CN103031791A CN201110311152XA CN201110311152A CN103031791A CN 103031791 A CN103031791 A CN 103031791A CN 201110311152X A CN201110311152X A CN 201110311152XA CN 201110311152 A CN201110311152 A CN 201110311152A CN 103031791 A CN103031791 A CN 103031791A
Authority
CN
China
Prior art keywords
track
road
phase dealings
dealings
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110311152XA
Other languages
Chinese (zh)
Inventor
徐元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110311152XA priority Critical patent/CN103031791A/en
Publication of CN103031791A publication Critical patent/CN103031791A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a road facility capable of enabling vehicles on a crossing road of city to smoothly run. The road facility comprises a longitudinal road and a transverse road which are arranged on the crossing road, and a crossing path formed when the longitudinal road and the transverse road intersect, wherein a plurality of corresponding underground traffic lanes are arranged under the crossing road, a plurality of corresponding connecting roads are arranged at entrances and exits of the corresponding underground traffic lanes, one ends of the corresponding connecting roads are connected with the corresponding underground traffic lanes, the other ends of the connecting roads are connected with running lanes, and isolation belts are arranged on two sides of the corresponding connecting roads. By adopting the technical scheme provided by the invention, the vehicle discharge capacity on each connecting road of the crossing road can be increased several times. The road facility has the advantages and effects of little investment, resource saving, simple technology, no traffic light, no limit of vehicle flow, smoothness without stop, convenience in running and the like, and radically solves the problem of traffic jam in the city.

Description

A kind ofly can make the road equipment that vehicle passes unimpeded on the cross road, city
(1), technical field:
The invention belongs to crossing, cross road, track, city facility, be specifically related to a kind ofly can make the road equipment that vehicle passes unimpeded on the cross road, city.
(2), background technology:
The city driving is blocked up, and is the ubiquitous problem in domestic and international flourishing city.Present crossing, track, city, generally adopt traffic light signal to control, oriented vehicle is in the shunting at crossing, because the signal of traffic lights carries out frequent, cause vehicle to wait, in the large situation of vehicle flow, very easily cause the vehicle congestion phenomenon, relevant city to be taked the broadening track, builds overpass bridge and driving tunnel, is collected the ways such as the expense of blocking up and restricting the number trip in order to address this is that.Facts have proved, can only alleviate traffic congestion, can not fundamentally solve the driving lane problem of blocking up.
(3), summary of the invention:
The object of the present invention is to provide a kind ofly can make the road equipment that vehicle passes unimpeded on the cross road, city, this facility has less investment, economizes on resources, and technology is simple, without traffic lights, the car amount is not limit, take their own roads, unimpeded through, driving is convenient, has fundamentally solved the city driving problem of blocking up.
For achieving the above object, the present invention is a kind of to make the road equipment that vehicle passes unimpeded on the cross road, city, comprise that the vertical road on the cross road intersects the mutually dealings that forms with belt road and they, it is characterized in that: described road surface in the cross road has some accordingly descending tracks, be provided with corresponding correspondence in the accordingly import and export in descending track and connect the road, the corresponding end in road that connects is connected with descending track accordingly, the other end is connected with the track that will travel, and the corresponding both sides that connect the road are provided with the isolation strip.
The road surface of described vertical road on the phase dealings has accordingly descending track.
The road surface of described belt road on the phase dealings has accordingly descending track.
Several lane auxiliaries are established respectively in described vertical road on the cross road on both sides of the road outside in track.
Several lane auxiliaries are established respectively in the outside in described track, belt road both sides on the cross road.
The described corresponding isolation strip that connects the both sides in road is greenbelt or railing or driving shielding wire.
In technique scheme, have some accordingly descending tracks on the road surface in cross road, be provided with corresponding correspondence in the accordingly import and export in descending track and connect the road, the corresponding end in road that connects is connected with descending track accordingly, vertical track, accordingly descending track and horizontal track, connect into the non-intersect communication channel that travels.Its effect:
By this way, so that in certain hour, being conducive to accelerate on the connection track at crossing, cross road, at first is vertical track and the horizontal road speed on the track.Be conducive to increase the driving quantity on the phase dealings.Such scheme compared with prior art, the present invention has the following advantages:
1, modern design, rational in infrastructure.This programme can make the vehicle at the crossing, cross road in longitudinal vehicle road and horizontal track, without under the traffic lights indications, simultaneously disjoint, drive on other road junction roadways, can eliminate because of red parking, cause the situation of the track wasting of resources and traffic congestion, it is without hindrance to reach vehicle smooth, takes their own roads.Be each track up train that crossing, cross road connects, can travel respectively simultaneously, need provides realization condition on other road junction roadway of arrival.This design has obtained beyond thought technique effect, has solved that people thirst for solving always and the difficult problem of blocking up of unsolved Vehicle Driving Cycle all the time.
2, cost is low, and social benefit is large.This programme can take full advantage of existing resource, and cost of investment is low, can make that realize non-intersectly travelling in the crossing in whole cross road, without hindrance shunting, has accelerated the passage rate of vehicle, has shortened running time, can fundamentally solve the city driving problem of blocking up.
3, have a extensive future.Technical scheme of the present invention can practical application on the crossing, cross road of the different kinds of roads of big and medium-sized cities, and range of application is very wide.
(4), description of drawings:
Fig. 1 is a kind of embodiment one structural representation that can make the road equipment that vehicle passes unimpeded on the cross road, city of the present invention;
Fig. 2 is a kind of embodiment two structural representations that can make the road equipment that vehicle passes unimpeded on the cross road, city of the present invention;
Fig. 3 is a kind of embodiment three structural representations that can make the road equipment that vehicle passes unimpeded on the cross road, city of the present invention.
(5), the specific embodiment:
To the present invention is a kind of the road equipment that vehicle passes unimpeded on the cross road, city is described in further detail below in conjunction with accompanying drawing.
Embodiment one:
As seen from Figure 1, the a kind of of present embodiment can make the road equipment that vehicle passes unimpeded on the cross road, city, comprise that the vertical road on the cross road intersects the mutually dealings that forms with belt road and they, under the road intersection face, longitudinally be provided with accordingly descending track 1, be provided with corresponding correspondence in the accordingly import and export in descending track 1 and connect road 2, the corresponding end in road 2 that connects is connected with descending track 1 accordingly, and the other end is connected with the track that will travel.In the present embodiment, vertically road is made as vertical craspedodrome road with the road surface that belt road intersects on the mutually dealings that forms.
In vertical both sides, phase dealings, be connected with respectively the six-lane that vertically travels in opposite directions.
In phase dealings both lateral sides, be connected with respectively the six-lane that laterally travels in opposite directions.
The right at the track center line of facing southern side, phase dealings: be provided with G1, G2, G3 track.On the G1 track, be provided with the accordingly descending track 1 of craspedodrome; On the G2 track, be provided with the accordingly descending track 1 that turns to.The left side at above-mentioned track center line: be provided with H1, H2, H3 track.On the H1 track, be provided with the accordingly descending track 1 of craspedodrome.On the H2 track, be provided with the accordingly descending track 1 that turns to.On the underground track in southern side, phase dealings, be provided with successively southward first, second corresponding road 2 that connects from north.
The right at the track center line of facing north side, phase dealings: be provided with B1, B2, B3 track.On the B1 track, be provided with the accordingly descending track 1 of craspedodrome; On the B2 track, be provided with the accordingly descending track 1 that turns to.The left side at above-mentioned track center line: be provided with A1, A2, A3 track.On the A1 track, be provided with the accordingly descending track 1 of craspedodrome.On the A2 track, be provided with the accordingly descending track 1 that turns to.On the underground track of north side, phase dealings, be provided with successively first, second corresponding road 2 that connects from Nan Wangbei.
The right in the face of track, east, phase dealings center line is provided with C1, C2, C3 runway.On the C1 track, be provided with from east westerly, laterally keep straight on and pass the accordingly descending track 1 of the craspedodrome under the phase dealings.On the left side of above-mentioned track center line, be provided with E1, E2, E3 runway.On the E1 track, this track connects from the west toward east, laterally keeps straight on and pass the accordingly descending track 1 of the craspedodrome under the phase dealings.
The right in the face of track, west, phase dealings center line is provided with F1, F2, F3 runway.On the F1 track, be provided with from the west toward east, laterally keep straight on and pass the accordingly descending track 1 of the craspedodrome under the phase dealings.On the left side of above-mentioned track center line, be provided with D1, D2, D3 runway.On the D1 track, this track connects from east westerly, laterally keeps straight on and pass the accordingly descending track 1 of the craspedodrome under the phase dealings.
The below is illustrated the process of Vehicle Driving Cycle, for example:
One, when vehicle in the face of on the track, south, phase dealings:
1, vehicle is in the face of on the G2 track, south, phase dealings, in the time of turning left to the D2 track, west, phase dealings:
Vehicle travels in the G2 track, enter southern side, phase dealings, 1 li in the accordingly descending track that turns to, to overtake on the vertical craspedodrome road on the phase dealings, enter 1 li in the accordingly descending track that turns on the A2 track, north side, phase dealings, after going out this entrance to a tunncl, turn left, second the correspondence of being followed successively by from Nan Wangbei of travelling in north side, phase dealings connects on the road 2, travel at A1, B1, above the tunnel in B2 track, left lateral sails on the B3 track forward, on this track, travel southwards, with in the face of D3 track, west, phase dealings in joint, phase dealings, turn right, westwards drive on the D2 track in west, phase dealings.
2, vehicle is being faced on the G3 track, south, phase dealings, in the time of turning right on the E3 track, east, phase dealings:
Vehicle northwards travels on the G3 track, with E3 track in the east, phase dealings in joint, phase dealings, turn right, drive to eastwards on the E3 track in the east, phase dealings.
3, vehicle is on G1 track, south, phase dealings, in the time of on the A1 track that sails to the north, phase dealings of keeping straight on:
Vehicle travels in the G1 track, enter 1 li in the accordingly descending track of southern side, phase dealings, craspedodrome, to overtake on the vertical craspedodrome road on the phase dealings, 1 li in the accordingly descending track of enter on the A1 track, north side, phase dealings, keeping straight on, after going out this entrance to a tunncl, to overtake on the A1 track on the north, phase dealings.
Two, when vehicle in the face of on the track, the north, phase dealings:
1, vehicle is on B2 track, the north, phase dealings, in the time of turning left to the phase dealings in the east on the E2 track:
Vehicle travels in the B2 track, 1 li in the accordingly descending track that enter north side, phase dealings, turns to, to overtake on the vertical craspedodrome road on the phase dealings, enter 1 li in accordingly descending track on the H2 track, southern side, phase dealings, that turn to, after going out this entrance to a tunncl, turn left, second the correspondence of being followed successively by southward from north of travelling in southern side, phase dealings connects on the road 2, travel on the tunnel in H1, G1, G2 track, left lateral sails on the G3 track forward.On this track, northwards travel, turning right in joint, phase dealings in the E3 track in the east with facing the phase dealings, drive to eastwards on the E2 track in the east, phase dealings.
2, vehicle is on B3 track, the north, phase dealings, in the time of turning right on the D3 track in west, phase dealings:
Vehicle travels on the B3 track southwards, with the D3 track in west, phase dealings in joint, phase dealings, turn right, westwards drive on the D3 track in west, phase dealings.
3, when vehicle on B1 track, the north, phase dealings, in the time of on the H1 track that sails to south, phase dealings of keeping straight on:
Vehicle travels in the B1 track, enter 1 li in the accordingly descending track of north side, phase dealings, craspedodrome, to overtake on the vertical craspedodrome road on the phase dealings, 1 li in the accordingly descending track of enter on the H1 track, southern side, phase dealings, keeping straight on, after going out this entrance to a tunncl, drive on the H1 track in south, phase dealings.
Three, when vehicle in the face of phase dealings in the east on the track:
1, vehicle is in the face of phase dealings in the east on the C2 track, in the time of turning left to the H2 track, south, phase dealings:
Vehicle is on the C2 track, to overtake to the phase dealings, with the joint, A3 track on the north, phase dealings, turn right and travel on the A3 track, genuine west under the A2 track, travel left on A2, the A1 on the north, phase dealings, tunnel under the B1 track, travel on first corresponding connection road 2 from south toward north of north side, phase dealings, drive to left on the B2 track.Travel southwards on vertical craspedodrome road on the phase dealings, enter 1 li in accordingly descending track on the H2 track, southern side, phase dealings, that turn to, go out this entrance to a tunncl after, drive to southwards on the H2 track in south, phase dealings.
2, vehicle is on C3 track, east, phase dealings, in the time of turning right on the A3 track, the north, phase dealings:
Vehicle on the C3 track, to overtake to the phase dealings, with the joint, A3 track on the north, phase dealings, turn right, northwards travel on the A3 track on the north, phase dealings.
3, vehicle is on C1 track in the east, phase dealings, in the time of on the D1 track in west, the phase of keeping straight on dealings:
Vehicle on residing C1 track, 1 li in the accordingly descending track that to overtake, enters from east westerly, is horizontally through under the phase dealings, keeps straight on, go out this tunnel after, drive on the D1 track in west, phase dealings.
Four, when vehicle in the face of on the track, west, phase dealings:
1, vehicle is on the F2 track in west, phase dealings, in the time of turning left to the A2 track on the north, phase dealings:
Vehicle is on the F2 track, to overtake to the phase dealings, with the joint, H3 track in south, phase dealings, turn right and travel on the H3 track, genuine west under the H2 track, travel left on H2, the H1 in south, phase dealings, tunnel under the G1 track, travel southern side, phase dealings from southern first corresponding connection on road 2, drive to left on the G2 track.Northwards travel on vertical craspedodrome road on the phase dealings, enter 1 li in accordingly descending track on the A2 track, north side, phase dealings, that turn to, go out this entrance to a tunncl after, northwards drive on the A2 track on the north, phase dealings.
2, when vehicle in the face of on the F3 track, west, phase dealings, in the time of turning right on the H3 track, south, phase dealings:
Vehicle on the F3 track, to overtake to the phase dealings, with the joint, H3 track in south, phase dealings, turn right, travel southwards on the H3 track in south, phase dealings.
3, when vehicle on the F1 track in west, phase dealings, the phase of keeping straight on dealings is in the east on the track of E1 the time:
Vehicle to overtake, enters from the west toward east, is horizontally through 1 li in the accordingly descending track of keeping straight under the phase dealings on residing F1 track, go out this tunnel after, drive on the E1 track in east, phase dealings.
In the present embodiment, the corresponding both sides that connect road 2 are provided with the isolation strip, and the isolation strip is the driving shielding wire.
In the present embodiment, accordingly descending track 1 also can be located at the phase dealings along under the road surface of belt road.
The running mode of present embodiment is the driving on phase dealings and the connection track, and from track of living in, disjoint Turning travel provides realizability condition to other road junction roadways simultaneously.
Embodiment two:
As seen from Figure 2, the a kind of of present embodiment can make the road equipment that vehicle passes unimpeded on the cross road, city, comprise that the vertical road on the road intersects the mutually dealings that forms with belt road and they, under the road intersection face, longitudinally be provided with accordingly descending track 1, be provided with corresponding correspondence in the accordingly import and export in descending track 1 and connect road 2, the corresponding end in road 2 that connects is connected with descending track 1 accordingly, the other end is connected with the track that will travel, all is provided with respectively two lane auxiliaries 3 in the outside in track on both sides of the road in the vertical and horizontal road of road.In the present embodiment, vertically road is made as horizontal craspedodrome road with the road surface that belt road intersects the mutually dealings that forms.
In vertical both sides, phase dealings, connect respectively the six-lane that vertically travels in opposite directions.
In phase dealings both lateral sides, connect respectively the six-lane that laterally travels in opposite directions.
On the right in the face of track, vertical road southern side center line: be provided with G1, G2, G3 track.On the right, G3 track, be provided with first, second lane auxiliary 3.
On G1, G2 track, be provided with the accordingly descending track 1 of the craspedodrome of vertically passing under the phase dealings;
On the G3 track, be provided with the accordingly descending track 1 that turns to of passing under the phase dealings.
On first lane auxiliary 3 on the right, G3 track, be provided with the accordingly descending track 1 that turns to of passing the phase dealings.
The left side at above-mentioned track center line: be provided with H1, H2, H3 track.On the left side, H3 track, be provided with first, second lane auxiliary 3.
On H1, H2 track, H1, H2 track connect respectively the accordingly descending track 1 of the craspedodrome of passing under the phase dealings from north to south.
Southern side at the phase dealings in H3 track is provided with the accordingly outlet in descending track 1 that turns to of passing the phase dealings from north to south.
On first lane auxiliary 3 on the left side, H3 track, be provided with the accordingly descending track 1 that turns to and the outlet of from north to south, passing the phase dealings.
On the underground track in southern side, phase dealings, be provided with successively southward first, second corresponding road 2 that connects from north.
On the right in the face of track, road north side center line: be provided with B1, B2, B3 track.On B3 track the right, be provided with first, second lane auxiliary 3.
On B1, B2 track, be provided with the accordingly descending track 1 of the craspedodrome of passing the phase dealings;
On the B3 track, be provided with the accordingly descending track 1 that turns to of passing the phase dealings.
On first lane auxiliary 3 on the right, B3 track, be provided with the accordingly descending track 1 that turns to of passing the phase dealings.
On the left side in the face of track, north side, phase dealings center line: be provided with A1, A2, A3 track.On the left side, A3 track, be provided with first, second lane auxiliary 3.
On A1, A2 track, A1, A2 track connect respectively the accordingly descending track 1 of the craspedodrome of passing under the phase dealings from south to north.
North side at the phase dealings in A3 track is provided with the accordingly outlet in descending track 1 that turns to of passing the phase dealings from south to north.
On first lane auxiliary 3 on the left side, A3 track, be provided with the accordingly descending track 1 that turns to of from south to north, passing road.
On the underground track of north side, phase dealings, from Nan Wangbei be provided with successively first, second corresponding road 2 that connects.
The right in the face of track, east, phase dealings center line is provided with C1, C2, C3 runway, on C3 runway the right, is provided with a lane auxiliary 3.
In the face of the center line left side, track, east, phase dealings, be provided with E1, E2, E3 runway, on the E3 runway left side, be provided with a lane auxiliary 3.
The right in the face of track, west, phase dealings center line is provided with F1, F2, F3 runway, on F3 runway the right, is provided with a lane auxiliary 3.
The left side in the face of track, west, phase dealings center line is provided with D1, D2, D3 runway, on the left side of D3 runway, is provided with a lane auxiliary 3.
The below is illustrated the process of Vehicle Driving Cycle, for example:
One, when vehicle in the face of on the track, south, phase dealings:
1, vehicle is on G3 track, south, phase dealings, in the time of turning left to the D3 track, west, phase dealings:
Vehicle is on the G3 track, northwards travel and enter this track and connect 1 li in the accordingly descending track that turns under phase dealings, under the phase dealings, pass, the place, crossing, the north, phase dealings that connects in A3 track, the north, phase dealings is rolled away from from this entrance to a tunncl, drives to the north, phase dealings, the correspondence that is followed successively by southward second from north connects on the road 2, turn left, drive to phase dealings top rail to from ragged edge track westerly, east, westwards drive on the D3 track that this track connects west, phase dealings.
2, vehicle is on G3 track, south, phase dealings, in the time of turning right on the E3 track, east, phase dealings:
Vehicle is on the G3 track, right lateral sails on first, second lane auxiliary 3 on the right, G3 track, northwards travel, with in the face of lane auxiliary 3 joints on the left side, E3 track in the east, phase dealings, turn right, drive on the lane auxiliary 3 on the left side, E3 track, left lateral sails on the E3 track in the east, phase dealings forward.
3, vehicle is on phase dealings south G1, G2 track, in the time of on the A1 that sails to the north, phase dealings of keeping straight on, the A2 track:
Vehicle is on G1, G2 track, and 1 li in the accordingly descending track of travelling respectively forward and entering the craspedodrome on the phase dealings that these two tracks connect is passed under the phase dealings, respectively to overtake on the A1 on the north, phase dealings, A2 track.
Two, when vehicle in the face of on the track, the north, phase dealings:
1, vehicle is on B3 track, the north, phase dealings, in the time of turning left to the phase dealings in the east on the E3 track:
Vehicle is on the B3 track, travel southwards and enter this track and connect 1 li in the accordingly descending track that turns under phase dealings, under the phase dealings, pass, the place, crossing, south, phase dealings that connects in H3 track, south, phase dealings is rolled away from from this entrance to a tunncl, drives to south, phase dealings, the correspondence that is followed successively by second from Nan Wangbei connects on the road 2, turn left, drive to phase dealings top rail to the ragged edge track from the west toward east on, drive to eastwards on E3 track that this track connects east, phase dealings.
2, vehicle is on B3 track, limit, the crossing way north of a road, in the time of turning right on the D3 track in west, phase dealings:
Vehicle is on the B3 track, right lateral sails on first, second lane auxiliary 3 on the right, B3 track, travel southwards, with in the face of lane auxiliary 3 joints on the left side, D3 track, west, phase dealings, turn right, drive on the lane auxiliary 3 on the left side, D3 track, left lateral sails on the E3 track in the east, phase dealings forward.
3, vehicle is on phase dealings north B1, B2 track, in the time of on the H1 that sails to south, phase dealings of keeping straight on, the H2 track:
Vehicle is on B1, B2 track, and 1 li in the accordingly descending track of travelling respectively forward and entering the craspedodrome on the phase dealings that these two tracks connect is passed under the phase dealings, respectively to overtake on the H1 in south, phase dealings, H2 track.
Three, when vehicle in the face of phase dealings in the east on the track:
1, vehicle is in the face of phase dealings in the east on the C3 track, in the time of turning left to the H3 track, south, phase dealings:
Vehicle is on the C3 track, arrive to overtake the phase dealings in the east, with in the face of the left side, A3 track, the north, phase dealings, first lane auxiliary 3 joints, second the correspondence of being followed successively by from Nan Wangbei of travelling in north side, phase dealings of turning right connects on the road 2, on the underground track of north side, phase dealings, westwards drive in the face of on first lane auxiliary 3 of the right, B3 track, the north, phase dealings, turn left, travel southwards and enter 1 li in the accordingly descending track that turns on this track, under the phase dealings, pass, drive in the face of on first lane auxiliary 3 on the left side, H3 track, south, phase dealings, left lateral sails on the H3 track in south, phase dealings forward.
2, vehicle is being faced on the C3 track, east, phase dealings, in the time of turning right on the A3 track, the north, phase dealings:
Vehicle is on the C3 track, right lateral sails on the lane auxiliary 3 on the right, C3 track forward, to overtake, with in the face of second lane auxiliary 3 joint on the left side, A3 track, the north, phase dealings, turn right, drive on second lane auxiliary 3 on the left side, A3 track, left lateral sails on first lane auxiliary 3 on the left side, A3 track forward, and left lateral sails on the A3 track on the north, phase dealings forward.
3, vehicle is on the C1 that faces east, phase dealings, C2 track, in the time of on the phase of keeping straight on dealings west D1, the D2 track:
Vehicle is on residing C1, C2 track, and to overtake, the direct lane on the phase dealings passes, and drives on the D1, D2 track in west, phase dealings.
Four, when vehicle in the face of on the track, west, phase dealings:
1, vehicle is in the face of on the F3 track, west, phase dealings, in the time of turning left to the A3 track, the north, phase dealings:
Vehicle is on the F3 track, arrive to overtake west, phase dealings, with in the face of the left side, H3 track, south, phase dealings, first lane auxiliary 3 joints, second the correspondence of being followed successively by southward from north of travelling in southern side, phase dealings of turning right connects on the road 2, on the underground track in southern side, phase dealings, drive to eastwards in the face of on first lane auxiliary 3 of the right, B3 track, south, phase dealings, turn left, northwards travel and enter 1 li in the accordingly descending track that turns on this track, under the phase dealings, pass, drive in the face of on first lane auxiliary 3 on the left side, A3 track, the north, phase dealings, left lateral sails on the A3 track on the north, phase dealings forward.
2, vehicle is being faced on the F3 track, west, phase dealings, in the time of turning right on the H3 track, south, phase dealings:
Vehicle is on the F3 track, right lateral sails on the lane auxiliary 3 on the right, F3 track forward, to overtake, with in the face of second lane auxiliary 3 joint on the left side, H3 track, south, phase dealings, turn right, drive on second lane auxiliary 3 on the left side, H3 track, left lateral sails on first lane auxiliary 3 on the left side, H3 track forward, and left lateral sails on the H3 track in south, phase dealings forward
3, vehicle is on the F1 that faces west, phase dealings, F2 track, in the time of on east, the phase of keeping straight on dealings E1, the E2 track:
Vehicle is on residing F1, F2 track, and to overtake, the direct lane on the phase dealings passes, and drives in the east E1 of phase dealings, the E2 track.
In the present embodiment, the corresponding both sides that connect road 2 are provided with the isolation strip, and the isolation strip is the driving shielding wire.
In the present embodiment, accordingly descending track 1 also can be located at the phase dealings along under the road surface of belt road.
The running mode of present embodiment is the driving on phase dealings and the connection track, and from track of living in, disjoint Turning travel provides realizability condition to other road junction roadways simultaneously.
Embodiment three:
As seen from Figure 3, the a kind of of present embodiment can make the road equipment that vehicle passes unimpeded on the cross road, city, comprise that the vertical road on the road intersects the mutually dealings that forms with belt road and they, under the road surface of vertical road of both sides, phase dealings, longitudinally be provided with accordingly descending track 1, be provided with corresponding correspondence in the accordingly import and export in descending track 1 and connect road 2, the corresponding end in road 2 that connects is connected with descending track 1 accordingly, the other end is connected with the track that will travel, all is provided with respectively lane auxiliary 3 in the outside in track on both sides of the road in the vertical and horizontal road at phase dealings.
In vertical both sides, phase dealings, be connected with respectively the six-lane that vertically travels in opposite directions.
In phase dealings both lateral sides, be connected with respectively the six-lane that laterally travels in opposite directions.
The right at the track center line of facing southern side, phase dealings: be provided with G1, G2, G3 track.On the right, G3 track, be provided with first, second, third lane auxiliary 3.The left side at above-mentioned track center line: be provided with H1, H2, H3 track.On the left side, H3 track, be provided with first, second, third lane auxiliary 3.Center line both sides, track in southern side, phase dealings: on G1, H1, H3 track, be provided with the accordingly descending track 1 that turns to; On G2, H2 track, be provided with the accordingly descending track 1 of craspedodrome; Establish make two accordingly descending tracks 1 in G1, G2 track, than establishing make three accordingly descending tracks 1 on H1, H2, the H3 track, will grow at least one more than the track in south, phase dealings.In southern side, phase dealings: establish in H1, H2, H3, G1, G2 track make accordingly above the descending track 1: be provided with successively southward first, second corresponding road 2 that connects from north; Establish in G1, G2 track make accordingly above the descending track 1, be provided with successively southward the 3rd the corresponding road 2 that connects from north.
The right at the track center line of facing north side, phase dealings: be provided with B1, B2, B3 track.On the right, B3 track, be provided with first, second, third lane auxiliary 3.The left side at above-mentioned track center line: be provided with A1, A2, A3 track.On the left side, A3 track, be provided with first, second, third lane auxiliary 3.
Center line both sides, track in north side, phase dealings: on B1, A1, A3 track, be provided with the accordingly descending track 1 that turns to; On B2, A2 track, be provided with the accordingly descending track 1 of craspedodrome; Establish make two accordingly descending tracks 1 in B1, B2 track, than establishing make three accordingly descending tracks 1 on A1, A2, the A3 track, will grow at least one more than the track in road south.In north side, phase dealings: establish in A1, A2, A3, B1, B2 track make accordingly above the descending track 1, be provided with successively first, second corresponding road 2 that connects from Nan Wangbei; Establish in B1, B2 track make accordingly above the descending track 1, be provided with successively the 3rd the corresponding road 2 that connects from Nan Wangbei.
On the center line the right, track in the face of east side, phase dealings: be provided with C1, C2, C3 track.The center line left side in above-mentioned track: be provided with E1, E2, E3 track.
On the center line the right, track in the face of west side, phase dealings: be provided with F1, F2, F3 track.The center line left side in above-mentioned track: be provided with D1, D2, D3 track.
The below is illustrated the process of Vehicle Driving Cycle, for example:
One, when vehicle in the face of on the track, vertical south, phase dealings:
1, vehicle is in G1 track, south, phase dealings, in the time of turning left to the D2 track, west, phase dealings:
Vehicle is on the G1 track, drive to 1 li in the accordingly descending track that southern side, phase dealings turns to, after going out this tunnel, drive on the direct lane on the phase dealings, travel in the accordingly descending track 1 that turns on A1 track, the north, phase dealings, after going out this tunnel, turn left to B1, on the B2 track, two above the tunnel, drive to the 3rd corresponding the connection on the road 2 from south toward north of north side, phase dealings, westwards drive on second lane auxiliary 3 in the face of the right, B3 track, the north, phase dealings, travel southwards, with joint, D2 track, west, phase dealings, turning right drives on the D2 track in west, phase dealings.
2, vehicle is in G3 track, south, phase dealings, in the time of turning right on the E3 track, east, phase dealings:
Vehicle is on the G3 track, and right lateral sails on first, second, third lane auxiliary 3 on G3 track the right, northwards travel, with cross road joint, E3 track in the east, turning right drives on the E3 track in the east, phase dealings.
3, vehicle will be kept straight on when sailing on the A2 track, the north, phase dealings in G2 track, south, phase dealings:
Vehicle is on the G2 track, to overtake on the direct lane on accordingly 1 li in descending track, the phase dealings of the craspedodrome in southern side, phase dealings, accordingly 1 li in the descending track of the craspedodrome on the A2 track of north side, phase dealings, go out this tunnel after, drive on the A2 track on the north, phase dealings.
Two, when vehicle in the face of on the track, vertical north, phase dealings:
1, vehicle is in B1 track, the north, phase dealings, in the time of turning left to the phase dealings in the east on the E2 track:
Vehicle is on the B1 track, drive to 1 li in the accordingly descending track that turns to of north side, phase dealings, after going out this tunnel, drive on the direct lane on the phase dealings, travel in the accordingly descending track 1 that turns on the H1 track in southern side, phase dealings, after going out this tunnel, turn left to G1, on the G2 track, two above the tunnel, drive to connecting on the road 2 from southern the 3rd correspondence of southern side, phase dealings, drive to eastwards on second lane auxiliary 3 in the face of the right, the G3 track in southern side, phase dealings, northwards travel, with joint, E2 track in the east, phase dealings, turning right drives on the E2 track in the east, phase dealings.
2, when vehicle in B3 track, the north, phase dealings, in the time of turning right on the D3 track, west, phase dealings:
Vehicle is on the B3 track, and right lateral sails on first, second, third lane auxiliary 3 on B3 track the right, travel southwards, with joint, D3 track, cross road west, turning right drives on the D3 track in west, phase dealings.
3, when vehicle in B2 track, the north, phase dealings, keep straight on when sailing on the H2 track, south, phase dealings:
Vehicle is on the B2 track, to overtake on the direct lane on accordingly 1 li in descending track, the phase dealings of the craspedodrome of north side, phase dealings, accordingly 1 li in the descending track of the craspedodrome on the H2 track in southern side, phase dealings, go out this tunnel after, drive on the H2 track in south, phase dealings.
Three, when vehicle in the face of phase dealings in the east on the track:
1, vehicle at the phase dealings in the east on the C1 track, in the time of will turning left to the H3 track, south, phase dealings:
Vehicle on the C1 track to overtake, at the phase dealings in the east, with in the face of first lane auxiliary 3 joints on the left side, A3 track, the north, phase dealings, turn right, northwards travel, the accordingly east in descending track 1 that connects in A3 track, the north, phase dealings, turn left, drive on first corresponding connection road 2 from south toward north, the north, phase dealings, travel at A3, A2, A1, B1, above the accordingly descending track 1 that the B2 track connects, westwards drive on the B3 track and turn left, drive to southwards on the craspedodrome road on the phase dealings, drive to 1 li in the accordingly descending track that turns to that the H3 track in southern side, phase dealings connects, after going out this tunnel, drive on the H3 track in south, phase dealings.
2, when vehicle at the phase dealings in the east on the C3 track, in the time of will turning right on the A3 track on the north, phase dealings:
Vehicle on the C3 track to overtake, at the phase dealings in the east, with the 3rd lane auxiliary 3 joints on the left side, A3 track, the north, phase dealings, turn right, northwards drive on the 3rd the lane auxiliary 3 on the left side, A3 track, on this track, forward left lateral sail to the left side, A3 track second, on first lane auxiliary 3, left lateral sails on the A3 track on the north, phase dealings forward.
3, vehicle at the phase dealings in the east on the C2 track, to keep straight on when sailing on the D1 track, west, phase dealings:
Vehicle travels in the C2 track, at the phase dealings in the east, with in the face of second lane auxiliary 3 joint on the left side, A3 track, the north, phase dealings, turn right, northwards left lateral sails on first lane auxiliary 3 on the left side, A3 track, the accordingly east in descending track 1 that connects in the A3 track, turn left, drive to second corresponding connect road 2 on of the north, phase dealings from south toward north, travel at A3, A2, A1, B1, above the accordingly descending track 1 that the B2 track connects, westwards drive on first lane auxiliary 3 in the face of the right, B3 track, the north, phase dealings, turn left, travel southwards, in west, phase dealings, with joint, D1 track, west, phase dealings, turn right, westwards drive on the D1 track in west, phase dealings.
Four, when vehicle in the face of on the track, horizontal west, phase dealings:
1, vehicle is on F1 track, west, phase dealings, in the time of will turning left to the A3 track, the north, phase dealings:
Vehicle on the F1 track to overtake, in west, phase dealings, with in the face of first lane auxiliary 3 joints on the left side, H3 track, south, phase dealings, turn right, travel southwards, the accordingly west in descending track 1 that connects in H3 track, south, phase dealings, turn left, drive to south, phase dealings from southern first corresponding connection on the road 2, travel at H3, H2, H1, G1, above the accordingly descending track 1 that the G2 track connects, drive to eastwards on the G3 track and turn left, northwards drive on the craspedodrome road on the phase dealings, drive to 1 li in the accordingly descending track that turns to that the A3 track of north side, phase dealings connects, after going out this tunnel, drive on the A3 track on the north, phase dealings.
2, vehicle is on F3 track, west, phase dealings, in the time of will turning right on the H3 track, south, phase dealings:
Vehicle on the F3 track to overtake, in west, phase dealings, with the 3rd lane auxiliary 3 joints on the left side, H3 track, south, phase dealings, turn right, drive to southwards on the 3rd the lane auxiliary 3 on the left side, H3 track, on this track, forward left lateral sail to the left side, H3 track second, on first lane auxiliary 3, left lateral sails on the H3 track in south, phase dealings forward.
3, when vehicle on F2 track, west, phase dealings, keep straight on sails to the phase dealings in the east on the E1 track time:
Vehicle travels in the F2 track, in west, phase dealings, with in the face of second lane auxiliary 3 joint on the left side, H3 track, south, phase dealings, turn right, left lateral to the south sails on first lane auxiliary 3 on the left side, H3 track, the accordingly west in descending track 1 that connects in the H3 track, turn left, drive to south, phase dealings from southern second corresponding connection on the road 2, travel at H3, H2, H1, G1, above the accordingly descending track 1 that the G2 track connects, drive to eastwards on first lane auxiliary 3 in the face of the right, G3 track, south, phase dealings, turn left, northwards travel, at the phase dealings in the east, with joint, E1 track in the east, phase dealings, turn right, drive to eastwards on the E1 track in the east, phase dealings.
In the present embodiment, the corresponding both sides that connect road 2 are provided with the isolation strip, and the isolation strip is the driving shielding wire.
In the present embodiment, accordingly descending track 1 also can be located at the phase dealings along under the road surface of belt road.
The running mode of present embodiment is the driving on road and the connection track, and from track of living in, disjoint Turning travel provides realizability condition to other road junction roadways simultaneously.
Implement this programme, can make track, vertical both sides on the cross road, city and the vehicle on the both lateral sides track, travelling when being located at the accordingly descending track on the phase dealings, can accomplish that disjoint, checkless left-hand rotation drives on other road junction roadway that need to arrive, disjoint, the checkless right-hand rotation of vehicle on the road intersection mouth is travelled and craspedodrome sails on other road junction roadway.

Claims (6)

1. one kind can make the road equipment that vehicle passes unimpeded on the cross road, city, comprise that the vertical road on the cross road intersects the mutually dealings that forms with belt road and they, it is characterized in that: described road surface in the cross road has some accordingly descending track (1), be provided with corresponding correspondence in the accordingly import and export of descending track (1) and connect road (2), the corresponding end in road (2) that connects is connected with accordingly descending track (1), and the other end is connected with the track that will travel.
2. according to claim 1ly a kind ofly can make the road equipment that vehicle passes unimpeded on the cross road, city, it is characterized in that: the road surface of described vertical road on the cross road has accordingly descending track (1).
3. according to claim 1ly a kind ofly can make the road equipment that vehicle passes unimpeded on the cross road, city, it is characterized in that: the road surface of described belt road on the cross road has accordingly descending track (1).
4. according to claim 1ly a kind ofly can make the road equipment that vehicle passes unimpeded on the cross road, city, it is characterized in that: several lane auxiliaries (3) are established respectively in described vertical road on the cross road on both sides of the road outside in track.
5. according to claim 1ly a kind ofly can make the road equipment that vehicle passes unimpeded on the cross road, city, it is characterized in that: several lane auxiliaries (3) are established respectively in the outside in described track, belt road both sides on the cross road.
6. according to claim 1ly a kind ofly can make the road equipment that vehicle passes unimpeded on the cross road, city, it is characterized in that: the described both sides that connect road (2) in correspondence are provided with the isolation strip, and described isolation strip is greenbelt or railing or driving shielding wire.
CN201110311152XA 2011-10-07 2011-10-07 Road facility capable of enabling vehicles on crossing road of city to smoothly run Pending CN103031791A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110311152XA CN103031791A (en) 2011-10-07 2011-10-07 Road facility capable of enabling vehicles on crossing road of city to smoothly run

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110311152XA CN103031791A (en) 2011-10-07 2011-10-07 Road facility capable of enabling vehicles on crossing road of city to smoothly run

Publications (1)

Publication Number Publication Date
CN103031791A true CN103031791A (en) 2013-04-10

Family

ID=48019154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110311152XA Pending CN103031791A (en) 2011-10-07 2011-10-07 Road facility capable of enabling vehicles on crossing road of city to smoothly run

Country Status (1)

Country Link
CN (1) CN103031791A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1165892A (en) * 1997-05-09 1997-11-26 庞树仁 Design plan of highway turnable single-deck stereo cross bridge
CN1609338A (en) * 2004-11-19 2005-04-27 李凤歧 On-ground and underground passage way for people and vehicles going through smoothly at road crossing close to river and like
CN1693585A (en) * 2004-12-07 2005-11-09 安岗 Fishhook type rotation road full oilrection overpass
CN101078192A (en) * 2007-06-22 2007-11-28 郑勤民 Crossroad traffic building for releasing traffic blockage
KR20090048971A (en) * 2007-11-12 2009-05-15 (주)지앤지컨설턴트에프디아이 Variable road system
CN201553961U (en) * 2009-06-09 2010-08-18 沈家伟 Double-arch underpass
CN202298397U (en) * 2011-10-07 2012-07-04 徐元 Road facility capable of keeping vehicles on urban cross road smooth

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1165892A (en) * 1997-05-09 1997-11-26 庞树仁 Design plan of highway turnable single-deck stereo cross bridge
CN1609338A (en) * 2004-11-19 2005-04-27 李凤歧 On-ground and underground passage way for people and vehicles going through smoothly at road crossing close to river and like
CN1693585A (en) * 2004-12-07 2005-11-09 安岗 Fishhook type rotation road full oilrection overpass
CN101078192A (en) * 2007-06-22 2007-11-28 郑勤民 Crossroad traffic building for releasing traffic blockage
KR20090048971A (en) * 2007-11-12 2009-05-15 (주)지앤지컨설턴트에프디아이 Variable road system
CN201553961U (en) * 2009-06-09 2010-08-18 沈家伟 Double-arch underpass
CN202298397U (en) * 2011-10-07 2012-07-04 徐元 Road facility capable of keeping vehicles on urban cross road smooth

Similar Documents

Publication Publication Date Title
CN101463582B (en) The more newly-installed crossing of means of transportation
CN103233403B (en) Convenient counter-bottleneck mode traffic at level crossing for longitudinally and transversely interacted pedestrians, vehicles and buses
CN103046444B (en) Intersection with optimized settings and traffic control method of the intersection
CN201634978U (en) Road intersection system of T-shaped junction
CN104074112A (en) Tidal lane of upstream and downstream intersection of urban road and design method of tidal lane
CN103590292A (en) Unblocked overpass at intersection
CN102493298B (en) Intersection capable of realizing simultaneous left turn
CN110060488A (en) A kind of the two-phase intersection traffic organization system and signal timing dial method of Lothrus apterus
CN103280112A (en) Road canalization and signal coordination control method improving bus running efficiency
CN102787541A (en) Crossroad traffic system with no traffic light
CN202809421U (en) Checkless overpass
CN202694578U (en) Left turning vehicle traffic control system
WO2016165637A1 (en) Optimized development of multi-dimensional traffic road network
WO2015055006A1 (en) Level crossing having five-direction complementary and vertically and horizontally interactive traffic at level crossing
CN202298397U (en) Road facility capable of keeping vehicles on urban cross road smooth
CN102787540A (en) Unimpeded overpass
CN103233404B (en) A kind of intersection improving public transit vehicle operational efficiency
CN202298396U (en) Road facility capable of making vehicles on urban cross road run in nonintersecting way
CN202766940U (en) Road facility for enabling vehicles on lanes to run in non-intersected mode
CN103031790A (en) Road facility capable of enabling vehicles on crossing road of city not to intersecting
CN202247566U (en) Lane facility capable of smoothly separating vehicles at urban lane intersection
CN103031791A (en) Road facility capable of enabling vehicles on crossing road of city to smoothly run
CN202744915U (en) Intersection traffic system without traffic light
CN202247567U (en) Road facility enabling vehicles of urban crossroad to be smoothly shunted
CN102864709A (en) Road facility capable of smoothly shunting vehicles at crossroads of urban roads

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130410