CN103017741A - Method for measuring power cable circuit data - Google Patents

Method for measuring power cable circuit data Download PDF

Info

Publication number
CN103017741A
CN103017741A CN2011102888451A CN201110288845A CN103017741A CN 103017741 A CN103017741 A CN 103017741A CN 2011102888451 A CN2011102888451 A CN 2011102888451A CN 201110288845 A CN201110288845 A CN 201110288845A CN 103017741 A CN103017741 A CN 103017741A
Authority
CN
China
Prior art keywords
data
power cable
computer
computing machine
data information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102888451A
Other languages
Chinese (zh)
Inventor
陆贤标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiulong Electric Power Group Co Ltd
Original Assignee
Shanghai Jiulong Electric Power Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiulong Electric Power Group Co Ltd filed Critical Shanghai Jiulong Electric Power Group Co Ltd
Priority to CN2011102888451A priority Critical patent/CN103017741A/en
Publication of CN103017741A publication Critical patent/CN103017741A/en
Pending legal-status Critical Current

Links

Landscapes

  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

The invention relates to a method for measuring power cable circuit data. The method is characterized by comprising the following steps that: (1) a GPS (Global Positioning System) acquires testing station coordinates, and transmits the acquired coordinate data of the testing stations to a computer; (2) the computer transmits the data of the testing stations to a total station; and (3) the total station acquires the data information of whole cable circuits according to the data of the testing stations and transmits the data information to the computer; and the computer firstly carries out balancing processing on the data information, and subsequently displays the data information in an electronic topographic map by using mapping software. Compared with the prior art, the method has the advantages that the positioning efficiency is high, methods and steps of conventional measurement are greatly simplified, the efficiency in on-site measurement is improved, and the like.

Description

A kind of measuring method of power cable circuit-switched data
Technical field
The present invention relates to a kind of measuring method, especially relate to a kind of measuring method of power cable circuit-switched data.
Background technology
Along with the national economic development and social progress, electric power is just being brought into play the effect that becomes more and more important as one of foundation of national economy energy.Shanghai newly promoted 2000 kilometers cables in recent years as the tap of Yangtze River Delta development, and these cable laying installations and completion mapping task are very heavy.
Traditional power cable DATA REASONING flow process is very complicated, receive after the task when measuring on the spot to the scene, because survey instrument (tape measure, pen, operation manuals) is relatively backward, be subject to the impact of weather, once rainy day, serious meeting causes the unclear of on-the-spot field survey data, and its calcellation is done over again, and causes the loss of the aspects such as manpower and materials.
After the field data measurement is complete, require to transcribe regular sketch, machine account card, draw at last as-constructed drawing.Because the material of regular sketch, machine account card, as-constructed drawing mostly is paper products, have in various degree aging after several years, add the data of browsing of day-to-day operation work, quite serious to these data agings and damage degree, therefore, on these data were repaired, we had also spent many time, energy.
In recent years, the Shanghai Municipal Construction trend pickup, when operation troubles, repairing occurring, our mapping worker need spend a large amount of time and search data (machine account card, completion blueprint, sketch), often topography and geomorphology and actual differing widely on the completion blueprint occur, brought great inconvenience to breakdown repair like this.
Summary of the invention
Purpose of the present invention is exactly to provide a kind of bearing accuracy high in order to overcome the defective that above-mentioned prior art exists, and has greatly simplified mode, the step of traditional measurement, has improved the measuring method of power cable circuit-switched data of the efficient of in-site measurement.
Purpose of the present invention can be achieved through the following technical solutions: a kind of measuring method of power cable circuit-switched data, it is characterized in that, the method may further comprise the steps: (1) GPS orientator gathers the survey station point coordinate, and the coordinate data of the survey station point that gathers is sent to computing machine; (2) computing machine sends to total powerstation with the data of survey station point; (3) total powerstation is according to the data message of the whole cable line of data acquisition of survey station point, then data message is sent to computing machine, computing machine at first carries out adjustment processing to data message, then by mapping software data message is shown in electronic topographic map.
Mapping software in the described step (3) is the AUTOCAD mapping software.
Compared with prior art, the present invention has the following advantages:
1, uses two kinds of different modes of electronic total station and GPS GPS, cable is accurately located.
2, utilize electronic total station collection automatic angle measurement, range finding, survey to be higher than one, the characteristics of automatic acquisition, demonstration, transmission, identification, processing calculating are carried out in realization to measurement data, cable louding, geomorphological features to the scene carry out data acquisition, greatly simplify mode, the step of traditional measurement, improved the efficient of in-site measurement.
3, use the T-COM data transmission system that the data that gather are exported to computer, data are carried out by the AUTOCAD mapping software its data being become figure with the CAD form after automatic Adjustment processes, in electronic topographic map, reflected accurately.
4, in sum, the total station survey new technology is done once comprehensively innovation to traditional simulated measurement, the needs of era development, will in production practices, adopt in a large number in this measuring technique soon, become a bright spot of company, for from now on digital management of enterprise is laid a good foundation.
Embodiment
The present invention is described in detail below in conjunction with specific embodiment.
Embodiment
A kind of measuring method of power cable circuit-switched data, the method may further comprise the steps:
Step (1) GPS orientator gathers the survey station point coordinate, and the coordinate data of the survey station point that gathers is sent to computing machine;
Step (2) computing machine sends to total powerstation with the data of survey station point;
Step (3) total powerstation is according to the data message of the whole cable line of data acquisition of survey station point, then data message is sent to computing machine, computing machine at first carries out adjustment processing to data message, then by mapping software data message is shown in electronic topographic map.Mapping software in the step (3) is the AUTOCAD mapping software.
The present invention introduces the total station survey technology in the power cable DATA REASONING, and its maximum advantage can accurately be located cable position under various execution conditions exactly.Effectively reduce the error rate of cable absolute coordinates position in geographic information data, our cable Operation safety and power supply reliability have been improved, reduce the personnel of other teams and groups when construction, repairing, because can't in time finding the definite geographic position at cable place, cause the loss on human and material resources, the financial resources, and the delay of repairing time.
The total station survey technology is compared with traditional power cable measuring technique, and another advantage is exactly that it has simplified the operating process in the traditional measurement, operation greatly.The collection of in-situ data, because total powerstation is with automatic recording function, can directly record image data, therefore need not as traditional measurement, be recorded in first the result who measures on the primal sketch, can be placed on more energy like this and use multiple metering system, improve on the accuracy of cable measurement.In finishing interior industry work, use the T-COM data transmission system that the data of total powerstation collection are exported to computing machine, data are carried out by the AUTOCAD mapping software its data being become figure with the CAD form after automatic Adjustment processes, in electronic topographic map, reflected accurately.Even regional landform changes, the data of collection do not change.So after the several years, still can accurately reflect the position of underground cable.And the as-constructed drawing of drawing in the traditional measurement, the time that often is subject to is long, and the variation of site contour landforms waits greatly all factors, and loses the existing meaning of original as-constructed drawing.
On the other hand, because the total station survey technology is used the pure digi-tal management from going into operation to last one-tenth figure filing, data maintenance is convenient and simple, and is unsuitable impaired, greatly improved the efficient of data maintenance.
Determine relatively difficulty of survey station point coordinate before using total station survey.Because each local situation is different, sometimes to spend the quite a long time for definite survey station point, our measurement band is served inconvenience.Therefore, in order better to increase work efficiency, introduce GPS GPS measuring technique, for the accuracy of power cable data more provides strong technical guarantee.

Claims (2)

1. the measuring method of a power cable circuit-switched data is characterized in that, the method may further comprise the steps:
(1) the GPS orientator gathers the survey station point coordinate, and the coordinate data of the survey station point that gathers is sent to computing machine;
(2) computing machine sends to total powerstation with the data of survey station point;
(3) total powerstation is according to the data message of the whole cable line of data acquisition of survey station point, then data message is sent to computing machine, computing machine at first carries out adjustment processing to data message, then by mapping software data message is shown in electronic topographic map.
2. the measuring method of a kind of power cable circuit-switched data according to claim 1 is characterized in that, the mapping software in the described step (3) is the AUTOCAD mapping software.
CN2011102888451A 2011-09-26 2011-09-26 Method for measuring power cable circuit data Pending CN103017741A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102888451A CN103017741A (en) 2011-09-26 2011-09-26 Method for measuring power cable circuit data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102888451A CN103017741A (en) 2011-09-26 2011-09-26 Method for measuring power cable circuit data

Publications (1)

Publication Number Publication Date
CN103017741A true CN103017741A (en) 2013-04-03

Family

ID=47966620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102888451A Pending CN103017741A (en) 2011-09-26 2011-09-26 Method for measuring power cable circuit data

Country Status (1)

Country Link
CN (1) CN103017741A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106123872A (en) * 2016-06-20 2016-11-16 中国葛洲坝集团勘测设计有限公司 A kind of coordinate transmission method for shaft excavation construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2867360Y (en) * 2005-12-14 2007-02-07 中国人民解放军63983部队 Digital map exploration device
CN2890951Y (en) * 2006-04-30 2007-04-18 武汉大学 Underground pipe network information acquisition vehicle
CN101159068A (en) * 2007-07-31 2008-04-09 东南大学 Information acquisition and processing method for field operation equipment executing land patrolling and real time monitoring
WO2008099915A1 (en) * 2007-02-16 2008-08-21 Mitsubishi Electric Corporation Road/feature measuring device, feature identifying device, road/feature measuring method, road/feature measuring program, measuring device, measuring method, measuring program, measured position data, measuring terminal, measuring server device, drawing device, drawing method, drawing program, and drawing data
CN101306691A (en) * 2008-07-03 2008-11-19 株洲南车时代电气股份有限公司 Track curve parameter measuring device and method
CN201173773Y (en) * 2008-03-14 2008-12-31 河南工程学院 GPS RTK total station type measuring apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2867360Y (en) * 2005-12-14 2007-02-07 中国人民解放军63983部队 Digital map exploration device
CN2890951Y (en) * 2006-04-30 2007-04-18 武汉大学 Underground pipe network information acquisition vehicle
WO2008099915A1 (en) * 2007-02-16 2008-08-21 Mitsubishi Electric Corporation Road/feature measuring device, feature identifying device, road/feature measuring method, road/feature measuring program, measuring device, measuring method, measuring program, measured position data, measuring terminal, measuring server device, drawing device, drawing method, drawing program, and drawing data
CN101159068A (en) * 2007-07-31 2008-04-09 东南大学 Information acquisition and processing method for field operation equipment executing land patrolling and real time monitoring
CN201173773Y (en) * 2008-03-14 2008-12-31 河南工程学院 GPS RTK total station type measuring apparatus
CN101306691A (en) * 2008-07-03 2008-11-19 株洲南车时代电气股份有限公司 Track curve parameter measuring device and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
奚毓敏: "GPS-RTK在线路测量工程中的选、定线方法", 《电力勘测》 *
雷志: "GPS在架空送电线路测量中的应用研究", 《科技传播》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106123872A (en) * 2016-06-20 2016-11-16 中国葛洲坝集团勘测设计有限公司 A kind of coordinate transmission method for shaft excavation construction

Similar Documents

Publication Publication Date Title
CN108696313B (en) Optical cable fault accurate positioning method
CN102495413B (en) Method for acquiring transmission line tower coordinate
CN104820759A (en) Data acquisition method and system of pipeline facility
CN112637261A (en) Equipment maintenance informatization management system based on handheld terminal
Chen et al. Application of GIS/GPS in Shanghai Airport pavement management system
CN103116097B (en) Device parameter online identification method based on multi-section hybrid measurement information
CN110146789B (en) Intelligent operation and inspection reporting method and device
Ma et al. A Method of line fault location based on traveling wave theory
CN108204819A (en) A kind of map datum automatic testing method and device and hybrid navigation system
Liu et al. Detection of high-speed railway subsidence and geometry irregularity using terrestrial laser scanning
CN107133236A (en) The method and apparatus of geographical position track optimizing
CN101929858A (en) Precise surveying and mapping method of 0.25m contour interval of flat ground with large scale of 1:500 to 1:200
CN110672622A (en) Tunnel defect rapid positioning method based on point cloud data and total station
CN104091090A (en) Calculating method for equivalent sound level A of any point in transformer substation sound field
CN105651202A (en) Three-dimensional scanning method and device used for measuring volume of mine
CN103017741A (en) Method for measuring power cable circuit data
CN203703626U (en) System for searching actual position of leakage point of pipeline
CN114740510A (en) Operation and maintenance railway digital tamping method and system based on linear measurement
CN202304829U (en) Line data measuring device for power cable
CN204613941U (en) The data acquisition system (DAS) of pipeline facility
CN111062825A (en) Low-voltage fault diagnosis and rapid power restoration method based on mobile App
CN116205399A (en) Cable channel resource management system
CN114973017A (en) High-precision positioning method and system for power transmission and transformation equipment integrating remote sensing and GIS technology
CN105717517A (en) Vehicle-mounted Beidou multi-mode GNSS high-precision road basic data collection method
CN110096782A (en) A kind of oil-gas pipeline engineering power cable minute design method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130403