CN103009265A - Hoisting assembly of overhead rail shot blasting machine - Google Patents

Hoisting assembly of overhead rail shot blasting machine Download PDF

Info

Publication number
CN103009265A
CN103009265A CN2012105148557A CN201210514855A CN103009265A CN 103009265 A CN103009265 A CN 103009265A CN 2012105148557 A CN2012105148557 A CN 2012105148557A CN 201210514855 A CN201210514855 A CN 201210514855A CN 103009265 A CN103009265 A CN 103009265A
Authority
CN
China
Prior art keywords
track
rail
blasting machine
chamber body
hoisting assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105148557A
Other languages
Chinese (zh)
Inventor
周圣祥
徐健
杨晨
朱锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANCHENG FENGTE CASTING MACHINERY CO Ltd
Original Assignee
YANCHENG FENGTE CASTING MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANCHENG FENGTE CASTING MACHINERY CO Ltd filed Critical YANCHENG FENGTE CASTING MACHINERY CO Ltd
Priority to CN2012105148557A priority Critical patent/CN103009265A/en
Publication of CN103009265A publication Critical patent/CN103009265A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Chain Conveyers (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

A hoisting assembly of an overhead rail shot blasting machine provided by the invention relates to a surface treatment device. The hoisting assembly of the overhead rail shot blasting machine comprises two hook components and a track component, wherein each hook component comprises a travelling trolley and an electric hook block. The hoisting assembly of the overhead rail shot blasting machine is characterized in that the track component comprises a translation rail exchange device and three I-shaped steel rails; one of the three I-shaped steel rails is fixed on a straight track at the top part of a cleaning room body; the other two I-shaped steel rails are fixed in front of the room body in a splayed shape; the translation rail exchange device is arranged between the straight track at the top part of the room body and the tracks in front of the room body; the hoisting assembly comprises two sections of transition tracks capable of horizontally moving; two stations are arranged on the translation rail exchange device; each station corresponds to one transition track and forms smooth connection together with the straight track at the top part of the room body and one track in front of the room body; and two edges of a travelling trolley of each hook component are clamped on the tracks at two sides of each I-shaped steel rail of the track component by dual rollers. The hoisting assembly of the overhead rail shot blasting machine has the advantages that a large work-piece can be hoisted; and the hoisting assembly has good safety performance, and can meet the requirements of alternately charging and shot blasting by double hooks.

Description

Hanger rail shot-blasting machine lifting assembly
Technical field
The present invention relates to surface processing equipment, especially suspension hook shot-blast cleaning machine parts.
Background technology
In suspension hook impeller blasting machine series products, for increasing work efficiency, the impact cleaning device of double-hung is adopted in general design.One is hooked in the switching of cleaning chamber inward turning is subjected to ball blast, and another hook is then at outdoor lifting workpiece.Existing lifting assembly comprises suspension hook assembly and track assembly.Track assembly wherein, it is two independent tracks that track adopts two channel-section steels, the opposing setting of notch, two tracks are close to setting at cleaning indoor section back, at cleaning outdoor section two lateral bends to the left and right respectively, form " people " font.Existing suspension hook assembly, suspension hook electric block pass through the running trolley mobile link on Lift-on/Lift-off System, and drive operation before and after left and right delivery track is done by running trolley; The lifting of suspension hook then is to realize by Motor Driven Elevating Calabash; Running trolley is comprised of runway upper roller, runway bottom roller, roller mount and driving reductor; Runway upper roller, runway bottom roller are stuck in the track accessories of delivery track, form travelling mechanism, guarantee operation.Existing lifting assembly, two electric hoist suspension hooks are respectively in separately alternately operation of track.Because this device is that single face is hung on delivery track, does not need to do the action that switches tracks, its operation is simple, easy to operate, certain use value is arranged, and be used widely in most products.But a deadly defect of this mode is exactly the suspension hook electric block can only adopt single face to hang, stressed asymmetric, adjusts the center during by assembling, high to the wearability requirement of runway upper roller, and can only hoisting weight not be too large workpiece; In case wearing and tearing appear in the runway upper roller, overhaul untimelyly, can cause the suspension hook electric block to turn on one's side and drop, damage equipment even cause personnel's injury.
Summary of the invention
The object of the invention is to overcome defects, provide a kind of and can lift larger workpiece, security performance is good, can satisfy again the alternately hanger rail shot-blasting machine lifting assembly of charging, ball blast needs of double-hung.
Technical solution of the present invention is: hanger rail shot-blasting machine lifting assembly comprises two hanger components and a track component; Wherein hanger components comprises running trolley, and is fixedly connected on the suspension hook electric block on the running trolley, and the hanger components center of gravity can be regulated it is overlapped with track centerline; It is characterized in that: track component comprises translation track exchanging device and three " worker " word rail, and one in three " worker " word rail is the straight rail that is fixed on cleaning chamber body top, in addition two be " eight " word shape and be fixed on the chamber body before; Described translation track exchanging device is arranged between chamber body top straight rail and the front track of chamber body, it comprises two sections twilight orbits that can move horizontally, the translation track exchanging device has two stations, and the corresponding twilight orbit of each station and chamber body top straight rail and the front track of chamber body consist of in smoothing junction; The running trolley of described hanger components adopts two roller both sides to be installed on " worker " word rail two siding tracks of track component.
Say further, the translation track exchanging device is comprised of track fixed head, action roller and twilight orbit, and two twilight orbits fixed in the one side of track fixed head " eight " font, and another side is action roller fixedly, and movable pulley is erected on the front fixed mount of chamber body.
Say further, the translation track exchanging device is by manual or electronic or hydraulic pressure or air pressure driving.
The present invention changes suspension hook electric block orbit into " worker " word steel track, adopt two roller both sides to clamp, two rollers are walked in the I-steel both sides respectively, and adjustable center of gravity makes it overlap with track centerline, avoided the form of single face lifting, stop the rail phenomenon, and lift by crane the restriction that thing is not subjected to weight, can lift by crane larger workpiece.Adopt the translation track exchanging device by the mode of conversion station, be two " worker " word rail formation smooth transition bridges that " eight " font distributes before being respectively interior " worker " the word rail of cleaning chamber and chamber body, make the two cover lifting assemblies that minute are on two " worker " word rail that " eight " font distributes can free-running operation inside and outside cleaning chamber, satisfy the functional requirement of double-hung.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is plan-position figure of the present invention.
Among the figure: 1, suspension hook electric block, 2, running trolley, 3, the twilight orbit I, 4, twilight orbit II, 5, track fixed head, 6, action roller, 7, cylinder, 8, fixed mount, 9, chamber body top straight rail, 10, track I before the body of chamber, 11, track II before the body of chamber, 12, hanger components I, 13, the hanger components II.
The present invention is described in detail below in conjunction with accompanying drawing.
The specific embodiment
Hanger rail shot-blasting machine lifting assembly comprises two hanger components and a track component.Wherein track component comprises translation track exchanging device and three " worker " word rail.Body top, chamber straight rail 9 in three " worker " word rail is fixed on top, cleaning chamber chamber, and cleaning cup chamber is fixed with fixed mount 8 on the top, before the body of chamber before track I 10, the chamber body track II 11 be " eight " word shape and be fixed on the fixed mount 8.Described translation track exchanging device is arranged on before track I 10 before body top, chamber straight rail 9 and the chamber body, the chamber body on the fixed mount between the track II 11, it is comprised of track fixed head 5, action roller 6 and twilight orbit I 3, twilight orbit II 4, twilight orbit I 3, twilight orbit II 4 are the one side that " eight " font is fixed on track fixed head 5, another side is fixed 6, four movable pulleys 6 of four action rollers and is erected on the fixed mount 8.The push rod of cylinder 7 is fixedly connected with track fixed head 5.The translation track exchanging device has two stations under the effect of cylinder 7, station one, and twilight orbit I 3 is connected between body top, chamber straight rail 9 and the front track I 10 of chamber body, and track I 10 forms in smoothing junction before making body top, chamber straight rail 9 and chamber body; Station two, twilight orbit II 4 are connected between body top, chamber straight rail 9 and the front track II 11 of chamber body, and track II 11 forms in smoothing junction before making body top, chamber straight rail 9 and chamber body.Hanger components comprises running trolley 2, and be fixedly connected on suspension hook electric block 1 on the running trolley 2, running trolley 2 adopts two roller both sides to be installed on " worker " word rail two siding tracks of track component, and can regulate the hanger components center of gravity it is overlapped with track centerline.Hanger components I 12 is articulated on the front track I 10 of chamber body, and hanger components II 13 is articulated on the front track II 11 of chamber body.Before transition track I 3 is connected in body top, chamber straight rail 9 and chamber body between the track I 10 time, hanger components I 12 can free-running operation inside and outside cleaning chamber; Hanger components II 13 can free-running operation inside and outside cleaning chamber between the track II 11 time before transition track II 4 is connected in body top, chamber straight rail 9 and chamber body.
The translation track exchanging device also can be by manual or electronic or hydraulic-driven.

Claims (3)

1. hanger rail shot-blasting machine lifting assembly comprises two hanger components and a track component; Wherein hanger components comprises running trolley, and is fixedly connected on the suspension hook electric block on the running trolley, and the hanger components center of gravity can be regulated it is overlapped with track centerline; It is characterized in that: track component comprises translation track exchanging device and three " worker " word rail, and one in three " worker " word rail is the straight rail that is fixed on cleaning chamber body top, in addition two be " eight " word shape and be fixed on the chamber body before; Described translation track exchanging device is arranged between chamber body top straight rail and the front track of chamber body, it comprises two sections twilight orbits that can move horizontally, the translation track exchanging device has two stations, and the corresponding twilight orbit of each station and chamber body top straight rail and the front track of chamber body consist of in smoothing junction; The running trolley of described hanger components adopts two roller both sides to be installed on " worker " word rail two siding tracks of track component.
2. according to hanger rail shot-blasting machine lifting assembly claimed in claim 1, it is characterized in that: the translation track exchanging device is comprised of track fixed head, action roller and twilight orbit, two twilight orbits fixed in the one side of track fixed head " eight " font, another side is action roller fixedly, and movable pulley is erected on the front fixed mount of chamber body.
3. according to hanger rail shot-blasting machine lifting assembly claimed in claim 1, it is characterized in that: the translation track exchanging device is by manual or electronic or hydraulic pressure or air pressure driving.
CN2012105148557A 2012-12-05 2012-12-05 Hoisting assembly of overhead rail shot blasting machine Pending CN103009265A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105148557A CN103009265A (en) 2012-12-05 2012-12-05 Hoisting assembly of overhead rail shot blasting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105148557A CN103009265A (en) 2012-12-05 2012-12-05 Hoisting assembly of overhead rail shot blasting machine

Publications (1)

Publication Number Publication Date
CN103009265A true CN103009265A (en) 2013-04-03

Family

ID=47958663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105148557A Pending CN103009265A (en) 2012-12-05 2012-12-05 Hoisting assembly of overhead rail shot blasting machine

Country Status (1)

Country Link
CN (1) CN103009265A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107738193A (en) * 2017-10-18 2018-02-27 苏州耀玮彤机械有限公司 A kind of die-cast product sand blasting unit
CN109610249A (en) * 2018-12-12 2019-04-12 中国长江电力股份有限公司 A kind of track support component for rail changing device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1511094A1 (en) * 1986-09-17 1989-09-30 Всесоюзный конструкторско-технологический институт по механизации монтажных и специальных строительных работ Shot-blasting unit
JP2002321193A (en) * 2001-04-25 2002-11-05 Kawatetsu Transportation & Technology Co Ltd Cutting/abrasive-sweeping device and execution method using it
CN2851191Y (en) * 2005-10-27 2006-12-27 田世忠 Materials conveying line turnout in air
CN201471300U (en) * 2009-08-21 2010-05-19 潍坊华星铸造机械有限公司 Double-track lifting and hooking frame without changing track
CN102248491A (en) * 2010-10-26 2011-11-23 聂健 Shot blasting spraying process of automobile metal fuel tank
CN202985362U (en) * 2012-12-05 2013-06-12 盐城市丰特铸造机械有限公司 Hoisting assembly of overhead rail shot blasting machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1511094A1 (en) * 1986-09-17 1989-09-30 Всесоюзный конструкторско-технологический институт по механизации монтажных и специальных строительных работ Shot-blasting unit
JP2002321193A (en) * 2001-04-25 2002-11-05 Kawatetsu Transportation & Technology Co Ltd Cutting/abrasive-sweeping device and execution method using it
CN2851191Y (en) * 2005-10-27 2006-12-27 田世忠 Materials conveying line turnout in air
CN201471300U (en) * 2009-08-21 2010-05-19 潍坊华星铸造机械有限公司 Double-track lifting and hooking frame without changing track
CN102248491A (en) * 2010-10-26 2011-11-23 聂健 Shot blasting spraying process of automobile metal fuel tank
CN202985362U (en) * 2012-12-05 2013-06-12 盐城市丰特铸造机械有限公司 Hoisting assembly of overhead rail shot blasting machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107738193A (en) * 2017-10-18 2018-02-27 苏州耀玮彤机械有限公司 A kind of die-cast product sand blasting unit
CN109610249A (en) * 2018-12-12 2019-04-12 中国长江电力股份有限公司 A kind of track support component for rail changing device
CN109610249B (en) * 2018-12-12 2024-05-28 中国长江电力股份有限公司 Track bracket assembly for track-changing device

Similar Documents

Publication Publication Date Title
CN102019247A (en) Suspension type 3-D pneumatically operating basket
CN207436459U (en) Pressure-bearing floor covering layers machine
CN204125835U (en) A kind of bridge inspection vehicle
CN202985362U (en) Hoisting assembly of overhead rail shot blasting machine
CN103009265A (en) Hoisting assembly of overhead rail shot blasting machine
CN203541516U (en) Cooling cleaning system of truck swing bolster side frame
CN203767802U (en) Special device for elevator installation
CN204873574U (en) Hoist girder construction of stretching out and drawing back
CN107399352B (en) A kind of electronic transporting device for oil drum
CN206437089U (en) A kind of curved surface adaptive crawler belt and the climbing robot for installing the crawler belt
EP2942319A1 (en) Safety solution for crane tracks and a crane
CN200975336Y (en) Double well single power oil pumping machine
CN202866692U (en) Petroleum drilling tool ramp transferring device
CN201471300U (en) Double-track lifting and hooking frame without changing track
CN202657628U (en) Reciprocating trolley type conveyer
CN205045724U (en) Hoisting apparatus of lifting hook formula impeller head
CN211035043U (en) Large-scale motor assembly handling device
CN205342830U (en) Tank car abrator
CN211496577U (en) Plate semi-finished product lifting appliance
CN203654112U (en) Special hoist for rail hoisting
CN203755704U (en) Building pipe placing and conveying support
CN209227397U (en) A kind of stride pushing tow jack dismounting device
CN209064849U (en) A kind of upper and lower pieces system of furnace body paint line
CN208777876U (en) A kind of two-door structure of counterweight each other
CN103879860A (en) Device special for elevator installation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130403