CN102989267A - Regular-flow packed bed and mounting method thereof - Google Patents

Regular-flow packed bed and mounting method thereof Download PDF

Info

Publication number
CN102989267A
CN102989267A CN2012105313770A CN201210531377A CN102989267A CN 102989267 A CN102989267 A CN 102989267A CN 2012105313770 A CN2012105313770 A CN 2012105313770A CN 201210531377 A CN201210531377 A CN 201210531377A CN 102989267 A CN102989267 A CN 102989267A
Authority
CN
China
Prior art keywords
collar tie
packed bed
guide bar
flow guide
tie beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105313770A
Other languages
Chinese (zh)
Other versions
CN102989267B (en
Inventor
方达辉
朱武华
郭丽丽
何晶
陈容
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN BILV EP INDUSTRY DEVELOPMENT Co Ltd
Original Assignee
HUNAN BILV EP INDUSTRY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN BILV EP INDUSTRY DEVELOPMENT Co Ltd filed Critical HUNAN BILV EP INDUSTRY DEVELOPMENT Co Ltd
Priority to CN201210531377.0A priority Critical patent/CN102989267B/en
Publication of CN102989267A publication Critical patent/CN102989267A/en
Application granted granted Critical
Publication of CN102989267B publication Critical patent/CN102989267B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a regular-flow packed bed which comprises four parts of a supporting frame, ring beams, a diversion strip, and an intermediate blind cylinder; the supporting frame is used for supporting and fixing the ring beam; the ring beam is an annular beam mounted on the supporting frame, and a plurality of ring beams are distributed concentrically; the diversion strip is movably mounted between two adjacent ring beams; the intermediate blind cylinder is located in the central ring beam to close the intermediate space. The invention also discloses a mounting method of the regular-flow packed bed. All parts of the regular-flow packed bed of the invention can be dismounted, and parts at the windward side are easy to replace, which reduces maintenance workload, and reduces the manufacture cost of the regular-flow packed bed.

Description

A kind of rule stream packed bed and installation method thereof
Technical field
The present invention relates to a kind of rule stream packed bed and installation method thereof.
Background technology
Existing rule stream packed bed is that a block of metal material that adopts is made, and bed surface is an integral body, and in running, because corrosion, local corrosion is very large in rule stream packed bed windward side, and corrosion area has distribution at whole bed surface.Although corrosion failure is local, as will keep in repair the work that certainly will failure area will be cut and weld, time-consuming taking a lot of work.
Summary of the invention
The present invention provides a kind of rule stream packed bed in order to overcome the above problems, and described rule stream packed bed adopts easy-disassembling-assembling modular construction, when having solved existing rule stream packed bed operation the windward side corrosion large, the deficiency of easy-maintaining not after the corrosion.
Technical scheme of the present invention is: whole rule stream packed bed is made of bracing frame, collar tie beam, flow guide bar, intermediate blind cylinder four parts, support frame as described above be used for to support and fixing collar tie beam, collar tie beam is the annular girder that is installed on the bracing frame, a plurality of collar tie beams are concentric distribution, flow guide bar is movably installed between adjacent two collar tie beams, the intermediate blind cylinder is positioned at the center collar tie beam, with the sealing intermediate space.
The present invention can also further implement by following technical solution: the radiation beam that support frame as described above extends around by the intermediate beam of ring-type with from the intermediate beam lateral forms; Described flow guide bar is installed between adjacent two collar tie beams by screw rod.Described flow guide bar is made by anti-corrosion material.
The present invention also provides the installation method of above-mentioned rule stream packed bed, finish by following steps: bracing frame is packed on the pedestal, the intermediate blind cylinder is fixed to the bracing frame center, the first lap collar tie beam is take the intermediate blind cylinder as benchmark, and the first lap collar tie beam is welded to the sidewall of intermediate blind cylinder, forms a whole circle, then flow guide bar is fixed on the first lap collar tie beam, next according to mounted flow guide bar the second circle collar tie beam is installed, by that analogy, next collar tie beam and the flow guide bar of back is installed.The installation of whole like this rule fluidized bed.
Advantage of the present invention is:
All members of rule stream packed bed of the present invention all can be dismantled, and the member that is in the windward side is easy to change, and has reduced maintenance load, have reduced simultaneously the manufacturing cost of rule stream packed bed.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is the three-dimensional exploded view of invention.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is further described in detail.
By accompanying drawing as seen, rule of the present invention stream packed bed is made of bracing frame 1, collar tie beam 2, flow guide bar 3, intermediate blind cylinder 4 four parts, and support frame as described above 1 is used for supporting and fixing collar tie beam 2, and brace summer 1 is divided into again intermediate beam 11 and radiation beam 12; Collar tie beam 2 is for being installed in the annular girder on the bracing frame, and a plurality of collar tie beams are concentric distribution, and flow guide bar 3 is installed between adjacent two collar tie beams by screw rod, and intermediate blind cylinder 4 is positioned at the center collar tie beam, with the sealing intermediate space.
In the present embodiment, bracing frame 1 is comprised of an annular intermediate beam 11 and 8 radiation beams 12.Flow guide bar 3 is made by anti-corrosion material.
The step that rule stream packed bed of the present invention is installed on the absorption tower is as follows:
By circumference equal dividing radiation beam 12 is welded on smoke absorption Tata body relevant position, intermediate beam again is welded, again intermediate blind cylinder 4 is fixed on the intermediate beam 11, first lap collar tie beam 2 is take intermediate blind cylinder 4 as benchmark, be welded on the sidewall of intermediate blind cylinder 4, form a whole circle, then flow guide bar 3 is fixed on the first lap collar tie beam, flow guide bar 3 can adopt various ways with being fixedly connected with of collar tie beam 2, and the screw rod connection is exactly a good way in the present embodiment.Next the second circle collar tie beam is installed, is put down and be evenly distributed on the first lap collar tie beam because flow guide bar is fixing, therefore the collar tie beam of the second circle can be according to mounted flow guide bar, and a collar tie beam is done at the scene, cooperates closely with flow guide bar to guarantee the circle collar tie beam.Next collar tie beam and the flow guide bar of back are installed by that analogy.The installation of whole like this rule stream packed bed.
The above, it only is preferred embodiment of the present invention, be not that the present invention is done any pro forma restriction, any technical solution of the present invention content that do not break away from,, all still belong in the scope of technical solution of the present invention any simple modification, equivalent variations and modification that above embodiment does according to technical spirit of the present invention.

Claims (5)

1. rule are flowed packed bed, it is characterized in that: consisted of by bracing frame, collar tie beam, flow guide bar, intermediate blind cylinder four parts, support frame as described above be used for to support and fixing collar tie beam, collar tie beam is the annular girder that is installed on the bracing frame, a plurality of collar tie beams are concentric distribution, flow guide bar is movably installed between adjacent two collar tie beams, and the intermediate blind cylinder is positioned at the center collar tie beam, with the sealing intermediate space.
2. kind according to claim 1 rule stream packed bed is characterized in that: the radiation beam that support frame as described above extends around by the intermediate beam of ring-type with from the intermediate beam lateral forms.
3. kind rule according to claim 1 are flowed packed bed, and it is characterized in that: described flow guide bar is installed between two collar tie beams by screw rod.
4. kind rule according to claim 1 are flowed packed bed, and it is characterized in that: described flow guide bar is made by anti-corrosion material.
5. arbitrary described kind rule are flowed the installation method of packed bed according to claim 1-4, comprise the steps: bracing frame is packed on the pedestal, the intermediate blind cylinder is fixed to the bracing frame center, the first lap collar tie beam is take the intermediate blind cylinder as benchmark, the first lap collar tie beam is welded to the sidewall of intermediate blind cylinder, form a whole circle, then flow guide bar is fixed on the first lap collar tie beam, next according to mounted flow guide bar the second circle collar tie beam is installed, next collar tie beam and the flow guide bar of back are installed by that analogy.
CN201210531377.0A 2012-12-12 2012-12-12 A kind of rule stream packed bed and its installation method Active CN102989267B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210531377.0A CN102989267B (en) 2012-12-12 2012-12-12 A kind of rule stream packed bed and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210531377.0A CN102989267B (en) 2012-12-12 2012-12-12 A kind of rule stream packed bed and its installation method

Publications (2)

Publication Number Publication Date
CN102989267A true CN102989267A (en) 2013-03-27
CN102989267B CN102989267B (en) 2017-03-29

Family

ID=47918677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210531377.0A Active CN102989267B (en) 2012-12-12 2012-12-12 A kind of rule stream packed bed and its installation method

Country Status (1)

Country Link
CN (1) CN102989267B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103394321A (en) * 2013-07-22 2013-11-20 杭州杭氧股份有限公司 Mounting method for large-diameter packed tower internals
CN107789929A (en) * 2017-12-19 2018-03-13 湖南碧绿环保产业发展有限公司 One kind rule stream packed bed rule stream phase change device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56163727A (en) * 1980-05-21 1981-12-16 Kyowa Kako Kk Gas absorption tower
US5514205A (en) * 1994-12-30 1996-05-07 Awaji; Toshio Apparatus for removing harmful objects from a gas
CN1621130A (en) * 2004-10-01 2005-06-01 方达辉 Self revolving planet fluidized bed
CN101172219A (en) * 2006-10-31 2008-05-07 中国石油大学(北京) Component in gas-solid fluidized beds
CN201896101U (en) * 2010-10-13 2011-07-13 杭州金枫叶科技有限公司 Microbe suspending medium for moving bed biofilm reactor
CN203017948U (en) * 2012-12-12 2013-06-26 湖南碧绿环保产业发展有限公司 Regulated fluidization packed bed

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56163727A (en) * 1980-05-21 1981-12-16 Kyowa Kako Kk Gas absorption tower
US5514205A (en) * 1994-12-30 1996-05-07 Awaji; Toshio Apparatus for removing harmful objects from a gas
CN1621130A (en) * 2004-10-01 2005-06-01 方达辉 Self revolving planet fluidized bed
CN101172219A (en) * 2006-10-31 2008-05-07 中国石油大学(北京) Component in gas-solid fluidized beds
CN201896101U (en) * 2010-10-13 2011-07-13 杭州金枫叶科技有限公司 Microbe suspending medium for moving bed biofilm reactor
CN203017948U (en) * 2012-12-12 2013-06-26 湖南碧绿环保产业发展有限公司 Regulated fluidization packed bed

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103394321A (en) * 2013-07-22 2013-11-20 杭州杭氧股份有限公司 Mounting method for large-diameter packed tower internals
CN103394321B (en) * 2013-07-22 2015-04-01 杭州杭氧股份有限公司 Mounting method for large-diameter packed tower internals
CN107789929A (en) * 2017-12-19 2018-03-13 湖南碧绿环保产业发展有限公司 One kind rule stream packed bed rule stream phase change device

Also Published As

Publication number Publication date
CN102989267B (en) 2017-03-29

Similar Documents

Publication Publication Date Title
CN203640309U (en) Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame
CN203201562U (en) Shield tunneling machine initial counter-force frame convenient to detach, install and transport
CN103266778B (en) Detachable triangular scaffold and steel truss assembly construction method
CN103722297A (en) Compound welding equipment and manufacturing technology for hollow-type transverse diaphragm of steel box beam
CN204266124U (en) The pre-assembled moulding bed of large sections steel box-girder
CN102989267A (en) Regular-flow packed bed and mounting method thereof
CN205057364U (en) Truss assemble bed -jig
CN203017948U (en) Regulated fluidization packed bed
CN204551936U (en) A kind of steel external staircase
CN104612908A (en) Wind power generation tower cylinder platform and wind power generation tower cylinder
CN207980737U (en) A kind of rule stream packed bed rule stream phase change device
CN204627001U (en) PC structure floor assembled prefabricated post diagonal brace support system
CN204645668U (en) The top support structure of shape steel support installed by a kind of rack
CN202788131U (en) Single tube communication tower platform
CN203247703U (en) Steel structural plant frame
CN203393721U (en) Inner support main purlin component
CN104526601A (en) Assembling jig for sheet slab steel structural bridge
CN206736951U (en) A kind of integrally foot bolt and framework shearing-resistant member positioning disk
CN205065184U (en) Semiconductor device manufacture equipment frame
CN204283198U (en) A kind of aerial ladder engineering machinery and ladder thereof
CN103388336A (en) Main purline part for inner support
CN107789929A (en) One kind rule stream packed bed rule stream phase change device
CN204780483U (en) A frock that is used for on tub truss fixed interim structure
CN203277420U (en) Novel photovoltaic support
CN204152264U (en) A kind of Chimney in Fossil Power Plant access path

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant