CN103175998B - A kind of portable test shaft tower detected for transmission circuit insulator string high-voltage performance - Google Patents
A kind of portable test shaft tower detected for transmission circuit insulator string high-voltage performance Download PDFInfo
- Publication number
- CN103175998B CN103175998B CN201310038489.7A CN201310038489A CN103175998B CN 103175998 B CN103175998 B CN 103175998B CN 201310038489 A CN201310038489 A CN 201310038489A CN 103175998 B CN103175998 B CN 103175998B
- Authority
- CN
- China
- Prior art keywords
- cross arm
- test
- fixed
- pillars
- insulator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
一种用于输电线路绝缘子串高压性能检测的便捷式试验杆塔,试验塔体采用框架结构,两支柱(3)底端采用预埋地脚螺栓(1)与混凝土浇筑的基础(2)相固定,在支柱(3)顶端固定横担(5)中央设置两台带自锁功能的同步电动葫芦(8),分别通过两支柱(3)内侧靠近顶端的固定滑轮(12)用钢丝绳(10)与固定横担(5)下方的移动横担(6)两端连接,移动横担(6)与两支柱(3)内侧设置的固定导轨(4)组成导轨副(7)。本发明组装方便,可用于单串绝缘子高压性能的检测,亦可用于检测多相绝缘子之间电气性能的相互影响。
A portable test pole tower for testing the high-voltage performance of transmission line insulator strings. The test tower body adopts a frame structure, and the bottom ends of the two pillars (3) are fixed to the concrete pouring foundation (2) by pre-embedded anchor bolts (1) , set two synchronous electric hoists (8) with self-locking function in the center of the fixed cross arm (5) at the top of the pillar (3), respectively pass the fixed pulley (12) on the inner side of the two pillars (3) close to the top with the wire rope (10) It is connected with both ends of the movable cross arm (6) below the fixed cross arm (5), and the movable cross arm (6) forms a guide rail pair (7) with the fixed guide rails (4) arranged inside the two pillars (3). The invention is easy to assemble, can be used for detecting the high-voltage performance of a single string of insulators, and can also be used for detecting the mutual influence of electrical properties between multi-phase insulators.
Description
技术领域technical field
本发明涉及电力系统高压电气领域,特别是涉及输电线路金具、绝缘子串等输电设备高压性能检测试验装置结构领域。The invention relates to the field of high-voltage electric power system, in particular to the structural field of a high-voltage performance detection test device for transmission equipment such as transmission line fittings and insulator strings.
背景技术Background technique
高压输电线路是电力系统的重要组成部分,输电线路的安全稳定运行直接决定了电力系统的安全稳定性和供电的可靠性。绝缘子串、线路金具等输电设备及避雷器、互感器等保护设备和二次设备的运行性能及抗外界干扰性能是保障输电线路安全稳定运行的基础,特别是绝缘子串承担着线路对地及对其他物体之间的绝缘,是输电线路最基本的设备。不同结构尺寸、不同材料及位于不同环境运行的绝缘子串其绝缘性能不同,绝缘子串配合线路其他金具后的绝缘性能也会发生变化,为了保证绝缘子串挂网后的实际运行性能和抗外界干扰性能,通常需要对绝缘子串或者绝缘子串配合其他金具后的工频耐受电压和工频闪络电压(针对交流线路用绝缘子串)、直流耐受电压和直流闪络电压(针对直流线路用绝缘子串)以及雷电冲击过电压、操作冲击过电压等特性进行一系列的高压电气性能检测试验。The high-voltage transmission line is an important part of the power system, and the safe and stable operation of the transmission line directly determines the safety and stability of the power system and the reliability of power supply. The operation performance and anti-interference performance of transmission equipment such as insulator strings and line fittings, protection equipment such as lightning arresters and transformers, and secondary equipment and anti-interference performance are the basis for ensuring the safe and stable operation of transmission lines, especially the insulator strings are responsible for the line-to-ground and other The insulation between objects is the most basic equipment for transmission lines. Insulator strings with different structural sizes, different materials, and operating in different environments have different insulation properties. The insulation performance of the insulator strings will also change when they are matched with other fittings on the line. In order to ensure the actual operating performance and anti-interference performance of the insulator strings after hanging , it is usually necessary to check the power frequency withstand voltage and power frequency flashover voltage (for insulator strings for AC lines), DC withstand voltage and DC flashover voltage (for insulator strings for DC lines) of insulator strings or insulator strings with other fittings ) and lightning impulse overvoltage, operating impulse overvoltage and other characteristics to conduct a series of high-voltage electrical performance testing tests.
通常上述电气性能检测试验在真型塔上进行,但真型塔建设成本高、施工周期长,体积庞大笨重,占地多,且一旦建成一种塔型则不易改装建造成其他塔型,从而不能进行绝缘子串或绝缘子串配合其他金具在不同布局形式下的电气性能检测试验,杆塔利用率不高;另一方面,在真型塔进行上述试验时,悬挂、更换及调节试品绝缘子串需要高空作业,不仅增加了作业人员的风险,且不便于操作,费时费力,所需配合人员增多,工作效率低。因此有必要提出一种能够有效解决上述在真型塔进行电气性能检测时固有缺点的便捷式试验杆塔。Usually the above-mentioned electrical performance test is carried out on the real-type tower, but the real-type tower has high construction cost, long construction period, bulky and bulky, occupies a lot of land, and once one type of tower is built, it is not easy to refit and build it into another tower type, thus Insulator strings or insulator strings combined with other fittings cannot be tested for electrical performance under different layout forms, and the utilization rate of the tower is not high; Working at heights not only increases the risk of operators, but also is inconvenient to operate, time-consuming and labor-intensive, requiring more coordinating personnel and low work efficiency. Therefore, it is necessary to propose a portable test tower that can effectively solve the above-mentioned inherent shortcomings in the electrical performance testing of the real tower.
发明内容Contents of the invention
本发明所要解决的技术问题是:解决了线路绝缘子串或绝缘子串配合其他金具等设备在进行各种高压电气性能检测试验需要真型塔,而真型塔建设施工周期长、成本高,试验时不便于悬挂、更换及调节试品绝缘子串,需要进行高空作业,效率低、风险大等问题。The technical problem to be solved by the present invention is: to solve the problem that line insulator strings or insulator strings cooperate with other fittings and other equipment to perform various high-voltage electrical performance testing tests that require true-type towers, and the construction period of true-type towers is long and the cost is high. It is inconvenient to hang, replace and adjust the insulator string of the test product, and it needs to work at heights, resulting in low efficiency and high risk.
本发明提供了一种能够用于绝缘子串或绝缘子串配合其他金具等设备进行上述高压电气性能检测试验的便捷式杆塔,该试验杆塔组装方便,建设施工周期短、成本低、占地少,小巧实用,利用该试验杆塔,避免了在悬挂、更换及调节试品绝缘子串时的高空作业,且可以进行绝缘子串或绝缘子串配合其他金具在不同布局形式下的高压电气性能检测试验,大大提高了杆塔利用率,同时减少了作业人数,提高了工作效率。The invention provides a convenient pole tower that can be used for insulator strings or insulator strings in conjunction with other equipment such as other fittings to perform the above-mentioned high-voltage electrical performance detection test. The test pole tower is easy to assemble, has a short construction period, low cost, and occupies less land. Practical, the use of the test tower avoids high-altitude operations when hanging, replacing and adjusting the insulator strings of the test product, and can perform high-voltage electrical performance testing tests of insulator strings or insulator strings with other fittings in different layout forms, greatly improving The tower utilization rate is improved, while reducing the number of operators and improving work efficiency.
本发明所采用的技术方案是:The technical scheme adopted in the present invention is:
一种用于输电线路绝缘子串高压性能检测的便捷式试验杆塔,本发明特征在于,试验塔体采用框架结构,两支柱与其顶端的固定横担通过连接法兰固定,两支柱底端采用预埋地脚螺栓与混凝土浇筑的基础相固定,在支柱顶端固定横担中央设置两台带自锁功能的同步电动葫芦,分别通过两支柱内侧靠近顶端的固定滑轮用钢丝绳与固定横担下方的移动横担两端连接,移动横担与两支柱内侧设置的固定导轨组成导轨副。A portable test pole tower for testing the high-voltage performance of insulator strings in transmission lines. The invention is characterized in that the test tower body adopts a frame structure, the two pillars and the fixed cross arms at the top are fixed by connecting flanges, and the bottom ends of the two pillars are pre-buried. The anchor bolts are fixed to the foundation of concrete pouring, and two synchronous electric hoists with self-locking function are installed in the center of the fixed cross arm at the top of the pillar, and the steel wire rope for the fixed pulley near the top on the inner side of the two pillars and the movable cross arm under the fixed cross arm are respectively connected to each other. The two ends of the pole are connected, and the moving cross arm and the fixed guide rails set on the inside of the two pillars form a guide rail pair.
移动横担沿固定导轨能够在垂直平面内上下自由滑动,带动与移动横担相连的试品绝缘子串上下移动,从而升降试品绝缘子串,调节试品绝缘子串对地高度。The movable cross-arm can freely slide up and down in the vertical plane along the fixed guide rail, driving the test insulator string connected with the movable cross-arm to move up and down, thereby raising and lowering the test insulator string and adjusting the height of the test insulator string to the ground.
本发明支柱顶端固定横担中央具有自锁功能的同步电动葫芦可以保证固定横担下方的移动横担沿固定导轨平稳的升降,当移动横担升降到指定高度时电动葫芦断电自锁,移动横担与试品绝缘子串固定在一定离地高度上。The synchronous electric hoist with self-locking function in the center of the fixed cross arm at the top of the pillar can ensure that the moving cross arm below the fixed cross arm can rise and fall smoothly along the fixed guide rail. The cross arm and the test insulator string are fixed at a certain height from the ground.
本发明电动葫芦钢丝绳与移动横担通过电气隔离绝缘子连接,保证了进行高压试验时电动葫芦(8)与高电压之间可靠的电气隔离。The steel wire rope of the electric hoist of the present invention is connected with the movable cross arm through the electrical isolation insulator, which ensures reliable electrical isolation between the electric hoist (8) and the high voltage during the high voltage test.
本发明悬挂试品绝缘子串的连接杆可灵活拆卸安装在移动横担上,用于调节试品绝缘子串的布局及试品绝缘子串之间或试品绝缘子串与支柱之间的电气间隙。The connecting rod for hanging the test insulator strings of the present invention can be flexibly disassembled and installed on the movable cross arm, and is used for adjusting the layout of the test insulator strings and the electrical gap between the test insulator strings or between the test insulator strings and the pillars.
本发明固定横担上面电动葫芦保护罩的两侧各凿出一圆孔引出钢丝绳,以保护电动葫芦。The two sides of the electric hoist protective cover on the fixed cross arm of the present invention respectively chisel out a round hole to lead out the steel wire rope, to protect the electric hoist.
本发明在进行高压电气性能检测试验时的基本步骤如下:The basic steps of the present invention when carrying out the high-voltage electrical performance detection test are as follows:
(1)遥控操作同步电动葫芦,使移动横担沿固定导轨平稳下降,直至便于人工在地面往移动横担上安装试品绝缘子串的离地高度位置处断电,电动葫芦自锁,移动横担固定;(1) Operate the synchronous electric hoist by remote control, so that the moving cross arm will drop steadily along the fixed guide rail until it is convenient to manually cut off the power at the height above the ground where the test insulator string is installed on the moving cross arm. The electric hoist locks itself, and the moving cross arm bear fixed;
(2)根据试验内容和试验方案,按照试品绝缘子串布置型式及各种电气间隙,确定移动横担上连接杆的位置及长度并做好固定,悬挂好试品绝缘子串,连接好高压引线和地线等;(2) According to the test content and test plan, according to the arrangement type of the test insulator string and various electrical clearances, determine the position and length of the connecting rod on the moving cross arm and fix it well, hang the test insulator string, and connect the high-voltage lead wire and ground, etc.;
(3)遥控操作同步电动葫芦,使移动横担沿固定导轨平稳上升,直至试验要求的试品绝缘子串离地高度位置处断电,电动葫芦自锁,移动横担和试品绝缘子串固定;(3) Operate the synchronous electric hoist by remote control to make the moving cross arm rise steadily along the fixed guide rail until the power is cut off at the height of the test insulator string from the ground required by the test, the electric hoist is self-locking, and the moving cross arm and the test insulator string are fixed;
(4)根据试验安排进行高压电气性能检测试验;(4) Carry out the high-voltage electrical performance testing test according to the test arrangement;
(5)本次试验完成后,再次遥控操作同步电动葫芦,使移动横担沿固定导轨平稳下降,直至便于人工在地面更换或调节试品绝缘子串的离地高度位置处断电,电动葫芦自锁,移动横担固定;(5) After the test is completed, operate the synchronous electric hoist again by remote control, so that the moving cross arm can be lowered steadily along the fixed guide rail until the power is cut off at the position where it is convenient to manually replace or adjust the height above the ground of the insulator string of the test product, and the electric hoist automatically Lock, mobile cross arm fixed;
(6)根据试验内容和试验方案,在地面更换或调节试品绝缘子串,重复步骤(2)、(3)、(4)、(5)直至试验全部完成;(6) According to the test content and test plan, replace or adjust the test insulator string on the ground, repeat steps (2), (3), (4), and (5) until the test is completed;
(7)试验全部完成后,遥控操作同步电动葫芦,使移动横担沿固定导轨平稳下降,直至便于人工在地面拆除试品绝缘子串的离地高度位置处断电,电动葫芦自锁,移动横担固定;(7) After all the tests are completed, operate the synchronous electric hoist by remote control, so that the moving cross arm will drop steadily along the fixed guide rail until the power is cut off at the height above the ground where it is convenient for manual removal of the test insulator string on the ground. bear fixed;
(8)拆除试品绝缘子串,遥控操作同步电动葫芦,使移动横担下降至地面,使钢丝绳不受力。(8) Remove the insulator string of the test product, and operate the synchronous electric hoist remotely to lower the moving cross arm to the ground so that the wire rope is not stressed.
本发明的优点是:结构新颖、构思巧妙、便于实施,成本低、风险小、效率高。具体来讲具有以下优点:The invention has the advantages of novel structure, ingenious conception, convenient implementation, low cost, small risk and high efficiency. Specifically, it has the following advantages:
(1)遥控操作同步电动葫芦来控制移动横担在固定导轨上做垂直平面内的上下自由滑动,进而控制试品绝缘子串不同的离地高度,避免了高空作业,降低了作业风险,同时提高了工作效率。通常在进行高压电气性能检测试验时需多次悬挂、更换及调节试品绝缘子串,在真型塔上操作时需要高空作业车进行配合,作业人员多,工作效率低下且高空作业时存在作业人员从高空坠落的风险。本便捷式试验杆塔在悬挂、更换及调节试品绝缘子串时只需遥控操作同步电动葫芦使移动横担下降至便于人工操作的高度进行,无需高空作业,避免了高空作业风险,且需要的作业人员少,同时提高了工作效率。(1) Remotely operate the synchronous electric hoist to control the mobile cross arm to slide freely up and down in the vertical plane on the fixed guide rail, and then control the different heights of the test insulator strings from the ground, avoiding high-altitude operations, reducing operation risks, and improving work efficiency. Usually, it is necessary to hang, replace and adjust the insulator string of the test product many times during the high-voltage electrical performance testing test. When operating on the real tower, an aerial work vehicle is required to cooperate. There are many operators, the work efficiency is low, and there are operators when working at altitude. Risk of falling from height. This portable test pole tower only needs to operate the synchronous electric hoist remotely to lower the mobile cross arm to a height convenient for manual operation when suspending, replacing and adjusting the insulator string of the test product. Fewer personnel, while improving work efficiency.
(2)建设成本低,施工周期短。一般电气性能检测试验用真型塔多采用型钢经螺栓连接或者焊接起来的空间桁架结构,施工工艺复杂、钢材笨重运输不便,且真型塔所需钢材较多,造价高,铁塔的建设周期也长。本便捷式试验杆塔采用框架结构、分段组装形式,生产厂家在车间根据设计图纸首先生产出试验塔所需各组装段、连接法兰盘及导轨、连接件等,与此同时可进行支柱基础的带预埋地脚螺栓混凝土的浇筑施工和具有自锁功能的同步电动葫芦的准备。上述准备工作完成以后即可以在现场通过法兰盘将试验塔组装起来,施工工艺简单,且试验塔的主体是由高强度硬铝合金制成的杆塔段,轻巧便于运输,在相同试验要求的前提下所需塔材较铁塔少,降低了成本,同时也缩短了建设周期。(2) Low construction cost and short construction period. Generally, the real-type towers used for electrical performance testing and testing mostly adopt the space truss structure with section steel connected by bolts or welded together. long. The portable test pole tower adopts frame structure and segmented assembly form. The manufacturer first produces the assembly sections, connecting flanges, guide rails, connectors, etc. required for the test tower in the workshop according to the design drawings. At the same time, the pillar foundation can be carried out. The concrete pouring construction with pre-embedded anchor bolts and the preparation of the synchronous electric hoist with self-locking function. After the above preparatory work is completed, the test tower can be assembled on site through the flange. The construction process is simple, and the main body of the test tower is a pole section made of high-strength hard aluminum alloy, which is light and easy to transport. Under the premise, the required tower material is less than that of the iron tower, which reduces the cost and shortens the construction period.
(3)移动横担上用于连接试品绝缘子串的连接杆拆装方便,可调节试品绝缘子串的布局及试品之间或试品与支柱之间的电气间隙,因此可满足各类高压电气性能检测试验对不同间隙距离的要求。(3) The connecting rods used to connect the test insulator strings on the movable cross arm are easy to disassemble, and the layout of the test insulator strings and the electrical gap between the test products or between the test products and the pillars can be adjusted, so it can meet all kinds of high voltage Requirements for different gap distances in electrical performance testing tests.
附图说明Description of drawings
图1是本发明用于输电线路三相绝缘子串高压性能检测的便捷式试验杆塔结构示意图;Fig. 1 is a schematic diagram of the structure of a portable test pole tower for the detection of the high-voltage performance of a three-phase insulator string of a transmission line according to the present invention;
图2是本发明用于输电线路三相绝缘子串配合招弧角的高压性能检测图。Fig. 2 is a high-voltage performance detection diagram of the present invention used in three-phase insulator strings matching arcing angles of transmission lines.
图中:1、地脚螺栓;2、支柱基础;3、硬铝合金分段组装支柱;4、铸铁固定导轨;5、硬铝合金分段组装固定横担;6、硬铝合金分段组装移动横担;7、导轨副接触部分局部放大俯视图;8、具有自锁功能的同步电动葫芦;9、电动葫芦保护罩;10、电动葫芦钢丝绳;11、电动葫芦电气隔离绝缘子;12、定滑轮;13、连接法兰;14、连接杆;15、试品绝缘子串;16、招弧角上下电极;17、模拟导线。In the figure: 1. Anchor bolts; 2. Pillar foundation; 3. Hard aluminum alloy section assembly pillar; 4. Cast iron fixed guide rail; 5. Hard aluminum alloy section assembly and fixed cross arm; 6. Hard aluminum alloy section assembly Moving cross arm; 7. Partial enlarged top view of the contact part of guide rail pair; 8. Synchronous electric hoist with self-locking function; 9. Protective cover of electric hoist; 10. Wire rope of electric hoist; 11. Electric isolation insulator of electric hoist; 12. Fixed pulley ; 13. Connecting flange; 14. Connecting rod; 15. Test insulator string; 16. Upper and lower electrodes of arcing angle;
具体实施方式detailed description
下面,结合附图对本发明的具体实施方式做进一步的描述。Below, the specific implementation manners of the present invention will be further described in conjunction with the accompanying drawings.
一种用于输电线路绝缘子串高压性能检测的便捷式试验杆塔,本发明特征在于,试验塔体采用框架结构,两支柱3与其顶端的固定横担5通过连接法兰13固定,两支柱3底端采用预埋地脚螺栓1与混凝土浇筑的基础2相固定,在支柱3顶端固定横担5中央设置两台带自锁功能的同步电动葫芦8,分别通过两支柱3内侧靠近顶端的固定滑轮12用钢丝绳10与固定横担5下方的移动横担6两端连接,移动横担6与两支柱3内侧设置的固定导轨4组成导轨副7。A portable test tower for testing the high-voltage performance of transmission line insulator strings. The present invention is characterized in that the test tower body adopts a frame structure, and the two pillars 3 and the fixed cross arm 5 at the top are fixed by connecting flanges 13. The two pillars 3 bottom The end is fixed with the concrete pouring foundation 2 by pre-embedded anchor bolts 1, and two synchronous electric hoists 8 with self-locking function are installed in the center of the fixed cross arm 5 on the top of the pillar 3, respectively passing through the fixed pulleys on the inner side of the two pillars 3 near the top 12 is connected with the mobile cross arm 6 two ends of fixed cross arm 5 below with steel wire rope 10, and the fixed guide rail 4 that moves cross arm 6 and two pillars 3 inner sides that are provided with forms guide rail pair 7.
移动横担6沿固定导轨4能够在垂直平面内上下自由滑动,带动与移动横担6相连的试品绝缘子串15上下移动,从而升降试品绝缘子串15,调节试品绝缘子串15对地高度。The movable cross arm 6 can freely slide up and down in the vertical plane along the fixed guide rail 4, and drives the test insulator string 15 connected with the movable cross arm 6 to move up and down, thereby lifting and lowering the test insulator string 15 and adjusting the height of the test insulator string 15 to the ground .
本发明支柱3顶端固定横担5中央具有自锁功能的同步电动葫芦8可以保证固定横担5下方的移动横担6沿固定导轨4平稳的升降,当移动横担6升降到指定高度时电动葫芦8断电自锁,移动横担6与试品绝缘子串15固定在一定离地高度上。The synchronous electric hoist 8 with self-locking function in the center of the fixed cross arm 5 at the top of the pillar 3 of the present invention can ensure that the moving cross arm 6 below the fixed cross arm 5 can move up and down smoothly along the fixed guide rail 4. The gourd 8 is self-locking when power is off, and the movable cross arm 6 and the test insulator string 15 are fixed at a certain height from the ground.
本发明电动葫芦钢丝绳10与移动横担6通过电气隔离绝缘子11连接,保证了进行高压试验时电动葫芦8与高电压之间可靠的电气隔离。The electric hoist steel wire rope 10 of the present invention is connected to the movable cross arm 6 through the electrical isolation insulator 11, which ensures reliable electrical isolation between the electric hoist 8 and the high voltage during the high voltage test.
本发明悬挂试品绝缘子串15的连接杆14可灵活拆卸安装在移动横担6上,用于调节试品绝缘子串15的布局及试品绝缘子串15之间或试品绝缘子串15与支柱3之间的电气间隙。The connecting rod 14 for suspending the test insulator string 15 of the present invention can be flexibly disassembled and installed on the movable cross arm 6 for adjusting the layout of the test insulator string 15 and between the test insulator strings 15 or between the test insulator string 15 and the pillar 3 electrical clearance between them.
本发明固定横担5上面电动葫芦保护罩9的两侧各凿出一圆孔引出钢丝绳10,以保护电动葫芦。The both sides of the electric hoist protective cover 9 on the fixed cross arm 5 of the present invention respectively chisel out a circular hole and lead the wire rope 10, to protect the electric hoist.
如图1、图2所示,本发明整体上由基础、支柱、固定横担、移动横担、导轨副及具有自锁功能的同步电动葫芦六大部分组成,其中支柱、固定横担、移动横担采用硬铝合金由生产厂家在车间分标准段加工制作,包括连接用的连接法兰、连接杆及地脚螺栓、各种连接螺钉等。本试验塔所用导轨副其中固定导轨(垂直放置导轨)采用较硬的耐磨铸铁加工,动导轨(水平放置导轨)由移动横担和硬铝合金导轨头两部分组成,导轨头表面喷涂一层耐磨涂层,导轨头和移动横担通过二通法兰可靠连接共同组成动导轨。As shown in Fig. 1 and Fig. 2, the present invention is generally composed of six major parts: foundation, pillar, fixed crossarm, movable crossarm, guide rail pair and synchronous electric hoist with self-locking function, among which pillar, fixed crossarm, mobile The cross arm is made of duralumin alloy, which is processed by the manufacturer in standard sections in the workshop, including connecting flanges, connecting rods, anchor bolts, and various connecting screws. The guide rail pair used in this test tower, the fixed guide rail (vertically placed guide rail) is made of hard wear-resistant cast iron, and the moving guide rail (horizontally placed guide rail) is composed of two parts: the movable cross arm and the hard aluminum alloy guide rail head, and the surface of the guide rail head is sprayed with a layer The wear-resistant coating, the guide rail head and the moving cross arm are reliably connected through the two-way flange to form a moving guide rail.
在上述准备工作完成以后将试验杆塔所需全部零部件运抵现场即可开始试验杆塔的组建施工,试验杆塔组建施工的基本步骤有:After the above preparatory work is completed, all the parts required for the test tower can be transported to the site to start the construction of the test tower. The basic steps for the construction of the test tower are as follows:
(1)在地面将各杆塔段组装成支柱、固定横担和移动横档;(1) Assemble the tower sections into pillars, fixed cross-arms and movable crosspieces on the ground;
(2)通过法兰盘将支柱和固定横担连接起来,在固定横担中央配置、调试好同步电动葫芦,同时在两支柱内侧安装好固定导轨;(2) Connect the pillar and the fixed cross arm through the flange, configure and debug the synchronous electric hoist in the center of the fixed cross arm, and install the fixed guide rail inside the two pillars;
(3)利用吊车将地面组装好的试验杆塔吊至浇筑好的混凝土支柱基础所在位置,并保持试验杆塔与基础垂直;(3) Use a crane to hoist the test pole tower assembled on the ground to the position of the poured concrete pillar foundation, and keep the test pole tower vertical to the foundation;
(4)将两支柱塔脚固定在混凝土基础中的预埋地脚螺栓上(此处若对杆塔的稳定性有特殊要求,则还可以分别在两支柱顶端引四根拉线,将其固定在地面上);(4) Fix the tower feet of the two pillars on the pre-embedded anchor bolts in the concrete foundation (here, if there are special requirements for the stability of the tower, you can also lead four stay wires at the top of the two pillars and fix them on the on the ground);
(5)将导轨头和移动横担通过法兰盘连接起来,利用吊车将移动横担运至已固定好的杆塔塔脚位置处;(5) Connect the guide rail head and the mobile cross arm through the flange, and use the crane to transport the mobile cross arm to the fixed pole tower foot;
(6)将同步电动葫芦通过电气隔离绝缘子用钢丝绳分别与移动横档的两端相连,将移动横担两端的导轨头与固定导轨对齐;(6) Connect the synchronous electric hoist to the two ends of the moving crosspiece with steel wire ropes through the electrical isolation insulator, and align the guide rail heads at both ends of the moving crossarm with the fixed guide rail;
(7)遥控操作同步电动葫芦将移动横担沿固定导轨吊起,至此便携式试验杆塔组建施工完成。(7) Remotely operate the synchronous electric hoist to lift the mobile cross arm along the fixed guide rail, and the construction of the portable test tower is completed.
作为一个实施例,利用本发明所发明的试验用便携式杆塔对220kV复合绝缘子串配合招弧角的雷电冲击U50%放电特性进行试验,如图2所示,其中试品由复合绝缘子串、招弧角及模拟导线组成。由于不同绝缘子串长、不同招弧角尺寸下的雷电冲击特性不同,因此试验需要频繁更换试品绝缘子串和招弧角。As an example, the lightning impulse U 50% discharge characteristic of the 220kV composite insulator string with the strike arc angle is tested by using the portable pole tower for the test invented by the present invention, as shown in Figure 2, wherein the test product is composed of composite insulator string, stroke arc Composition of arc angle and simulated wire. Due to the different lightning impulse characteristics under different insulator string lengths and different arc strike angle sizes, the test needs to frequently replace the test insulator string and arc strike angle.
根据相关试验规程,雷电冲击U50%放电特性通过升降法获取,试验步骤主要是:首先选取约为预期U50%的10%作为电压级差ΔU,选取接近于50%闪络电压的一个电压作为起始电压并加压,若不发生闪络,则电压增加ΔU,反之,则下一次试验时电压降低ΔU;然后确定第一个有效的起始电压值,与前一次试验产生的效果不同的第一个试验选作为第一个“有效的”试验,只有这一次试验和随后至少9次试验才作为有效的试验,并用它们来确定50%闪络电压,50%闪络电压使用下式计算。According to the relevant test regulations, the lightning impulse U 50% discharge characteristics are obtained by the lifting method. The main test steps are: first select 10% of the expected U 50% as the voltage difference ΔU, and select a voltage close to 50% of the flashover voltage as the Start the voltage and pressurize it. If there is no flashover, the voltage will increase by ΔU, otherwise, the voltage will decrease by ΔU in the next test; then determine the first effective starting voltage value, which is different from the effect produced by the previous test. The first test is selected as the first "effective" test, only this test and at least 9 subsequent tests are considered valid tests, and they are used to determine the 50% flashover voltage, which is calculated using the following formula .
220kV复合绝缘子串配合招弧角的雷电冲击U50%放电特性试验的主要步骤如下:The main steps of the lightning impulse U 50% discharge characteristic test of 220kV composite insulator strings with the arc angle are as follows:
(1)遥控操作同步电动葫芦,使移动横担沿固定导轨平稳下降,直至便于人工在地面往移动横担上安装试品的离地高度位置处断电,电动葫芦自锁,移动横担固定;(1) Operate the synchronous electric hoist by remote control, so that the moving cross arm will drop steadily along the fixed guide rail until the power is cut off at the height above the ground where it is convenient to manually install the test product on the moving cross arm on the ground, the electric hoist is self-locking, and the moving cross arm is fixed ;
(2)根据试验方案,按照复合绝缘子串和招弧角的安装型式,确定移动横担上连接杆的位置及长度并做好固定,悬挂好复合绝缘子串和招弧角以及模拟导线等,同时连接好高压引线和地线等;(2) According to the test plan, according to the installation type of the composite insulator string and the arc angle, determine the position and length of the connecting rod on the moving cross arm and fix it well, hang the composite insulator string, the arc angle and the simulated wire, etc., at the same time Connect the high-voltage leads and ground wires, etc.;
(3)遥控操作同步电动葫芦,使移动横担沿固定导轨平稳上升,直至试验要求的安全离地高度位置处断电,电动葫芦自锁,移动横担和试品固定;(3) Operate the synchronous electric hoist by remote control, so that the moving cross arm rises steadily along the fixed guide rail, until the power is cut off at the safe height above the ground required by the test, the electric hoist locks itself, and the moving cross arm and the sample are fixed;
(4)根据雷电冲击放电特性U50%的试验步骤开始试验,并做好记录;(4) Start the test according to the test procedure of lightning impulse discharge characteristic U 50% , and make a record;
(5)再次遥控操作同步电动葫芦,使移动横担沿固定导轨平稳下降,直至便于人工在地面操作试品的离地高度位置处断电,电动葫芦自锁,移动横担固定;(5) Operate the synchronous electric hoist again by remote control, so that the moving cross arm will descend steadily along the fixed guide rail until the power is cut off at the height above the ground where the test product is convenient for manual operation on the ground, the electric hoist is self-locking, and the moving cross arm is fixed;
(6)根据试验方案,在地面调节招弧角尺寸,重复步骤(2)、(3)、(4)、(5)直至复合绝缘子串配合不同招弧角尺寸下的雷电冲击特性试验全部完成;(6) According to the test plan, adjust the size of the arcing angle on the ground, repeat steps (2), (3), (4), and (5) until the lightning impulse characteristic tests of the composite insulator strings with different sizes of the arcing angle are all completed ;
(7)试验全部完成后,遥控操作同步电动葫芦,使移动横担沿固定导轨平稳下降,直至便于人工在地面拆除试品的离地高度位置处断电,电动葫芦自锁,移动横担固定;(7) After all the tests are completed, operate the synchronous electric hoist by remote control to make the moving cross-arm drop steadily along the fixed guide rail until the power is cut off at the height above the ground where it is convenient to manually remove the test product on the ground, the electric hoist locks itself, and the moving cross-arm is fixed ;
(8)拆除试品,遥控操作同步电动葫芦,使移动横担下降至地面,使钢丝绳不受力。(8) Remove the test product, and operate the synchronous electric hoist by remote control to lower the moving cross arm to the ground so that the wire rope is not stressed.
复合绝缘子串带并联间隙的雷电冲击放电特性U50%的试验结果如下,其中招弧角上电极为棒形,下电极为球拍形。当招弧角间隙长度与复合绝缘子串结构高度的比值为0.80时其雷电冲击U50%放电特性的试验结果如下表1,其雷电冲击放电特性U50%为为953.86kV。The test results of lightning impulse discharge characteristics U 50% of composite insulator series with parallel gap are as follows, in which the upper electrode of the arcing angle is rod-shaped, and the lower electrode is racket-shaped. When the ratio of arc angle gap length to composite insulator string structure height is 0.80, the test results of the lightning impulse U 50% discharge characteristic are shown in Table 1, and the lightning impulse discharge characteristic U 50% is 953.86kV.
表1Table 1
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310038489.7A CN103175998B (en) | 2013-01-31 | 2013-01-31 | A kind of portable test shaft tower detected for transmission circuit insulator string high-voltage performance |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310038489.7A CN103175998B (en) | 2013-01-31 | 2013-01-31 | A kind of portable test shaft tower detected for transmission circuit insulator string high-voltage performance |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103175998A CN103175998A (en) | 2013-06-26 |
| CN103175998B true CN103175998B (en) | 2016-04-20 |
Family
ID=48635991
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310038489.7A Active CN103175998B (en) | 2013-01-31 | 2013-01-31 | A kind of portable test shaft tower detected for transmission circuit insulator string high-voltage performance |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103175998B (en) |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104444878A (en) * | 2014-11-12 | 2015-03-25 | 宁夏嘉翔自控技术有限公司 | Pump type overhauling and hoisting device for sewage treatment system for filtering quartz sand |
| CN104330672B (en) * | 2014-11-14 | 2015-08-12 | 贵州电网公司输电运行检修分公司 | Motion guide rail formula electric transmission line isolator automatic detection device and detection method |
| CN104502747B (en) * | 2014-12-02 | 2017-08-08 | 国家电网公司 | A kind of apparatus and method detected suitable for extra-high voltage insulator |
| CN105019713B (en) * | 2015-08-13 | 2017-07-07 | 国家电网公司 | A kind of Novel electric line bar |
| CN108398620B (en) * | 2018-02-12 | 2020-10-09 | 西北核技术研究所 | Surface flashover experiment sample replacement device, experimental device and sample replacement method |
| CN111579395A (en) * | 2020-05-20 | 2020-08-25 | 浙江华电器材检测研究所有限公司 | Test tower device |
| CN111751681B (en) * | 2020-06-15 | 2022-07-29 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Network access detection test method for layered insulator |
| CN111784285A (en) * | 2020-06-19 | 2020-10-16 | 上海华力集成电路制造有限公司 | Engineering experiment scheme management system |
| US11799278B1 (en) | 2020-08-07 | 2023-10-24 | Inventus Holdings, Llc | Type C compact electric transmission line support structure |
| CN112649705B (en) * | 2020-12-21 | 2024-10-15 | 中国电力科学研究院有限公司 | An automatic disc insulator replacement device for steep wave testing |
| CN114486713B (en) * | 2021-12-31 | 2023-11-17 | 贵州电网有限责任公司 | Resistance test device and method for weathering steel tower |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201149613Y (en) * | 2008-01-18 | 2008-11-12 | 北京国电华北电力工程有限公司 | Door type skeleton tower for outdoor impact test site |
| CN201148761Y (en) * | 2008-01-18 | 2008-11-12 | 北京国电华北电力工程有限公司 | Experiment line segment door type tangent tower |
| CN202330626U (en) * | 2011-11-07 | 2012-07-11 | 江西省电力科学研究院 | Withstand voltage test platform of live line tool |
| CN202486159U (en) * | 2011-12-05 | 2012-10-10 | 安康供电局 | Lifting insulation rod test stand |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3226653B2 (en) * | 1993-02-08 | 2001-11-05 | チクシ電気株式会社 | Transmission line tower flash detection system |
-
2013
- 2013-01-31 CN CN201310038489.7A patent/CN103175998B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201149613Y (en) * | 2008-01-18 | 2008-11-12 | 北京国电华北电力工程有限公司 | Door type skeleton tower for outdoor impact test site |
| CN201148761Y (en) * | 2008-01-18 | 2008-11-12 | 北京国电华北电力工程有限公司 | Experiment line segment door type tangent tower |
| CN202330626U (en) * | 2011-11-07 | 2012-07-11 | 江西省电力科学研究院 | Withstand voltage test platform of live line tool |
| CN202486159U (en) * | 2011-12-05 | 2012-10-10 | 安康供电局 | Lifting insulation rod test stand |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103175998A (en) | 2013-06-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103175998B (en) | A kind of portable test shaft tower detected for transmission circuit insulator string high-voltage performance | |
| CN102623923B (en) | Lifting type rail insulation operation platform | |
| CN105129627B (en) | The folding suspension arm assembly that electric pole is supported | |
| CN202486159U (en) | Lifting insulation rod test stand | |
| CN207765885U (en) | A kind of 10kV aerial condutors lifting device | |
| CN101958519B (en) | Method for transforming tangent tower of double-circuit double-bundle transmission lines by lifting in electrified mode in another place | |
| CN102664358B (en) | Live replacement method for static contact of 220 kV flexible busbar | |
| CN206430892U (en) | A kind of static mechanical load of terminal test tool | |
| CN202111415U (en) | Multi-functional combination live working device of distribution line | |
| CN201656340U (en) | High voltage pipe busbar support insulator replacement tool | |
| CN105811301B (en) | The insulation of the 35kV supply lines livewire work of low cost carries line apparatus | |
| CN203284128U (en) | Hoisting tool of main mechanism of switch blade | |
| CN214201567U (en) | Windproof DC high voltage generator and windproof DC high voltage generator assembly | |
| CN205791238U (en) | A kind of 10kV distribution line charged lifter of straightway three-phase conducting wire | |
| CN102510029B (en) | Ground potential electrified bar cutter device changing method | |
| CN209948529U (en) | Live lifting mechanism for three-phase lead of straight-line section of 10kV distribution network line | |
| CN103323224B (en) | A kind of anti-falling safe pick-up unit | |
| CN207499793U (en) | Transformer high-voltage bushing upkeep operation frame | |
| CN105514867A (en) | Method for replacing V-shaped insulator string of power transmission line pole | |
| CN107069508B (en) | Auxiliary tool for replacing post insulator of isolating switch under 110kV | |
| CN110212324A (en) | A kind of hanging device and method of voltage levels temporary ground wire | |
| CN210419024U (en) | Top rotary suspension arm of hot-line maintenance robot | |
| CN204760830U (en) | Isolator maintenance work frame | |
| CN204384733U (en) | Bus plug-in strip Lift-on/Lift-off System | |
| CN211150812U (en) | Novel grounding wire device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |