CN103046943A - Hydraulic bracket - Google Patents

Hydraulic bracket Download PDF

Info

Publication number
CN103046943A
CN103046943A CN2013100318325A CN201310031832A CN103046943A CN 103046943 A CN103046943 A CN 103046943A CN 2013100318325 A CN2013100318325 A CN 2013100318325A CN 201310031832 A CN201310031832 A CN 201310031832A CN 103046943 A CN103046943 A CN 103046943A
Authority
CN
China
Prior art keywords
tail
hinged
tail boom
coal
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100318325A
Other languages
Chinese (zh)
Inventor
王利峰
魏连河
邵天旗
陈欢欢
卢新伟
张天营
张海建
张连涛
丁国玺
鲁超
张天成
崔磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Caterpillar Zhengzhou Ltd
Original Assignee
Zhengzhou Siwei Mechanical and Electrical Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Siwei Mechanical and Electrical Manufacturing Co Ltd filed Critical Zhengzhou Siwei Mechanical and Electrical Manufacturing Co Ltd
Priority to CN2013100318325A priority Critical patent/CN103046943A/en
Publication of CN103046943A publication Critical patent/CN103046943A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a hydraulic bracket belonging to the field of coal-mining machinery. The hydraulic bracket comprises a base, a top beam and a shield beam, wherein an upright is hinged between the base and the top beam, a front connecting rod and a rear connecting rod are hinged between the shield beam and the base, a tail beam is hinged on the tail end of the top beam, a tail beam jack is hinged between the shield beam and the tail beam, and a waste filling device is arranged on the lower part of the tail beam. The hydraulic bracket can realize the simultaneous operation of underground coal mining and waste filling. The tail jack between the top beam and the tail beam plays a role in supporting the tail beam, and thus the stability of the tail beam is ensured. In addition, the tail beam swings through the movement of the tail beam jack, and the state of the tail beam is regulated, so that waste filling adapts to different coal mining environments and especially meets the requirement on layer mining of coal beds with dirt band layers, the range of the waste filling is enlarged, and the filling operation is more flexible.

Description

A kind of hydraulic support
Technical field
The present invention relates to fully-mechanized coalface support apparatus under the coal mine, particularly relate to a kind of hydraulic support that is applicable to the coal seam separate zone production of dirt band layer.
Background technology
Rich coal resources in China, the civilian and industrial energy is high to the dependency degree of coal.Be accompanied by the high development of China's economy, and the demand brought of other energy deficiencies, the exploitation quantity of coal also will further improve.But thing followed problem is day by day serious owing to dealing with the coal mining environmental disruption problem that causes improperly.
As everyone knows, in the recovery process of coal, can produce a large amount of gangues.Gangue is the solid waste that discharges in coal mining process and the coal washing process, be a kind of lower with a kind of phosphorus content of coal seam association in coalification course, than the hard black gray expandable rock of coal, comprise the spoil of washing of choosing the spoil of extraction in top board, base plate and interlayer in digging gangue in the tunnelling process, the mining process and the coal washing process.Although gangue has certain value, in view of utilizing the higher problem of cost, only have few part to be utilized in the gangue.A large amount of undressed gangues can only be deposited in ground behind the coal mining, the ground hillock of formation.This not only can affect the atmosphere pollution that utilizes of Land resources, because gangue air storage meeting produces a large amount of airborne dusts, will worsen the quality of mining area atmosphere simultaneously, also can endanger water and soil.
For solving " hillock " problem, China progressively adopts in technology such as filling minings, gangue is fills up to the goaf solves the gangue treatment problem.It is exactly to utilize digging space (tunnel, goaf) that mining forms as the place that stores refuse that gangue is filled the goaf, and the final disposal that gangue is carried out.
But thing followed problem is that waste filling will certainly increase the coal work amount and improve mining costs.Carry out in addition waste filling after the coal mining and greatly reduce coal mining speed and efficient.
Summary of the invention
In order to improve coal mining efficient, be implemented in the synchronous operation of mining under the different subsurface environments with waste filling, the invention provides a kind of coal mining support, the integrated hydraulic support of filling.
A kind of hydraulic support of the present invention, comprise base, back timber, caving shield, described back timber and described caving shield are hinged, between described base and described back timber, be hinged with column, be hinged with front rod and back link between described caving shield and the described back timber, the tail end of described caving shield is hinged with tail boom, also is hinged with the tail boom jack between described caving shield and the described tail boom.
A kind of hydraulic support of the present invention, the bottom of described tail boom is provided with the waste filling device.
A kind of hydraulic support of the present invention, described waste filling device comprises the chute that is arranged at the tail boom lower end, the scratch board conveyor that can move in chute.
A kind of hydraulic support of the present invention, the front end of described base is provided with advancing jack.
The beneficial effect of technical scheme provided by the invention is: top beam rear end of the present invention is hinged tail boom, be provided with the waste filling device in the bottom of tail boom, and can realize underground coal exploitation and simultaneously operation of waste filling.
Simultaneously, between back timber and tail boom, also be hinged with the tail boom jack, played the supporting role to tail boom, guaranteed the stability of tail boom.Can realize the oscillating motion of tail boom by the motion of tail boom jack, regulate the state of tail boom, and then make waste filling adapt to different coal mining environment, particularly satisfy the coal seam separate zone production of band dirt band layer, increased the scope that spoil is filled, made packing job more flexible.
Description of drawings
Fig. 1 is the structural representation of a kind of hydraulic support of providing of the embodiment of the invention.
The specific embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, embodiment of the present invention is described further in detail below in conjunction with accompanying drawing.
As shown in Figure 1, hydraulic support of the present invention mainly is comprised of base 8, back timber 1, caving shield 3, tail boom 6, column 2 and connecting rod more than 7 parts.
This hydraulic support be base 8 bottom, be hinged with at least one group of column 2 on the base, the upper end of column 2 and back timber 1 are hinged.The rear end of back timber 1 is provided with caving shield 3.Caving shield 3 lower hinge have connecting rod 7, and the bottom of connecting rod 7 and base 8 are hinged.Usually, connecting rod is set to two groups, is respectively front rod and back link.The constitutionally stable four-bar linkage structure of the common formation of front rod, back link, back timber and base.
Be hinged with tail boom 6 in the rear end of caving shield 3.Also be connected with tail boom jack 5 between tail boom 6 and the caving shield 3.One end of tail boom jack 5 is articulated in caving shield 3, and the other end is articulated in tail boom 6.Tail boom jack 5 has been realized supporting role to tail boom 6 on the one hand, has guaranteed the stability of tail boom; On the other hand, the motion by tail boom jack 5 can drive tail boom 6 with respect to the motion of caving shield 3.
Be provided with waste filling device 10 in the bottom of tail boom 6.For the ease of settling waste filling device 10, tail boom 6 adopts body structures, is provided with abreast chute at bottom and the tail boom 6 of tail boom 6.In addition waste filling device 10 also comprise can be in chute along the scratch board conveyor of runner movement.Scratch board conveyor can along runner movement, be transported to spoil in the goaf of hydraulic support rear end by the effect of jack.
In addition, for the facility of hydraulic moving stand, also be provided with advancing jack 9 at the front end of hydraulic support foundation 8.
The back timber rear portion of hydraulic support of the present invention is provided with tail boom, can realize underground coal exploitation and simultaneously operation of waste filling, has improved waste filling efficient.Being arranged at tail boom jack between hydraulic support shield beam and the tail boom has increased the stability of tail boom, can adjust according to the needs of subsurface environment simultaneously the state of tail boom, has improved the flexibility of waste filling.
The above only is preferred embodiment of the present invention, and is in order to limit the present invention, within the spirit and principles in the present invention not all, any modification of doing, is equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (4)

1. hydraulic support, comprise base, back timber, caving shield, described back timber and described caving shield are hinged, between described base and described back timber, be hinged with column, be hinged with front rod and back link between described caving shield and the described base, it is characterized in that the tail end of described caving shield is hinged with tail boom, also be hinged with the tail boom jack between described caving shield and the described tail boom.
2. a kind of hydraulic support according to claim 1 is characterized in that, the bottom of described tail boom is provided with the waste filling device.
3. a kind of hydraulic support according to claim 2 is characterized in that, described waste filling device comprises the chute that is arranged at the tail boom lower end, the scratch board conveyor that can move in chute.
4. a kind of hydraulic support according to claim 1 is characterized in that, the front end of described base is provided with advancing jack.
CN2013100318325A 2013-01-28 2013-01-28 Hydraulic bracket Pending CN103046943A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100318325A CN103046943A (en) 2013-01-28 2013-01-28 Hydraulic bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100318325A CN103046943A (en) 2013-01-28 2013-01-28 Hydraulic bracket

Publications (1)

Publication Number Publication Date
CN103046943A true CN103046943A (en) 2013-04-17

Family

ID=48059769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100318325A Pending CN103046943A (en) 2013-01-28 2013-01-28 Hydraulic bracket

Country Status (1)

Country Link
CN (1) CN103046943A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105136A (en) * 2007-08-10 2008-01-16 郑州煤矿机械集团有限责任公司 Four column protected type hydraulic prop frame for low position blasting down the roof coal
CN201062525Y (en) * 2007-08-10 2008-05-21 郑州煤矿机械集团有限责任公司 Four-post supporting secured low-roof coal bracket
CN201381867Y (en) * 2008-12-19 2010-01-13 河北天择重型机械有限公司 Filling-type hydraulic support
CN201507320U (en) * 2009-09-30 2010-06-16 林州重机集团股份有限公司 Light top caving coal support frame for front-single and rear-single positive four-connecting rod
CN201606097U (en) * 2010-02-25 2010-10-13 郑州四维机电设备制造有限公司 Waste rock filling supporting bracket
CN101988388A (en) * 2009-07-31 2011-03-23 郑州四维机电设备制造有限公司 Filling and supporting hydraulic support with compaction mechanism
US20110097158A1 (en) * 2008-06-20 2011-04-28 Bucyrus Europe Gmbh Shield support assembly for underground mining and supporting surface element therefor
CN202402054U (en) * 2011-12-21 2012-08-29 平顶山煤矿机械有限责任公司 Caving power support
CN203067006U (en) * 2013-01-28 2013-07-17 郑州四维机电设备制造有限公司 Hydraulic support

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105136A (en) * 2007-08-10 2008-01-16 郑州煤矿机械集团有限责任公司 Four column protected type hydraulic prop frame for low position blasting down the roof coal
CN201062525Y (en) * 2007-08-10 2008-05-21 郑州煤矿机械集团有限责任公司 Four-post supporting secured low-roof coal bracket
US20110097158A1 (en) * 2008-06-20 2011-04-28 Bucyrus Europe Gmbh Shield support assembly for underground mining and supporting surface element therefor
CN201381867Y (en) * 2008-12-19 2010-01-13 河北天择重型机械有限公司 Filling-type hydraulic support
CN101988388A (en) * 2009-07-31 2011-03-23 郑州四维机电设备制造有限公司 Filling and supporting hydraulic support with compaction mechanism
CN201507320U (en) * 2009-09-30 2010-06-16 林州重机集团股份有限公司 Light top caving coal support frame for front-single and rear-single positive four-connecting rod
CN201606097U (en) * 2010-02-25 2010-10-13 郑州四维机电设备制造有限公司 Waste rock filling supporting bracket
CN202402054U (en) * 2011-12-21 2012-08-29 平顶山煤矿机械有限责任公司 Caving power support
CN203067006U (en) * 2013-01-28 2013-07-17 郑州四维机电设备制造有限公司 Hydraulic support

Similar Documents

Publication Publication Date Title
CN103133003B (en) Opencut steep end-slope mining method
CN103590830B (en) Open pit and underground space-time synchronous mining method for multiple-ore body
Guo et al. Subsidence control and farmland conservation by solid backfilling mining technology
CN104088639A (en) Large-inclination angle thick coal seam strike long-wall workface large-mining height mining method
CN101749020A (en) Forward coal mining by filling method
CN105952453A (en) Long wall advancing type mechanical non-roadway mining complete plant for coal seam face
CN101915100A (en) Loess-filling coal-mining method in a coal mine
CN103104260A (en) Comprehensive-conventional mechanical mining double-unit face coal mining method under complicated geological conditions
CN103075153B (en) Open-air drilling coal cutter
CN113047839A (en) Method for planning dump of strip mine in ultra-thick inclined coal seam and efficiently recovering end slope resources
CN203067006U (en) Hydraulic support
CN202391442U (en) Two-column shield type hydraulic support for filling and mining
CN108331580B (en) Clean and efficient coal mining method
CN110284883A (en) Recovery method is filled by a kind of row of adopting, open coal mine end side
CN203962014U (en) Combine and adopt the dual-purpose working surface hydraulic support of filling
CN205778971U (en) Hydraulic support for bashing
CN103362511A (en) Steep medium-thickness coal seam stepped coal pillar-free coal mining method
CN205677650U (en) Support automatic moving type continuous digging machine
CN203905987U (en) Backfill hydraulic bracket
CN103643991B (en) The paste body filling of support assorted template combines device for picking and method
CN205100151U (en) Colliery underground transportation track clearance car
CN103046943A (en) Hydraulic bracket
CN201705389U (en) Gangue pushing device for filling gangue in gob
CN115043138A (en) Coal mine underground gangue backfill continuous conveying equipment and gangue backfill method
CN203257461U (en) Rapid filling mechanism for filling coal mining conveyor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: Wu town Xingyang city Henan province 450103 Zhengzhou city wide road

Applicant after: Caterpillar (Zhengzhou) Co., Ltd.

Address before: 450001 No. 7 shuttle Road, Zhengzhou hi tech Development Zone, Henan, China

Applicant before: Zhengzhou Siwei Electromechanical Equipment Manufacturing Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: ZHENGZHOU SIWEI ELECTROMECHANICAL EQUIPMENT MANUFACTURING CO., LTD. TO: CATERPILLAR (ZHENGZHOU) CO., LTD.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130417