CN102962596A - Installation method of framework main body inclined support of single-point mooring system manifold platform structure - Google Patents

Installation method of framework main body inclined support of single-point mooring system manifold platform structure Download PDF

Info

Publication number
CN102962596A
CN102962596A CN2012104374508A CN201210437450A CN102962596A CN 102962596 A CN102962596 A CN 102962596A CN 2012104374508 A CN2012104374508 A CN 2012104374508A CN 201210437450 A CN201210437450 A CN 201210437450A CN 102962596 A CN102962596 A CN 102962596A
Authority
CN
China
Prior art keywords
section
inclined support
framework
installation method
he200b
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104374508A
Other languages
Chinese (zh)
Inventor
宋清竹
郑重
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DSIC SHIPBUILDING Co Ltd
Original Assignee
DSIC SHIPBUILDING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DSIC SHIPBUILDING Co Ltd filed Critical DSIC SHIPBUILDING Co Ltd
Priority to CN2012104374508A priority Critical patent/CN102962596A/en
Publication of CN102962596A publication Critical patent/CN102962596A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses an inclined support for a single-point mooring manifold platform main body, and each inclined support comprises a first section, a second section and closure plates on two ends; in order to solve the problem that the inclined support cannot be installed after a framework is formed, a first section Z-shaped interface and a second section Z-shaped interface are adopted, and an installation sequence for installing the second section after the first section is installed is adopted; the closure plates 3 are adopted, so that the phenomenon that the inclined support cannot be welded because of small space on the junction of a main framework can be solved; and the closure plates and a framework web form a closed space, so that the difficult links for filling sand and coating in the subsequent step of an open space can be saved. The inclined support is simple in structure and convenient to produce, and the problem that the weld seam is overlapped, the welding cannot be carried out because of small space and the inclined support cannot be installed can be effectively solved.

Description

The installation method of single point mooring system manifold platform structure chassis body bearing diagonal
Technical field
The present invention relates to structural framing in ocean engineering and strengthen the installation method supported, particularly a kind of installation method of single point mooring system manifold platform structure chassis body bearing diagonal.
Background technology
4 parts as shown in Figure 1, single point mooring system manifold platform structure framework is 9 meters of the length with anchoring pile skirt structure, wide 9 meters, the high approximately H structural steel frame structure of 3 meters, during duty, by four anchoring pile integral body, be positioned for a long time sea bed, piping 5 parts in seabed are played a supporting role.
Considering design, production task, buying, inventories and site operation needs, is first that the HE900B of 4 parts and HE600B big frame assembly welding is complete in a lot of situations, last welded H 200B type steel support.In this case, the situation that there will be type steel support to install.Particularly the structure of this framework+support there will be the H structural steel frame web of square shape the phenomenon overlapped to occur with hypotenuse H shape steel web weld seam, and because the space angle at welding line joint place is too little, and can't welding or can't complete the complete penetration (see figure 2).
Summary of the invention
The present invention has overcome deficiency of the prior art, a kind of installation method of single point mooring system manifold platform structure chassis body bearing diagonal is provided, being intended to strengthen supporting for the HE200B hypotenuse in H structural steel frame structure provides a kind of joint style, and after capturing the main frame moulding, H shaped steel is strengthened supporting a kind of method that HE200B is assembled, thereby reach the purpose of optimizing structure, conveniently making.
In order to solve the technical problem of above-mentioned existence, realize above-mentioned purpose, the present invention adopts following technical proposals:
A kind of installation method (see figure 4) of single point mooring system manifold platform structure chassis body bearing diagonal, it comprises following concrete steps:
(i) bearing diagonal comprises that 1,2 section and two ends are provided with shrouding 3, and at first a kind of joint style is provided, and increases thick high-strength plate is installed, and makes the shrouding of subframe intersection form enclosure space in order to avoid follow-up sanding is sprayed and exerts an influence with the framework web;
(ii) according to web and the flange plate of zigzag otch cutting HE200B H shaped steel, making 1,2 segment interfaces is zigzag; During installation, the erection sequence of 1,2 section is first after 1 section 2 sections, first by 1 section location of HE200B, because the top flange plate of H shaped steel is less than the lower wings listrium, can't install from top for 2 sections, location upwards need be installed in its bottom from framework, last complete penetration.
The invention provides a kind of joint style, the high-strength plate 3(peculiar to vessel that has increased suitable thickness of slab is shown in Fig. 3).In addition, in the situation that main frame assembles is complete, because HE200B web catercorner length is greater than the framework catercorner length, can't install for whole, HE200B is cut according to zigzag, substep is installed on main frame, and is welded (see figure 4).The connection of above-mentioned all parts all connects with welding manner.
Owing to adopting technique scheme, joint form provided by the invention and bearing diagonal installation method compared with prior art have such beneficial effect:
The present invention is simple in structure, easy to make, can effectively ensure the quality of products, and reduces costs.
The accompanying drawing explanation
Fig. 1 is manifold main platform body structural representation;
Fig. 2 is initial joint design schematic diagram;
Fig. 3 is the improved structure of connector schematic diagram of Fig. 2;
Fig. 4 is that HE200B strengthens supporting the installation method schematic diagram.
The specific embodiment
Below in conjunction with accompanying drawing and the specific embodiment, the present invention is described in further detail:
As shown in Figure 1, manifold platform main frame is that the H shaped steel by several specifications is spliced, and wherein main frame is comprised of subframe again.
Specifically, as shown in Figure 4, after being formed by the H shaped steel subframe frame of HE600B, need to install the HE200B bearing diagonal.For avoiding weld seam to overlap, need to do two work before the location and installation bearing diagonal: (i) increase the thick high-strength plate of 30mm is installed, make subframe intersection form enclosure space in order to avoid follow-up sanding spraying is exerted an influence, as Fig. 3; (ii) cut web and the flange plate of HE200B H shaped steel according to the zigzag otch.Should be first by 1 section location of HE200B during installation, because the top flange plate of H shaped steel is less than the lower wings listrium, the B section can't be installed from top, location upwards need be installed in its bottom from framework, last complete penetration.
Can well solve three difficult problems according to above-mentioned steps: the problem that weld seam overlaps, narrow space can't welding and HE200B can't install.
The above; it is only the preferably specific embodiment of the present invention; but protection scope of the present invention is not limited to this; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to replacement or changed according to technical scheme of the present invention and inventive concept thereof, within all should being encompassed in protection scope of the present invention.

Claims (1)

1. the installation method of a single point mooring system manifold platform structure chassis body bearing diagonal, it comprises following concrete steps:
(i) bearing diagonal comprises that 1,2 section and two ends are provided with shrouding, and at first a kind of joint style is provided, and increases thick high-strength plate 3 is installed, and makes the shrouding of subframe intersection form enclosure space in order to avoid follow-up sanding is sprayed and exerts an influence with the framework web;
(ii) according to web and the flange plate of zigzag otch cutting HE200B H shaped steel, making 1,2 segment interfaces is zigzag; During installation, the erection sequence of 1,2 section is first after 1 section 2 sections, first by 1 section location of HE200B, because the top flange plate of H shaped steel is less than the lower wings listrium, can't install from top for 2 sections, location upwards need be installed in its bottom from framework, last complete penetration.
CN2012104374508A 2012-11-06 2012-11-06 Installation method of framework main body inclined support of single-point mooring system manifold platform structure Pending CN102962596A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104374508A CN102962596A (en) 2012-11-06 2012-11-06 Installation method of framework main body inclined support of single-point mooring system manifold platform structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104374508A CN102962596A (en) 2012-11-06 2012-11-06 Installation method of framework main body inclined support of single-point mooring system manifold platform structure

Publications (1)

Publication Number Publication Date
CN102962596A true CN102962596A (en) 2013-03-13

Family

ID=47793186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104374508A Pending CN102962596A (en) 2012-11-06 2012-11-06 Installation method of framework main body inclined support of single-point mooring system manifold platform structure

Country Status (1)

Country Link
CN (1) CN102962596A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000186432A (en) * 1998-12-22 2000-07-04 Fujimoto:Kk Temporary walkway construction method and temporary walkway material
KR20060040035A (en) * 2004-11-04 2006-05-10 재단법인 포항산업과학연구원 An axial load link member and union method of vertical member for set up of steel frame retaining wall
CN2793162Y (en) * 2005-06-01 2006-07-05 天津一建机施钢结构工程有限公司 Symmetrical steel supporting structure with multiple diagonal bracings and large space
CN102632313A (en) * 2012-03-14 2012-08-15 中色十二冶金建设有限公司 Cutting method of Z-shaped notch of H-shaped steel
CN202379314U (en) * 2011-12-19 2012-08-15 中国国际海运集装箱(集团)股份有限公司 Container and sealing plate thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000186432A (en) * 1998-12-22 2000-07-04 Fujimoto:Kk Temporary walkway construction method and temporary walkway material
KR20060040035A (en) * 2004-11-04 2006-05-10 재단법인 포항산업과학연구원 An axial load link member and union method of vertical member for set up of steel frame retaining wall
CN2793162Y (en) * 2005-06-01 2006-07-05 天津一建机施钢结构工程有限公司 Symmetrical steel supporting structure with multiple diagonal bracings and large space
CN202379314U (en) * 2011-12-19 2012-08-15 中国国际海运集装箱(集团)股份有限公司 Container and sealing plate thereof
CN102632313A (en) * 2012-03-14 2012-08-15 中色十二冶金建设有限公司 Cutting method of Z-shaped notch of H-shaped steel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李树彦等: "大跨度现浇劲性混凝土框架施工方法", 《建筑技术》, no. 2, 28 February 1994 (1994-02-28) *
郭成伟: ""高层钢框架的施工技术研究"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》, no. 8, 15 August 2008 (2008-08-15), pages 038 - 351 *

Similar Documents

Publication Publication Date Title
CN103114681B (en) High-altitude long-span reinforced concrete beam treat pouring structure
CN102352604B (en) Truss sheet unit of steel truss girder, steel truss girder structure and mounting method thereof
CN207659983U (en) A kind of steel-pipe pile steel construction cushion cap tower crane foundation structure
CN104314009B (en) Big sections hoisting mechanism and using method
CN202689040U (en) Steel end seal wall structure for large immersed tunnel
CN106567548B (en) Rectangular raw coal bucket is segmented installation method
CN102003074B (en) Construction method for indoor long-span steel connecting bridge
CN203080537U (en) High-strength bolt connecting steel cofferdam
CN202831643U (en) Combined type concrete chute
CN102635070B (en) Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge
CN102962596A (en) Installation method of framework main body inclined support of single-point mooring system manifold platform structure
CN201843087U (en) Bottom plate packing structure for steel overhead bin
CN104594373A (en) Construction technology of high-pile water-submerging bearing table steel suspending box of open unshielded sea area bridge
CN204282609U (en) A kind of separate type precast truss frame floor support plate
CN204139334U (en) Girder steel and steel column weld temporary connecting structure entirely
CN202401386U (en) Cable bridge for frame bridge
CN202430700U (en) Continuous lifting device for large-tonnage upper assembly block of ocean platform
CN113699961A (en) Pile-beam connecting structure and method for offshore independent fixed concrete mixing station
CN103362152A (en) Method for transforming roller way foundation
CN203361168U (en) Steel enclosure purlin structure for foundation pit supporting
CN204266127U (en) Large sections hoisting mechanism
CN205754133U (en) A kind of photovoltaic module mounting bracket of fishing light complementary light overhead utility
CN207919594U (en) A kind of telescopic steel-pipe pile connects under water is
CN205012372U (en) Novel waterproof post -cast strip of side wall structure
CN104452599B (en) Large-span continuous steel truss girder bridge construction method under low limit for height condition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130313