CN102999784B CN201210474202.0A CN201210474202A CN102999784B CN 102999784 B CN102999784 B CN 102999784B CN 201210474202 A CN201210474202 A CN 201210474202A CN 102999784 B CN102999784 B CN 102999784B
Authority
CN
China
Prior art keywords
equipment
information
turned
load
power failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210474202.0A
Other languages
Chinese (zh)
Other versions
CN102999784A (en
Inventor
杜旭
吴福疆
关焯荣
钟世冠
桂媛
李隽�
黎炼
苏俊杰
郑景立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201210474202.0A priority Critical patent/CN102999784B/en
Publication of CN102999784A publication Critical patent/CN102999784A/en
Application granted granted Critical
Publication of CN102999784B publication Critical patent/CN102999784B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of power grid heavy-load analyzes method and system, and the method includes: obtain current real-time load data when power failure plan information, major network and distribution net equipment topology information, major network and distribution net equipment account information, the operation of each equipment;Corresponding being turned for equipment of each power failure equipments is determined according to major network and distribution net equipment topology information;According to power failure plan information, major network and distribution net equipment topology information, carry out the conversion of the side of fortune, it is thus achieved that the power network topology information after the conversion of fortune side;Current real-time load data according to power failure equipments, determine to be turned and carry out the Real-time Load after the conversion of the side of fortune for equipment, and according to this turned the Real-time Load after changing for equipment fortune side, this turned for the rated load of equipment and default load factor, it is determined that this turn is supplied whether equipment transships.The present invention program can be that network operation personnel/decision-maker/plan auditor provides reference to the safety of the specified plan that has a power failure, and improves electrical network accordingly and turns the safety for operation of power networks afterwards.

Description

Power grid heavy-load analyzes method and system
Technical field
The present invention relates to electric power network technique field, analyze method and a kind of electrical network particularly to a kind of power grid heavy-load Heavy duty analysis system.
Background technology
Supply of electric power plays the most important effect, continuing of grid power supply in the life of people Property, reliability are closely bound up with the life of people.Therefore, in order to improve constantly customer service quality, guarantee To the continued power ability of client, effectively promoting power supply reliability, electrical network, when being designed, can design ring Netting twine road, when ensureing scheduled outage, fault outage accordingly, it is possible to is turned for ensureing holding of electrical network by circuit Continuous power supply capacity.But, the building-up work of electrical network is the work that a persistence is the strongest, how ensure that Grid power blackout, carried out electrical network turn for after, equipment can run in normal safety range, is electrical network The factor that decision-maker arranges in plan, fortune side be must take into when adjusting.In current electric power network technique, Still when plan arrangement, the amplifier adjustment of electrical network, circuit is not turned the problems such as the electric network security after supplying to carry out The rational technique means considered, can only be accounted for by artificial experience.And the consideration of artificial experience is unavoidable There will be deviation, affect power network line and turn the safety for power network line afterwards.
Summary of the invention
For above-mentioned problems of the prior art, one of them purpose of the present invention is to provide a kind of electricity Net heavy duty analysis method, further object is that a kind of power grid heavy-load of offer analyzes system, and it can The safety for operation of power networks afterwards is turned with raising electrical network.
For reaching above-mentioned purpose, the present invention by the following technical solutions:
A kind of power grid heavy-load analyzes method, including step:
Obtaining relevant rudimentary data, described basic data includes: power failure plan information, master network equipment topology are believed Breath, master network equipment account information, distribution net equipment topology information, distribution net equipment account information and each equipment Current real-time load data during operation;
According to described master network equipment topology information, distribution net equipment topology information, determine that each power failure equipments is corresponding Turned for equipment;
According to described power failure plan information and described master network equipment topology information, described distribution net equipment topology information, Carry out the conversion of the side of fortune, it is thus achieved that the power network topology information after the conversion of fortune side;
According to the current real-time load data of power failure equipments, determine and turned the reality after the equipment of confession carries out the conversion of the side of fortune Time load, and according to this by turn for equipment fortune side change after Real-time Load, this by turn supply equipment specified bear Lotus and default load factor, it is determined that whether this is turned transships for equipment.
A kind of power grid heavy-load analyzes system, including:
The integrated acquiring unit of information, is used for obtaining relevant rudimentary data, and described relevant rudimentary data include: stop Electricity plan information, master network equipment topology information, master network equipment account information, distribution net equipment topology information, join Current real-time load data when net equipment account information and each equipment run;
Unit is determined for equipment, for according to described master network equipment topology information, distribution net equipment topology letter by turning Power network topology information after breath and the conversion of fortune side, determines corresponding being turned for equipment of each power failure equipments;
Fortune side's converting unit, for according to described master network equipment topology information, described distribution net equipment topology information, Described power failure plan information, carries out the conversion of the side of fortune, it is thus achieved that the power network topology information after the conversion of fortune side;
Overloading analysis unit, for the current real-time load data according to power failure equipments, determines and is turned for equipment Carry out the Real-time Load after the conversion of the side of fortune, and turned the Real-time Load after changing for equipment fortune side according to this, be somebody's turn to do Turned the rated load for equipment and default load factor, it is determined that whether this is turned transships for equipment.
According to the scheme in the present embodiment, it is to obtain power failure plan information and the relevant power network topology of correspondence After information and equipment account information, determine based on current power network topology information and turned the equipment of confession, according to Power failure plan information carries out the simulated operation of the side's of fortune conversion, and then obtains the power network topology information after the conversion of the side of fortune, And be supplied to be turned on the premise of equipment being turned by the current Real-time Load of power failure equipments, determine that fortune side changes Turned the Real-time Load for equipment afterwards, and judged to be turned whether transship, at quilt for equipment based on this Real-time Load Turn for, in the case of apparatus overload, illustrating that carrying out power failure by this power failure plan may cause equipment overload operation Situation, for the network operation personnel/decision-maker/plan auditor safety to the specified plan that has a power failure Reference is provided, improves electrical network accordingly and turn the safety for operation of power networks afterwards.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the power grid heavy-load analysis embodiment of the method for the present invention;
Fig. 2 is the structural representation of the power grid heavy-load analysis system embodiment of the present invention.
Detailed description of the invention
Below in conjunction with better embodiment therein, the present invention program is described in detail.In the following description, First the embodiment for the power grid heavy-load analysis method of the present invention illustrates, then the power grid heavy-load to the present invention The embodiment of analysis system illustrates.
It Fig. 1 is the schematic flow sheet of the power grid heavy-load analysis embodiment of the method for the present invention.As it is shown in figure 1, Power grid heavy-load in the present embodiment is analyzed method and is included step:
Step S101: obtaining relevant rudimentary data, these relevant rudimentary data include: power failure plan information, master Net equipment topology information, master network equipment account information, distribution net equipment topology information, distribution net equipment account information, And current real-time load data during each equipment operation;
Step S102: according to above-mentioned master network equipment topology information, distribution net equipment topology information, determine each power failure Corresponding being turned for equipment of equipment;
Step S103: open up according to above-mentioned power failure plan information, above-mentioned master network equipment topology information, distribution net equipment Flutter information, carry out the conversion of the side of fortune, it is thus achieved that the power network topology information after the conversion of fortune side;
Step S104: according to the current real-time load data of power failure equipments, determines that being turned the equipment of confession carries out fortune side Real-time Load after conversion, and according to this by turn for equipment fortune side change after Real-time Load, this by turn supply set Standby rated load and default load factor, it is determined that whether this is turned transships for equipment.
According to the scheme in the present embodiment, it is to obtain power failure plan information and the relevant power network topology of correspondence After information and equipment account information, determine based on current power network topology information and turned the equipment of confession, according to Power failure plan information carries out the simulated operation of the side's of fortune conversion, and then obtains the power network topology information after the conversion of the side of fortune, And be supplied to be turned on the premise of equipment being turned by the current Real-time Load of power failure equipments, determine that fortune side changes Turned the Real-time Load for equipment afterwards, and judged to be turned whether transship, at quilt for equipment based on this Real-time Load Turn for, in the case of apparatus overload, illustrating that carrying out power failure by this power failure plan may cause equipment overload operation Situation, for the network operation personnel/decision-maker/plan auditor safety to the specified plan that has a power failure Reference is provided, improves electrical network accordingly and turn the safety for operation of power networks afterwards.
Wherein, when above-mentioned judgement is turned for apparatus overload, it is also possible to include step:
Step S105: be given and turned the overload prompting message for apparatus overload.
Thus, in the case of occurring being turned for apparatus overload, network operation personnel/decision-maker/plan examination & verification Personnel can directly give this overload prompting message and which is known be turned and overload phenomenon occur for equipment, convenient the most just Prompt.
Judge by turn for equipment whether transship time, be based on by turn for equipment fortune side conversion after load factor enter Row compares, and this load factor is born for the specified of equipment with being turned by turning the Real-time Load after supplying equipment fortune side to change The ratio value of lotus, when being turned the load factor for equipment up to or over default load factor, i.e. when being turned confession Real-time Load after the conversion of equipment fortune side is up to or over being turned the setting ratio of the rated load for equipment Time, then judge to be turned for apparatus overload.This default load factor (setting ratio) can be entered according to actual needs Row sets, such as, can be 70%, 80% etc..
The most just it is described in detail with one of them concrete example.
As it has been described above, need when the present invention program implements to obtain the various data needing and obtaining, including: obtain Power failure plan information, master network equipment topology information, master network equipment account information, distribution net equipment topology information, Current real-time load data when distribution net equipment account information and each equipment run etc..Accordingly, this Bright scheme in the specific implementation, can obtain these information datas by the way of data integration.Carry out During data integration, can by with major network asset system, distribution generalized information system, major network production system, distribution The systems such as production system, EMS system, metering automation system carry out integrated, after carrying out data integration, When needs obtain relevant information data, power failure plan information can be obtained from master, distribution production system, from Major network EMS system obtains master network equipment topology information, obtains master network equipment account information from major network asset system, Distribution net equipment topology information, distribution net equipment account information is obtained, from metering automation system from distribution generalized information system System obtains current real-time load data when each equipment runs.
Accordingly, after all departments, operation teams and groups make power failure plan, by data integration, obtain in real time Take power failure plan information, main distribution topological data and the equipment real-time running data needed for heavy duty is analyzed, and Power grid heavy-load based on the invention described above is analyzed method and is carried out heavy duty analysis, i.e. by decision-making level according to the present invention's Method carries out plan examination & approval, arranges, analyze according to carry out after this power failure scheduled outage fortune side turn supply rear (i.e. After equipment turns power supply), turned the heavy overload situations for equipment, arrange to turn power supply for plan operational staff and ginseng is provided Examine, thus the equipment that effectively avoids turns for causing apparatus overload, causes the generation of power grid risk.
In master network equipment topology, distribution net equipment topology, maintain the topological relation of electrical network, including equipment Power supply relation, and in the topology design of electrical network, in order to ensure continued power, typically have main confession equipment (i.e. Time properly functioning, it is powered for equipment by main) (i.e. when grid power blackout, fault, logical with available equipment Cross and turn power supply, it is achieved available equipment is powered).And the conversion of the side of fortune is the simulated operation in network system, Ji Jiangting The power supply relation of electricity equipment disconnects, and by turn load that power failure equipments is carried by power supply, (i.e. power failure equipments is powered Scope) be given to be turned power supply unit and be powered, thus obtain the power network topology information after simulated operation.
Accordingly, the present invention program can determine according to master network equipment topology information, distribution net equipment topology information Corresponding being turned for equipment of each power failure equipments, and after carry out the conversion of the side of fortune according to power failure plan information, it is possible to Obtain the power network topology information after the conversion of fortune side.
Determining each being turned for after equipment and carry out the conversion of the side of fortune and obtain the power network topology after fortune side changes and believe After breath, whether each being turned can be analyzed by overburden for equipment.In the present invention program, passing through After the conversion of fortune side, it is believed that the current real-time load data of power failure equipments is all turned to be fed to be turned on the equipment of confession, Therefore, current real-time load data based on power failure equipments, turned for the current real-time load data of equipment, Can obtain being turned the equipment of confession Real-time Load after fortune side changes, this Real-time Load is stopping before fortune side changes The current real-time load data of electricity equipment with turned for the current real-time load data sum of equipment.Then should By turn for equipment fortune side change after Real-time Load with this by turn supply equipment rated load compared with, such as fruit Time load relative to rated load ratio up to or over set ratio, i.e. preset load factor, such as 80%, i.e. when setting ratio as 80%, meetingIn the case of, then judge that this is turned For equipment, overload occurs, provide overload prompting message, plan approving person is carried out overload and reminds.Wherein, Above-mentioned by a turn rated load for confession equipment, it is the master network equipment account information of above-mentioned acquisition, distribution net equipment account Information and include each being turned for the rated load of equipment, the present invention program can directly carry out applying.
Can turn have for equipment multiple in the case of, then analyze each equipment for each turn one by one turn for equipment Load condition after Gong.
The power grid heavy-load of the present invention analyzes method, after the equipment that is primarily directed to has a power failure, and plan approving person's peace When row's equipment turns power supply, it is analyzed by the equipment turning power supply, analyzes and turned the heavily overload feelings for equipment Condition, thus realize reasonable arrangement and turn power supply, it is to avoid power grid risk occurs.The heavy duty analysis side of the application present invention The application of method, mainly have a power failure the approving persons such as specific responsibility, scheduling, at the not same order of plan examination & approval that has a power failure Section, the specific responsibility that has a power failure, scheduling all can utilize the power grid heavy-load of the present invention to analyze method, analyze merit by heavy duty Can, check analysis result.
After have a power failure plan or the arrangement adjustment that has a power failure, need to obtain the most in real time, update power failure plan letter Breath, re-executes the analysis process of the invention described above, it is thus achieved that up-to-date analysis result.The present invention program is permissible Obtain the information arranging whether adjust that has a power failure in real time, i.e. before above-mentioned steps S101, it is also possible to include step Rapid:
Step S100: detection has a power failure and arranges whether to occur the information of adjustment, is detecting that power failure arranges to adjust During whole information, enter above-mentioned steps S101.
Generally, detect when power failure arranges the information occurring to adjust, it may be possible to specify and got well one newly The prompting given by power failure plan have the new information having a power failure and arranging, it is also possible to judge to send out in step S104 The information be given after being adjusted revising after raw overload, to power failure plan.
Power grid heavy-load according to the invention described above analyzes method, and the present invention also provides for a kind of power grid heavy-load analysis system System.Fig. 2 showing, the power grid heavy-load of the present invention analyzes the structural representation of system embodiment.
Include as in figure 2 it is shown, the power grid heavy-load of the present invention analyzes system:
The integrated acquiring unit of information 201, is used for obtaining relevant rudimentary data, and these relevant rudimentary data include: stop Electricity plan information, master network equipment topology information, master network equipment account information, distribution net equipment topology information, join Current real-time load data when net equipment account information and each equipment run;
Unit 202 is determined for equipment, for according to described master network equipment topology information, described distribution net equipment by turning Topology information, determines corresponding being turned for equipment of each power failure equipments;
Fortune side's converting unit 203, for according to described master network equipment topology information, distribution net equipment topology information, Described power failure plan information, carries out the conversion of the side of fortune, it is thus achieved that the power network topology information after the conversion of fortune side;
Overloading analysis unit 204, for the current real-time load data according to power failure equipments, determines and power failure is set Standby current real-time load data turns and is supplied to be turned for after equipment, and turned after changing for equipment fortune side real-time bears Lotus, and according to this by turn for equipment fortune side change after Real-time Load, this by turn supply equipment rated load with And default load factor, it is determined that whether this is turned transships for equipment.
According to the scheme in the present embodiment, it is to obtain power failure plan information and the relevant power network topology of correspondence After information and equipment account information, determine based on current power network topology information and turned the equipment of confession, according to Power failure plan information carries out the simulated operation of the side's of fortune conversion, and then obtains the power network topology information after the conversion of the side of fortune, And be supplied to be turned on the premise of equipment being turned by the current Real-time Load of power failure equipments, determine that fortune side changes Turned the Real-time Load for equipment afterwards, and judged to be turned whether transship, at quilt for equipment based on this Real-time Load Turn for, in the case of apparatus overload, illustrating that carrying out power failure by this power failure plan may cause equipment overload operation Situation, for the network operation personnel/decision-maker/plan auditor safety to the specified plan that has a power failure Reference is provided, improves electrical network accordingly and turn the safety for operation of power networks afterwards.
Can also include as in figure 2 it is shown, the power grid heavy-load in the present embodiment analyzes system:
Alarm reminding unit 205, for when overloading analysis unit 204 judges to be turned for apparatus overload, being given Turned the overload prompting message for apparatus overload.
Thus, in the case of occurring being turned for apparatus overload, network operation personnel/decision-maker/plan examination & verification Personnel can directly give this overload prompting message and which is known be turned and overload phenomenon occur for equipment, convenient the most just Prompt.
When overloading analysis unit 204 judges whether turned the equipment of confession transships, can be to being turned the load for equipment Rate compares, and this load factor is turned the Real-time Load after changing for equipment fortune side and turned the volume for equipment The ratio system of constant load, when being turned the load factor for equipment up to or over default load factor, i.e. works as quilt Turn the Real-time Load after changing for equipment fortune side to compare up to or over by the setting turning the rated load for equipment During example, then judge to be turned for apparatus overload.This default load factor (setting ratio) can be according to actual needs It is set, such as, can be 70%, 80% etc..
Data capture unit 201, when obtaining data, can be to stop from described in master, the acquisition of distribution production system Electricity plan information, obtains described master network equipment topology information from major network EMS system, obtains from major network asset system Take described master network equipment account information, obtain described distribution net equipment topology information, distribution from distribution generalized information system Equipment account information, obtains current real-time load data when described each equipment runs from metering automation system.
After have a power failure plan or the arrangement adjustment that has a power failure, need to obtain the most in real time, update power failure plan letter Breath, re-executes the analysis process of the invention described above, it is thus achieved that up-to-date analysis result.The present invention program is permissible Obtain the information arranging whether adjust that has a power failure in real time, therefore, as in figure 2 it is shown, the electrical network in the present embodiment is born Lotus density Analysis System can also include:
Detector unit 200, for detecting the information arranging whether to adjust that has a power failure, and is detecting power failure peace During the information that discharge life adjusts, send information to data capture unit 201.
Now, above-mentioned data capture unit 201, when receiving the information of detector unit 200, obtain Above-mentioned related data.
Generally, detect when power failure arranges the information occurring to adjust, it may be possible to specify and got well one newly The prompting given by power failure plan have the new information having a power failure and arranging, it is also possible at overloading analysis unit 204 The information be given after being adjusted revising after judging to transship, to power failure plan.
The concrete processing mode of each unit in the power grid heavy-load analysis system of the present invention, can be with the electricity of the present invention Net heavy duty analysis method in identical, do not repeat them here.
Embodiment described above only have expressed the several embodiments of the present invention, and it describes more concrete and detailed, But therefore can not be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that, for this area Those of ordinary skill for, without departing from the inventive concept of the premise, it is also possible to make some deformation and Improving, these broadly fall into protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be with appended Claim is as the criterion.

Claims (8)

1. a power grid heavy-load analyzes method, it is characterised in that include step:
Obtaining relevant rudimentary data, described basic data includes: power failure plan information, master network equipment topology are believed Breath, master network equipment account information, distribution net equipment topology information, distribution net equipment account information and each equipment Current real-time load data during operation, obtains described power failure plan information from master, distribution production system, from Major network EMS system obtains described master network equipment topology information, obtains described master network equipment from major network asset system Account information, obtains described distribution net equipment topology information, distribution net equipment account information from distribution generalized information system, Current real-time load data when described each equipment runs is obtained from metering automation system;
According to described master network equipment topology information, distribution net equipment topology information, determine that each power failure equipments is corresponding Turned for equipment;
According to described power failure plan information and described master network equipment topology information, described distribution net equipment topology information, Carry out the conversion of the side of fortune, it is thus achieved that the power network topology information after the conversion of fortune side;
According to the current real-time load data of power failure equipments, determine and turned the reality after the equipment of confession carries out the conversion of the side of fortune Time load, and according to this by turn for equipment fortune side change after Real-time Load, this by turn supply equipment specified bear Lotus and default load factor, it is determined that whether this is turned transships for equipment.
Power grid heavy-load the most according to claim 1 analyzes method, it is characterised in that turned for equipment When load factor after the conversion of fortune side exceedes default load factor, it is determined that turned for apparatus overload.
Power grid heavy-load the most according to claim 2 analyzes method, it is characterised in that described default load Rate is 80%.
4. analyze method according to the power grid heavy-load described in claims 1 to 3 any one, it is characterised in that:
When judging to be turned for apparatus overload, further comprise the steps of: to be given to be turned and remind for the overload of apparatus overload Information;
Or
Further comprise the steps of: the information arranging whether to adjust that has a power failure that detects, and detecting that power failure arrangement is sent out During the information that life adjusts, enter the step of described acquisition relevant rudimentary data.
5. a power grid heavy-load analyzes system, it is characterised in that including:
The integrated acquiring unit of information, is used for obtaining relevant rudimentary data, and described relevant rudimentary data include: stop Electricity plan information, master network equipment topology information, master network equipment account information, distribution net equipment topology information, join Current real-time load data when net equipment account information and each equipment run, wherein, from master, distribution Production system obtains described power failure plan information, obtains described master network equipment topology information from major network EMS system, Obtain described master network equipment account information from major network asset system, obtain described distribution from distribution generalized information system and set Standby topology information, distribution net equipment account information, obtain when described each equipment runs from metering automation system Current real-time load data;
Unit is determined for equipment, for according to described master network equipment topology information, distribution net equipment topology letter by turning Breath, determines corresponding being turned for equipment of each power failure equipments;
Fortune side's converting unit, for according to described master network equipment topology information, described distribution net equipment topology information, Described power failure plan information, carries out the conversion of the side of fortune, it is thus achieved that the power network topology information after the conversion of fortune side;
Overloading analysis unit, for the current real-time load data according to power failure equipments, determines and is turned for equipment Carry out the Real-time Load after the conversion of the side of fortune, and turned the Real-time Load after changing for equipment fortune side according to this, be somebody's turn to do Turned the rated load for equipment and default load factor, it is determined that whether this is turned transships for equipment.
Power grid heavy-load the most according to claim 5 analyzes system, it is characterised in that described overloading analysis Unit is when being turned the load factor after changing for equipment fortune side and being exceeded default load factor, it is determined that turned for equipment mistake Carry.
Power grid heavy-load the most according to claim 6 analyzes system, it is characterised in that described default load Rate is 80%.
8. analyze system according to the power grid heavy-load described in claim 5 to 7 any one, it is characterised in that:
Also include alerting reminding unit, be used for when described overloading analysis unit judges to be turned for apparatus overload, Be given and turned the overload prompting message for apparatus overload;
Or
Also include detector unit, for detecting the information arranging whether to adjust that has a power failure, and stop detecting When electricity arranges the information occurring to adjust, send information to described data capture unit;
Described data capture unit, when receiving the information of detector unit, obtains described relevant rudimentary number According to.
CN201210474202.0A 2012-11-20 2012-11-20 Power grid heavy-load analyzes method and system Active CN102999784B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210474202.0A CN102999784B (en) 2012-11-20 2012-11-20 Power grid heavy-load analyzes method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210474202.0A CN102999784B (en) 2012-11-20 2012-11-20 Power grid heavy-load analyzes method and system

Publications (2)

Publication Number Publication Date
CN102999784A CN102999784A (en) 2013-03-27
CN102999784B true CN102999784B (en) 2016-08-24

Family

ID=47928331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210474202.0A Active CN102999784B (en) 2012-11-20 2012-11-20 Power grid heavy-load analyzes method and system

Country Status (1)

Country Link
CN (1) CN102999784B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106708162A (en) * 2017-01-18 2017-05-24 温州博远工业设计有限公司 Static resource separation technology based on web request
CN110263078B (en) * 2019-08-14 2019-11-29 广东电网有限责任公司佛山供电局 A kind of distribution line heavy-overload Intelligent statistical method
CN110635571A (en) * 2019-11-08 2019-12-31 国网河南省电力公司新乡供电公司 Power failure monitoring system for power distribution network equipment
CN110879335B (en) * 2019-12-16 2022-05-10 深圳供电局有限公司 Method for evaluating heavy overload condition of power distribution network line
CN111967658B (en) * 2020-07-31 2021-10-29 广东卓维网络有限公司 Comprehensive power failure analysis method based on marketing and distribution information integration platform
CN112101707A (en) * 2020-07-31 2020-12-18 广东卓维网络有限公司 Power utilization emergency management system
CN112234603B (en) * 2020-09-08 2023-01-24 广东电网有限责任公司江门供电局 Heavy overload checking method for open-loop power grid load transfer decision
CN113078730B (en) * 2021-03-31 2024-01-30 王文林 Periodic switching method for working state of power grid equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7184903B1 (en) * 2006-03-16 2007-02-27 Vrb Power Systems Inc. System and method for a self-healing grid using demand side management techniques and energy storage
CN102088209A (en) * 2011-03-15 2011-06-08 河海大学 Self-healing control method of distribution network
CN102290799A (en) * 2011-08-11 2011-12-21 中国电力科学研究院 Small-scale quick recovery method for power supply of power distribution network in open loop running
CN102403798A (en) * 2011-10-31 2012-04-04 广东电网公司江门供电局 Intelligent automatic transformer district monitoring method and system based on GIS (geographical information system)
CN102545138A (en) * 2012-02-07 2012-07-04 中国电力科学研究院 Modeling power supply recovering method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7184903B1 (en) * 2006-03-16 2007-02-27 Vrb Power Systems Inc. System and method for a self-healing grid using demand side management techniques and energy storage
CN102088209A (en) * 2011-03-15 2011-06-08 河海大学 Self-healing control method of distribution network
CN102290799A (en) * 2011-08-11 2011-12-21 中国电力科学研究院 Small-scale quick recovery method for power supply of power distribution network in open loop running
CN102403798A (en) * 2011-10-31 2012-04-04 广东电网公司江门供电局 Intelligent automatic transformer district monitoring method and system based on GIS (geographical information system)
CN102545138A (en) * 2012-02-07 2012-07-04 中国电力科学研究院 Modeling power supply recovering method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
配电网故障恢复重构研究;杨成峰;《中国优秀博硕士学位论文全文数据库(硕士)工程科技Ⅱ辑》;20021215;第1-25页 *

Also Published As

Publication number Publication date
CN102999784A (en) 2013-03-27

Similar Documents

Publication Publication Date Title
CN102999784B (en) Power grid heavy-load analyzes method and system
CN105337308B (en) A kind of grid side area distribution formula photovoltaic operation management system and management method
CN105305444B (en) The alarm of distribution comprehensive intelligent and processing method based on allotment integration
CN105656024B (en) Electric power system operation standby margin of safety online evaluation method
CN111934332B (en) Energy storage power station system based on cloud edge cooperation
CN106093704B (en) A kind of monitoring of power grid stealing user and localization method and system
CN100590947C (en) Large electric network on-line preventing control method based on static state and transient safety steady mode
CN105184521B (en) A kind of methods of risk assessment of grid operation mode, apparatus and system
WO2016062179A1 (en) Method for implementing plan security check on the basis of power grid operation service bus
CN104810921B (en) Feeder line broken string power failure range identifying system and method based on distribution transformer terminals information
CN103701212B (en) A kind of method for monitoring and analyzing for safety and stability control device of electric network and system
CN102938106B (en) Major network N-1 methods of risk assessment based on grid power blackout plan and system
CN105356461B (en) A kind of accounting method of the load unbalanced administration project carbon emission reduction amount of low voltage electric network
CN103310296B (en) A kind of operation order Security Checking method based on disturbance assessment and trend analysis
CN106655158A (en) Smart grid based distribution network self-healing control system and method
CN102289731A (en) Method for maintaining state of power transmission equipment based on system risk
CN105069516B (en) The monthly repair schedule coordination approach of power transmission and transforming equipment based on integrated risk
CN106451761A (en) Dynamic data driving-based automatic monitoring and analysis system for widespread blackout
CN109767063A (en) Stability control device operation information system and online power grid risk assessment method thereof
CN106786609A (en) A kind of distribution line cyclization fast calibration method based on data fusion
CN201498990U (en) Source-side power-saving network control system
CN106056218A (en) Equipment monthly maintenance scheduling optimization method considering overload and transient stability constraint
CN103885372B (en) A kind of Switching Power Supply rectification module monitoring and early warning method and system
CN110265998A (en) A kind of method and device that stabilized control system strategy definite value is checked
CN104578050B (en) Transient stability strongly-correlated power transmission section identification method for power grid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant