CN103064942A - Maintenance method and system of distribution network thematic map based on GIS (Geographic Information System) - Google Patents

Maintenance method and system of distribution network thematic map based on GIS (Geographic Information System) Download PDF

Info

Publication number
CN103064942A
CN103064942A CN2012105724388A CN201210572438A CN103064942A CN 103064942 A CN103064942 A CN 103064942A CN 2012105724388 A CN2012105724388 A CN 2012105724388A CN 201210572438 A CN201210572438 A CN 201210572438A CN 103064942 A CN103064942 A CN 103064942A
Authority
CN
China
Prior art keywords
resource data
distribution
thematic map
data
described resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105724388A
Other languages
Chinese (zh)
Other versions
CN103064942B (en
Inventor
杨立明
任恒杰
朱振洪
肖杨
陈柏军
陈高其
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuyao power supply bureau
State Grid Corp of China SGCC
Original Assignee
Yuyao power supply bureau
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuyao power supply bureau, State Grid Corp of China SGCC filed Critical Yuyao power supply bureau
Priority to CN201210572438.8A priority Critical patent/CN103064942B/en
Publication of CN103064942A publication Critical patent/CN103064942A/en
Application granted granted Critical
Publication of CN103064942B publication Critical patent/CN103064942B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Alarm Systems (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention provides a maintenance method of a distribution network thematic map based on GIS (Geographic Information System). Resource data of distribution network equipment can be collected and the distribution network thematic map is automatically generated according to resource data and an isodense space algorithm, so that the problem of high maintenance cost caused by artificially maintaining a distribution network map through CAD (Computer Aided Design) in the prior art is effectively solved. The maintenance method and a system of the distribution network thematic map based on the GIS solve the problem that grid resource drawings are easy to be missing at present as well by sending the resource data and the distribution network thematic map to a master control center.

Description

A kind of maintaining method and system of the distribution thematic map based on GIS
Technical field
The present invention relates to database field, in particular, relate to a kind of maintaining method and system of the distribution thematic map based on GIS.
Background technology
Along with the progress of society, information-based and automaticity is more and more higher, society is also increasing to the degree of dependence of electric power, communication, finance and transportation industry, and this is just so that socially have higher requirement to the reliability of electric power system.
Traditional thematic map maintenance mode is the mode that manually adopts CAD to draw at present, changeable in the power network resources structure, that grid structure becomes increasingly complex today, have a strong impact on the efficient of distribution daily management, and be accompanied by the raising of human cost and the reduction of data accuracy.Whenever untimely renewal have equipment changing just to need again to draw and file, if will bring risk for work about electric power.
The inventor finds: there is the obviously problem of disappearance in present power network resources drawing, and the system diagram that has all is drawn on the drawing with CAD, in case grid structure changes, safeguards that the cost that gets up can be very high.To sum up, how the distribution thematic map of safeguarding of efficiently and accurately is the problem that those skilled in the art need to be resolved hurrily.
Summary of the invention
In view of this, the invention provides a kind of maintaining method and system of the distribution thematic map based on GIS, the low problem of maintenance efficiency of bringing to overcome the distribution thematic map adopts artificial CAD to draw in the prior art mode.
For achieving the above object, the invention provides following technical scheme:
A kind of maintaining method of the distribution thematic map based on GIS comprises:
Gather the resource data of distribution net equipment, described resource data comprises at least: distribution frame topological data and equipment data data;
According to described resource data and isodensity space arithmetic, generate the distribution thematic map, described distribution thematic map comprises at least: primary connection figure or dispatching system figure;
Send described resource data and described distribution thematic map to Master Control Center.
Preferably, also comprise:
Store the described resource data that collects and described distribution thematic map.
Preferably, also comprise:
Pre-set the collection period of described resource data;
Resource data according to the collection distribution net equipment of the automatic control cycle of described collection period.
Preferably,, to Master Control Center, also comprise at the described resource data of described transmission and described distribution thematic map:
Detect described resource data and whether exceed default critical field, if described distribution net equipment is carried out the attended operation corresponding with the resource data that exceeds default critical field.
Preferably, when described resource data exceeds default critical field, also comprise:
Send the alerting signal corresponding with the described resource data that exceeds the preset standard scope by alarm.
Preferably, described alarm comprises:
Light emitting diode and/or hummer.
A kind of maintenance system of the distribution thematic map based on GIS comprises:
Harvester, for the resource data that gathers distribution net equipment, described resource data comprises at least: distribution frame topological data and equipment data data;
Generating apparatus is used for according to described resource data and isodensity space arithmetic, generates the distribution thematic map, and described distribution thematic map comprises at least: primary connection figure or dispatching system figure;
Dispensing device is used for sending described resource data and described distribution thematic map to Master Control Center.
Preferably, also comprise:
Memory storage is used for storing the described resource data that collects and described distribution thematic map.
Preferably, also comprise:
Timing device is for the collection period that pre-sets described resource data;
Resource data according to the collection distribution net equipment of the automatic control cycle of described collection period.
Preferably, also comprise:
Whether pick-up unit exceeds default critical field for detection of described resource data, if described distribution net equipment is carried out the attended operation corresponding with the resource data that exceeds default critical field.
Preferably, also comprise:
Warning device is used for sending the alerting signal corresponding with the described resource data that exceeds the preset standard scope by alarm.
Via above-mentioned technical scheme as can be known, compared with prior art, the invention provides a kind of maintaining method of the distribution thematic map based on GIS, can gather the resource data of distribution net equipment, and according to resource data and isodensity space arithmetic, automatically generate the distribution thematic map, effectively solved in the prior art and manually distribution figure has been safeguarded the high problem of maintenance cost of bringing by CAD, the present invention also is sent to Master Control Center with resource data and distribution thematic map, has solved the easily problem of disappearance of present power network resources drawing.
Description of drawings
In order to be illustrated more clearly in the embodiment of the invention or technical scheme of the prior art, the below will do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art, apparently, accompanying drawing in the following describes only is embodiments of the invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to the accompanying drawing that provides other accompanying drawing.
The process flow diagram of the maintaining method of a kind of distribution thematic map based on GIS that Fig. 1 provides for the embodiment of the invention;
The another process flow diagram of the maintaining method of a kind of distribution thematic map based on GIS that Fig. 2 provides for the embodiment of the invention;
The another process flow diagram of the maintaining method of a kind of distribution thematic map based on GIS that Fig. 3 provides for the embodiment of the invention;
The another process flow diagram of the maintaining method of a kind of distribution thematic map based on GIS that Fig. 4 provides for the embodiment of the invention;
The another process flow diagram of the maintaining method of a kind of distribution thematic map based on GIS that Fig. 5 provides for the embodiment of the invention;
The structural representation of the maintenance system of a kind of distribution thematic map based on GIS that Fig. 6 provides for the embodiment of the invention;
The another structural representation of the maintenance system of a kind of distribution thematic map based on GIS that Fig. 7 provides for the embodiment of the invention;
The another structural representation of the maintenance system of a kind of distribution thematic map based on GIS that Fig. 8 provides for the embodiment of the invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that obtains under the creative work prerequisite.
Embodiment one
See also accompanying drawing 1, the process flow diagram for the maintaining method that the invention provides a kind of distribution thematic map based on GIS comprises:
S101: the resource data that gathers distribution net equipment.
Here, described resource data comprises at least: distribution frame topological data and equipment data data.
S102: according to described resource data and isodensity space arithmetic, generate the distribution thematic map.
Wherein, described distribution thematic map can comprise at least: primary connection figure or dispatching system figure, but be not limited to this.
S103: send described resource data and described distribution thematic map to Master Control Center.
Adopt the maintaining method of a kind of distribution thematic map based on GIS provided by the invention, effectively solved in the prior art manually by CAD distribution figure is safeguarded the problem that the maintenance cost brought is high and solved the easily problem of disappearance of present power network resources drawing.
On the basis of the embodiment that the invention described above provides, as shown in Figure 2, the present invention also provides step S204: store the described resource data that collects and described distribution thematic map.
Here need to prove that the step S201 among Fig. 2 is identical with S101 among Fig. 1, same, in other accompanying drawings with Fig. 1 in identical step be same step, this instructions adopts the describing mode that progressively goes forward one by one, at this, the step of repetition is introduced no longer one by one.
Preferably, as shown in Figure 3, also comprise:
Step S300: the collection period that pre-sets described resource data;
Resource data according to the collection distribution net equipment of the automatic control cycle of described collection period.
Preferably, as shown in Figure 4,, to Master Control Center, also comprise at the described resource data of described transmission and described distribution thematic map:
S404: detect described resource data and whether exceed default critical field, if described distribution net equipment is carried out the attended operation corresponding with the resource data that exceeds default critical field.
Preferably, as shown in Figure 5, when described resource data exceeds default critical field, also comprise:
S505: send the alerting signal corresponding with the described resource data that exceeds the preset standard scope by alarm.In the present embodiment, alarm can be light emitting diode and/or hummer.
Describe method in detail among the embodiment that the invention described above provides, can adopt the device of various ways to realize for method of the present invention, so the present invention also provides a kind of system, the below provides specific embodiment and is elaborated.
Embodiment two
See also Fig. 6, the structural representation of the maintenance system of a kind of distribution thematic map based on GIS that provides for present embodiment comprises:
Harvester 601, for the resource data that gathers distribution net equipment, described resource data comprises at least: distribution frame topological data and equipment data data;
Generating apparatus 602 is used for according to described resource data and isodensity space arithmetic, generates the distribution thematic map, and described distribution thematic map comprises at least: primary connection figure or dispatching system figure;
Dispensing device 603 is used for sending described resource data and described distribution thematic map to Master Control Center.
Preferably, see also Fig. 7, also comprise memory storage 704, be used for storing the described resource data that collects and described distribution thematic map.
Preferably, as shown in Figure 8, also comprise:
Timing device 800 is for the collection period that pre-sets described resource data;
Resource data according to the collection distribution net equipment of the automatic control cycle of described collection period.
Whether pick-up unit 805 exceeds default critical field for detection of described resource data, if described distribution net equipment is carried out the attended operation corresponding with the resource data that exceeds default critical field.
Preferably, also comprise:
Warning device is used for sending the alerting signal corresponding with the described resource data that exceeds the preset standard scope by alarm.
In sum: the maintaining method that the invention provides a kind of distribution thematic map based on GIS, can gather the resource data of distribution net equipment, and according to resource data and isodensity space arithmetic, automatically generate the distribution thematic map, effectively solved in the prior art and manually distribution figure has been safeguarded the high problem of maintenance cost of bringing by CAD, the present invention also is sent to Master Control Center with resource data and distribution thematic map, has solved the easily problem of disappearance of present power network resources drawing.
Each embodiment adopts the mode of going forward one by one to describe in this instructions, and what each embodiment stressed is and the difference of other embodiment that identical similar part is mutually referring to getting final product between each embodiment.For the device that embodiment provides, because it is corresponding with the method that embodiment provides, so description is fairly simple, relevant part partly illustrates referring to method and gets final product.
Above-mentioned explanation to the embodiment that provides makes this area professional and technical personnel can realize or use the present invention.Multiple modification to these embodiment will be apparent concerning those skilled in the art, and General Principle as defined herein can in the situation that does not break away from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention will can not be restricted to these embodiment shown in this article, but principle and the features of novelty the widest consistent scope that provides with this paper will be provided.

Claims (10)

1. the maintaining method based on the distribution thematic map of GIS is characterized in that, comprising:
Gather the resource data of distribution net equipment, described resource data comprises at least: distribution frame topological data and equipment data data;
According to described resource data and isodensity space arithmetic, generate the distribution thematic map, described distribution thematic map comprises at least: primary connection figure or dispatching system figure;
Send described resource data and described distribution thematic map to Master Control Center.
2. maintaining method according to claim 1 is characterized in that, also comprises:
Store the described resource data that collects and described distribution thematic map.
3. maintaining method according to claim 1 is characterized in that, also comprises:
Pre-set the collection period of described resource data;
Resource data according to the collection distribution net equipment of the automatic control cycle of described collection period.
4. maintaining method according to claim 1 is characterized in that,, also comprises to Master Control Center at the described resource data of described transmission and described distribution thematic map:
Detect described resource data and whether exceed default critical field, if described distribution net equipment is carried out the attended operation corresponding with the resource data that exceeds default critical field.
5. method according to claim 4 is characterized in that, when described resource data exceeds default critical field, also comprises:
Send the alerting signal corresponding with the described resource data that exceeds the preset standard scope by alarm.
6. the maintenance system based on the distribution thematic map of GIS is characterized in that, comprising:
Harvester, for the resource data that gathers distribution net equipment, described resource data comprises at least: distribution frame topological data and equipment data data;
Generating apparatus is used for according to described resource data and isodensity space arithmetic, generates the distribution thematic map, and described distribution thematic map comprises at least: primary connection figure or dispatching system figure;
Dispensing device is used for sending described resource data and described distribution thematic map to Master Control Center.
7. maintenance system according to claim 6 is characterized in that, also comprises:
Memory storage is used for storing the described resource data that collects and described distribution thematic map.
8. maintenance system according to claim 6 is characterized in that, also comprises:
Timing device is for the collection period that pre-sets described resource data;
Resource data according to the collection distribution net equipment of the automatic control cycle of described collection period.
9. maintenance system according to claim 6 is characterized in that, also comprises:
Whether pick-up unit exceeds default critical field for detection of described resource data, if described distribution net equipment is carried out the attended operation corresponding with the resource data that exceeds default critical field.
10. maintenance system according to claim 9 is characterized in that, also comprises:
Warning device is used for sending the alerting signal corresponding with the described resource data that exceeds the preset standard scope by alarm.
CN201210572438.8A 2012-12-25 2012-12-25 A kind of maintaining method of the distribution thematic map based on GIS and system Active CN103064942B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210572438.8A CN103064942B (en) 2012-12-25 2012-12-25 A kind of maintaining method of the distribution thematic map based on GIS and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210572438.8A CN103064942B (en) 2012-12-25 2012-12-25 A kind of maintaining method of the distribution thematic map based on GIS and system

Publications (2)

Publication Number Publication Date
CN103064942A true CN103064942A (en) 2013-04-24
CN103064942B CN103064942B (en) 2016-01-20

Family

ID=48107572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210572438.8A Active CN103064942B (en) 2012-12-25 2012-12-25 A kind of maintaining method of the distribution thematic map based on GIS and system

Country Status (1)

Country Link
CN (1) CN103064942B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102722764A (en) * 2012-05-22 2012-10-10 合肥恒卓科技有限公司 Integrated power grid optimization auxiliary decision analysis system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102722764A (en) * 2012-05-22 2012-10-10 合肥恒卓科技有限公司 Integrated power grid optimization auxiliary decision analysis system

Also Published As

Publication number Publication date
CN103064942B (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN107133273A (en) A kind of transit's routes data processing method and server cluster based on big data
CN104462121A (en) Data processing method, device and system
WO2015041741A3 (en) Systems and methods for utility usage monitoring and management
CN106992517A (en) Electric power line loss analysis method, device and system
CN106202406A (en) A kind of 3D visualization machine room assets information management method and system
CN104951856A (en) GIS-based comprehensive emergency material visualization system and method
CN103985008A (en) Intelligent monitoring system of city underground pipeline
CN103544652A (en) Power grid industry classification load automatic statistical method and system
CN108156225B (en) Micro-application monitoring system and method based on container cloud platform
CN107862446A (en) Water supply network integrated management analysis system based on Internet of Things
CN105449859B (en) The methods of exhibiting of panorama intelligent power system based on Away3D engines
CN110080071A (en) A kind of road collapsion method for early warning, system and terminal device
CN104573208B (en) A kind of distribution wiring diagram mapping method based on generalized information system
CN109976674A (en) A kind of hard disk management method, system, equipment and computer readable storage medium
CN206235319U (en) Smart city installations and facilities operation maintenance management system
CN206149326U (en) Data acquisition analysis monitoring system
CN105760284A (en) Website performance monitoring method and device
CN104484521A (en) Rule for positioning VISIO topological graphs for dispatching and monitoring power grids
CN103064942A (en) Maintenance method and system of distribution network thematic map based on GIS (Geographic Information System)
CN205353708U (en) Two real -time monitoring system that live of application data
CN105446707A (en) Data conversion method
CN109445369A (en) Tool goes out checking device for putting in storage and system
CN204374835U (en) A kind of cloud memory storage being applied to school student information management
CN203882180U (en) Object monitoring system based on Internet-of-things
CN113553315A (en) GIS-based regional power grid statistics professional index display method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant