CN102968096A - Safe error proof verifying method for master station type comprehensive intelligent error proof system - Google Patents

Safe error proof verifying method for master station type comprehensive intelligent error proof system Download PDF

Info

Publication number
CN102968096A
CN102968096A CN2012104201138A CN201210420113A CN102968096A CN 102968096 A CN102968096 A CN 102968096A CN 2012104201138 A CN2012104201138 A CN 2012104201138A CN 201210420113 A CN201210420113 A CN 201210420113A CN 102968096 A CN102968096 A CN 102968096A
Authority
CN
China
Prior art keywords
graphical interfaces
current
error proof
service
real
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104201138A
Other languages
Chinese (zh)
Inventor
周伊琳
孙建伟
陈炯聪
余南华
黄曙
刘菲
黄缙华
唐升卫
夏亚君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority to CN2012104201138A priority Critical patent/CN102968096A/en
Publication of CN102968096A publication Critical patent/CN102968096A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The invention discloses a safe error proof verifying method for a master station type comprehensive intelligent error proof system. The method includes creating a gird model, switching the gird model to a simulation environment and reading real-time data, wherein the received grid operation mode is displayed on a graphical interface, and the current grid operation mode is in accordance with a real-time grid operation mode; and arranging the current equipment state into a switching on state to be displayed on the graphical interface; and intelligently simulating a ticket and performing safe error proof verifying, wherein an added task order is sent to operation ticket service, all allowed operation types are sent back to the graphical interface, current operating equipment and selected operation types are sent to the operation ticket service, c the steps are divided into a plurality of operation steps for comparison to form error proof verifying information to the graphical interface for display. According to the master station type comprehensive intelligent error proof verifying method, safe error proof verifying is performed by using an operation mode under the simulation environment, the simulation environment and a real-time environment are separated, and any operation performed in the simulation environment cannot affect the real-time environment.

Description

The method that a kind of main website formula comprehensive intelligent anti-error system safe related function is checked
Technical field
The present invention relates to the method for the anti-error check of a kind of electric power system dispatching handling safety, especially relate to the method that a kind of main website formula comprehensive intelligent anti-error system safe related function is checked.
Background technology
Along with the fast development of national economy, the electrical network scale also will constantly enlarge, and the transformer station that dispatchings of power netwoks at different levels are administered is more and more, and the intensity of its work is also increasing, cause that security issues become increasingly urgent in the power production process.And along with the progressively implementation of large operation and management mode, all to integrative development, the anti-error system of the operation of electric system also should be to integrative development from management to operational system for electrical production at different levels.Therefore, be necessary in the anti-error system of the regulation and control center construction one integrated intelligent comprehensive of cover, it will be on accurately power network topology model and real time data basis, carry out the research of security constraint analytical approach towards the whole network, solve the straighforward operation of ordering in the dispatching center to command with Surveillance center lack science, the anti-error means problem of security of system.So that its workflow standard more, to the security constraint analysis of dispatch command and straighforward operation more comprehensively and reliable.Avoid simultaneously causing casualties, device damage, large-area power-cuts, even cause the vibration of electrical network and disintegrate the economic loss heaviness.
Existing electric power system dispatching operation verification mode more complicated also can affect real time environment sometimes, may affect operation of power networks, produces adverse consequences.
The noun explanation:
The operation order service: the specific product of existing realization the art of this patent, " operation order service " executable program operates on the server machine.
Power system operating mode: the current state of each element in the Network Topology for Real-Time data of electrical network and the electrical network.
Real time environment: link to each other with real time service, reflect current electrical network real time operation mode, the operation in this environment directly affects the electrical network real time operation mode.
Simulated environment: link to each other with the operation order service, can read the real-time grid running mode data, the operation in this environment can not affect the electrical network real time operation mode.
Equipment: refer to operation power equipment, comprise switch, bus, transformer, circuit.
Action type: the initial sum final state of describing equipment.For example divide to turn and close.
Summary of the invention
Technical matters to be solved by this invention just provides the method that a kind of main website formula comprehensive intelligent anti-error system safe related function is checked, and verification mode is simple and convenient, and any operation of doing does not affect real time environment, effectively avoids maloperation.
Solve the problems of the technologies described above, the technical solution used in the present invention is as follows:
The method that a kind of main website formula comprehensive intelligent anti-error system safe related function is checked may further comprise the steps:
S1 creates electric network model
Draw power network topology figure by physical cabling figure, generate simultaneously electric network model, the current state of each element in the Network Topology for Real-Time data of the current electrical network of operation order service acquisition and the electrical network;
S2 switches to simulated environment from real time environment
Start main website formula comprehensive intelligent anti-error system, open graphical interfaces, by the handed over service function, select simulated environment to connect;
Associative operation in the S3 simulated environment
S3-1 and real time data are carried out synchronously: read the real time data menu by triggering, send the order of reading a real time data to the operation order service; After the operation order service is received and is read the real time data order, to Real-time Data Service request power system operating mode data, after the power system operating mode data receiver is complete the power system operating mode that receives is shown to graphical interfaces, current power system operating mode is consistent with the real-time grid method of operation in the graphical interfaces;
S3-2 adjust operation mode: in graphical interfaces, relevant devices is inserted the releasing menu by trigger data and change current state; After data are inserted and removed menu and be triggered, will insert and remove order and send to the operation order service, the operation order service receive insert remove order after, the current device state is set to "on" position and is shown to graphical interfaces;
S3-3 intelligence intends ticket and safe related function is checked: the increase task menu of trigger action equipment in graphical interfaces, the increase task order of current operation equipment is sent to the operation order service, after the operation order service was received and increased task order, all operations type that allows under the current state with current device returned to graphical interfaces; Graphical interfaces is selected action type after receiving all operations type, the action type of current operation equipment and selection is sent to the operation order service, after operating equipment and action type are received in the operation order service, resolve into many operation stepss according to the plan ticket rule in the database, and equipment operating correct in operation steps and the database compared, forming anti-error check information returns to graphical interfaces and shows, operation steps all by after the safe related function verification, is added operation steps in the list of steps of operation order forms.
Beneficial effect: adopt the simulated environment form, simulated environment is comprised of electric network model, figure and real time operation mode, the yardman carries out graphics aided work under simulated environment, utilize the method for operation under the simulated environment to carry out the safe related function check, simulated environment and real time environment isolation, any operation of doing under simulated environment does not affect real time environment.And, when electric network model, figure or the method for operation change in the basic platform, can adopt the automatic or manual mode to realize the synchronous of simulated environment and basic platform data.
Carry out just entering the practical operation execution after the safe related function check, effectively avoid maloperation.
Description of drawings
Fig. 1 is schematic flow sheet of the present invention;
Fig. 2 is embodiment topology synoptic diagram.
Embodiment
As shown in Figure 1, the embodiment of the method that main website of the present invention formula comprehensive intelligent anti-error system safe related function is checked may further comprise the steps:
The first step creates electric network model:
Draw power network topology figure by physical cabling figure, generate simultaneously electric network model, the current state of each element in the Network Topology for Real-Time data of the current electrical network of operation order service acquisition and the electrical network.
Second step switches to simulated environment from real time environment:
Start main website formula comprehensive intelligent anti-error system, operating personnel open graphical interfaces, by the handed over service function, select simulated environment to connect, and switch to simulated environment.
The 3rd step, associative operation in the simulated environment:
Operating personnel proceed as follows in graphical interfaces:
1. carry out synchronously with real time data: read the real time data menu by triggering, send the order of reading a real time data to the operation order service; After the operation order service is received and is read the real time data order, beginning is to real time data request power system operating mode data, after data receiver is complete the power system operating mode that receives is shown to graphical interfaces, current power system operating mode is consistent with the real-time grid method of operation in the graphical interfaces.
2. adjust operation mode: can insert by trigger data disconnecting link, switch in graphical interfaces and remove menu and change current state, for example 12494 disconnecting link current states are separating brake, and current state was set to close a floodgate after trigger data was inserted and removed menu.After data are inserted and are removed menu and be triggered, can will insert releasing order (comprising current device (12494 disconnecting link) and action type (divide to turn and close)) and send to the operation order service, after the operation order service was received and inserted the releasing order, current device (12494 disconnecting link) state was set to "on" position and is shown to graphical interfaces.By revising the state of disconnecting link and switch, reach the purpose of revising power system operating mode.
3. intelligence is intended ticket and safe related function check: the increase task right-click menu of trigger action equipment in graphical interfaces, the increase task order of current operation equipment is sent to the operation order service, after the operation order service was received and increased task order, all operations type that allows under the current state with current device returned to graphical interfaces; Graphical interfaces is selected action type after receiving all operations type, the action type of current operation equipment and selection is sent to the operation order service, after operating equipment and action type are received in the operation order service, resolve into many operation stepss according to the plan ticket rule in the database, and equipment operating correct in operation steps and the database compared, forming anti-error check information returns to graphical interfaces and shows, operation steps all by after the safe related function verification, is added operation steps in the list of steps of operation order forms.

Claims (1)

1. method that main website formula comprehensive intelligent anti-error system safe related function is checked may further comprise the steps:
S1 creates electric network model
Draw power network topology figure by physical cabling figure, generate simultaneously electric network model, the current state of each element in the Network Topology for Real-Time data of the current electrical network of operation order service acquisition and the electrical network;
S2 switches to simulated environment from real time environment
Start main website formula comprehensive intelligent anti-error system, open graphical interfaces, by the handed over service function, select simulated environment to connect;
Associative operation in the S3 simulated environment
S3-1 and real time data are carried out synchronously: read the real time data menu by triggering, send the order of reading a real time data to the operation order service; After the operation order service is received and read the real time data order, to Real-time Data Service request power system operating mode data, after the power system operating mode data receiver is complete the power system operating mode that receives is shown to graphical interfaces;
S3-2 adjust operation mode: in graphical interfaces, relevant devices is inserted the releasing menu by trigger data and change current state; After data are inserted and removed menu and be triggered, will insert and remove order and send to the operation order service, the operation order service receive insert remove order after, the current device state is set to "on" position and is shown to graphical interfaces;
S3-3 intelligence intends ticket and safe related function is checked: the increase task menu of trigger action equipment in graphical interfaces, the increase task order of current operation equipment is sent to the operation order service, after the operation order service was received and increased task order, all operations type that allows under the current state with current device returned to graphical interfaces; Graphical interfaces is selected action type after receiving all operations type, the action type of current operation equipment and selection is sent to the operation order service, after operating equipment and action type are received in the operation order service, resolve into many operation stepss according to the plan ticket rule in the database, and equipment operating correct in operation steps and the database compared, forming anti-error check information returns to graphical interfaces and shows, operation steps all by after the safe related function verification, is added operation steps in the list of steps of operation order forms.
CN2012104201138A 2012-10-29 2012-10-29 Safe error proof verifying method for master station type comprehensive intelligent error proof system Pending CN102968096A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104201138A CN102968096A (en) 2012-10-29 2012-10-29 Safe error proof verifying method for master station type comprehensive intelligent error proof system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104201138A CN102968096A (en) 2012-10-29 2012-10-29 Safe error proof verifying method for master station type comprehensive intelligent error proof system

Publications (1)

Publication Number Publication Date
CN102968096A true CN102968096A (en) 2013-03-13

Family

ID=47798285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104201138A Pending CN102968096A (en) 2012-10-29 2012-10-29 Safe error proof verifying method for master station type comprehensive intelligent error proof system

Country Status (1)

Country Link
CN (1) CN102968096A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103714422A (en) * 2013-12-16 2014-04-09 北京能源投资(集团)有限公司 Intelligent management method and intelligent management equipment
CN103729731A (en) * 2013-12-16 2014-04-16 北京能源投资(集团)有限公司 Sign management method and device
CN103761624A (en) * 2014-01-28 2014-04-30 国网安徽省电力公司 Implementing method of integrated power grid dispatching operation intelligent mistaken-early-warning preventing system
CN104571021A (en) * 2014-12-12 2015-04-29 国家电网公司 Equipment state operation executing method and device
CN104966150A (en) * 2015-05-26 2015-10-07 国网山东省电力公司青岛供电公司 Intelligent anti-error analysis method and system
CN111401864A (en) * 2020-06-04 2020-07-10 广东电网有限责任公司东莞供电局 Regulation and control programmed operation application system based on artificial intelligence
CN113177081A (en) * 2021-05-07 2021-07-27 国电南瑞科技股份有限公司 Uninterrupted visual checking method for one-key sequential control operation order
WO2022105483A1 (en) * 2020-11-20 2022-05-27 国电南瑞科技股份有限公司 Transformer substation misoperation-prevention logic visualization method capable of realizing real-time checking and simulation checking

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐俊杰等: ""基于SCADA系统的地区电网调度操作票系统的设计"", 《电力系统保护与控制》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103714422A (en) * 2013-12-16 2014-04-09 北京能源投资(集团)有限公司 Intelligent management method and intelligent management equipment
CN103729731A (en) * 2013-12-16 2014-04-16 北京能源投资(集团)有限公司 Sign management method and device
CN103729731B (en) * 2013-12-16 2017-12-29 北京能源集团有限责任公司 A kind of nameplate management method and equipment
CN103761624A (en) * 2014-01-28 2014-04-30 国网安徽省电力公司 Implementing method of integrated power grid dispatching operation intelligent mistaken-early-warning preventing system
CN104571021A (en) * 2014-12-12 2015-04-29 国家电网公司 Equipment state operation executing method and device
CN104966150A (en) * 2015-05-26 2015-10-07 国网山东省电力公司青岛供电公司 Intelligent anti-error analysis method and system
CN111401864A (en) * 2020-06-04 2020-07-10 广东电网有限责任公司东莞供电局 Regulation and control programmed operation application system based on artificial intelligence
WO2022105483A1 (en) * 2020-11-20 2022-05-27 国电南瑞科技股份有限公司 Transformer substation misoperation-prevention logic visualization method capable of realizing real-time checking and simulation checking
CN113177081A (en) * 2021-05-07 2021-07-27 国电南瑞科技股份有限公司 Uninterrupted visual checking method for one-key sequential control operation order

Similar Documents

Publication Publication Date Title
CN102968096A (en) Safe error proof verifying method for master station type comprehensive intelligent error proof system
CN103904779B (en) A kind of full station intelligent terminal analogue means of intelligent substation and using method thereof
CN104678960B (en) It is a kind of based on scene it is anti-error and intend ticket training off-line type Dispatching system and method
CN102957205B (en) A kind of method and system setting up electricity distribution network model
CN102931727B (en) Topological anti-error check method of power dispatching master station type integrated intelligent anti-error system
CN103607042B (en) The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town
CN102591223B (en) Intelligentized diagnostic system of substation-operation operation tickets
CN103593809A (en) Intelligent operation-ticket semanteme verification method of automatic power dispatching system
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN104682560B (en) Graphical verifying method for power distribution network model transaction
CN105227402A (en) The integrated method of testing of a kind of intelligent substation many stipulations communication
CN106600457B (en) Microcomputer five-prevention main wiring diagram analysis system of transformer substation
CN104133443A (en) Method for automatically generating power grid dispatching operation order through power grid overhaul application forms
CN103529708B (en) The pre-operation analogue system of power distribution network and simulating analysis
CN110784020A (en) Automatic checking and accepting equipment, system and method for monitoring information
CN105119237B (en) The method that relay protection operation is checked
CN104036374A (en) Method for assisting in disposing operating accidents of power grid
CN104460607A (en) Production system graphic ticketing method based on simulated rehearsal
CN103545917A (en) Scheduling-automation sub-station simulation system
CN104360835A (en) Automatic sequential control operation ticket generation method based on topologic mode
CN102426309A (en) Method for testing area spare power automatic switching system in engine room environment of master station
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN105680441B (en) Simulation based on stimulated replacement technology is to a device
CN104407577A (en) Intelligent check anti-maloperation method based on real-time trend
CN103093028B (en) The modeling method of power scheduling simulation training system pilot signal and analogy method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130313