CN206235319U - Smart city installations and facilities operation maintenance management system - Google Patents

Smart city installations and facilities operation maintenance management system Download PDF

Info

Publication number
CN206235319U
CN206235319U CN201621310795.7U CN201621310795U CN206235319U CN 206235319 U CN206235319 U CN 206235319U CN 201621310795 U CN201621310795 U CN 201621310795U CN 206235319 U CN206235319 U CN 206235319U
Authority
CN
China
Prior art keywords
data
city
city equipment
processor
task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621310795.7U
Other languages
Chinese (zh)
Inventor
彭永光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Great Idea Touchplus Information Corp
Original Assignee
Wuhan Great Idea Touchplus Information Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Great Idea Touchplus Information Corp filed Critical Wuhan Great Idea Touchplus Information Corp
Priority to CN201621310795.7U priority Critical patent/CN206235319U/en
Application granted granted Critical
Publication of CN206235319U publication Critical patent/CN206235319U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

A kind of smart city installations and facilities operation maintenance management system, it includes following component:Distributed camera for monitoring and gathering city equipment image;City equipment bottom is arranged on, the hydrostatic level for gathering city equipment settlement data;It is arranged in the soil layer of city equipment bottom, the settlement gauge for gathering city equipment bottom solum settling data;Barcode device for storing city equipment type information;For data storage, and by above-mentioned data and the one-to-one distributed memory of acquisition time;For by the CORS data processors of the data is activation after treatment to remote server;For the data after the treatment for receiving the transmission of CORS data processors, fault message is sent to the remote server that task distributes processor;Task for issue handling scheme to be sent to hand-held mobile terminal distributes processor;For receiving the issue handling scheme that task distribution processor sends, and show, be prompted to the hand-held mobile terminal of attendant.

Description

Smart city installations and facilities operation maintenance management system
Technical field
The utility model is related to municipal plant maintenance technical field, more particularly to a kind of smart city installations and facilities operation dimension Shield management system.
Background technology
Expand with the development of the city, more and more various city equipments are applied to townie every aspect.
As the continuous expansion of city size, each city equipment can be safeguarded in time, resident can be directly influenced Experience.And because city commuting time cost is improved so that city equipment often cannot on the whole be maintained personnel's money The rational allocation in source.
Utility model content
Therefore, it is necessary to provide a kind of wisdom for carrying out intellectual monitoring, maintenance to city equipment based on internet of things sensors City equipment installation fishery maintaining-managing system.
A kind of smart city installations and facilities operation maintenance management system, it includes following component:
Distributed camera for monitoring and gathering city equipment image;City equipment bottom is arranged on, for gathering The hydrostatic level of city equipment settlement data;It is arranged in the soil layer of city equipment bottom, for gathering city equipment The settlement gauge of bottom solum settling data;Barcode device for storing city equipment type information;For storing static(al) water Quasi- instrument, the settling data of settlement gauge collection, the city equipment view data of distributed camera collection, and by above-mentioned data with adopt Collection time one-to-one distributed memory;For the city equipment settlement data gathered to hydrostatic level, sedimentation The city equipment bottom solum settling data for counting collection is processed, and the data is activation after treatment is arrived into remote server CORS data processors;For the data after the treatment for receiving the transmission of CORS data processors, and broken down in city equipment When, fault message is sent to the remote server that task distributes processor;For the type according to fault message, problem is generated Processing scheme, and distribute processor by the task that issue handling scheme is sent to hand-held mobile terminal;For receiving task distribution The issue handling scheme that processor sends, and show, be prompted to the hand-held mobile terminal of attendant;
Distributed camera, barcode device, CORS data processors, hydrostatic level, settlement gauge simultaneously with distribution Memory is electrically connected;CORS data processors simultaneously with remote server wireless communication connection;Remote server is while and task Distribution processor electrical connection;Task distribution processor simultaneously with hand-held mobile terminal wireless communication connection.
In a kind of smart city installations and facilities operation maintenance management system described in the utility model,
The distributed camera quantity is multiple.
In a kind of smart city installations and facilities operation maintenance management system described in the utility model,
Task distributes processor by built-in 4G communication modules and hand-held mobile terminal wireless communication connection.
Implement the smart city installations and facilities operation maintenance management system that the utility model is provided, can be by static level Instrument, settlement gauge are realized to city equipment in itself and city equipment subsoil settlement issues are monitored;And by setting CORS data processors, can realize processing the settling data for gathering, and obtain the readable data form of server;Pass through Setting task distributes processor and hand-held mobile terminal, can receive the issue handling scheme that task distribution processor sends, And show, be prompted to attendant so that the maintenance to city equipment is more timely and convenient.
Brief description of the drawings
Fig. 1 is the smart city installations and facilities operation maintenance management system structured flowchart of the utility model embodiment.
Specific embodiment
As shown in figure 1, a kind of smart city installations and facilities operation maintenance management system, it includes following component:
Distributed camera 1 for monitoring and gathering city equipment image;City equipment bottom is arranged on, for gathering The hydrostatic level 2 of city equipment settlement data;It is arranged in the soil layer of city equipment bottom, for gathering city equipment The settlement gauge 3 of bottom solum settling data;Barcode device 4 for storing city equipment type information;For storing static(al) Spirit level 2, the settling data of the collection of settlement gauge 3, the city equipment view data of distributed camera 1 collection, and by above-mentioned number According to the one-to-one distributed memory 5 of acquisition time;For the city equipment settlement number gathered to hydrostatic level 2 According to the city equipment bottom solum settling data of the collection of settlement gauge 3 is processed, and the data is activation after treatment is taken to long-range The CORS data processors 6 of business device 7;For the data after the treatment for receiving the transmission of CORS data processors 6, and in city equipment During failure, fault message is sent to the remote server 7 that task distributes processor 8;For the class according to fault message Type, generates issue handling scheme, and distribute processor 8 by the task that issue handling scheme is sent to hand-held mobile terminal 9;For The issue handling scheme that reception task distribution processor 8 sends, and show, be prompted to the hand-held mobile terminal 9 of attendant;
Distributed camera 1, barcode device 4, CORS data processors 6, hydrostatic level 2, settlement gauge 3 simultaneously with point Cloth memory 5 is electrically connected;CORS data processors 6 simultaneously with the wireless communication connection of remote server 7;Remote server 7 is same When with task distribution processor 8 electrically connect;Task distribution processor 8 simultaneously with the wireless communication connection of hand-held mobile terminal 9.
In the utility model embodiment, task distributes processor 8 according to the schemes generation rule being pre-configured with and event Barrier information obtains issue handling scheme with matching for schemes generation rule;Issue handling scheme pre-sets.
In a kind of smart city installations and facilities operation maintenance management system described in the utility model,
The quantity of distributed camera 1 is multiple.
In a kind of smart city installations and facilities operation maintenance management system described in the utility model,
Task distributes processor 8 by built-in 4G communication modules and the wireless communication connection of hand-held mobile terminal 9.
Implement the smart city installations and facilities operation maintenance management system that the utility model is provided, can be by static level Instrument 2, settlement gauge 3 are realized to city equipment in itself and city equipment subsoil settlement issues are monitored;And by setting CORS data processors 6 are put, can realize processing the settling data for gathering, obtain the readable data form of server; Processor 8 and hand-held mobile terminal 9 are distributed by setting task, can be received at the problem that task distribution processor 8 sends Reason scheme, and show, be prompted to attendant so that the maintenance to city equipment is more timely and convenient.
It is understood that for the person of ordinary skill of the art, can be according to technology structure of the present utility model Think of makes other various corresponding changes and deformation, and all these changes and deformation should all belong to the utility model claim Protection domain.

Claims (3)

1. a kind of smart city installations and facilities operation maintenance management system, it is characterised in that it includes following component:
Distributed camera for monitoring and gathering city equipment image;City equipment bottom is arranged on, for gathering city The hydrostatic level of equipment settlement data;It is arranged in the soil layer of city equipment bottom, for gathering city equipment bottom The settlement gauge of solum settlement data;Barcode device for storing city equipment type information;For store hydrostatic level, The settling data of settlement gauge collection, the city equipment view data of distributed camera collection, and during by above-mentioned data with collection Between one-to-one distributed memory;For the city equipment settlement data gathered to hydrostatic level, settlement gauge is adopted The city equipment bottom solum settling data of collection is processed, and by the CORS numbers of the data is activation after treatment to remote server According to processor;For the data after the treatment for receiving the transmission of CORS data processors, and when city equipment breaks down, by event Barrier information is sent to the remote server that task distributes processor;For the type according to fault message, issue handling side is generated Case, and distribute processor by the task that issue handling scheme is sent to hand-held mobile terminal;For receiving task distribution processor The issue handling scheme of transmission, and show, be prompted to the hand-held mobile terminal of attendant;
Distributed camera, barcode device, CORS data processors, hydrostatic level, settlement gauge are while and distributed storage Device is electrically connected;CORS data processors simultaneously with remote server wireless communication connection;Remote server is distributed with task simultaneously Processor is electrically connected;Task distribution processor simultaneously with hand-held mobile terminal wireless communication connection.
2. a kind of smart city installations and facilities operation maintenance management system as claimed in claim 1, it is characterised in that
The distributed camera quantity is multiple.
3. a kind of smart city installations and facilities operation maintenance management system as claimed in claim 1, it is characterised in that
Task distributes processor by built-in 4G communication modules and hand-held mobile terminal wireless communication connection.
CN201621310795.7U 2016-12-01 2016-12-01 Smart city installations and facilities operation maintenance management system Expired - Fee Related CN206235319U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621310795.7U CN206235319U (en) 2016-12-01 2016-12-01 Smart city installations and facilities operation maintenance management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621310795.7U CN206235319U (en) 2016-12-01 2016-12-01 Smart city installations and facilities operation maintenance management system

Publications (1)

Publication Number Publication Date
CN206235319U true CN206235319U (en) 2017-06-09

Family

ID=58981348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621310795.7U Expired - Fee Related CN206235319U (en) 2016-12-01 2016-12-01 Smart city installations and facilities operation maintenance management system

Country Status (1)

Country Link
CN (1) CN206235319U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107966175A (en) * 2017-10-31 2018-04-27 山西路桥集团试验检测中心有限公司 A kind of road and bridge detecting system and its detection method
CN110207655A (en) * 2019-07-04 2019-09-06 石家庄铁道大学 Subgrade settlement monitoring settlement gauge and monitoring method
CN110929072A (en) * 2019-11-29 2020-03-27 深圳市商汤科技有限公司 Clustering system and method, electronic device and storage medium

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107966175A (en) * 2017-10-31 2018-04-27 山西路桥集团试验检测中心有限公司 A kind of road and bridge detecting system and its detection method
CN110207655A (en) * 2019-07-04 2019-09-06 石家庄铁道大学 Subgrade settlement monitoring settlement gauge and monitoring method
CN110929072A (en) * 2019-11-29 2020-03-27 深圳市商汤科技有限公司 Clustering system and method, electronic device and storage medium

Similar Documents

Publication Publication Date Title
CN206235319U (en) Smart city installations and facilities operation maintenance management system
WO2015041741A3 (en) Systems and methods for utility usage monitoring and management
CN103366245B (en) Electric network fault information issuing method based on OSB bus and system
CN105632142A (en) Transformer wireless monitoring system
CN207319050U (en) A kind of Centralized Monitoring operational system of photovoltaic power station
CN206743249U (en) A kind of power concentrator and the system for transmitting electric power data
CN202652238U (en) Fault list automatic distribution system
CN102970767B (en) Weather monitoring system based on time division long term evolution (TD-LTE) private network
CN207337164U (en) Sewage discharge monitors system
CN208046653U (en) A kind of electric power monitoring system network security monitoring main website plateform system
CN204206220U (en) Electrical network cloud computing management system
CN206181241U (en) Power equipment monitored control system that makes a video recording based on wireless vibration sensor
CN105137891A (en) Internet of things passive data acquisition system
CN206249047U (en) Data acquisition server and system for data acquisition integrity of intelligent meter
CN206960581U (en) Power distribution station thunder and lightning warning system
CN107450430A (en) A kind of transformer substation grounding wire uses management platform
CN203177820U (en) High voltage line sagging monitoring system based on UWB
CN106871952A (en) A kind of electric power tower multifunctional monitoring terminal
CN107968414A (en) A kind of intelligence SVG dynamic passive compensation systems
CN204721012U (en) A kind of battery vehicle self-filling power station control system
CN205643387U (en) Intelligence acceleration sensor based on 6LoWPAN technique
CN205541358U (en) Interactive intelligent water resource management device
CN207457785U (en) A kind of transformer substation grounding wire uses management platform
CN205608112U (en) High soil resistivity area large hydropower station ground system
CN207602024U (en) A kind of radar level wireless GPRS remote transmitting system based on sponge city

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609

Termination date: 20191201

CF01 Termination of patent right due to non-payment of annual fee