CN102995916A - Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site - Google Patents

Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site Download PDF

Info

Publication number
CN102995916A
CN102995916A CN2012105378775A CN201210537877A CN102995916A CN 102995916 A CN102995916 A CN 102995916A CN 2012105378775 A CN2012105378775 A CN 2012105378775A CN 201210537877 A CN201210537877 A CN 201210537877A CN 102995916 A CN102995916 A CN 102995916A
Authority
CN
China
Prior art keywords
steel
tread
board
marking time
steel board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105378775A
Other languages
Chinese (zh)
Inventor
邱首伟
周红兵
张铭
黄轶
顾靖
李松
孔德志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 4 Group Co Ltd
Original Assignee
Shanghai Construction No 4 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 4 Group Co Ltd filed Critical Shanghai Construction No 4 Group Co Ltd
Priority to CN2012105378775A priority Critical patent/CN102995916A/en
Publication of CN102995916A publication Critical patent/CN102995916A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention relates to a safe and practical tread board for realizing the simple and convenient disassembly and assembly of a temporary staircase in a construction site, comprising a tread steel board and steel tube rings, wherein the outer side of the tread steel board is turned downwards, the inner side of the tread steel board is turned upwards, and one steel tube ring used for penetrating in a tread steel tube is welded at each of the both sides of the back surface of the tread steel board respectively. The tread steel board is a steel board with patterns which are 3 mm thick, as well as is 900 mm long and 250 mm wide. The inner side and the outer side of the tread steel board are turned upwards by 30 mm and turned downwards by 30 mm respectively. The two steel tube rings on the back surface of the steel board have a diameter of 50 mm. According to the invention, the tread steel board which is convenient to disassemble and assemble is additionally arranged on the basis of the original temporary staircase which is erected by all-steel tubes, thus overcoming the defect that the original tread steel board composed of double steel tubes is bad in anti-slide force and extremely easy to cause safety accidents. Except the tread steel board, the whole temporary staircase structure can be formed by standard scaffold steel tubes and fasteners, and is simple and convenient to erect.

Description

Realize the easy and safe and practical step plate of the interim stair dismounting in job site
Technical field
The interim stair that the construction of a kind of building site of the present invention is set up, especially a kind of flexible form of setting up is applicable to the step plate of the interim stair of each construction stages such as on-the-spot excavation of foundation pit, structure construction.
Background technology
In the present building construction process, the interim stair of setting up in each construction stage such as during the excavation of foundation pit, during the structure construction are seen everywhere, service time, extremely short major part adopted bamboo staircase, wooden staircase etc., service time is long then adopts stair when being set up clamping plate that the interim stair that form or timber sets up and faced by all-steel-pipe, also has the interim stair of section steel manufacture etc.And the interim stair of above-mentioned various construction respectively have its pluses and minuses: bamboo staircase, wooden staircase are applicable to the extremely short and little occasion of the discrepancy in elevation of operating period, and bearing capacity is little, generally is used for a small amount of librarian use, and safety is relatively poor, holds easy to fall down; The interim stair that adopt timber to set up, outward appearance is cleaner and tidier, but makes slowly, and dismounting inconvenience is difficult for recyclingly, consumes not environmental protection of timber, is applicable to only need do two, three, four occasions of marking time; By the stair of section steel manufacture, need to be unfavorable for reusing for the installation site customization, expense is larger; Existing job site is commonly by the interim stair of all-steel-pipe fastener assembly unit, what mainly adopt is the common scaffold tubes in job site, setting up angle can set up according to actual needs with height, set up flexibly, easy accessibility, but adopt two round steel pipe to form because it is marked time, skid resistance is relatively poor, particularly under the wet environment, cause easily user of service's falling accident that slips, safety has much room for improvement.
Summary of the invention
The present invention will provide a kind of easy and safe and practical step plate of the interim stair dismounting in job site of realizing, this step plate is the standard block plate, in conjunction with the interim stair of the common all-steel-pipe in job site, but be combined into the simple and easy construction stair with complete tread, mounting or dismounting are convenient, set up step number and angle is flexible, and step plate adopts checkered steel plate to make, and has preferably antiskid effect, makes things convenient for about the workman, safety is guaranteed, and greatly facilitates on-the-spot construction.
Technical scheme of the present invention is: a kind of easy and safe and practical step plate of the interim stair dismounting in job site of realizing, comprise the steel plate of marking time, the steel pipe ring, the steel plate lateral lower hem of marking time, the steel plate inboard of marking time is upward folded, and the both sides, the steel plate back side of marking time are welded with respectively a steel pipe ring that is used for penetrating the steel pipe of marking time.
The steel plate of marking time is the thick checkered steel plate of 3mm, and length is 900mm, the wide 250mm of tread.
The steel plate medial and lateral of marking time are rolled over respectively the 30mm limit up and down.
The diameter of two the steel pipe rings in the steel plate back side of marking time is 50mm.
The invention has the beneficial effects as follows:
The present invention sets up simple load and unload step plate on the basis of the interim stair that original all-steel-pipe is set up, and the skid resistance of marking time that has overcome former pair of steel pipe composition is poor, very easily causes the shortcoming of security incident.Whole interim staircase structure all can adopt standard steel pipe scaffolding and fastener except step plate, set up easy.
The present invention is by being processed into step plate the standard block plate, the interim stair of setting up in conjunction with job site steel tube fastener commonly used, by simple installation combination, formation is applicable to the interim stair of the various operating modes in job site, and simple in structure, the mounting or dismounting convenient transfer, recycling rate of waterused is high, safety is good, is conducive to the standardized construction of job site.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is along the sectional view of A-A among Fig. 1;
Fig. 3 is that the present invention's interim stair that are used to construct are set up schematic diagram.
The specific embodiment
Such as Fig. 1, shown in 2, a kind of easy and safe and practical step plate of the interim stair dismounting in job site of realizing comprises the steel plate 1 of marking time, steel pipe ring 2, the steel pipe 3 of marking time, steel tube fastener 4 etc.
The steel plate 1 lateral lower hem of marking time, the steel plate inboard of marking time is upward folded, and the both sides, the steel plate back side of marking time are welded with respectively a steel pipe ring 2 that is used for penetrating the steel pipe of marking time.
The steel plate 1 of marking time adopts the thick checkered steel plate of 3mm, length is 900mm, the wide 250mm of tread, mark time and roll over 30mm under steel plate 1 lateral, 30mm is then upwards rolled in steel plate 1 inboard of marking time, respectively weld the steel pipe ring 2 of two diameter 50mm in the both sides, steel plate 1 back side of marking time, be used for penetrating the steel pipe 3 of marking time of diameter 48mm, fixing with the both sides steel pipe 3 of marking time.Originally the unit board of marking time is made simple, and is lightweight, convenient in carrying, and recycling rate of waterused is high, and is economical good.
As shown in Figure 3, step plate of the present invention is set up for the interim stair of constructing, and marking time is fixedly connected with handrail steel pipe (steel pipe 3 of marking time) by steel tube fastener 4 above the steel pipe 3.The steel plate 1 of marking time is inserted in the steel pipe 3 interior formation of marking time by steel pipe ring 2 marks time.

Claims (4)

1. realize the easy and safe and practical step plate of the interim stair dismounting in job site for one kind, comprise the steel plate of marking time (1), steel pipe ring (2), it is characterized in that: the described steel plate of marking time (1) lateral lower hem, the steel plate (1) of marking time is inboard upward folded, and the steel plate of marking time (1) both sides, the back side are welded with respectively a steel pipe ring (2) that is used for penetrating the steel pipe of marking time (3).
2. the easy and safe and practical step plate of the interim stair dismounting in realization job site according to claim 1, it is characterized in that: the described steel plate of marking time (1) is the thick checkered steel plate of 3mm, and length is 900mm, the wide 250mm of tread.
3. the easy and safe and practical step plate of the interim stair dismounting in realization job site according to claim 1, it is characterized in that: the described steel plate of marking time (1) medial and lateral are rolled over respectively the 30mm limit up and down.
4. the easy and safe and practical step plate of the interim stair dismounting in realization job site according to claim 1, it is characterized in that: the diameter of the described steel plate of marking time (1) two the steel pipe rings in the back side (2) is 50mm.
CN2012105378775A 2012-12-13 2012-12-13 Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site Pending CN102995916A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105378775A CN102995916A (en) 2012-12-13 2012-12-13 Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105378775A CN102995916A (en) 2012-12-13 2012-12-13 Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site

Publications (1)

Publication Number Publication Date
CN102995916A true CN102995916A (en) 2013-03-27

Family

ID=47924969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105378775A Pending CN102995916A (en) 2012-12-13 2012-12-13 Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site

Country Status (1)

Country Link
CN (1) CN102995916A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352561A (en) * 2013-07-19 2013-10-16 上海建工四建集团有限公司 Device applied to building construction scaffold climb ladder rung
CN103711332A (en) * 2013-12-27 2014-04-09 上海建工二建集团有限公司 Steel ladder cage installation structure and installation method
CN105275196A (en) * 2015-06-18 2016-01-27 中建四局第三建筑工程有限公司 Detachable step plate and manufacturing method therefor
CN111197417A (en) * 2020-02-26 2020-05-26 中国建筑第八工程局有限公司 Pedal stair
CN112727152A (en) * 2020-12-28 2021-04-30 咸宁智锐机电科技有限公司 Connection structure between construction stair and floor in deep basal pit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0057168A1 (en) * 1981-01-22 1982-08-04 Gilbert Loix Assembling elements for provisional stairways
JP2004060247A (en) * 2002-07-29 2004-02-26 Nikko Co Ltd Temporary stair landing
CN2667083Y (en) * 2003-04-04 2004-12-29 广州市第一建筑工程有限公司 Steel pipe scaffold movable assembling slop steps board
CN2701982Y (en) * 2004-07-15 2005-05-25 北京建工一建工程建设有限公司 Inversely dismantled foundation pit berm
CN201704964U (en) * 2010-04-01 2011-01-12 中铁十局集团建筑工程有限公司 Assembled type simple and convenient construction steel pipe stair for buildings
CN203008409U (en) * 2012-12-13 2013-06-19 上海建工四建集团有限公司 Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0057168A1 (en) * 1981-01-22 1982-08-04 Gilbert Loix Assembling elements for provisional stairways
JP2004060247A (en) * 2002-07-29 2004-02-26 Nikko Co Ltd Temporary stair landing
CN2667083Y (en) * 2003-04-04 2004-12-29 广州市第一建筑工程有限公司 Steel pipe scaffold movable assembling slop steps board
CN2701982Y (en) * 2004-07-15 2005-05-25 北京建工一建工程建设有限公司 Inversely dismantled foundation pit berm
CN201704964U (en) * 2010-04-01 2011-01-12 中铁十局集团建筑工程有限公司 Assembled type simple and convenient construction steel pipe stair for buildings
CN203008409U (en) * 2012-12-13 2013-06-19 上海建工四建集团有限公司 Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352561A (en) * 2013-07-19 2013-10-16 上海建工四建集团有限公司 Device applied to building construction scaffold climb ladder rung
CN103711332A (en) * 2013-12-27 2014-04-09 上海建工二建集团有限公司 Steel ladder cage installation structure and installation method
CN103711332B (en) * 2013-12-27 2016-01-06 上海建工二建集团有限公司 steel ladder cage mounting structure and mounting method
CN105275196A (en) * 2015-06-18 2016-01-27 中建四局第三建筑工程有限公司 Detachable step plate and manufacturing method therefor
CN111197417A (en) * 2020-02-26 2020-05-26 中国建筑第八工程局有限公司 Pedal stair
CN112727152A (en) * 2020-12-28 2021-04-30 咸宁智锐机电科技有限公司 Connection structure between construction stair and floor in deep basal pit
CN112727152B (en) * 2020-12-28 2022-06-03 宜昌富海建设工程有限公司 Connection structure between construction stair and floor in deep basal pit

Similar Documents

Publication Publication Date Title
CN204386134U (en) The attached mould scaffold of a kind of concrete cylindrical hoop
CN102995916A (en) Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site
CN202055497U (en) Movable combination scaffold for construction works
CN201416263Y (en) Disc bolt type scaffold
CN203008409U (en) Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site
CN205742975U (en) A kind of direct plugging type scaffold
CN203834906U (en) Triangular operation platform used for capital construction slope face
CN207347923U (en) Across guardrail walking escape stair
CN207110442U (en) The connector that a kind of scaffold uses
CN202990406U (en) Bowl buckle type scaffold
CN104533071A (en) Concrete cylinder annular formwork-attached scaffold and construction method thereof
CN207228674U (en) Movable municipal administration open caisson ramp-type platform
CN214785753U (en) Scaffold convenient to dismantle installation
CN112211384B (en) Scaffold for building site
CN203654689U (en) Combined scaffold
CN205894638U (en) Balcony scaffolding structure that encorbelments
CN207538481U (en) A kind of floor height changeable type input and output material platform
CN104372935A (en) Scaffold
CN204370784U (en) A kind of tool-type construction elevator discharging platform
CN104328900A (en) Gantry type scaffold
CN203201126U (en) Novel scaffold convenient to disassemble and assemble
CN103615106B (en) Scaffold
CN203080906U (en) Four-way ring system scaffold
CN108222546A (en) The portable dismounting stair of temporary building
CN213115443U (en) Full steel type attached lifting scaffold rail

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130327