CN103064942B - A kind of maintaining method of the distribution thematic map based on GIS and system - Google Patents
A kind of maintaining method of the distribution thematic map based on GIS and system Download PDFInfo
- Publication number
- CN103064942B CN103064942B CN201210572438.8A CN201210572438A CN103064942B CN 103064942 B CN103064942 B CN 103064942B CN 201210572438 A CN201210572438 A CN 201210572438A CN 103064942 B CN103064942 B CN 103064942B
- Authority
- CN
- China
- Prior art keywords
- resource data
- distribution
- thematic map
- data
- described resource
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 29
- 238000012423 maintenance Methods 0.000 claims abstract description 16
- 230000000737 periodic effect Effects 0.000 claims description 6
- 230000005540 biological transmission Effects 0.000 claims description 3
- 230000005055 memory storage Effects 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 7
- 238000004891 communication Methods 0.000 description 1
- 230000008034 disappearance Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Abstract
The invention provides a kind of maintaining method of the distribution thematic map based on GIS, the resource data of distribution net equipment can be gathered, and according to resource data and isodensity space arithmetic, automatic generation distribution thematic map, effectively to solve in prior art and manually by CAD, the problem that the maintenance cost brought is high is safeguarded to distribution figure, resource data and distribution thematic map are also sent to Master Control Center by the present invention, solve the problem that present power network resources drawing easily lacks.
Description
Technical field
The present invention relates to database field, in particular, relate to a kind of maintaining method and system of the distribution thematic map based on GIS.
Background technology
Along with the progress of society, information-based and automaticity is more and more higher, the degree of dependence of society to electric power, communication, finance and transportation industry is also increasing, and this socially to have higher requirement to the reliability of electric power system with regard to making.
Thematic map maintenance mode traditional is at present the mode manually adopting CAD to draw, today that, grid structure changeable in power network resources structure becomes increasingly complex, have a strong impact on the efficiency of distribution daily management, and along with the raising of human cost and the reduction of data accuracy.Often there is equipment changing just to need again draw and file, risk will be brought for work about electric power if upgrade not in time.
Inventor finds: present power network resources drawing exists the problem of obviously disappearance, and some system diagrams are all drawn on drawing with CAD, once grid structure changes, safeguards that the cost got up can be very high.To sum up, how the maintenance distribution thematic map of efficiently and accurately is those skilled in the art's problems urgently to be resolved hurrily.
Summary of the invention
In view of this, the invention provides a kind of maintaining method and system of the distribution thematic map based on GIS, to overcome the low problem of maintenance efficiency that mode that in prior art, distribution thematic map adopts artificial CAD to draw brings.
For achieving the above object, the invention provides following technical scheme:
Based on a maintaining method for the distribution thematic map of GIS, comprising:
Gather the resource data of distribution net equipment, described resource data at least comprises: distribution frame topological data and equipment data data;
According to described resource data and isodensity space arithmetic, generate distribution thematic map, described distribution thematic map at least comprises: primary connection figure or dispatching system figure;
Send described resource data and described distribution thematic map to Master Control Center.
Preferably, also comprise:
The resource data collected described in storage and described distribution thematic map.
Preferably, also comprise:
Pre-set the collection period of described resource data;
According to the resource data of the collection distribution net equipment of the automatic controlling periodic of described collection period.
Preferably, after the described resource data of described transmission and described distribution thematic map to Master Control Center, also comprise:
Detect described resource data and whether exceed default critical field, if so, the attended operation corresponding with the resource data exceeding default critical field is performed to described distribution net equipment.
Preferably, when described resource data exceeds default critical field, also comprise:
The alerting signal corresponding with the described resource data exceeding preset standard scope is sent by alarm.
Preferably, described alarm comprises:
Light emitting diode and/or hummer.
Based on a maintenance system for the distribution thematic map of GIS, comprising:
Harvester, for gathering the resource data of distribution net equipment, described resource data at least comprises: distribution frame topological data and equipment data data;
Generating apparatus, for according to described resource data and isodensity space arithmetic, generate distribution thematic map, described distribution thematic map at least comprises: primary connection figure or dispatching system figure;
Dispensing device, for sending described resource data and described distribution thematic map to Master Control Center.
Preferably, also comprise:
Memory storage, for the resource data that collects described in storing and described distribution thematic map.
Preferably, also comprise:
Timing device, for pre-setting the collection period of described resource data;
According to the resource data of the collection distribution net equipment of the automatic controlling periodic of described collection period.
Preferably, also comprise:
Whether pick-up unit, exceed default critical field for detecting described resource data, if so, performs the attended operation corresponding with the resource data exceeding default critical field to described distribution net equipment.
Preferably, also comprise:
Warning device, for sending the alerting signal corresponding with the described resource data exceeding preset standard scope by alarm.
Known via above-mentioned technical scheme, compared with prior art, the invention provides a kind of maintaining method of the distribution thematic map based on GIS, the resource data of distribution net equipment can be gathered, and according to resource data and isodensity space arithmetic, automatic generation distribution thematic map, effectively to solve in prior art and manually by CAD, the problem that the maintenance cost brought is high is safeguarded to distribution figure, resource data and distribution thematic map are also sent to Master Control Center by the present invention, solve the problem that present power network resources drawing easily lacks.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments of the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
The process flow diagram of the maintaining method of a kind of distribution thematic map based on GIS that Fig. 1 provides for the embodiment of the present invention;
The another process flow diagram of the maintaining method of a kind of distribution thematic map based on GIS that Fig. 2 provides for the embodiment of the present invention;
The another process flow diagram of the maintaining method of a kind of distribution thematic map based on GIS that Fig. 3 provides for the embodiment of the present invention;
The another process flow diagram of the maintaining method of a kind of distribution thematic map based on GIS that Fig. 4 provides for the embodiment of the present invention;
The another process flow diagram of the maintaining method of a kind of distribution thematic map based on GIS that Fig. 5 provides for the embodiment of the present invention;
The structural representation of the maintenance system of a kind of distribution thematic map based on GIS that Fig. 6 provides for the embodiment of the present invention;
The another structural representation of the maintenance system of a kind of distribution thematic map based on GIS that Fig. 7 provides for the embodiment of the present invention;
The another structural representation of the maintenance system of a kind of distribution thematic map based on GIS that Fig. 8 provides for the embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Embodiment one
Referring to accompanying drawing 1, for the invention provides a kind of process flow diagram of maintaining method of the distribution thematic map based on GIS, comprising:
S101: the resource data gathering distribution net equipment.
Here, described resource data at least comprises: distribution frame topological data and equipment data data.
S102: according to described resource data and isodensity space arithmetic, generates distribution thematic map.
Wherein, described distribution thematic map can at least comprise: primary connection figure or dispatching system figure, but is not limited thereto.
S103: send described resource data and described distribution thematic map to Master Control Center.
Adopt the maintaining method of a kind of distribution thematic map based on GIS provided by the invention, effectively to solve in prior art and manually by CAD the problem that the maintenance cost brought is high is safeguarded to distribution figure and solve the problem that present power network resources drawing easily lacks.
On the basis of the embodiment provided in the invention described above, as shown in Figure 2, present invention also offers step S204: the resource data collected described in storage and described distribution thematic map.
Here it should be noted that, the S101 in step S201 and the Fig. 1 in Fig. 2 is identical, and equally, be same step with the identical step in Fig. 1 in other accompanying drawings, this instructions adopts the describing mode progressively gone forward one by one, and at this, the step of repetition is introduced no longer one by one.
Preferably, as shown in Figure 3, also comprise:
Step S300: the collection period pre-setting described resource data;
According to the resource data of the collection distribution net equipment of the automatic controlling periodic of described collection period.
Preferably, as shown in Figure 4, after the described resource data of described transmission and described distribution thematic map to Master Control Center, also comprise:
S404: detect described resource data and whether exceed default critical field, if so, performs the attended operation corresponding with the resource data exceeding default critical field to described distribution net equipment.
Preferably, as shown in Figure 5, when described resource data exceeds default critical field, also comprise:
S505: send the alerting signal corresponding with the described resource data exceeding preset standard scope by alarm.In the present embodiment, alarm can be light emitting diode and/or hummer.
Describe method in detail in the embodiment that the invention described above provides, the device of various ways can be adopted to realize for method of the present invention, therefore present invention also offers a kind of system, provide specific embodiment below and be described in detail.
Embodiment two
Refer to Fig. 6, the structural representation of the maintenance system of a kind of distribution thematic map based on GIS provided for the present embodiment, comprising:
Harvester 601, for gathering the resource data of distribution net equipment, described resource data at least comprises: distribution frame topological data and equipment data data;
Generating apparatus 602, for according to described resource data and isodensity space arithmetic, generate distribution thematic map, described distribution thematic map at least comprises: primary connection figure or dispatching system figure;
Dispensing device 603, for sending described resource data and described distribution thematic map to Master Control Center.
Preferably, refer to Fig. 7, also comprise memory storage 704, for the resource data that collects described in storing and described distribution thematic map.
Preferably, as shown in Figure 8, also comprise:
Timing device 800, for pre-setting the collection period of described resource data;
According to the resource data of the collection distribution net equipment of the automatic controlling periodic of described collection period.
Whether pick-up unit 805, exceed default critical field for detecting described resource data, if so, performs the attended operation corresponding with the resource data exceeding default critical field to described distribution net equipment.
Preferably, also comprise:
Warning device, for sending the alerting signal corresponding with the described resource data exceeding preset standard scope by alarm.
In sum: the maintaining method that the invention provides a kind of distribution thematic map based on GIS, the resource data of distribution net equipment can be gathered, and according to resource data and isodensity space arithmetic, automatic generation distribution thematic map, effectively to solve in prior art and manually by CAD, the problem that the maintenance cost brought is high is safeguarded to distribution figure, resource data and distribution thematic map are also sent to Master Control Center by the present invention, solve the problem that present power network resources drawing easily lacks.
In this instructions, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar portion mutually see.For the device that embodiment provides, the method provided due to itself and embodiment is corresponding, so description is fairly simple, relevant part illustrates see method part.
To the above-mentioned explanation of provided embodiment, professional and technical personnel in the field are realized or uses the present invention.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle provided in this article and features of novelty.
Claims (8)
1., based on a maintaining method for the distribution thematic map of GIS, it is characterized in that, comprising:
Gather the resource data of distribution net equipment, described resource data at least comprises: distribution frame topological data and equipment data data;
According to described resource data and isodensity space arithmetic, generate distribution thematic map, described distribution thematic map at least comprises: primary connection figure or dispatching system figure;
Send described resource data and described distribution thematic map to Master Control Center;
Wherein, also comprise:
Pre-set the collection period of described resource data;
According to the resource data of the collection distribution net equipment of the automatic controlling periodic of described collection period.
2. maintaining method according to claim 1, is characterized in that, also comprises:
The resource data collected described in storage and described distribution thematic map.
3. maintaining method according to claim 1, is characterized in that, after the described resource data of described transmission and described distribution thematic map to Master Control Center, also comprises:
Detect described resource data and whether exceed default critical field, if so, the attended operation corresponding with the resource data exceeding default critical field is performed to described distribution net equipment.
4. method according to claim 3, is characterized in that, when described resource data exceeds default critical field, also comprises:
The alerting signal corresponding with the described resource data exceeding preset standard scope is sent by alarm.
5., based on a maintenance system for the distribution thematic map of GIS, it is characterized in that, comprising:
Harvester, for gathering the resource data of distribution net equipment, described resource data at least comprises: distribution frame topological data and equipment data data;
Generating apparatus, for according to described resource data and isodensity space arithmetic, generate distribution thematic map, described distribution thematic map at least comprises: primary connection figure or dispatching system figure;
Dispensing device, for sending described resource data and described distribution thematic map to Master Control Center;
Wherein, also comprise:
Timing device, for pre-setting the collection period of described resource data;
According to the resource data of the collection distribution net equipment of the automatic controlling periodic of described collection period.
6. maintenance system according to claim 5, is characterized in that, also comprises:
Memory storage, for the resource data that collects described in storing and described distribution thematic map.
7. maintenance system according to claim 5, is characterized in that, also comprises:
Whether pick-up unit, exceed default critical field for detecting described resource data, if so, performs the attended operation corresponding with the resource data exceeding default critical field to described distribution net equipment.
8. maintenance system according to claim 7, is characterized in that, also comprises:
Warning device, for sending the alerting signal corresponding with the described resource data exceeding preset standard scope by alarm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210572438.8A CN103064942B (en) | 2012-12-25 | 2012-12-25 | A kind of maintaining method of the distribution thematic map based on GIS and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210572438.8A CN103064942B (en) | 2012-12-25 | 2012-12-25 | A kind of maintaining method of the distribution thematic map based on GIS and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103064942A CN103064942A (en) | 2013-04-24 |
CN103064942B true CN103064942B (en) | 2016-01-20 |
Family
ID=48107572
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210572438.8A Active CN103064942B (en) | 2012-12-25 | 2012-12-25 | A kind of maintaining method of the distribution thematic map based on GIS and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103064942B (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102722764A (en) * | 2012-05-22 | 2012-10-10 | 合肥恒卓科技有限公司 | Integrated power grid optimization auxiliary decision analysis system |
-
2012
- 2012-12-25 CN CN201210572438.8A patent/CN103064942B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102722764A (en) * | 2012-05-22 | 2012-10-10 | 合肥恒卓科技有限公司 | Integrated power grid optimization auxiliary decision analysis system |
Also Published As
Publication number | Publication date |
---|---|
CN103064942A (en) | 2013-04-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2015041741A3 (en) | Systems and methods for utility usage monitoring and management | |
CN108156225B (en) | Micro-application monitoring system and method based on container cloud platform | |
CN103544652A (en) | Power grid industry classification load automatic statistical method and system | |
EP2708966A3 (en) | Data collection system for electric discharge machines | |
CN107862446A (en) | Water supply network integrated management analysis system based on Internet of Things | |
CN206235319U (en) | Smart city installations and facilities operation maintenance management system | |
CN105449859A (en) | Away3D engine-based display method for panoramic intelligent power system | |
CN103064942B (en) | A kind of maintaining method of the distribution thematic map based on GIS and system | |
CN206149326U (en) | Data acquisition analysis monitoring system | |
CN202652238U (en) | Fault list automatic distribution system | |
CN205353708U (en) | Two real -time monitoring system that live of application data | |
CN108710347A (en) | A kind of monitoring cloud platform | |
CN203225790U (en) | Electric power inspection tour system based on cloud calculating | |
CN105446707A (en) | Data conversion method | |
CN204206220U (en) | Electrical network cloud computing management system | |
CN109445369A (en) | Tool goes out checking device for putting in storage and system | |
CN105427543A (en) | Temperature early warning method and system based on smart grid | |
CN102955994B (en) | A kind of method that road lamp management is moved automatically | |
CN104301159A (en) | Monitoring method and system of server cluster | |
CN204389996U (en) | A kind of data acquisition and supervisor control | |
CN105449856A (en) | Method for monitoring electric power device in long distance | |
CN205541358U (en) | Interactive intelligent water resource management device | |
CN202975339U (en) | Networked radon concentration monitoring system | |
CN105930952A (en) | Energy consumption analysis and evaluation system for power distribution equipment | |
CN205121325U (en) | Fault diagnostic based on embedded system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |