Prior art keywords
transformer
gis
oil
remove
base support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110236339.8A
Other languages
Chinese (zh)
Other versions
CN102957104A (en
Inventor
田凤兰
石峰
徐夏楠
赵珩
景中炤
何天骥
齐超亮
赵勇
苏迪
杨琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Henan Electric Power Co Ltd
Zhengzhou Power Supply Co of Henan Electric Power Co
Zhengzhou Huali Information Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Henan Electric Power Co Ltd
Zhengzhou Power Supply Co of Henan Electric Power Co
Zhengzhou Huali Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Henan Electric Power Co Ltd, Zhengzhou Power Supply Co of Henan Electric Power Co, Zhengzhou Huali Information Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201110236339.8A priority Critical patent/CN102957104B/en
Publication of CN102957104A publication Critical patent/CN102957104A/en
Application granted granted Critical
Publication of CN102957104B publication Critical patent/CN102957104B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention discloses the remodeling method of a kind of transformer and GIS power distribution equipment flexible connection structures, comprises the following steps:A:Gas is reclaimed;B:Remove GIS bus bar canisters and its support;C:Remove oil-gas casing and its connection equipment;D:Remove lightning arrester base support;E:Transformer casing air is installed;F:Zinc oxide surge arresters base support and GIS collar supports seat;G:Pipe is female to be installed.Enforcement difficulty of the present invention is small, safe and reliable, short construction period, transformer station keep overall operation, economic loss small.

Description

The remodeling method of transformer and GIS power distribution equipment flexible connection structures
Technical field:
The present invention relates to a kind of construction method of power transformation engineering, more specifically GIS substation transformers pass through with GIS Oil-gas casing direct connection arrangement transform the remodeling method of pipe mother's connected mode as.Belong to T & D Technology field.
Background technology:
Because nearby building the projects such as subway, CBD centers and east station, underground water is largely extracted out, so as to cause for GIS transformer stations Transformer substation foundation is settled.Because the station uses GIS to be connected by oil-gas casing direct connection arrangement with transformer, because Respective ground load is different, and the amplitude of sedimentation is also inconsistent, so as to cause GIS and transformer high-voltage and the direct interface of middle pressure Very big destructive power will be born, for the operation safety of transformer station, transformer is changed with GIS by oil-gas casing direct connection arrangement It is the connected mode of pipe bus to make.Domestic power transmission and transformation Lixing industry passes through oil-gas casing direct connection for GIS substation transformers and GIS Arrangement transform the installation of flexible circuit conductor as and reforming technology flow was originally:1st, gas recovery, removes oil-gas casing and transformer To GIS bus pipe bus bar canisters, bus bar canister basis is removed;2nd, portal frame foundation construction;3rd, portal frame is installed;4th, casing air peace Dress;5th, the installation of flexible circuit conductor and wire holding equipment.
, in the connection transformation operation of transformer oil gas bushing is carried out, there is larger restricted, erection in process above flow Portal frame, it is necessary to portal frame basis could be rebuild after first removing transformer to GIS bus bar canisters and its basis, then dragon is set up again Door frame, finally carry out the installation of flexible circuit conductor, flexible circuit conductor and GIS dock and wire holding equipment adjustment, the engineering time is general It is more long.Foregoing construction process, because of portal frame to be reconstructed basis, and sets up portal frame so that transformer station's power off time is more long, together When also increase difficulty of construction, cause network system for a long time in abnormal running mode, seriously threaten power grid security.Not only Itself construction cost is larger, while because of the long-term electricity sales amount decline for having a power failure and triggering, objectively having had influence on Zhengzhou City's energy scheduling. And process above also has the following disadvantages:1) enforcement difficulty is big:Transformation region narrow field, arrangement portal frame base bits are equipped with Limit.Portal frame is such as arranged, the dynamic and static load of portal frame is checked and bothered very much, will appear from structure type complicated foundation, because basis is attached Basis is more in nearly old use, is highly detrimental to construction.And surrounding ground will be destroyed during new foundation construction, change ensuing In making, Construction traffic will be unable to erect-position, be that follow-up work brings new problem.2) long construction period:It is with 220kV power distribution equipments Example, after such as using portal frame reconstruction flow, transformer oil feed channel all to remove, could change to original equipment foundation of civil work Make and civil engineering maintenance, set up again portal frame, flexible circuit conductor install and wire holding equipment adjustment etc. construction is accumulative about needs 42 days, apply The work cycle is long, relatively costly.3) network system normal mode is had a strong impact on:Because 1# main transformer in shore is stopped transport, and plus in meeting kurtosis The high load capacity energized period in summer, shore 1# becomes institute's on-load and is all undertaken down to shore 2# main transformers and osiery 1# main transformers, 2# main transformers, causes Network system is in abnormal running mode for a long time, serious to threaten Zhengzhou eastern region power grid security.4) economic loss is big: Under the influence of present financial crisis, last year is negative growth to city's electricity sales amount on year-on-year basis, in the critical period of summer peak meeting, Zhengzhou City east The power supply safety in portion area is extremely important.And if now because riverfront change is chronically at a main transformer stoppage in transit, causing Zhengzhou electricity Net is chronically under abnormal running mode, then certainly will largely effect on the power supply safety of Zhengzhou City, is not only difficult to complete state's household electrical appliances The sale of electricity index that net company assigns, and Zheng Dong new districts normal development is hidden some dangers for.
The content of the invention:
The invention aims to overcome that above-mentioned prior art difficulty of construction is big, the cycle is long, high cost, economic loss it is big Defect and deficiency, there is provided a kind of transformer and GIS power distribution equipments flexible connection structure and remodeling method.
To achieve the above object, the technical scheme is that:GIS substation transformers are straight by oil-gas casing with GIS Connection arrangement transform the female remodeling method of pipe as, comprises the following steps:
A:Gas is reclaimed:To need transformation air chamber carry out SF6 gas recovery, vacuumized, pressure release treatment.
B:Remove GIS bus bar canisters and its support:Dividedly dismantling original bus bar canister simultaneously splits lifting, removes former bus tube stent, Retain all original framework bases.
C:Remove oil-gas casing and its connection equipment:Transformer oil is reclaimed, what dismounting oil-gas casing was connected with transformer leads Body, removes oil-gas casing.
D:Remove lightning arrester base support:Select the strong point of robust, plus jack to prop up equipment, remove original and keep away Thunder device base is supported.
E:Transformer casing air is installed:According to the relatively low, alternate, relatively heavy of power transformer sleeve pipe live part Motor installs casing air and rises dais and transformer casing air to the minimum air void of low pressure winding terminal.
F:Zinc oxide surge arresters base support and GIS collar supports seat:The step of zinc oxide surge arresters base support, keeps away with dismounting The step of thunder device old base support, is conversely, and in lightning arrester base bracket basis over-assemble GIS collar supports seat.
G:Pipe is female to be installed:The connection of hard tube mother, flexible circuit conductor and wire and GIS device is installed.
Hand hole cover is opened using correct SF6 protective articles in the step B, GIS conductors are removed, confirmation will be had an impact Decompose bus bar canister conductor tab all to have removed, dividedly dismantling original bus bar canister simultaneously splits lifting, removes former bus tube stent, retains institute There is original framework basis.Dividedly dismantling removes former bus bar canister and splits lifting, removes crude oil gas bushing, removes former bus bar canister branch Frame, retains all original framework bases.
Transformer oil should be reclaimed first before bushing shell for transformer transformation is carried out in the step C, and oil level exposes less than dais is risen Transformer overhead guard, removes the conductor being connected with transformer in Oil/Gas Pipe, then remove oil-gas casing.Transformer oil tracheae is connected 110kV sides are connected as four-way connection, should first lift by crane four-way connection, then remove the conductor being connected with transformer in Oil/Gas Pipe, Oil-gas casing is removed again.
In the step D, (each two strong point, first will be lightning-arrest by a strong point for the strong point of selection robust The old branch of device base erects the place of tearing open and leaves original position, then another strong point is propped up into the old support of dismounting lightning arrester base), in log pile Upper plus jack props up equipment, removes the old support of former lightning arrester base.
In the step E, because a liter dais needs basis《Electrical Engineer's handbook》On power transformer sleeve pipe electro-mechanical part Minimum air void (220kV of relatively low, alternate, the relative heavy electric machinery for dividing to low pressure winding terminal:Relatively 1500~ 1900mm, alternate 1800~2250mm, to 1600~1800mm of other winding terminals;110kV:Minimum air void distance 880mm.) bushing lifting seat of onsite application is calculated, measured, transformed and assembled, sleeve pipe and rise installation period of dais It is long, nitrogen treatment should be sealed to transformer and rushed after same day end-of-job, it is ensured that pressure is pressure-fired in transformer (0.01~0.02Mpa).Bushing shell for transformer should carry out oil-filled and Circulation and Hot Oil Spray at the end of installing.Wire and transformer, wire with Shelf depreciation and pressure test should be first carried out before GIS device connection.
It is opposite with lightning arrester base support step is removed the step of zinc oxide surge arresters are newly supported in the step F.Assembling GIS collar supports seat when strictly by drawing carry out respective holder construction assembling, and to assembling support be corrected, adjustment level.
In the step G, during the support equipment of dismounting Oil/Gas Pipe connecting pipe is gas cutting dismounting method, is tackled after dismounting Foundation of civil work is processed by shot blasting, it is ensured that foundation of civil work surface it is smooth.Installed according to transformer transformation rear sleeve Height Adjustment The female T-shaped support height of pipe, the cross-arm distance of T-shaped support is adjusted according to electrical distance, and it is tight that the T-shaped support to adjusting carries out bolt Gu or four sides is welded, lifting pipe is female to support porcelain vase, then installing pipe capital tool, assembling lifting.According to transformer casing air and GIS outlet casing tubes to the female air line distance of pipe considers the length of connection copper core aluminum stranded conductor, and ensures that the sag of wire should meet and set Meter requires that the sag of three-phase conducting wire should be consistent in same span.
By implementing such scheme, the beneficial effects of the invention are as follows:
1) enforcement difficulty is small:Basis transformation and the complicated portal frame of building structure are not carried out so that Construction traffic and construction Personnel's erect-position and easy to adjust, it is safe and reliable.
2) short construction period:Make full use of existing foundation of civil work to be transformed, shorten the engineering time.
3) transformer station keeps overall operation:On the premise of 1# main transformer in shore is stopped transport, shore 2# main transformers and the corresponding method of operation Change, the network system abnormal running mode time is short, and power off time can shorten 3/4.
4) economic loss is small:Transformer GIS Oil/Gas Pipe connected modes are transformed using the inventive method, one is big construction cost Width reduction;Two is short power off time, on selling substantially without influence for Zhengzhou power grid electric.And also assures that the power supply of Zhengzhou City Safety.
Brief description of the drawings:
Fig. 1 is outdoor GIS main transformers inlet wire interval sectional drawing;
Fig. 2 is that GIS of the present invention transform pipe mother's schematic diagram as by oil-gas casing direct connection arrangement;
Fig. 3 is pipe mother's Steel Structure of the present invention and supports installation of porcelain insulator schematic diagram;
Fig. 4 is GIS sleeve pipes scheme of installation of the present invention.
In figure:Transformer 1, oil-gas casing rises dais 2, oil-gas casing 3, bus bar canister 4, bus tube stent 5, original basis 6, prolongs Stretch female connection copper core aluminum stranded conductor 9, pipe mother 10, the pipe mother support insulator 11 of cylinder 7, new clothes GIS sleeve pipes 8, sleeve pipe and pipe, T-bar support 12nd, bushing shell for transformer 13, bushing shell for transformer rises dais 14, T-bar support cross-arm 15, GIS collar supports seat 16, GIS sleeve pipe branch Frame 17, surge arrester support 18.
Specific embodiment:
The present invention is described in further detail with specific embodiment for explanation below in conjunction with the accompanying drawings:
GIS transformer stations oil-gas casing direct connection arrangement of the present invention transform the remodeling method of soft bus as including following Step:
A:To need transformation air chamber carry out SF6 gas recovery, vacuumized, pressure release treatment.
B:Remove related ground in flakes, hand hole cover is opened using correct SF6 protective articles, remove GIS conductors, confirming will Have an impact decomposition bus bar canister conductor tab all to have removed.First remove L-type pipe female, then remove straight tube pipe mother.According to live actual Situation, if L-type pipe mother firmly installs, unlikely influence equipment safety can be according to actual conditions change work journey when female for dismounting straight tube pipe Sequence.Note position of centre of gravity during the mother's lifting of L-type pipe, carry out leveling using chain block if necessary, then safety lifting.Straight tube pipe Mother is decomposed or whole dismounting according to on-site actual situations.Recurrence determines position of centre of gravity when hanging part long, if necessary using pulling Cucurbit carries out leveling, then sets up and slips rope and prevent beat.
C:The transformer oil in transformer 1 should be reclaimed first, when oil level exposes the overhead guard of transformer 1 less than liter dais 2, torn open Except the conductor being connected with transformer 1 in Oil/Gas Pipe, then remove oil-gas casing 3.The oil-gas casing of transformer 1 connection 110kV side connections For four-way is connected, four-way connection should be first lifted by crane, then extract the conductor being connected with transformer 1 in Oil/Gas Pipe, then remove oil gas Sleeve pipe.
D:Removing surge arrester support will take A, B, C three-phase to be respectively cut while the method for removing is carried out.Because old support is torn open Except when arrester without outer support, it is impossible to bear deadweight, threaten equipment safety, it is necessary to use jack jacking arrester.This makes With six 1 ton of jack, 3 jack are first supported 5 centimeters in the outer part of center.(this step is to prevent from being made because support is excessive Cannot be supported into rear fulcrum, vacate corresponding position to ensure the completion of rear step).It is overall to pull out support to preceding 3 jack Position, then 3 jack after the position support top of after-poppet.Jack before firmly rear dismounting to be supported.Because of old arrester branch Frame is 3, and new support is 1, must integrally be pulled out old support.
E:The bushing shell for transformer for installing casing air 13 additional on transformer 1 according to the rules rises dais 14, coordinates high pressure to do and becomes The reference test of depressor 1.In-site measurement, transformation and assembling, casing air 13 and transformation are needed because bushing shell for transformer rises dais 14 The installation period of device bushing lifting seat 14 is long, and nitrogen treatment should be sealed to transformer and rushed after same day end-of-job.Become Depressor casing air 13 is installed after terminating and should carry out oil-filled and Circulation and Hot Oil Spray.Transformer 1 is vacuumized afterwards and gas injection at Reason, coordinates high pressure to do the local discharge test of transformer 1.
F:The step of zinc oxide surge arresters support 18 and GIS collar supports seat 16, zinc oxide surge arresters support 18, is lightning-arrest with dismounting Device base support step is opposite.Respective holder construction assembling strictly is carried out by drawing when GIS collar supports seat 16 is installed, and to group Dress support is corrected, adjustment level, after installation bolt fastening, can carry out lower step work.
G:During the support equipment of dismounting Oil/Gas Pipe connecting pipe is gas cutting dismounting method, foundation of civil work is tackled after dismounting and is entered Row polishing, it is ensured that foundation of civil work surface it is smooth.According to the transformer female T-shaped support of transformation rear sleeve Height Adjustment installing pipe 11 height, the distance of the cross-arm 15 of T-shaped support 11 is adjusted according to electrical distance, lifts by crane T-shaped support 11, it is ensured that all base waters It is flat to ensure in same level, and ensure all with mutually basic in a straight line datum level.T-shaped support 11 to adjusting carries out spiral shell Bolt is fastened or four sides is welded, it is ensured that solid and reliable.To supporting that porcelain vase 12 carries out insulation measurement, confirm that pipe is female and support the product of porcelain vase 12 Up-to-standard, lifting pipe is female to support porcelain vase 12, then 10 gold utensils of installing pipe mother, assembling lifting.Slowly pipe mother 10 is sling to branch At the 20mm of post top, adjustment position starts to install, and ensures to release pipe mother 10 in each comfortable same straight line in three phase terminals head and tail portion On the suspender such as suspender belt, complete lifting operation.Examined according to transformer casing air and GIS outlet casing tubes to the female air line distance of pipe Consider the length of connection copper core aluminum stranded conductor 9, and ensure that the sag of wire should meet design requirement, the relaxation of three-phase conducting wire in same span Degree should be consistent.
GIS oil in transformer of electric substation gas bushing connected modes are transformed using the inventive method, is kept in original basis In the case of constant, transformer oil gas bushing connected mode is transformed, changed transformer oil gas bushing, changed bus Tube stent, surge arrester support, new clothes GIS sleeve pipes, new clothes GIS casing supports, and locally transformation etc. has been carried out to GIS.It is real Construct and power off time 11 days on border.This electric company 220kV Bridge Substation transformer oil gas bushings connected mode is transformed, and is used Portal frame supporting way, the transformation duration is 42 days;Osiery transformer station 110kVGIS is with transformer connected mode using erection gantry Frame supporting way is installed, and the set-up time is 30 days.

Claims (7)

1. the remodeling method of a kind of transformer and GIS power distribution equipment flexible connection structures, it is characterised in that comprise the following steps:
A:Gas is reclaimed:To need transformation air chamber carry out SF6 gas recovery, vacuumized, pressure release treatment;
B:Remove GIS bus bar canisters and its support:Dividedly dismantling original bus bar canister simultaneously splits lifting, removes former bus tube stent, retains All original framework bases;
C:Remove Oil/Gas Pipe and its connection equipment:Transformer oil is reclaimed, the conductor that Oil/Gas Pipe is connected with transformer is removed, oil is removed Tracheae;
D:Remove lightning arrester base support:Select the strong point of robust, plus jack to prop up equipment, remove arrester former Base support;
E:Transformer casing air is installed:According to power transformer sleeve pipe live part relatively, alternate, relative heavy electric machinery Casing air is installed with the minimum air void of low pressure winding terminal and rises dais and transformer casing air;
F:Zinc oxide surge arresters base support and GIS collar supports seat:The step of zinc oxide surge arresters new base support with remove lightning-arrest The step of device original base support, is conversely, and in the new base support basis over-assemble GIS collar supports seat of arrester;
G:Pipe is female to be installed:The connection of hard tube mother, flexible circuit conductor and wire and GIS device is installed.
2. the remodeling method of transformer as claimed in claim 1 and GIS power distribution equipment flexible connection structures, it is characterised in that:Institute State and use in step B correct SF6 protective articles and open hand hole cover, remove GIS conductors, confirm had an impact decomposition bus bar canister Conductor tab has all been removed, then carries out the dismounting crude oil tracheae in step C.
3. the remodeling method of transformer as claimed in claim 1 and GIS power distribution equipment flexible connection structures, it is characterised in that:Institute Stating and should reclaim transformer oil first before carry out in step C bushing shell for transformer transformation, oil level exposes transformer overhead guard less than a liter dais, Transformer oil tracheae connection 110kV sides are connected as four-way connection, should first lift by crane four-way connection, then remove in Oil/Gas Pipe with change The connected conductor of depressor, then remove Oil/Gas Pipe.
4. the remodeling method of transformer as claimed in claim 1 and GIS power distribution equipment flexible connection structures, it is characterised in that:Institute State in step D, select the strong point of robust, per two strong points of phase, jack is added on log pile, first by a support Point props up dismounting arrester original base support, then another strong point is propped up into dismounting arrester original base support.
5. the remodeling method of transformer as claimed in claim 1 and GIS power distribution equipment flexible connection structures, it is characterised in that:Institute State in step E, the bushing lifting seat to onsite application is calculated, measured, transformed and assembled, the erector of sleeve pipe and liter dais Phase is long, and nitrogen treatment should be sealed to transformer and rushed after same day end-of-job, it is ensured that pressure is pressure-fired in transformer, Bushing shell for transformer should carry out oil-filled and Circulation and Hot Oil Spray at the end of installing, wire should be first before being connected with transformer, wire and GIS device Carry out shelf depreciation and pressure test.
6. the remodeling method of transformer as claimed in claim 1 and GIS power distribution equipment flexible connection structures, it is characterised in that:Institute In stating step F, the step of zinc oxide surge arresters new base support with the step of removing arrester original base support conversely, assembling GIS Collar supports seat when carry out respective holder construction assembling, and to assembling support be corrected, adjustment level.
7. the remodeling method of transformer as claimed in claim 1 and GIS power distribution equipment flexible connection structures, it is characterised in that:Institute State in step G, during the support equipment of dismounting Oil/Gas Pipe connecting pipe is gas cutting dismounting method, foundation of civil work is tackled after dismounting and is entered Row polishing, it is ensured that foundation of civil work surface it is smooth.
CN201110236339.8A 2011-08-18 2011-08-18 The remodeling method of transformer and GIS power distribution equipment flexible connection structures Active CN102957104B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110236339.8A CN102957104B (en) 2011-08-18 2011-08-18 The remodeling method of transformer and GIS power distribution equipment flexible connection structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110236339.8A CN102957104B (en) 2011-08-18 2011-08-18 The remodeling method of transformer and GIS power distribution equipment flexible connection structures

Publications (2)

Publication Number Publication Date
CN102957104A CN102957104A (en) 2013-03-06
CN102957104B true CN102957104B (en) 2017-05-31

Family

ID=47765532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110236339.8A Active CN102957104B (en) 2011-08-18 2011-08-18 The remodeling method of transformer and GIS power distribution equipment flexible connection structures

Country Status (1)

Country Link
CN (1) CN102957104B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103381996B (en) * 2013-06-28 2015-02-18 国家电网公司 HGIS self-adaption emergency first-aid repair device and applications thereof
CN107424725A (en) * 2017-08-03 2017-12-01 特变电工沈阳变压器集团有限公司 Transformer anti-seismic structure
CN107742850B (en) * 2017-11-10 2019-03-29 云南省送变电工程公司 The oil-gas casing assembly and disassembly methods of connection exchange 500kV oil-immersed type transformer and GIS tube type bus
CN113964707A (en) * 2021-10-19 2022-01-21 上海宝冶冶金工程有限公司 Extension method of box-type GIS busbar barrel

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201813068U (en) * 2010-06-22 2011-04-27 湖北省电力勘测设计院 Distribution structure of support tubular bus leading and incoming equipment of ultra-high voltage main transformer incoming lines
CN201860059U (en) * 2010-11-16 2011-06-08 中国西电电气股份有限公司 Compound high-voltage combined electric appliance

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4657817B2 (en) * 2005-06-06 2011-03-23 三菱電機株式会社 Method for assembling gas insulated switchgear and assembly apparatus for gas insulated switchgear

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201813068U (en) * 2010-06-22 2011-04-27 湖北省电力勘测设计院 Distribution structure of support tubular bus leading and incoming equipment of ultra-high voltage main transformer incoming lines
CN201860059U (en) * 2010-11-16 2011-06-08 中国西电电气股份有限公司 Compound high-voltage combined electric appliance

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
GIS油气套管连接部位故障分析及建议;陈希正等;《高压电器》;20101031;第46卷(第10期);第59-61页 *
GIS设备与电力变压器硬连接设计和结构的改进;张晖;《云南水力发电》;20080430;第24卷(第2期);第64-66页 *

Also Published As

Publication number Publication date
CN102957104A (en) 2013-03-06

Similar Documents

Publication Publication Date Title
CN103175998B (en) A kind of portable test shaft tower detected for transmission circuit insulator string high-voltage performance
CN102957104B (en) The remodeling method of transformer and GIS power distribution equipment flexible connection structures
CN101958519B (en) Method for transforming tangent tower of double-circuit double-bundle transmission lines by lifting in electrified mode in another place
Bing et al. New research progress of HVDC transmission technology in China Southern Power Grid Corporation
CN201466574U (en) Device for isoelectrically replacing insulator and accessory of iron tower of transmission line
CN103594988B (en) 500kV transformer substation tubular busbar deflection correction method
CN209515538U (en) Embedded Double fracture ice-melt disconnecting switch
CN204011013U (en) The sealing syndeton of a kind of transformer, high-tension cable cable end and lightning arrester
CN107237535A (en) A kind of unilateral cross-arm anchor support used for transmission line
CN203026397U (en) Grounding hook
CN208337114U (en) Power grid arragement construction and system based on ice-melt function
CN207459403U (en) A kind of vertical wire outlet structure of compact 330kV substations GIS
CN105932602B (en) The method that three-phase conducting wire charges lifter and replaces insulator using the lifter
CN101824930B (en) Operation method of 10kV common-pylon double-circuit line charged vertical pylon
CN205489250U (en) GIS distribution device arrangement structure that business turn over line framework merges
CN204992266U (en) 220 kilovolt main transformer's inlet wire draws and connects device
CN208111923U (en) Three-row step type terrace open type high-voltage power distribution equipment arragement construction
CN201639188U (en) Novel earthing system applied to GIS and HGIS
CN204537776U (en) The adjustable parallel connection gaps structure of strain insulator string
CN209515539U (en) Multifunction combined ice-melt disconnecting switch
CN217485941U (en) Lightning protection system for high-rise building construction
CN111682479B (en) Single-loop power transmission line iron tower and power transmission line tower system
CN107591684B (en) Perpendicular outlet structure of 330kV transformer substation GIS
CN217935009U (en) Overhead ground wire suspension device on pillar bent arm
CN203271226U (en) 220-kV one-way cable terminal steel pole tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Tian Fenglan

Inventor after: Yang Lin

Inventor after: Shi Feng

Inventor after: Xu Xianan

Inventor after: Zhao Hang

Inventor after: Jing Zhongzhao

Inventor after: He Tianji

Inventor after: Qi Chaoliang

Inventor after: Zhao Yong

Inventor after: Su Di

Inventor before: Shi Feng

Inventor before: Tian Fenglan

Inventor before: Guo Rui

Inventor before: Lan Qi

Inventor before: Liu Yiqiang

Inventor before: Yuan Yang

Inventor before: Li Hongbo

Inventor before: Wang Yan

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170426

Address after: 450006, Zhengzhou province high tech Zone, Ruida Road, No. 96, No.

Applicant after: Zhengzhou Huali Information Technology Co., Ltd.

Applicant after: Zhengzhou electric company of State Grid Henan Power Supply Company

Applicant after: State Grid Henan Electric Power Company

Applicant after: State Grid Corporation of China

Address before: 450006 Huaihe Road, Henan, China, No. 9, No.

Applicant before: Henan Electric Power Company Zhengzhou Power Supply Branch