinforcing ribs along described pipe shoe main body and wedge structure peripheral, axial; The angle [alpha] of described cone angle is determined according to seafloor soil soil strength size, the stratum that intensity is larger, and described angle of taper α is less.
2. one as claimed in claim 1 penetrates riser pipe shoe soon, it is characterized in that: described wedge structure lower end lozenges peripheral region is arranged at intervals with 20 ~ 40 described pipe shoe teeth.
3. one as claimed in claim 1 or 2 penetrates riser pipe shoe soon, it is characterized in that: be arranged at intervals with 10 ~ 20 described reinforcing ribs in described pipe shoe main body and wedge structure peripheral, axial.
CN201310003629.7A 2013-01-06 2013-01-06 One penetrates riser pipe shoe soon Active CN103075117B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310003629.7A CN103075117B (en) 2013-01-06 2013-01-06 One penetrates riser pipe shoe soon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310003629.7A CN103075117B (en) 2013-01-06 2013-01-06 One penetrates riser pipe shoe soon

Publications (2)

Publication Number Publication Date
CN103075117A CN103075117A (en) 2013-05-01
CN103075117B true CN103075117B (en) 2015-12-02

Family

ID=48151799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310003629.7A Active CN103075117B (en) 2013-01-06 2013-01-06 One penetrates riser pipe shoe soon

Country Status (1)

Country Link
CN (1) CN103075117B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2787817Y (en) * 2005-04-04 2006-06-14 新疆石油管理局钻井工艺研究院 Casing guide shoe
CN201420514Y (en) * 2009-06-19 2010-03-10 中国海洋石油总公司 Watertight conduit pipe shoe
CN102561345A (en) * 2012-02-10 2012-07-11 中国石油大学(北京) Whipstock device for pre-inclining riser
CN202380990U (en) * 2011-11-30 2012-08-15 杨智恺 Pipe shoe self adaptive to stratum environment
CN203097753U (en) * 2013-01-06 2013-07-31 中国海洋石油总公司 Waterproof conduit shoe with fast penetrability

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2215017Y (en) * 1995-03-01 1995-12-13 李学军 High-efficiancy diamond compounded piece bit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2787817Y (en) * 2005-04-04 2006-06-14 新疆石油管理局钻井工艺研究院 Casing guide shoe
CN201420514Y (en) * 2009-06-19 2010-03-10 中国海洋石油总公司 Watertight conduit pipe shoe
CN202380990U (en) * 2011-11-30 2012-08-15 杨智恺 Pipe shoe self adaptive to stratum environment
CN102561345A (en) * 2012-02-10 2012-07-11 中国石油大学(北京) Whipstock device for pre-inclining riser
CN203097753U (en) * 2013-01-06 2013-07-31 中国海洋石油总公司 Waterproof conduit shoe with fast penetrability

Also Published As

Publication number Publication date
CN103075117A (en) 2013-05-01

Similar Documents

Publication Publication Date Title
CN104631438B (en) Long auger guncreting uplift pile construction method
CN103469829B (en) A kind of Anti-scouring device of offshore wind power foundation structure
CN103031847B (en) Reducing overlap joint combined type orifice pipe grouting method
CN106149677B (en) High-pressure water-enriched goaf grouting reinforcement means
CN106761783A (en) A kind of compound stratum shield tunnel the minimum depth determines method
CN103498478B (en) Rock curtain grouting in foundation of dam construction method
CN106088092B (en) Pile pile piling process occurs refusing the solution of hammer situation
CN104695433A (en) Construction method of bituminous coating pile in sandy foundation
CN208266910U (en) Negative pressure bucket
CN203097753U (en) Waterproof conduit shoe with fast penetrability
CN103075117B (en) One penetrates riser pipe shoe soon
CN105386444A (en) Foundation pile hole forming device and method
CN205444232U (en) Stock - gravity type infiltration retaining wall
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN109914390A (en) It is a kind of to construct the slip casting structure and construction method of cold seam for biting connecions campshed
CN205934907U (en) Foundation pile that no -dig tunnel section was used
CN205576880U (en) Luoyang shovel with anti - tooth shovel head
CN201250397Y (en) Concrete anti-seepage wall with quality inspection coring pipes
CN205049135U (en) Solve inclinometer card gauge head unit
CN203514313U (en) Driven type columnar ground anchor
CN203080534U (en) Supporting structure of fractured rock mass side slope
CN203701111U (en) Grouting type anchor cable antiskid continuous wall
CN203334275U (en) Child-mother type anchor pile
CN203229953U (en) Construction structure with guide hole and gravel bed penetrated by sunk pile
CN203145856U (en) Wedge-shaped tooth device for water-proof duct pipe shoe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Co-patentee after: CNOOC research institute limited liability company

Patentee after: China Offshore Oil Group Co., Ltd.

Co-patentee after: China University of Petroleum (Beijing)

Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Co-patentee before: CNOOC Research Institute

Patentee before: China National Offshore Oil Corporation

Co-patentee before: China University of Petroleum (Beijing)

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191211

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Co-patentee after: CNOOC research institute limited liability company

Patentee after: China Offshore Oil Group Co., Ltd.

Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Co-patentee before: CNOOC research institute limited liability company

Patentee before: China Offshore Oil Group Co., Ltd.

Co-patentee before: China University of Petroleum (Beijing)