CN102966104A - 一种复合锤振动沉管挤密桩工方法 - Google Patents

一种复合锤振动沉管挤密桩工方法 Download PDF

Info

Publication number
CN102966104A
CN102966104A CN2012104914667A CN201210491466A CN102966104A CN 102966104 A CN102966104 A CN 102966104A CN 2012104914667 A CN2012104914667 A CN 2012104914667A CN 201210491466 A CN201210491466 A CN 201210491466A CN 102966104 A CN102966104 A CN 102966104A
Authority
CN
China
Prior art keywords
pile
hammer
machine
pipe
diesel hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104914667A
Other languages
English (en)
Inventor
何福江
姜暑芳
刘福友
孙书伟
李春龙
柴仓锁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Sinohydro Bureau 7 Co Ltd
Original Assignee
China University of Mining and Technology Beijing CUMTB
Sinohydro Bureau 7 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB, Sinohydro Bureau 7 Co Ltd filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN2012104914667A priority Critical patent/CN102966104A/zh
Publication of CN102966104A publication Critical patent/CN102966104A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开了一种复合锤振动沉管挤密桩工方法,包括以下步骤:按照普通沉管桩机的施工方法进行成孔;在桩机自身反作用力达到预设的阈值而桩管仍无法再继续钻进时,停止桩机钻进,通过桩机卷扬系统将柴油锤提升;当柴油锤提升至预设高度后,柴油锤在卷扬系统辅助下爆发;随后柴油锤在自身重力及锤头自由落体产生的加速度下,通过底盘传递,推动桩管继续钻进至设计高度;在成孔完成后,提升柴油锤并锁定,沉管桩机按照填料、反插、振动密实步骤反复进行,直至成桩完毕。本发明具有成本低、效率高特点。

Description

一种复合锤振动沉管挤密桩工方法
技术领域
本发明涉及建筑施工技术领域,尤其涉及一种复合锤振动沉管挤密桩工方法。
背景技术
普通沉管桩机当遇到当遇到坚硬夹层后,要将桩管往下推进非常困难,或者先更换其它设备,当通过坚硬夹层后,再更换回普通沉管桩机,因此使用非常不方便,效率低。
发明内容
本发明解决的技术问题是一种复合锤振动沉管挤密桩工方法,能够适合各种地质情况,通过切换桩机头,高效地完成沉管打桩。
为了解决以上技术问题,本发明实施例公开了一种复合锤振动沉管挤密桩工方法,包括以下步骤:
按照普通沉管桩机的施工方法进行成孔;
在桩机自身反作用力达到预设的阈值而桩管仍无法再继续钻进时,停止桩机钻进,通过桩机卷扬系统将柴油锤提升;
当柴油锤提升至预设高度后,柴油锤在卷扬系统辅助下爆发;
随后柴油锤在自身重力及锤头自由落体产生的加速度下,通过底盘传递,推动桩管继续钻进至设计高度;
在成孔完成后,提升柴油锤并锁定,沉管桩机按照填料、反插、振动密实步骤反复进行,直至成桩完毕。
进一步,作为优选,填料具体为:首先小型装载机将填料装至桩机斗内,然后通过卷扬机牵引提升至桩机管身的受料口内,如此循环,直至按计算的填料量上料完成。
进一步,作为优选,反插具体为:拔管前先振动0.5~2min后再边振动边拔管,每提升0.5~1m导管反插30cm,留振10~20s,如此反复直至全管拔出。
进一步,作为优选,拔管速度为1~2m/min。
本发明通过在普通桩机顶部增设一钢制连接底盘,有效地将上部柴油锤和沉管桩机结合在一起,在柴油锤和沉管桩机导轨一致的前提下即可实现柴油锤和沉管桩机合二为一的共同作用,当遇到坚硬土层,快速结合使用柴油锤,提高了效率,降低了成本。
附图说明
当结合附图考虑时,通过参照下面的详细描述,能够更完整更好地理解本发明以及容易得知其中许多伴随的优点,但此处所说明的附图用来提供对本发明的进一步理解,构成本发明的一部分,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定,其中:
图1是本发明实施例一种复合锤振动沉管挤密桩工方法流程图。
具体实施方式
参照图1对本发明的实施例进行说明。
为使上述目的、特征和优点能够更加明显易懂,下面结合附图和具体实施方式对本发明作进一步详细的说明。
一种复合锤振动沉管桩机设备,包括整机主架、配电箱、桩机支架、操作平台、桩机主架、柴油锤头、桩机振动锤头、桩管、受料口、上料斗,整机主架支撑整个设备,上面安装有给整个设备提供电源的配电箱和控制整个设备的操作平台,桩机支架固定在整机主架上,柴油锤头和桩机振动锤头通过导轨和桩机支架连接,桩管一端和桩机振动锤头、柴油锤头顺序连接,桩机振动锤头通过振动给桩管施加力量,柴油锤头通过锤击给桩管施加力量,另一端自由设置,桩管靠近振动锤头一端开有受料口,在受料口旁设置上料斗。
如图1所示,本发明提供一种复合锤振动沉管挤密桩工方法,包括以下步骤:
S1、按照图纸的要求将导轨和底盘等安装并调节完毕,按照普通沉管桩机的施工方法进行成孔,即:沉管桩机通过自身反作用力成孔(一般孔径在桩管0.5~0.8倍左右);
S2、在桩机自身反作用力达到预设的阈值而桩管仍无法再继续钻进时,停止桩机钻进,通过桩机卷扬系统将柴油锤提升;
S3、当柴油锤提升至预设高度后,柴油锤在卷扬系统辅助下爆发;
S4、随后柴油锤在自身重力及锤头自由落体产生的加速度下,通过底盘传递,推动桩管继续钻进至设计高度;
现场砂石桩点线标记完成后,随即复合锤+振动沉管桩机就位,首先采用振动沉管桩机直接成孔,穿越上部液化土层;当遇到坚硬夹层后,振动沉管桩机停止工作,桩机卷扬系统将柴油锤提升,通过柴油锤法锤击穿越坚硬夹层,待穿越夹层后(此时可非常明显的看到下沉速度加快)即停止柴油锤引孔,再将柴油锤提升并开始采用振动沉管桩机引孔至最终桩底高程。
S5、在成孔完成后,提升柴油锤并锁定,沉管桩机按照填料、反插、振动密实步骤反复进行,直至成桩完毕。
在沉管桩机成孔过程中,即开始进行填料工作;首先小型装载机将填料装至桩机斗内,然后通过卷扬机牵引提升至桩机管身的受料口内,如此循环,直至按计算的填料量上料完成。
拔管前先振动1min后再边振动边拔管,每提升0.5~1m导管反插30cm,留振10~20s,如此反复直至全管拔出,拔管速度为1~2m/min(平均速度),重复以上步骤,直至桩孔内填满碎石并拔出套管,桩架移位,完成一根桩的施工作业。
虽然以上描述了本发明的具体实施方式,但是本领域的技术人员应当理解,这些具体实施方式仅是举例说明,本领域的技术人员在不脱离本发明的原理和实质的情况下,可以对上述方法和系统的细节进行各种省略、替换和改变。例如,合并上述方法步骤,从而按照实质相同的方法执行实质相同的功能以实现实质相同的结果则属于本发明的范围。因此,本发明的范围仅由所附权利要求书限定。

Claims (4)

1.一种复合锤振动沉管挤密桩工方法,其特征在于,包括以下步骤:
按照普通沉管桩机的施工方法进行成孔;
在桩机自身反作用力达到预设的阈值而桩管仍无法再继续钻进时,停止桩机钻进,通过桩机卷扬系统将柴油锤提升;
当柴油锤提升至预设高度后,柴油锤在卷扬系统辅助下爆发;
随后柴油锤在自身重力及锤头自由落体产生的加速度下,通过底盘传递,推动桩管继续钻进至设计高度;
在成孔完成后,提升柴油锤并锁定,沉管桩机按照填料、反插、振动密实步骤反复进行,直至成桩完毕。
2.根据权利要求1所述复合锤振动沉管挤密桩工方法,其特征在于,所述填料具体为:首先小型装载机将填料装至桩机斗内,然后通过卷扬机牵引提升至桩机管身的受料口内,如此循环,直至按计算的填料量上料完成。
3.根据权利要求1所述复合锤振动沉管挤密桩工方法,其特征在于,所述反插具体为:拔管前先振动0.5~2min后再边振动边拔管,每提升0.5~1m导管反插30cm,留振10~20s,如此反复直至全管拔出。
4.根据权利要求3所述复合锤振动沉管挤密桩工方法,其特征在于,所述拔管速度为1~2m/min。
CN2012104914667A 2012-11-27 2012-11-27 一种复合锤振动沉管挤密桩工方法 Pending CN102966104A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104914667A CN102966104A (zh) 2012-11-27 2012-11-27 一种复合锤振动沉管挤密桩工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104914667A CN102966104A (zh) 2012-11-27 2012-11-27 一种复合锤振动沉管挤密桩工方法

Publications (1)

Publication Number Publication Date
CN102966104A true CN102966104A (zh) 2013-03-13

Family

ID=47796517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104914667A Pending CN102966104A (zh) 2012-11-27 2012-11-27 一种复合锤振动沉管挤密桩工方法

Country Status (1)

Country Link
CN (1) CN102966104A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018486A (zh) * 2014-06-06 2014-09-03 中交上海三航科学研究院有限公司 挤密砂桩成桩过程的可打性分析方法
CN104947664A (zh) * 2015-06-30 2015-09-30 辽宁新天宇业水泥制品有限公司 一种厚密石块填海层预应力高强混凝土方桩施工方法
CN115233658A (zh) * 2022-05-11 2022-10-25 邵良荣 一种干作业扩底钻孔灌注桩施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5088564A (en) * 1990-06-02 1992-02-18 Kobayashi Construction Co., Ltd. Method of and apparatus for driving piles
GB2316430A (en) * 1996-06-04 1998-02-25 Roxbury Ltd Pile driving
WO2006027000A1 (en) * 2004-09-07 2006-03-16 Osama Kamal Roshdy Full displacement technique for soil improvement and constructing walls and piles
CN201024424Y (zh) * 2007-04-05 2008-02-20 许兆锋 一种穿心式多功能振动桩机
CN201817813U (zh) * 2010-10-23 2011-05-04 河南森木实业发展有限公司 振动、锤击一体桩机及其振动锤
WO2011125710A1 (ja) * 2010-04-01 2011-10-13 新日本製鐵株式会社 脱気工程を含む鋼杭打設工法
CN102392449A (zh) * 2011-10-13 2012-03-28 上海振中机械制造有限公司 采用振动和冲击联合作用沉混凝土预制管桩的装置及方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5088564A (en) * 1990-06-02 1992-02-18 Kobayashi Construction Co., Ltd. Method of and apparatus for driving piles
GB2316430A (en) * 1996-06-04 1998-02-25 Roxbury Ltd Pile driving
WO2006027000A1 (en) * 2004-09-07 2006-03-16 Osama Kamal Roshdy Full displacement technique for soil improvement and constructing walls and piles
CN201024424Y (zh) * 2007-04-05 2008-02-20 许兆锋 一种穿心式多功能振动桩机
WO2011125710A1 (ja) * 2010-04-01 2011-10-13 新日本製鐵株式会社 脱気工程を含む鋼杭打設工法
CN201817813U (zh) * 2010-10-23 2011-05-04 河南森木实业发展有限公司 振动、锤击一体桩机及其振动锤
CN102392449A (zh) * 2011-10-13 2012-03-28 上海振中机械制造有限公司 采用振动和冲击联合作用沉混凝土预制管桩的装置及方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宋治信: "振动沉管桩机与柴油锤联合施工挤密砂石桩的应用", 《河南水利与南水北调》 *
符运友等: "挤密砂石桩法消除地震液化在南水北调潮河段工程中的应用", 《河南水利与南水北调》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018486A (zh) * 2014-06-06 2014-09-03 中交上海三航科学研究院有限公司 挤密砂桩成桩过程的可打性分析方法
CN104018486B (zh) * 2014-06-06 2016-01-20 中交上海三航科学研究院有限公司 挤密砂桩成桩过程的可打性分析方法
CN104947664A (zh) * 2015-06-30 2015-09-30 辽宁新天宇业水泥制品有限公司 一种厚密石块填海层预应力高强混凝土方桩施工方法
CN115233658A (zh) * 2022-05-11 2022-10-25 邵良荣 一种干作业扩底钻孔灌注桩施工方法
CN115233658B (zh) * 2022-05-11 2024-01-05 邵良荣 一种干作业扩底钻孔灌注桩施工方法

Similar Documents

Publication Publication Date Title
CN101736746B (zh) 振动沉管高压注浆托换拔桩的施工方法
CN102383431B (zh) 中掘预应力离心管桩沉桩装置及其沉桩法
CN105178861A (zh) 钻进扩孔机构
CN103628463A (zh) 复杂地层的超深振冲碎石桩的施工方法
CN101761081A (zh) 抱压式静压沉管灌注桩施工方法及设备
CN107938666B (zh) 带桩靴管桩桩端内锤击沉桩及同步端测注浆结构及工艺
CN1963044A (zh) 拔出废桩的施工方法
CN102966104A (zh) 一种复合锤振动沉管挤密桩工方法
CN101798813A (zh) 用振动桩锤沉拔混凝土预制桩的施工方法
CN103452115B (zh) 一种利用套管式底送后插管后注浆装置进行施工的施工方法
CN201502056U (zh) 深水库区陡坡裸岩钻孔平台
CN102808407A (zh) 软土地基钢筋混凝土灌注桩施工方法
CN104047280A (zh) 软弱地基快速分离夯实法
CN105862862A (zh) 一种大直径桩埋锤打捞方法
CN203855967U (zh) 斜坡廊道钻灌台车
CN105951863B (zh) 一种主动装配式沉井的施工设备的施工方法
CN103911978A (zh) 一种海上预制式平台及其安装方法
CN102767177A (zh) 具有块石层的软土地基混凝土灌注桩施工方法
CN108118728B (zh) 异形深基坑高效挖土装置及挖土方法
CN202865863U (zh) 一种重件吊装架基础结构
CN102392449A (zh) 采用振动和冲击联合作用沉混凝土预制管桩的装置及方法
JP2013036280A (ja) 土留部材の撤去方法
KR20120120219A (ko) 수중 파일의 제조, 드라이빙-인 및 주입 방법
CN104895058B (zh) 全液压静压双管复合扩底桩机及其施工方法
CN102758434B (zh) 中掘预应力离心管桩沉桩装置及其沉桩法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130313