CN102953505B - Whitewash spraying gypsum metope structure and construction method thereof - Google Patents
Whitewash spraying gypsum metope structure and construction method thereof Download PDFInfo
- Publication number
- CN102953505B CN102953505B CN201210446862.8A CN201210446862A CN102953505B CN 102953505 B CN102953505 B CN 102953505B CN 201210446862 A CN201210446862 A CN 201210446862A CN 102953505 B CN102953505 B CN 102953505B
- Authority
- CN
- China
- Prior art keywords
- spraying
- gypsum
- point type
- type module
- metope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Curing Cements, Concrete, And Artificial Stone (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses one and whitewash spraying gypsum metope structure, it comprises body of wall basic unit (1), glass-fiber-fabric (2), spraying gypsum point type module (3), spraying gypsic horizon (4), glass-fiber-fabric (2) is fixed in body of wall basic unit (1) by several sprayings gypsum point type module (3), glass-fiber-fabric (2) and the overall metope of the upper formation of spraying gypsum point type module (3) are located in spraying gypsic horizon (4) spraying, overall metope flat appearance and metope and ground keep vertical.The present invention also discloses its construction method.The present invention adopts in basic unit, directly whitewashes spraying gypsum technology, can reach following object: disposable spray finishing 5 ~ 30mm thickness only need be smeared one time and receive light; Adopt the spraying of mechanical agitation, individual layer to put in place, be aided with and catch up with flat receipts light; Use glass-fiber-fabric to increase adhesion stress and overall metope intensity, do not ftracture; Polishing is not needed not have dust pollution etc.
Description
Technical field
The present invention relates to one and whitewash spraying gypsum metope structure and construction method thereof.
Background technology
Interior decoration partition wall emulsion paint facing is one of more common finish material, due to working procedure complexity, hollowing, cracking, planeness and verticality be difficult to control, the large affect people of dust of polishing healthy, take the time-consuming many-sided reason such as to take a lot of work of material, both sides are unwilling again to feel free to try, and have if things go on like this been difficult to new breakthrough.
There is following drawback in tradition partition wall form of construction work: complex procedures, pure manual operations is many, the on-the-spot artificial proportioning of land plaster, quality are wayward, need repeatedly criticize ash repeatedly make up a deficiency polishing take a lot of work, need in operation multiple intermittent time give dry time-consuming, secondary pollution serious, workers ' health also exists larger impact etc.
Summary of the invention
The object of the invention is: provide one to whitewash spraying gypsum metope structure, this metope structure decoration quality is high, not easily occurs the situation such as hollowing, cracking, and simple, the pure manual operations of working procedure less, save time.
Another object of the present invention is: provide a kind of construction method of whitewashing spraying gypsum metope structure, simple, the pure manual operations of its working procedure less, save time; And construction wall surfacing quality is high, not easily occurs the situation such as hollowing, cracking.
Metope structure technical scheme of the present invention is: one whitewashes spraying gypsum metope structure and construction method thereof, it comprises body of wall basic unit, glass-fiber-fabric, spraying gypsum point type module, spraying gypsic horizon, glass-fiber-fabric is fixed in body of wall basic unit by several spraying gypsum point type modules, the spraying of spraying gypsic horizon is located in glass-fiber-fabric and spraying gypsum point type module and is formed overall metope, overall metope flat appearance and metope and ground keep vertical.
Below technique scheme is further expalined:
Described body of wall basic unit is brick wall, concrete wall, aerated blocks wall or cement pressure plate wall.
Described spraying gypsum point type module is of a size of 50mm*50mm, and the thickness of spraying gypsic horizon is 5 ~ 30mm.
Several spraying gypsum point type modules described are quincunx arrangement.
Longitudinal, the horizontal spacing of several spraying gypsum point type modules described are 500 ~ 600mm.
Construction method technical scheme of the present invention is: a kind of construction method of whitewashing spraying gypsum metope structure, and it includes following construction sequence, a) directly in body of wall basic unit 1, settles glass-fiber-fabric, adopts spraying gypsum point type module 3 to be fixed; B) spray gypsic horizon 4 to be sprayed in glass-fiber-fabric, spraying gypsum point type module and to form and smooth keep vertical overall metope with ground; C) be aided with pressing receipts light after having sprayed again to wait to do.
Below technique scheme is further expalined:
Described body of wall basic unit is brick wall, concrete wall, aerated blocks wall or cement pressure plate wall.
Described spraying gypsum point type module is of a size of 50mm*50mm, and the thickness of spraying gypsic horizon is 5 ~ 30mm.
Several spraying gypsum point type modules described are quincunx arrangement.
Longitudinal, the horizontal spacing of several spraying gypsum point type modules described are 500 ~ 600mm.
Advantage of the present invention is:
1, of the present invention whitewashing sprays gypsum metope structure and construction method thereof, breach emulsion paint construction technology in the past, have employed use in the basic units such as brick wall, concrete wall, plaster board wall, calcium silicates board wall and whitewash spraying gypsum technology, itself and various interface (brick wall, concrete wall, aerated blocks wall, plasterboard partition wall and furred ceiling, cement pressure plate etc.) is made to bond firmly, without hollowing cracking, smooth vertical, smooth dustless, time and labour saving, energy-conserving and environment-protective.
2, of the present invention whitewashing sprays gypsum metope structure and construction method thereof, reaches following object: disposable spray finishing 5 ~ 30mm thickness only need be smeared one time and receive light; Adopt the spraying of mechanical agitation, individual layer to put in place, be aided with and catch up with flat receipts light; Use glass-fiber-fabric to increase adhesion stress and overall metope intensity, do not ftracture; Polishing is not needed not have dust pollution etc.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is structural profile schematic diagram of the present invention;
Fig. 2 is structural profile enlarged diagram of the present invention;
Fig. 3 is schematic perspective view of the present invention;
Wherein: 1 body of wall basic unit; 2 glass-fiber-fabrics; 3 spraying gypsum point type modules; 4 spraying gypsic horizons.
Detailed description of the invention
Embodiment one:
As shown in Figure 1, Figure 2, Figure 3 shows, one whitewashes spraying gypsum metope structure, it comprises body of wall basic unit 1, glass-fiber-fabric 2, spraying gypsum point type module 3, spraying gypsic horizon 4, glass-fiber-fabric 2 is fixed in body of wall basic unit 1 by several spraying gypsum point type modules 3, the spraying of spraying gypsic horizon 4 is located in glass-fiber-fabric 2 and spraying gypsum point type module 3 and is formed overall metope, overall metope flat appearance and metope and ground keep vertical.
Body of wall basic unit 1 is brick wall, concrete wall, aerated blocks wall or cement pressure plate wall.
Spraying gypsum point type module 3 is of a size of 50mm*50mm, and the thickness of spraying gypsic horizon 4 is 5 ~ 30mm.
Several spraying gypsum point type modules 3 are quincunx arrangement.
Longitudinal, the horizontal spacing of several spraying gypsum point type modules 3 are 500 ~ 600mm.
Embodiment two:
Whitewash a construction method for spraying gypsum metope structure, it includes following construction sequence:
A) directly in body of wall basic unit 1, glass-fiber-fabric 2(is settled to have good pliability and decay resistance), strengthen the adhesion strength in plate face, the instructions for use such as to reach in the application of its facade securely, strong adhesion, bonding endurance is stronger.Adopt 50mm*50mm to spray gypsum point type module 3 to be fixed, the vertical, horizontal spacing that arranges of spraying gypsum point type module 3 is 500 ~ 600mm, quincunx arrangement, thickness is determined according to smooth, the verticality of body of wall basic unit 1, be generally 5 ~ 30mm, the planeness in integral wall face, verticality can be controlled, greatly shorten base layer construction operation and construction period.
B) spray gypsic horizon 4 use mechanical agitation and be sprayed on glass-fiber-fabric 2, coating thickness is determined according to spraying gypsum point type module 3, is generally 5 ~ 30mm.
C) be aided with again after having sprayed to flatten and receive light, surface layer (emulsion paint, wallpaper etc.) operation can be carried out after dry, solve time-consuming in operation taking a lot of work, without problems such as filler mixing and polishing powder dust pollutions.
It should be pointed out that for the present invention through absolutely proving, also can have the embodiment of multiple conversion and remodeling, be not limited to the specific embodiment of above-mentioned embodiment.Above-described embodiment is as just explanation of the present invention, instead of limitation of the present invention.In a word, protection scope of the present invention should comprise those apparent conversion or alternative and remodeling to those skilled in the art.
Claims (8)
1. one kind is whitewashed spraying gypsum metope structure, it is characterized in that: it comprises body of wall basic unit (1), glass-fiber-fabric (2), spraying gypsum point type module (3), spraying gypsic horizon (4), glass-fiber-fabric (2) is fixed in body of wall basic unit (1) by several sprayings gypsum point type module (3), glass-fiber-fabric (2) and the overall metope of the upper formation of spraying gypsum point type module (3) are located in spraying gypsic horizon (4) spraying, overall metope flat appearance and metope and ground keep vertical;
Several sprayings gypsum point type module (3) described are quincunx arrangement.
2. according to claim 1 whitewashing sprays gypsum metope structure, it is characterized in that: described body of wall basic unit (1) is brick wall, concrete wall, aerated blocks wall or cement pressure plate wall.
3. according to claim 1 whitewashing sprays gypsum metope structure, it is characterized in that: described spraying gypsum point type module (3) is of a size of 50mm*50mm, and the thickness of spraying gypsic horizon (4) is 5 ~ 30mm.
4. according to claim 1 whitewashing sprays gypsum metope structure, it is characterized in that: longitudinal, the horizontal spacing of several sprayings gypsum point type module (3) described are 500 ~ 600mm.
5. whitewash a construction method for spraying gypsum metope structure, it is characterized in that: it includes following construction sequence, a) directly in body of wall basic unit (1), settle glass-fiber-fabric (2), adopt spraying gypsum point type module (3) to be fixed; B) spray that gypsic horizon (4) is sprayed at glass-fiber-fabric (2), spraying gypsum point type module (3) is gone up and form and smooth keep vertical overall metope with ground; C) be aided with pressing receipts light after having sprayed again to wait to do;
Several sprayings gypsum point type module (3) are quincunx arrangement.
6. construction method of whitewashing spraying gypsum metope structure according to claim 5, is characterized in that: described body of wall basic unit (1) is brick wall, concrete wall, aerated blocks wall or cement pressure plate wall.
7. construction method of whitewashing spraying gypsum metope structure according to claim 5, it is characterized in that: described spraying gypsum point type module (3) is of a size of 50mm*50mm, the thickness of spraying gypsic horizon (4) is 5 ~ 30mm.
8. construction method of whitewashing spraying gypsum metope structure according to claim 5, is characterized in that: longitudinal, the horizontal spacing of several sprayings gypsum point type module (3) described are 500 ~ 600mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210446862.8A CN102953505B (en) | 2012-11-11 | 2012-11-11 | Whitewash spraying gypsum metope structure and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210446862.8A CN102953505B (en) | 2012-11-11 | 2012-11-11 | Whitewash spraying gypsum metope structure and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102953505A CN102953505A (en) | 2013-03-06 |
CN102953505B true CN102953505B (en) | 2016-03-23 |
Family
ID=47762841
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210446862.8A Active CN102953505B (en) | 2012-11-11 | 2012-11-11 | Whitewash spraying gypsum metope structure and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102953505B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090068544A (en) * | 2007-12-24 | 2009-06-29 | 니오가드(주) | The installation and products on the floor,wall and ceil with the mixture of yellow soil stone powder,cement, and voc free solution |
CN101886460A (en) * | 2010-07-16 | 2010-11-17 | 江苏弘盛建设工程集团有限公司 | Press polishing method of plastered mesh cloth of inner wall |
CN101948289A (en) * | 2010-09-08 | 2011-01-19 | 深圳广田装饰集团股份有限公司 | Mortar for floating screed during building plastering construction and construction method thereof |
CN102390970A (en) * | 2011-07-28 | 2012-03-28 | 太原理工大学 | Plaster dried mortar for mechanical spraying |
CN102644362A (en) * | 2012-04-20 | 2012-08-22 | 深圳广田装饰集团股份有限公司 | Method for architectural decoration plastering construction |
CN102731030A (en) * | 2012-06-20 | 2012-10-17 | 上海德滨环保科技有限公司 | Environmentally-friendly machine spray mortar, its production method and its use method |
CN202899485U (en) * | 2012-11-11 | 2013-04-24 | 苏州金螳螂建筑装饰股份有限公司 | Wall surface painted and sprayed by gypsum |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004049423A1 (en) * | 2004-10-08 | 2006-04-13 | Wolfgang Braungardt | Method of making a building |
-
2012
- 2012-11-11 CN CN201210446862.8A patent/CN102953505B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090068544A (en) * | 2007-12-24 | 2009-06-29 | 니오가드(주) | The installation and products on the floor,wall and ceil with the mixture of yellow soil stone powder,cement, and voc free solution |
CN101886460A (en) * | 2010-07-16 | 2010-11-17 | 江苏弘盛建设工程集团有限公司 | Press polishing method of plastered mesh cloth of inner wall |
CN101948289A (en) * | 2010-09-08 | 2011-01-19 | 深圳广田装饰集团股份有限公司 | Mortar for floating screed during building plastering construction and construction method thereof |
CN102390970A (en) * | 2011-07-28 | 2012-03-28 | 太原理工大学 | Plaster dried mortar for mechanical spraying |
CN102644362A (en) * | 2012-04-20 | 2012-08-22 | 深圳广田装饰集团股份有限公司 | Method for architectural decoration plastering construction |
CN102731030A (en) * | 2012-06-20 | 2012-10-17 | 上海德滨环保科技有限公司 | Environmentally-friendly machine spray mortar, its production method and its use method |
CN202899485U (en) * | 2012-11-11 | 2013-04-24 | 苏州金螳螂建筑装饰股份有限公司 | Wall surface painted and sprayed by gypsum |
Also Published As
Publication number | Publication date |
---|---|
CN102953505A (en) | 2013-03-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103046709B (en) | Building construction method of inner wall surface | |
CN102477797A (en) | Construction method for preventing crack of infilled wall | |
CN101886460B (en) | Press polishing method of plastered mesh cloth of inner wall | |
CN104018598A (en) | Outer wall structure and construction and installation method | |
CN102704635B (en) | Paint brushing construction method | |
CN106121231A (en) | A kind of skyscraper interts cross construction method | |
CN105525726A (en) | Aerated brick wall plastering construction method | |
CN201850787U (en) | Clean chamber built by special modules | |
CN112267628A (en) | Construction method of plastering-free system for interior wall decoration of constructional engineering | |
CN104110112B (en) | Building wall decoration mortar construction technology | |
CN108049635A (en) | Stone curtain wall exterior decoration construction method | |
CN106284998A (en) | Plastering on inner walls completely spreads fiberglass gridding cloth construction method | |
CN108130992A (en) | Rubble plate, styrofoam and porous brick compound thermal-insulating decorative external wall construction engineering method | |
Ochilova | Technology of painting works in construction | |
CN107574936B (en) | A kind of heat preserving exterior wall construction technology | |
CN202899485U (en) | Wall surface painted and sprayed by gypsum | |
CN102953505B (en) | Whitewash spraying gypsum metope structure and construction method thereof | |
CN104612343A (en) | Method for constructing extruded polystyrene board molding of building outer wall | |
CN104405092A (en) | Mould-transferring construction method for natural stone paint of outer wall | |
CN207553357U (en) | Rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall | |
CN208685983U (en) | A kind of flexible stone tapestry brick | |
CN103572932A (en) | Flexible wall pasting wood veneer | |
CN204326296U (en) | A kind of novel construction wall energy-saving system | |
CN106401103A (en) | Wall surface large-size vitrified tile comprehensive method construction technology | |
CN2934449Y (en) | Combined type natural sandstone board wall surface |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |