CN103061350A CN2013100389551A CN201310038955A CN103061350A CN 103061350 A CN103061350 A CN 103061350A CN 2013100389551 A CN2013100389551 A CN 2013100389551A CN 201310038955 A CN201310038955 A CN 201310038955A CN 103061350 A CN103061350 A CN 103061350A
Authority
CN
China
Prior art keywords
steel pipe
platform
metal cage
drainage
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100389551A
Other languages
English (en)
Inventor
白双江
卢永胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Construction And Installation Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Construction And Installation Engineering Co filed Critical China Third Metallurgical Group Construction And Installation Engineering Co
Priority to CN2013100389551A priority Critical patent/CN103061350A/zh
Publication of CN103061350A publication Critical patent/CN103061350A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明涉及一种深基坑刚性排水平台装置及使用方法,包括箱体平台、钢管、法兰盘底盖、止水环、金属笼、钢丝网、加强肋、排水泵,所述的箱体平台为底部封闭的倒棱台结构,箱体平台外侧四周设有若干加强肋,箱体平台底部中央位置固定有钢管,钢管底部与箱体平台底部平齐,钢管在箱体平台底部上方1/3高度处固定连接止水环,钢管顶部固定有法兰盘底盖,钢管底部固定连接金属笼,金属笼周围设有钢丝网,底部固定连接钢板座,金属笼内设有排水泵。本发明的优点是:可以有效降低地下水位,减少排水工程量,防止基坑坍塌,缩短排水工期,节约工程成本,保证工程质量,结构设计简单,操作方便。

Description

一种深基坑刚性排水平台装置及使用方法
技术领域
本发明涉及建筑施工领域,尤其涉及一种深基坑刚性排水平台装置及使用方法。
背景技术
高层建筑飞速的发展,基础深度不断刷新,深基坑排水工作尤为重要。当遇到砂石持力层且地下水位较高时给排水工作带来很大的困难。传统的做法是采用降水井,将基坑内整体地下水位降至电梯基坑、集水坑等作业层下500mm(因为电梯基坑、集水坑等标高为基坑最低标高)。此种做法降水工程量大、施工周期长、工作效率低,排水费用高,一旦没用控制好地下水位,基坑极易发生坍塌,垫层及防水层容易发生破坏,给工程带来很大工期及经济损失。
发明内容
为克服现有技术的不足,本发明的目的是提供一种深基坑刚性排水平台装置及使用方法,能对砂石持力层、地下水位较高的有效基坑排水,可以降低地下水位、防止基坑坍塌,为下道工序施工提供无水作业平台。
为实现上述目的,本发明通过以下技术方案实现:
一种深基坑刚性排水平台装置,包括箱体平台、钢管、法兰盘底盖、止水环、金属笼、钢丝网、加强肋、排水泵,所述的箱体平台为底部封闭的倒棱台结构,箱体平台外侧四周设有若干加强肋,箱体平台底部中央位置固定有钢管,钢管底部与箱体平台底部平齐,钢管在箱体平台底部上方1/3高度处固定连接止水环,钢管顶部固定有法兰盘底盖,钢管底部固定连接金属笼,金属笼周围设有钢丝网,底部固定连接钢板座,金属笼内设有排水泵。
所述的箱体平台底部四角固定有用于吊装的吊环。
一种深基坑刚性排水平台装置的使用方法,包括以下步骤:
1)利用起重设备将本装置吊装在基坑内,位置确定好后再浇筑四周垫层混凝土,加强肋范围内的混凝土加厚,在浇筑完混凝土后加强肋全部埋在混凝土底部,在金属笼内放置排水泵,并通过排水管将积水排至基坑外侧;
2)在箱体平台内浇筑基础混凝土之前取出金属笼的排水泵及排水管,将法兰盘封闭,即在法兰顶盖与法兰盘底盖之间垫上胶垫并用螺丝拧紧,保证不漏水,因为装置在浇筑完基础混凝土后全部埋在混凝土底部,杜绝了漏水现象的发生;
 3)当地下水位超过基坑底部标高时,基坑四周砂石受到箱体平台的制约不会发生坍塌,更不会有地下水进入箱体平台内,为下道工序施工提供一个无水作业平台。
与现有技术相比,本发明的有益效果是:
可以有效降低地下水位,减少排水工程量,防止基坑坍塌,缩短排水工期,节约工程成本,保证工程质量,结构设计简单,操作方便。
附图说明
图1是本发明的俯视图。
图2是图1的A-A剖视图。
图3是本发明的安装剖视图。
图4是封闭钢管顶部时的结构示意图。
图中:1-箱体平台  2-钢管  3-法兰盘底盖  4-止水环  5-金属笼  6-钢丝网  7-加强肋  8-吊环  9-排水泵  10-排水管  11-法兰盘顶盖  12-螺丝  13-胶垫  14钢板座
具体实施方式
所述的箱体平台1底部四角固定有用于吊装的吊环8。下面结合说明书附图对本发明进行详细地描述,但是应该指出本发明的实施不限于以下的实施方式。
见图1-图4,一种深基坑刚性排水平台装置,包括箱体平台1、钢管2、法兰盘底盖3、止水环4、金属笼5、钢丝网6、加强肋7、排水泵9,所述的箱体平台1为底部封闭的倒棱台结构,箱体平台1外侧四周设有若干加强肋7,箱体平台1底部中央位置固定有钢管2,钢管2底部与箱体平台1底部平齐,钢管2在箱体平台1底部上方1/3高度处固定连接止水环4,钢管2顶部固定有法兰盘底盖3,钢管2底部固定连接金属笼5,金属笼5周围设有钢丝网6、底部固定连接钢板座14,金属笼5内设有排水泵9。
一种深基坑刚性排水平台装置的使用方法,包括以下步骤:
1)利用起重设备将本装置吊装在基坑内,位置确定好后再浇筑四周垫层混凝土,加强肋7范围内的混凝土加厚,在浇筑完混凝土后加强肋7全部埋在混凝土底部,在金属笼5内放置排水泵9,并通过排水管10将积水排至基坑外侧;
2)在水箱平台1内浇筑基础混凝土之前取出金属笼的排水泵9及排水管10,将法兰盘封闭,即在法兰顶盖11与法兰盘底盖3之间垫上胶垫13并用螺丝12拧紧,保证不漏水,因为装置在浇筑完基础混凝土后全部埋在混凝土底部,杜绝了漏水现象的发生;
3)当地下水位超过基坑底部标高时,基坑四周砂石受到箱体平台1的制约不会发生坍塌,更不会有地下水进入箱体平台1内,为下道工序施工提供一个无水作业平台。
实施例:
见图1和图2,根据工程施工图纸的基坑放坡尺寸(与地面成60°夹角)焊制箱体平台1,箱体平台1高度为基底深度。箱体平台1外侧沿四周设置支撑加强肋7,加强肋7采用Φ18圆钢焊接至箱体平台1外侧,间距为400mm,水平长度为500mm,伸至混凝土垫层底部防止本装置倾覆。箱体平台1底部中央位置安装钢管2(Φ300mm),高度700mm且要低于基坑混凝土底板厚度,钢管2顶部焊接法兰盘底盖3,在钢管上1/3高度焊接钢板止水环4。在箱体平台1底部四角焊接四个Φ20圆钢吊环8,用于吊装。
在箱体平台1下方,即钢管2底部焊接金属笼5,高度在500-700mm之间,金属笼5四周用钢丝网6包裹,底部焊接钢板座14,防止砂石进入笼内。
见图3,利用起重设备将本装置吊装在基坑内,位置确定好后在浇筑四周混凝土与垫层混凝土,加强肋7范围内混凝土加厚。与此同时在金属笼5内放置排水泵9,并通过排水管10将积水排至基坑外侧。即便地下水位超过基坑底部标高,基坑四周砂石受到箱体平台1的制约不会发生坍塌,更不会有地下水进入箱体平台1内,确保了作业面无积水,为下道工序施工提供一个无水操作平台。
在浇筑基坑混凝土之前取出排水泵9及排水管10,将法兰盘封闭,即在法兰顶盖11下垫上胶垫13并用螺丝12拧紧,见图4,保证不漏水。最后浇筑基坑混凝土。因为装置在浇筑完混凝土后全部埋在混凝土底部,杜绝了漏水现象的发生,确保了工程质量。
本发明可以有效降低地下水位,减少排水工程量,防止基坑坍塌,缩短排水工期,节约工程成本,保证工程质量,结构设计简单,操作方便。

Claims (3)

1.一种深基坑刚性排水平台装置,其特征在于,包括箱体平台、钢管、法兰盘底盖、止水环、金属笼、钢丝网、加强肋、排水泵,所述的箱体平台为底部封闭的倒棱台结构,箱体平台外侧四周设有若干加强肋,箱体平台底部中央位置固定有钢管,钢管底部与箱体平台底部平齐,钢管在箱体平台底部上方1/3高度处固定连接止水环,钢管顶部固定有法兰盘底盖,钢管底部固定连接金属笼,金属笼周围设有钢丝网,底部固定连接钢板座,金属笼内设有排水泵。
2.根据权利要求1所述的一种深基坑刚性排水平台装置,其特征在于,所述的箱体平台底部四角固定有用于吊装的吊环。
3.一种深基坑刚性排水平台装置的使用方法,其特征在于,包括以下步骤:
1)利用起重设备将本装置吊装在基坑内,位置确定好后再浇筑四周垫层混凝土,加强肋范围内的混凝土加厚,在浇筑完混凝土后加强肋全部埋在混凝土底部,在金属笼内放置排水泵,并通过排水管将积水排至基坑外侧;
2)在箱体平台内浇筑基础混凝土之前取出金属笼的排水泵及排水管,将法兰盘封闭,即在法兰顶盖与法兰盘底盖之间垫上胶垫并用螺丝拧紧,保证不漏水,因为装置在浇筑完基础混凝土后全部埋在混凝土底部,杜绝了漏水现象的发生;
3)当地下水位超过基坑底部标高时,基坑四周砂石受到箱体平台的制约不会发生坍塌,更不会有地下水进入箱体平台内,为下道工序施工提供一个无水作业平台。
CN2013100389551A 2013-01-31 2013-01-31 一种深基坑刚性排水平台装置及使用方法 Pending CN103061350A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100389551A CN103061350A (zh) 2013-01-31 2013-01-31 一种深基坑刚性排水平台装置及使用方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100389551A CN103061350A (zh) 2013-01-31 2013-01-31 一种深基坑刚性排水平台装置及使用方法

Publications (1)

Publication Number Publication Date
CN103061350A true CN103061350A (zh) 2013-04-24

Family

ID=48104216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100389551A Pending CN103061350A (zh) 2013-01-31 2013-01-31 一种深基坑刚性排水平台装置及使用方法

Country Status (1)

Country Link
CN (1) CN103061350A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846836A (zh) * 2015-05-21 2015-08-19 中铁四局集团有限公司 用于深基坑的给排水装置及基于该给排水装置的施工方法
CN107288379A (zh) * 2017-08-07 2017-10-24 上海鸿亿机电设备安装工程有限公司 双止水板穿泳池不锈钢管
CN107975054A (zh) * 2016-10-24 2018-05-01 中国三冶集团有限公司 一种深基坑刚性排水平台装置及其使用方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58207420A (ja) * 1982-05-27 1983-12-02 Sanwa Doshitsu Kiso Kk 根伐り工事における地下水位の低下工法
RU2147645C1 (ru) * 1998-05-15 2000-04-20 Закрытое акционерное общество Промышленно-строительная фирма "Содружество" Способ понижения уровня грунтовых вод при строительстве и эксплуатации подземных сооружений и устройство для его осуществления
JP3406554B2 (ja) * 2000-02-02 2003-05-12 株式会社関配 地下水位低下方法とその装置
CN201896316U (zh) * 2010-12-22 2011-07-13 中国建筑第六工程局有限公司 岩石地基深基坑承压水降排水系统
CN102433886A (zh) * 2011-09-27 2012-05-02 天津住宅集团建设工程总承包有限公司 一种集水井内增加降水井施工方法
CN202450536U (zh) * 2011-12-29 2012-09-26 青岛新华友建工集团股份有限公司 一种基坑内浅降水与封堵施工装置
CN203113360U (zh) * 2013-01-31 2013-08-07 中国三冶集团有限公司建筑安装工程公司 一种深基坑刚性排水平台装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58207420A (ja) * 1982-05-27 1983-12-02 Sanwa Doshitsu Kiso Kk 根伐り工事における地下水位の低下工法
RU2147645C1 (ru) * 1998-05-15 2000-04-20 Закрытое акционерное общество Промышленно-строительная фирма "Содружество" Способ понижения уровня грунтовых вод при строительстве и эксплуатации подземных сооружений и устройство для его осуществления
JP3406554B2 (ja) * 2000-02-02 2003-05-12 株式会社関配 地下水位低下方法とその装置
CN201896316U (zh) * 2010-12-22 2011-07-13 中国建筑第六工程局有限公司 岩石地基深基坑承压水降排水系统
CN102433886A (zh) * 2011-09-27 2012-05-02 天津住宅集团建设工程总承包有限公司 一种集水井内增加降水井施工方法
CN202450536U (zh) * 2011-12-29 2012-09-26 青岛新华友建工集团股份有限公司 一种基坑内浅降水与封堵施工装置
CN203113360U (zh) * 2013-01-31 2013-08-07 中国三冶集团有限公司建筑安装工程公司 一种深基坑刚性排水平台装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846836A (zh) * 2015-05-21 2015-08-19 中铁四局集团有限公司 用于深基坑的给排水装置及基于该给排水装置的施工方法
CN107975054A (zh) * 2016-10-24 2018-05-01 中国三冶集团有限公司 一种深基坑刚性排水平台装置及其使用方法
CN107288379A (zh) * 2017-08-07 2017-10-24 上海鸿亿机电设备安装工程有限公司 双止水板穿泳池不锈钢管

Similar Documents

Publication Publication Date Title
CN102116033A (zh) 深基坑盲沟集水井降排水方法及装置
CN107386307B (zh) 基坑内结构抗浮系统及其施工方法
CN106193132A (zh) 用于深基坑高水位建筑物底板的泄压抗浮系统及其用于泄压抗浮的方法
CN103061350A (zh) 一种深基坑刚性排水平台装置及使用方法
CN103382722B (zh) 地下水压较大的预留集水井处混凝土基础底板恢复方法
CN204876019U (zh) 一种新老管线沟通的逆作法井
CN103088838A (zh) 沉井封底排水装置及施工方法
CN203113360U (zh) 一种深基坑刚性排水平台装置
CN102733398B (zh) 一种组合式可回收的基坑支护内支撑立柱
CN104131570A (zh) 用于基坑施工的钢箱围护装置及其施工方法
CN103374905A (zh) 可移动自安装平台
CN201679008U (zh) 基坑刚性排水装置
CN216475128U (zh) 一种集水井内设临时水箱的建筑底板抽排水结构
CN103174154A (zh) 一种固封地下建筑底板涌水井坑的方法及辅助降水装置
CN108517885B (zh) 一种高桩承台围堰及围堰施工方法
CN103031851A (zh) 沉箱装置及其应用于水基坑中的施工方法
CN105735240B (zh) 一种用于吹填淤泥加固的竖向立体排水装置及使用方法
CN202989939U (zh) 贮灰场排水竖井
CN212801545U (zh) 一种深基坑排水结构
CN104631477B (zh) 一种处理基坑内降水装置安装和封堵的方法
CN204059872U (zh) 建筑物防水型管道井
CN203222805U (zh) 内支撑式深基坑格构柱井点降水系统
JP4863215B2 (ja) 水中鋼管建て込み工法
CN211472541U (zh) 一种集水井提泵圈装置
CN214363566U (zh) 集水井提泵圈装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 114036 ANSHAN, LIAONING PROVINCE TO: 114039 ANSHAN, LIAONING PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140728

Address after: 114039 Anshan province Liaoning City Mountain Road No. 105 building materials

Applicant after: CHINA THREE METALLURGICAL GROUP CO., LTD.

Address before: Anshan City, Liaoning Province Road 114036 building a mountain 148

Applicant before: China Third Metallurgical Group, Construction and Installation Engineering Company

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130424