CN102994934B - Method for continuously hot-dipping zinc on strip steel to prevent strip breakage in roll change - Google Patents

Method for continuously hot-dipping zinc on strip steel to prevent strip breakage in roll change Download PDF

Info

Publication number
CN102994934B
CN102994934B CN201210579948.8A CN201210579948A CN102994934B CN 102994934 B CN102994934 B CN 102994934B CN 201210579948 A CN201210579948 A CN 201210579948A CN 102994934 B CN102994934 B CN 102994934B
Authority
CN
China
Prior art keywords
steel
zinc
band
strip steel
corrosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210579948.8A
Other languages
Chinese (zh)
Other versions
CN102994934A (en
Inventor
刘春富
吴晶
薛世清
林志谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Panzhihua Steel and Vanadium Co Ltd
Original Assignee
Pangang Group Panzhihua Steel and Vanadium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Panzhihua Steel and Vanadium Co Ltd filed Critical Pangang Group Panzhihua Steel and Vanadium Co Ltd
Priority to CN201210579948.8A priority Critical patent/CN102994934B/en
Publication of CN102994934A publication Critical patent/CN102994934A/en
Application granted granted Critical
Publication of CN102994934B publication Critical patent/CN102994934B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coating With Molten Metal (AREA)

Abstract

The invention discloses a method for continuously hot-dipping zinc on strip steel to prevent strip breakage in roll change, relates to the field of cold-rolled strip steel production, and provides a method for continuously hot-dipping zinc on the strip steel to prevent strip breakage in roll change, which can reduce the production of waste products and non-standard products. The method comprises the following steps of: (a) after a sinking roll system is lifted out of a zinc pot, lifting a furnace nose, tightening the strip steel and enabling the whole strip steel to be positioned on zinc liquid level; (b) pulling out the unplated part of the strip steel from the furnace nose; (c) arranging an isolating device between the unplated part and the zinc liquid level; (d) cutting off the plated part of the strip steel; (e) connecting a corrosion-resistant belt and the unplated part; (f) pulling the whole unplated part back to the furnace nose, and removing the isolating device; and (g) installing the sinking roll system. The method disclosed by the invention can be applied in replacing the sinking roll in the production of continuously hot-dipping zinc on strip steel.

Description

The method of broken belt while preventing roll change with steel continuous hot-dipping galvanizing
Technical field
The present invention relates to cold rolled strip steel production field, relate in particular to a kind of method of broken belt while preventing roll change with steel continuous hot-dipping galvanizing.
Background technology
Hot dip process technology is that a kind of material that will plate (as iron and steel or other alloy) immerses in the coated metal liquid of fusing, after contacting for some time with molten metal, the metallic surface of maintenance matrix takes out, make it to adhere to one deck uniformly, any surface finish, with the technology of the coated metal of matrix mortise.Hot dip process technology is a kind of for a long time generally for the surface treatment method of metal products.Band steel continuous hot-dipping galvanizing (aluminium zinc) be band steel through cleaning by degreasing, continuous annealing and cooling after under protective atmosphere, enter zinc pot by stove nose; realize turning to by the sinking roll system in zinc pot and leave zinc pot; belt steel surface is blown away after unnecessary zinc liquid cooling through cool wind box by air knife, finally form the uniform coating of one deck at belt steel surface.
During continuous hot galvanizing is produced, change direction with steel by the sinking roller that immerses zinc pot, and sinking roller there is certain life cycle, use after certain hour, because following reason needs to change: 1, sinking roller group surface cord affects quality product; 2, band steel specification need be broadened by narrow; 3, bearing shell, axle sleeve life cycle finish.
Change sinking roller group and in fact comprise two groundworks: 1, sinking roller group is hung out to zinc pot; 2, new sinking roller is assembled into zinc pot.Conventionally completing a complete sinking roller group replacing time needs 1-2 hour.In replacing sinking roller group process, unit cannot move, if band steel rests in zinc pot for a long time, there will be corrosion reaction between steel plate and zinc liquid to occur that steel plate dissolves in zinc liquid, and long words of time there will be dissolves i.e. common " broken belt " said completely.Evidence, the straight carbon steel of 0.5mm is immersed in 600 DEG C of aluminium zinc liquid about 15 minutes and just there will be intensive corrosion cavity, can be with steel fracture about 30 minutes at zinc liquid level place.
Therefore when, being easy to occur band steel broken belt, especially aluminium zinc plating solution or producing thin specification steel band in replacing sinking roller group process.Existing control broken belt method is in the replacing professional etiquette lattice transition of advancing, and meets and changes the requirement of sinking roller group to extend the anticorrosive time by unit in the thick steel band arrangement of specification; And shortening packs the time of sinking roller group into and packs the rear unit starting time into as far as possible.Adopt this method often can produce a lot of non-target products; And need specification to transit back goal standard having changed after sinking roller group, cause great waste; Shorten pack the time of sinking roller group into and pack into the rear unit starting time also the equipment state to unit and operator's technical ability require high.
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of can reduce that waste product and nonstandard product produce prevent roll change with steel continuous hot-dipping galvanizing time broken belt method.
For the technical scheme that addresses the above problem employing is: while preventing roll change with steel galvanizing, the method for broken belt comprises the steps:
A, sinking roll system hang out after zinc pot, lift stove nose, and belt tensioner steel makes to be with steel to be all positioned at zinc liquid level top;
B, from stove nose the not plating part of pull-out with steel;
C, do not plate part and zinc liquid level between disrupter is set;
D, clip the plating part with steel;
E, anti-corrosion band is connected with plating part not;
F, will not plate part and all retract stove nose, remove disrupter;
G, installation sinking roll system.
Concrete: anti-corrosion band is Stainless Steel Band.
Concrete: anti-corrosion band is titanium band.
Concrete: anti-corrosion band and the welding of not plating part.
Concrete: anti-corrosion band and the riveted joint of not plating part.
The invention has the beneficial effects as follows: anti-corrosion band is not for zinc (aluminium zinc) chemical reaction or react slower metal strip, replace after anti-corrosion band, anti-corrosion band can be resisted zinc (aluminium zinc) corrosion the long period, what for example 0.5mm was thick 2 is stainless steel anti-corrosion time in 600 DEG C of zinc aluminum pots can exceed 4 hours, and condition of equivalent thickness 3 is that stainless steel can exceed 12 hours.Carry out transition without changing large gauge strips steel like this, greatly reduced the rejection number producing in recovery process after shutting down.
Brief description of the drawings
Fig. 1 is the normal production status schematic diagram of band steel continuous hot-dipping galvanizing;
Fig. 2 is step a schematic diagram;
Fig. 3 is step b schematic diagram;
Fig. 4 is step c schematic diagram;
Fig. 5 is steps d, e schematic diagram;
Fig. 6 is step f schematic diagram;
Fig. 7 is step g schematic diagram;
In figure, be labeled as: stove nose 1, do not plate part 2, band steel 3, plated part 4, sinking roll system 5, zinc pot 6, zinc liquid level 7, disrupter 8, be anti-corrosionly with 9.
Embodiment
Below in conjunction with the drawings and specific embodiments, invention is further illustrated.
For provide a kind of can reduce that waste product and nonstandard product produce prevent roll change with steel continuous hot-dipping galvanizing time broken belt method.As shown in Figures 2 to 7, while preventing roll change with steel continuous hot-dipping galvanizing, the method for broken belt comprises the steps: that a, sinking roll system 5 hang out after zinc pot 6, lifts stove nose 1, and belt tensioner steel 3 makes to be with steel 3 to be all positioned at zinc liquid level 7 tops; B, from stove nose 1 the not plating part 2 of pull-out with steel 3; C, disrupter 8 is set not plating between part 2 and zinc liquid level 7; D, clip the plating part 4 with steel 3; E, by anti-corrosion be with 9 with do not plate part 2 and be connected; F, will not plate part 2 and all retract stove nose 1, remove disrupter 8; G, installation sinking roll system 5, resume production.Anti-corrosionly be not with zinc (aluminium zinc) chemical reaction or react slower metal strip with 9, replace after anti-corrosion band, because corrosion-resistant material can be resisted zinc (aluminium zinc) corrosion the long period, what for example 0.5mm was thick 2 is stainless steel anti-corrosion time in 600 DEG C of zinc aluminum pots can exceed 4 hours, and condition of equivalent thickness 3 is that stainless steel can exceed 12 hours.Without steel band is carried out to transition, greatly reduce the rejection number producing in recovery process after shutting down like this.
Anti-corrosionly as previously mentioned be not with zinc (aluminium zinc) chemical reaction or react slower metal strip with 9, the present invention is preferably anti-corrosion is with 9 for Stainless Steel Band or titanium band.On Stainless Steel Band or titanium band market, all there is sale, obtain easily, and anti-breaking effective.
Anti-corrosion be with 9 with do not plate part 2 and have and can be connected in many ways, optimal way of the present invention is: anti-corrosion be with 9 with do not plate part 2 and weld or rivet.Welding or riveted joint have technique simple, connect reliable advantage.

Claims (3)

1. while preventing roll change with steel continuous hot-dipping galvanizing, the method for broken belt, is characterized in that comprising the steps:
A, sinking roll system (5) hang out after zinc pot (6), lift stove nose (1), and belt tensioner steel (3) makes to be with steel (3) to be all positioned at zinc liquid level (7) top;
B, from stove nose (1) the not plating part (2) of pull-out band steel (3);
C, disrupter (8) is set not plating between part (2) and zinc liquid level (7);
D, clip band steel (3) plating part (4);
E, anti-corrosion band (9) is connected with plating part (2) not, anti-corrosion band (9) is Stainless Steel Band or titanium band;
F, will not plate part (2) all retract stove nose (1), remove disrupter (8);
G, installation sinking roll system (5).
2. the method for broken belt while preventing roll change with steel continuous hot-dipping galvanizing according to claim 1, is characterized in that: described anti-corrosion band (9) and plating part (2) welding.
3. the method for broken belt while preventing roll change with steel continuous hot-dipping galvanizing according to claim 1, is characterized in that: described anti-corrosion band (9) and plating part (2) riveted joint.
CN201210579948.8A 2012-12-27 2012-12-27 Method for continuously hot-dipping zinc on strip steel to prevent strip breakage in roll change Expired - Fee Related CN102994934B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210579948.8A CN102994934B (en) 2012-12-27 2012-12-27 Method for continuously hot-dipping zinc on strip steel to prevent strip breakage in roll change

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210579948.8A CN102994934B (en) 2012-12-27 2012-12-27 Method for continuously hot-dipping zinc on strip steel to prevent strip breakage in roll change

Publications (2)

Publication Number Publication Date
CN102994934A CN102994934A (en) 2013-03-27
CN102994934B true CN102994934B (en) 2014-07-16

Family

ID=47924035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210579948.8A Expired - Fee Related CN102994934B (en) 2012-12-27 2012-12-27 Method for continuously hot-dipping zinc on strip steel to prevent strip breakage in roll change

Country Status (1)

Country Link
CN (1) CN102994934B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108676996B (en) * 2018-04-24 2019-08-13 邯郸钢铁集团有限责任公司 A kind of strip processing method when replacement continuous annealing furnace furnace nose
CN110129705A (en) * 2019-06-04 2019-08-16 甘肃酒钢集团宏兴钢铁股份有限公司 A kind of continuous zinc/aluminium/aluminium zinc coating silicon unit machine control method
CN113817975B (en) * 2021-08-23 2023-07-14 山东钢铁集团日照有限公司 Method for preventing strip steel from fusing during stop of fixed zinc pot

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101205598A (en) * 2006-12-22 2008-06-25 沈阳大陆激光技术有限公司 Dip-roll sleeve and method for manufacturing the same
EP1696047B1 (en) * 2003-12-11 2014-02-12 Hitachi Metals, Ltd. Roll for molten metal plating bath

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004091831A (en) * 2002-08-30 2004-03-25 Jfe Steel Kk Manufacturing apparatus and manufacturing method for hot dip coated metallic strip

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1696047B1 (en) * 2003-12-11 2014-02-12 Hitachi Metals, Ltd. Roll for molten metal plating bath
CN101205598A (en) * 2006-12-22 2008-06-25 沈阳大陆激光技术有限公司 Dip-roll sleeve and method for manufacturing the same

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2004-91831A 2004.03.25

Also Published As

Publication number Publication date
CN102994934A (en) 2013-03-27

Similar Documents

Publication Publication Date Title
JP7122045B2 (en) Method for manufacturing corrosion resistant hot stamped parts
CN102994934B (en) Method for continuously hot-dipping zinc on strip steel to prevent strip breakage in roll change
JP5894721B2 (en) Surface-treated metal plate and method for producing molded product using the surface-treated metal plate
CN1575348A (en) Hot press forming method, and a plated steel material therefor and its manufacturing method
CN102251201B (en) Preparation method of high purity nickel wire
CN107739998B (en) A kind of preparation method of flat cold-rolled sheet
CN105247095A (en) Zinc-coated steel for press hardening application and method of production
JP4995140B2 (en) Ni-plated steel sheet for containers, container manufactured thereby, and method for manufacturing the same
CN101590495A (en) A kind of preparation method of particle reinforced aluminum-matrix steel-backed composite board
CN104439935A (en) Bolt manufacturing process
CN104046916A (en) High-strength cold-rolled electrogalvanized binding strip and production method thereof
CN108330307A (en) A kind of electric arc spraying zinc-copper-titanium alloy silk material and its preparation process
CN104278140A (en) Production method of ultra-thin full-hard aluminum and zinc-plated plate
CN106591624B (en) A method of it improving metal and rolls anode comprehensive performance
CN103372641A (en) Steel wire rope head casting method
CN104066859B (en) The method of the metallic coating on refining steel band
JPS5945757B2 (en) Manufacturing method for single-sided coated galvanized steel sheet
JP4561359B2 (en) Conductor roll
CN102899514A (en) Noble metal alloy smelting method
CN201424498Y (en) Hot galvanizing mechanism
CN108588610A (en) A kind of process of surface of steel plate continuous hot-dipping galvanizing titanium alloy
CN110129705A (en) A kind of continuous zinc/aluminium/aluminium zinc coating silicon unit machine control method
Yuzov et al. Tendencies of variation of the production and economic parameters for the Russian metallurgical works
CN202643817U (en) Hot galvanizing product production line
CN104294139A (en) Preparation method of nodular cast iron material

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140716

Termination date: 20161227