CN103074901A - 大坡角护坡的砌块结构及其护坡方式 - Google Patents
大坡角护坡的砌块结构及其护坡方式 Download PDFInfo
- Publication number
- CN103074901A CN103074901A CN2013100311966A CN201310031196A CN103074901A CN 103074901 A CN103074901 A CN 103074901A CN 2013100311966 A CN2013100311966 A CN 2013100311966A CN 201310031196 A CN201310031196 A CN 201310031196A CN 103074901 A CN103074901 A CN 103074901A
- Authority
- CN
- China
- Prior art keywords
- building block
- geotextile
- stainless steel
- block
- net
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明公开了大坡角护坡的砌块结构及其护坡方式,它包括一个由方形的砌块连结而成的“砌块网”和埋设在不同深度的、通过绳索与“砌块网”上不锈钢拉环相连结的多层土工织物;“砌块网”是由相邻砌块通过扣环相互铰接组成,相邻砌块的金属扣环通过铁丝扎在一起;土工织物分布在不同深度的土体中,其通过一根根绳索与砌块背面的不锈钢拉环连接。使得砌块之间相互连接形成了一张具有一定韧性“砌块网”,砌块结构组装完成后“砌块网”紧紧地罩在坡面上,解决了大坡角时护坡砌块不稳定的现象,特别在降雨量比较大的地区处理的大坡角和山坡效果更加明显。
Description
技术领域
本发明涉及大坡角护坡的砌块结构及其护坡方式,属于土木、交通,水利技术领域。
背景技术
预制混凝土互嵌式砌块在国外应用较为普遍,使用这种砌块施工速度快、工程质量易于控制,施工后坡面有一定的柔性,并且整体美观、环保等特点。 但是,这种互嵌式砌块上的“嵌入部分”在运输过程中容易碰坏,而且在使用中,因为其脆性也容易折断。另外,现在的互嵌式砌块组成的结构不能承担较大水平方向土压力,因而,它无法用于大坡角坡面。在大坡角的护坡工程中,随着时间的推移,土体会不断变形,因而现有互嵌式砌块结构会由于不能适应这种变形,而发生砌块脱落现象,从而使护坡失效。
鉴于以上问题,有必要创新砌块以及砌块结构形式,增加砌块与坡面之间的相互作用力,以增加砌块护坡的稳定性。
发明内容
本发明所要解决的技术问题是针对原有的护坡砌块的不足,提出一种新型的砌块结构,包括护坡方式。它可以用于大坡角甚至垂直坡面的护坡,从而更加有利于砌块护坡的稳定。
本发明用如下技术方案:
大坡角护坡的砌块结构
一种用于大坡角护坡的新型砌块结构,包括一个由方形的砌块连结而成的“砌块网”和埋设在不同深度的、通过绳索与“砌块网”上不锈钢拉环相连结的多层土工织物。
所述的砌块正面边缘的中部和四角预制了扣环,背面中部预设了不锈钢拉环,砌块上还有四个预制的镂空方形空洞。
所述的“砌块网”是由相邻砌块通过扣环相互铰接组成,相邻砌块的金属扣环通过铁丝扎在一起,增加了砌块之间的相互作用力,从而使砌块形成一张“网”。
所述的土工织物分布在不同深度的土体中,其通过一根根0.5-1米长的绳索与砌块背面的不锈钢拉环连接,从而使土工织物和“砌块网”紧密联系在一起形成一个土体、土工织物和砌块的联合结构。
大坡角护坡的砌块结构的护坡方式
1、 第一层的砌块按照设计的坡角摆放稳定,在砌块后面填充填土至第一层砌块中的不锈钢拉环高度,铺设第一层的土工织物,并用适量填土压紧土工织物。
2、 用绳索将土工织物和第一层砌块上的不锈钢拉环相连并拉紧。
3、 在土工织物上继续填土,当填土层的高度达到第二层砌块不锈钢拉环的高度时,安装第二层砌块,注意第二层砌块左右接缝处要与对应的第一层砌块的中间位置相对齐。采用与步骤1、2相同的方法完成第二层土工织物和绳索的安装。
4、 第二层砌块安装完毕后,用铁丝将第一层砌块和第二层砌块通过预留的扣环相连。
5、 重复上述操作,直至砌块铺设到预定高度。
6、 用防锈漆涂抹金属扣环和铁丝,并用沥青灌注其周围。
7、 在砌块预留的小孔中种植植物。
与现有的技术相比,本发明的有益效果是:
1. 本发明通过埋设在土体中的土工织物与砌块连接,使砌块和坡体形成了一个整体,即使大坡角坡面,也能够有效地保证砌块的稳定性,使坡体更加稳固。
2. 砌块与砌块之间通过扣环和铁丝相互连接,使得大量的砌块形成一个具有一定韧性网状结构,组装完成后整个坡面被“砌块网”罩住,不仅增加了砌块之间的相互作用,还使砌块更加牢固的固定在坡面上,同时又能够适应坡体的微变形。
3. 由于埋设在土体中的土工织物会随着土体一起固结沉降,那么,通过绳索拉拽,砌块会向土体压紧,所以,这种新型砌块结构不但不会随着土体变形导致砌块和土体脱落,反而会与坡面更加紧密的结合。
4. 由于本发明当中砌块上没有突出的嵌入式构件,所以,该砌块在运输和使用会大大降低破损率。
附图说明
图1是本发明砌块结构示意图。
图2 是本发明砌块的正视图。
图3 是本发明砌块和土工织物相连接示意图。
图4 是本发明砌块组装完成后示意图。
图中:1、砌块上预留小孔,2、砌块扣环,3、不锈钢拉环,4、绳索,5、砌块,6、土工织物,7、填土
具体实施方式
下面结合附图,对实施方式做详细说明:
大坡角护坡的砌块结构,包括砌块5,砌块上预留小孔1,砌块扣环2,不锈钢拉环3,绳索4,土工织物6。
单块砌块结构,如图1、图2所示,砌块正面边缘的中部和四角预制了扣环,背面中部预设了不锈钢拉环,砌块上还有四个预制的镂空方形空洞。
大坡角护坡的砌块结构,如图3、图4所示,包括一个由方形的砌块5连结而成的“砌块网”和埋设在不同深度的、通过绳索4与“砌块网”上不锈钢拉环3相连结的多层土工织物6。“砌块网”是由相邻砌块通过扣环相互铰接组成,相邻砌块的金属扣环通过铁丝扎在一起,增加了砌块5之间的相互作用力,从而使砌块形成一张“网”。土工织物6分布在不同深度的土体中,其通过一根根0.5-1米长的绳索与砌块背面的不锈钢拉环3连接,从而使土工织物6和“砌块网”紧密联系在一起形成一个土体、土工织物6和砌块5的联合结构。
大坡角护坡的砌块结构的护坡方式
1、第一层砌块5按照设计的坡角排放安装完毕后,固定砌块。
2、在砌块后填充填土7,在填土的过程中对土体进行压实,当土体厚度达第一层砌块不锈钢拉环3时,铺设第一层土工织物6。
3、在铺设的土工织物6上填上一定量的土将土工织物6压牢,用绳索4将土工织物和不锈钢拉环3相连,不锈钢拉环3至土工织物6之间的绳索4长度为0.5至1米。
4、在土工织物上继续填土,当填土7的高度达到第二层砌块不锈钢拉环3的高度时,在第一排砌块上排放安装第二排砌块。
5、砌块安装时,左右砌块接缝处要与上下层砌块的中间位置相对齐,不同砌块上预留的扣环2分区域集中在一起,这样就可以用铁丝把上下左右的砌块通过扣环2结合在一起,如图4所示。
6、铺设第二层土工织物6且用一定量的土压紧这层土工织物6,通过绳索4将第二层土工织物6与第二层不锈钢拉环3连接。.
7、第二层砌块安装完毕后,用铁丝将第一层砌块5和第二层砌块5通过预留的扣环2相连。
8、重复上面的步骤就可以一层层把砌块5和土工织物6连接成本发明所述的砌块结构,如图3所示。
9、砌块安装并连接完成后,在铁丝和扣环2表面涂防锈漆并用沥青灌注在其周围。
10、最后在砌块预留的小孔1中种植植物(如草皮等),既增强了透水性又可以防止水土流失。使得护坡环保、美观。
需要注意的是,土工织物不一定在每一层砌块都铺设,可以隔一层甚至两层砌块铺设一层土工织物,具体情况需要根据土体物理力学性质决定。
Claims (2)
1.大坡角护坡的砌块结构,包括砌块,砌块上预留小孔,砌块扣环,不锈钢拉环,绳索,土工织物,其特征在于:
所述砌块正面边缘的中部和四角预制了扣环,背面中部预设了不锈钢拉环,砌块上还有四个预制的镂空方形空洞;
所述大坡角护坡的砌块结构,包括一个由方形的砌块连结而成的“砌块网”和埋设在不同深度的、通过绳索与“砌块网”上不锈钢拉环相连结的多层土工织物;
所述“砌块网”是由相邻砌块通过扣环相互铰接组成,相邻砌块的金属扣环通过铁丝扎在一起,增加了砌块之间的相互作用力,从而使砌块形成一张“网”;
所述土工织物分布在不同深度的土体中,其通过一根根0.5-1米长的绳索与砌块背面的不锈钢拉环连接,从而使土工织物和“砌块网”紧密联系在一起形成一个土体、土工织物和砌块的联合结构。
2.根据权利1所述的大坡角护坡的砌块结构的护坡方式,其特征在于包括以下步骤:
1) 第一层的砌块按照设计的坡角摆放稳定,在砌块后面填充填土至第一层砌块中的不锈钢拉环高度,铺设第一层的土工织物,并用适量填土压紧土工织物;
2) 用绳索将土工织物和第一层砌块上的不锈钢拉环相连并拉紧;
3) 在土工织物上继续填土,当填土层的高度达到第二层砌块不锈钢拉环的高度时,安装第二层砌块,注意第二层砌块左右接缝处要与对应的第一层砌块的中间位置相对齐;
采用与步骤1、2相同的方法完成第二层土工织物和绳索的安装;
4) 第二层砌块安装完毕后,用铁丝将第一层砌块和第二层砌块通过预留的扣环相连;
5) 重复上述操作,直至砌块铺设到预定高度;
6) 用防锈漆涂抹金属扣环和铁丝,并用沥青灌注其周围;
7) 在砌块预留的小孔中种植植物。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100311966A CN103074901A (zh) | 2013-01-28 | 2013-01-28 | 大坡角护坡的砌块结构及其护坡方式 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100311966A CN103074901A (zh) | 2013-01-28 | 2013-01-28 | 大坡角护坡的砌块结构及其护坡方式 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103074901A true CN103074901A (zh) | 2013-05-01 |
Family
ID=48151590
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013100311966A Pending CN103074901A (zh) | 2013-01-28 | 2013-01-28 | 大坡角护坡的砌块结构及其护坡方式 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103074901A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638626A (zh) * | 2016-11-16 | 2017-05-10 | 光大国信建设发展(北京)有限公司 | 一种护坡砖单元、护坡砖组及具有其的护坡砖结构 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4929125A (en) * | 1989-03-08 | 1990-05-29 | Hilfiker William K | Reinforced soil retaining wall and connector therefor |
US4936713A (en) * | 1988-07-14 | 1990-06-26 | Miner Thomas M | Earth retaining system |
US5131791A (en) * | 1990-11-16 | 1992-07-21 | Beazer West, Inc. | Retaining wall system |
US5451120A (en) * | 1990-12-21 | 1995-09-19 | Planobra, S.A. De C.V. | Earth reinforcement and embankment building systems |
JP2001131940A (ja) * | 1999-11-02 | 2001-05-15 | Shionome Block Kk | 表面多孔性コンクリートブロック |
JP2002105928A (ja) * | 2000-09-28 | 2002-04-10 | Toei Concrete Industrial Co Ltd | 護岸用ブロック、およびそれを使用する法面工法 |
JP2002371535A (ja) * | 2001-06-15 | 2002-12-26 | Hokunan Concrete Kk | 植生ブロック及びその製造型枠並びにその製造方法 |
CN1419019A (zh) * | 2000-10-25 | 2003-05-21 | 约翰M·斯凯尔斯 | 与土体挡土墙中的土体加强板相啮合的自锁夹杆及其方法 |
JP2003213689A (ja) * | 2002-01-21 | 2003-07-30 | Ranzu Space:Kk | 壁面緑化パネル及びそれを用いた壁面緑化方法 |
CN202672096U (zh) * | 2012-06-07 | 2013-01-16 | 邹瑾 | 可植被嵌锁护坡砌块及可植被嵌锁护坡 |
-
2013
- 2013-01-28 CN CN2013100311966A patent/CN103074901A/zh active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4936713A (en) * | 1988-07-14 | 1990-06-26 | Miner Thomas M | Earth retaining system |
US4929125A (en) * | 1989-03-08 | 1990-05-29 | Hilfiker William K | Reinforced soil retaining wall and connector therefor |
US5131791A (en) * | 1990-11-16 | 1992-07-21 | Beazer West, Inc. | Retaining wall system |
US5451120A (en) * | 1990-12-21 | 1995-09-19 | Planobra, S.A. De C.V. | Earth reinforcement and embankment building systems |
JP2001131940A (ja) * | 1999-11-02 | 2001-05-15 | Shionome Block Kk | 表面多孔性コンクリートブロック |
JP2002105928A (ja) * | 2000-09-28 | 2002-04-10 | Toei Concrete Industrial Co Ltd | 護岸用ブロック、およびそれを使用する法面工法 |
CN1419019A (zh) * | 2000-10-25 | 2003-05-21 | 约翰M·斯凯尔斯 | 与土体挡土墙中的土体加强板相啮合的自锁夹杆及其方法 |
JP2002371535A (ja) * | 2001-06-15 | 2002-12-26 | Hokunan Concrete Kk | 植生ブロック及びその製造型枠並びにその製造方法 |
JP2003213689A (ja) * | 2002-01-21 | 2003-07-30 | Ranzu Space:Kk | 壁面緑化パネル及びそれを用いた壁面緑化方法 |
CN202672096U (zh) * | 2012-06-07 | 2013-01-16 | 邹瑾 | 可植被嵌锁护坡砌块及可植被嵌锁护坡 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638626A (zh) * | 2016-11-16 | 2017-05-10 | 光大国信建设发展(北京)有限公司 | 一种护坡砖单元、护坡砖组及具有其的护坡砖结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103790598B (zh) | 一种盾构隧道纵向预应力混凝土衬砌管片的制备方法 | |
CN106087629A (zh) | 无桥头锥坡预制挡板泡沫混凝土轻质路堤结构及施工方法 | |
CN102041845A (zh) | 一种有效降低尾矿库堆积坝浸润线的联合排渗系统 | |
CN207760804U (zh) | 一种多功能经济型堤防结构 | |
CN106013171A (zh) | 一种深基坑侧壁的半刚性半柔性支护结构和方法 | |
CN103334371B (zh) | 一种路基沉陷注浆处治结构及施工方法 | |
CN105332370A (zh) | 一种装配式地下连续墙单元及其施工方法 | |
CN201801793U (zh) | 一种地下道路与地面桥梁的合建结构 | |
CN209555948U (zh) | 一种拼装式生态桩间挡土板构造 | |
CN205444201U (zh) | 一种钢筋混凝土腰梁结构 | |
CN205617390U (zh) | 一种用于黄土地区的柔性面层基坑支护体系 | |
CN202989868U (zh) | 震区高土石坝抗震结构 | |
CN201695341U (zh) | 一种箱梁预制台座 | |
CN204551490U (zh) | 一种吊挂式钢筋混凝土围檩 | |
CN103074901A (zh) | 大坡角护坡的砌块结构及其护坡方式 | |
CN102912768A (zh) | 震区高土石坝抗震结构 | |
CN106759264A (zh) | 一种灌浆管网及其施工方法 | |
CN107326791A (zh) | 一种漫水桥的改进方法及结构 | |
CN102094419A (zh) | 地基中存在粉质沙层的钻孔桩成型方法 | |
CN102277876A (zh) | 多功能桩筏基础及其施工工艺 | |
CN206090197U (zh) | 无桥头锥坡预制挡板泡沫混凝土轻质路堤结构 | |
CN204626424U (zh) | 用于河道边坡的台阶式多边形植生砌块 | |
RU2377363C1 (ru) | Грунтовая неоднородная насыпная плотина | |
CN203049611U (zh) | 一种框格式重力挡土墙 | |
CN208395856U (zh) | 一种带种植槽的生态石笼挡墙 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130501 |