CN207659983U - A kind of steel-pipe pile steel construction cushion cap tower crane foundation structure - Google Patents

A kind of steel-pipe pile steel construction cushion cap tower crane foundation structure Download PDF

Info

Publication number
CN207659983U
CN207659983U CN201721784217.1U CN201721784217U CN207659983U CN 207659983 U CN207659983 U CN 207659983U CN 201721784217 U CN201721784217 U CN 201721784217U CN 207659983 U CN207659983 U CN 207659983U
Authority
CN
China
Prior art keywords
steel
pipe pile
tower crane
anchor ear
attachment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721784217.1U
Other languages
Chinese (zh)
Inventor
杨浩涛
龙进辉
黄亮
李华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Pangyuan Engineering Machinery Co ltd
Original Assignee
Guangdong Pangyuan Engineering Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Pangyuan Engineering Machinery Co ltd filed Critical Guangdong Pangyuan Engineering Machinery Co ltd
Priority to CN201721784217.1U priority Critical patent/CN207659983U/en
Application granted granted Critical
Publication of CN207659983U publication Critical patent/CN207659983U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of steel-pipe pile steel construction cushion cap tower crane foundation structures, it include the steel-pipe pile in matrix distribution, it is vertically welded with lateral on side wall between steel-pipe pile, attachment anchor ear is nested at the top of steel-pipe pile, the upper surface of attachment anchor ear is welded with lower part girder, it is welded with anchor ear inner support on the adjacent inner wall of attachment anchor ear, adheres on the outer wall of anchor ear and is bolted symmetrical the first attachment and the second attachment.This steel-pipe pile steel construction cushion cap tower crane foundation structure, it is to consider that the resistance horizontal force of steel-pipe pile itself is poor to be connect with bridge pier using main pier bearing platform, it can help to weaken the security risk for bearing horizontal force of steel-pipe pile after having added main pier bearing platform, it avoids cannot be satisfied tower crane peace to tear open under the requirement of attached wall etc., the positioning of tower crane is arranged into optimization, using this base form, it can very easily arrange the oplimal Location of tower crane, can also conveniently gather materials on the spot for material.

Description

A kind of steel-pipe pile steel construction cushion cap tower crane foundation structure
Technical field
The utility model is related to tower crane technical field, specially a kind of steel-pipe pile steel construction cushion cap tower crane foundation structure.
Background technology
With the development of economy, the construction speed of bridge project is getting faster, and wears the various bridges of the excessively extra large formula in mountain It is in full flourish in motherland's the earth.In view of in the construction of bridge, bridge main tower will often use tool of the tower crane as vertical transport, And due to the severe of execution conditions and for construction cost, design refine the considerations of, the design of pier cap is often simpler About, it if tower crane consideration is directly installed on pier cap, tends to mutually conflict with the structure of bridge, to the angle etc. of attached wall There are many restrictions, and cause great difficulty to the dismounting in the future etc. of tower crane.
Utility model content
The purpose of this utility model is to provide a kind of steel-pipe pile steel construction cushion cap tower crane foundation structures, have tower crane Positioning is arranged into optimizations, using this base form, the advantages of can very easily arranging the oplimal Location of tower crane, solves and shows There is the problems in technology.
To achieve the above object, the utility model provides the following technical solutions:A kind of steel-pipe pile steel construction cushion cap tower crane base Plinth structure includes the steel-pipe pile in matrix distribution, and lateral, the top of steel-pipe pile are vertically welded on the side wall between the steel-pipe pile Portion is nested with attachment anchor ear, and the upper surface of the attachment anchor ear is welded with lower part girder, is welded on the adjacent inner wall of attachment anchor ear There is anchor ear inner support, adheres on the outer wall of anchor ear and be bolted symmetrical the first attachment and the second attachment, first is attached And second attachment far from attachment anchor ear the perforative bolt in another port and main pier bearing platform at the top of be meshed, the lower part master The upper surface of beam is welded with horizontal positioned top girder, and tower crane base has been bolted on the surface of the top girder , the through-hole opened up in tower crane base has been embedded in tower crane, and perforative bolt is meshed with tower crane on tower crane base side wall.
Preferably, the upper surface flush of the upper surface of the main pier bearing platform and attachment anchor ear.
Preferably, the axis of the top girder and lower part girder is vertical, and top girder is identical with lower part girder thickness.
Preferably, the steel-pipe pile constitutes sphere of movements for the elephants type structure with 3*3 matrix distributions, lateral with steel-pipe pile cross section.
Compared with prior art, the beneficial effects of the utility model are as follows:
This steel-pipe pile steel construction cushion cap tower crane foundation structure, general bridge in rivers sea construction section custom steel-pipe pile, therefore Know that materials and the construction of steel-pipe pile are more convenient, main pier bearing platform is spliced using shaped steel, and basis is connected using main pier bearing platform and bridge pier It is to consider that the resistance horizontal force of steel-pipe pile itself is poor to connect, and has added can help to weaken steel-pipe pile after main pier bearing platform to bear water The security risk of flat power avoids cannot be satisfied tower crane peace and tears open under the requirement of attached wall etc., especially rivers Haiti section, it is contemplated that With the base form of this form, the positioning of tower crane is arranged into optimization, using this base form, can very easily arrange tower The oplimal Location hung can also conveniently gather materials on the spot for material.
Description of the drawings
Fig. 1 is the vertical view of the utility model;
Fig. 2 is the whole front view of the utility model;
Fig. 3 is the whole side view of the utility model;
Fig. 4 is the anchor ear inner support vertical view of the utility model;
Fig. 5 is the top girder and lower part girder vertical view of the utility model.
In figure:1 steel-pipe pile, 2 laterals, 3 anchor ears, 31 anchor ear inner supports, 32 first attachments, 33 second attachments, 4 lower part girders, 5 Top girder, 51 tower crane bases, 6 tower cranes, 7 main pier bearing platforms.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 5 are please referred to Fig.1, a kind of steel-pipe pile steel construction cushion cap tower crane foundation structure includes the steel-pipe pile 1 in matrix distribution, Lateral 2 is vertically welded on side wall between steel-pipe pile 1, steel-pipe pile 1 is with 3*3 matrix distributions, lateral 2 and 1 cross section of steel-pipe pile Sphere of movements for the elephants type component is constituted, the fastness between steel-pipe pile 1 is reinforced, the top of steel-pipe pile 1 is nested with attachment anchor ear 3, and attachment is embraced The upper surface of hoop 3 is welded with lower part girder 4, and anchor ear inner support 31 is welded on the adjacent inner wall of attachment anchor ear 3, attachment anchor ear 3 Symmetrical the first attachment 32 and the second attachment 33 are bolted on outer wall, the first attachment 32 and the second attachment 33 are remote The perforative bolt in another port from attachment anchor ear 3 is meshed with the top of main pier bearing platform 7, by attachment anchor ear 3 and main pier bearing platform 7 It connects, plays the role of Auxiliary support, the upper surface flush of the upper surface and attachment anchor ear 3 of main pier bearing platform 7, lower part girder 4 upper surface is welded with horizontal positioned top girder 5, and top girder 5 is vertical with the axis of lower part girder 4,5 He of top girder Girder 4 thickness in lower part is identical, and tower crane base 51 has been bolted on the surface of top girder 5, has been opened up in tower crane base 51 Through-hole be embedded in tower crane 6, perforative bolt is meshed with tower crane 6 on 51 side wall of tower crane base, general bridge rivers sea Construction section custom steel-pipe pile 1, the materials of old friend's steel-pipe pile 1 and construction are more convenient, and main pier bearing platform 7 is spliced using shaped steel, It is to consider that the resistance horizontal force of steel-pipe pile 1 itself is poor that basis, which is connect using main pier bearing platform 7 with bridge pier, has added main pier bearing platform 7 The security risk for bearing horizontal force that steel-pipe pile 1 can be helped to weaken afterwards avoids cannot be satisfied the use that tower crane peace tears attached wall etc. open Under it is required that, especially rivers Haiti section, it is contemplated that with the base form of this form, the positioning of tower crane 6 is arranged into optimization, is adopted With this base form, it can very easily arrange the oplimal Location of tower crane 6, can also conveniently gather materials on the spot for material.
In summary:This steel-pipe pile steel construction cushion cap tower crane foundation structure, general bridge are accustomed to using in rivers sea construction section Steel-pipe pile 1, the materials of old friend's steel-pipe pile 1 and construction are more convenient, and main pier bearing platform 7 is spliced using shaped steel, and basis uses main pier It is to consider that the resistance horizontal force of steel-pipe pile 1 itself is poor that cushion cap 7 is connect with bridge pier, can help to subtract after having added main pier bearing platform 7 The security risk for bearing horizontal force of weak steel-pipe pile 1 avoids cannot be satisfied tower crane peace and tears open under the requirement of attached wall etc., especially Rivers Haiti section, it is contemplated that with the base form of this form, the positioning of tower crane 6 is arranged into optimization, using this base form, The oplimal Location that can very easily arrange tower crane 6, can also conveniently gather materials on the spot for material.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of steel-pipe pile steel construction cushion cap tower crane foundation structure, includes the steel-pipe pile in matrix distribution(1), it is characterised in that: The steel-pipe pile(1)Between side wall on be vertically welded with lateral(2), steel-pipe pile(1)Top be nested with attachment anchor ear(3), The attachment anchor ear(3)Upper surface be welded with lower part girder(4), adhere to anchor ear(3)It is welded in anchor ear on adjacent inner wall Support(31), adhere to anchor ear(3)Outer wall on be bolted symmetrical first attachment(32)With the second attachment(33), First attachment(32)With the second attachment(33)Far from attachment anchor ear(3)The perforative bolt in another port and main pier bearing platform(7)'s Top is meshed, the lower part girder(4)Upper surface be welded with horizontal positioned top girder(5), the top girder(5) Surface on be bolted tower crane base(51), tower crane base(51)On the through-hole that opens up be embedded in tower crane(6), tower Hang pedestal(51)Perforative bolt and tower crane on side wall(6)It is meshed.
2. a kind of steel-pipe pile steel construction cushion cap tower crane foundation structure according to claim 1, it is characterised in that:The main pier Cushion cap(7)Upper surface with attachment anchor ear(3)Upper surface flush.
3. a kind of steel-pipe pile steel construction cushion cap tower crane foundation structure according to claim 1, it is characterised in that:The top Girder(5)With lower part girder(4)Axis it is vertical, top girder(5)With lower part girder(4)Thickness is identical.
4. a kind of steel-pipe pile steel construction cushion cap tower crane foundation structure according to claim 1, it is characterised in that:The steel pipe Stake(1)With 3*3 matrix distributions, lateral(2)With steel-pipe pile(1)Cross section constitutes sphere of movements for the elephants type structure.
CN201721784217.1U 2017-12-20 2017-12-20 A kind of steel-pipe pile steel construction cushion cap tower crane foundation structure Active CN207659983U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721784217.1U CN207659983U (en) 2017-12-20 2017-12-20 A kind of steel-pipe pile steel construction cushion cap tower crane foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721784217.1U CN207659983U (en) 2017-12-20 2017-12-20 A kind of steel-pipe pile steel construction cushion cap tower crane foundation structure

Publications (1)

Publication Number Publication Date
CN207659983U true CN207659983U (en) 2018-07-27

Family

ID=62942843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721784217.1U Active CN207659983U (en) 2017-12-20 2017-12-20 A kind of steel-pipe pile steel construction cushion cap tower crane foundation structure

Country Status (1)

Country Link
CN (1) CN207659983U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535300A (en) * 2020-04-09 2020-08-14 焦刘霞 Water conservancy construction environment-friendly bridge pile foundation construction method
CN111535183A (en) * 2020-04-09 2020-08-14 焦刘霞 Bridge pile foundation construction equipment of water conservancy construction environmental protection
CN114016434A (en) * 2021-12-29 2022-02-08 山东天齐置业集团股份有限公司 Construction method of large-span space torsional cross-section double-arch bridge
CN114960731A (en) * 2022-04-07 2022-08-30 浙江国丰集团有限公司 Embedded and nested combined tower crane section foundation and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535300A (en) * 2020-04-09 2020-08-14 焦刘霞 Water conservancy construction environment-friendly bridge pile foundation construction method
CN111535183A (en) * 2020-04-09 2020-08-14 焦刘霞 Bridge pile foundation construction equipment of water conservancy construction environmental protection
CN114016434A (en) * 2021-12-29 2022-02-08 山东天齐置业集团股份有限公司 Construction method of large-span space torsional cross-section double-arch bridge
CN114960731A (en) * 2022-04-07 2022-08-30 浙江国丰集团有限公司 Embedded and nested combined tower crane section foundation and construction method

Similar Documents

Publication Publication Date Title
CN207659983U (en) A kind of steel-pipe pile steel construction cushion cap tower crane foundation structure
CN201850498U (en) Steel trestle in water
CN103866693B (en) A kind of mounting method of steel concrete bowstring arch bridge arch rib
CN206219997U (en) A kind of box crossbeam of bridge is reinforced and mounting structure
CN106012960A (en) Assembly type long piled wharf upper structure system and construction method thereof
CN201377089Y (en) Outer ring wall elastic foundation of one hundred and fifty square storage tanks
CN204491640U (en) A kind of circular single-arm steel hanging box being applicable to strong tidal bore district
CN104805857A (en) Detachable cyclic utilization bottomless steel jacket box and construction method thereof
CN101936009A (en) Deepwater single-wall steel overhead bin cofferdam and construction method thereof
CN208517810U (en) A kind of temporary trestle bridge for deep big foundation pit excavation construction
CN202881965U (en) High-torque pre-arranged type tower crane foundation in deep foundation pit
CN104313999A (en) Bridge pier structure
CN108894245A (en) A kind of netted offshore wind power foundation
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN203855904U (en) Windproof net upright column structure
CN208309610U (en) One kind exempting from bottom concrete steel lifted trunk bottom plate and steel pile casting attachment device
CN103981894A (en) Multi-cylindrical foundation combined foundation structure system
CN208105023U (en) Assembling type girder bridge
CN207878498U (en) A kind of tower-crane foundation structure of bridge deepwater foundation pit
CN203947417U (en) A kind of realization without the cast-in-place supporting structure of cushion cap approach viaduct concrete case beam limited bracket
CN201554033U (en) Tower crane foundation for deep foundation ditch
CN202577324U (en) Reinforced-concrete combined hanging box
CN201169781Y (en) Cap digging pit structure
CN210975819U (en) Recyclable steel jacket box hanger
CN210766850U (en) Ring cylinder reinforced concrete combined foundation structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 510000 Room 1130, 11th Floor, Traffic Building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province

Patentee after: Guangdong Pang Yuan construction machinery and equipment Co., Ltd

Address before: 510635 Unit 212, Second Floor, Comprehensive Building of Science and Technology Innovation Base, No. 80 Lanyue Road, Science City, Tianhe District, Guangzhou City, Guangdong Province

Patentee before: Guangdong Pang Yuan construction machinery and equipment Co., Ltd

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: Room 109-12, Building 3, 43 Yingbin Avenue West, Huadu District, Guangzhou City, Guangdong 510000

Patentee after: Guangdong Pang Yuan construction machinery and equipment Co., Ltd

Address before: 510000 Room 1130, 11th Floor, Traffic Building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province

Patentee before: Guangdong Pang Yuan construction machinery and equipment Co., Ltd

CP02 Change in the address of a patent holder