CN102953398B - Beach territory, river diaphragm wall enters locking device and the construction method thereof of rock section - Google Patents

Beach territory, river diaphragm wall enters locking device and the construction method thereof of rock section Download PDF

Info

Publication number
CN102953398B
CN102953398B CN201110247853.1A CN201110247853A CN102953398B CN 102953398 B CN102953398 B CN 102953398B CN 201110247853 A CN201110247853 A CN 201110247853A CN 102953398 B CN102953398 B CN 102953398B
Authority
CN
China
Prior art keywords
diaphragm wall
steel plate
rock
locking device
territory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110247853.1A
Other languages
Chinese (zh)
Other versions
CN102953398A (en
Inventor
杨前
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201110247853.1A priority Critical patent/CN102953398B/en
Publication of CN102953398A publication Critical patent/CN102953398A/en
Application granted granted Critical
Publication of CN102953398B publication Critical patent/CN102953398B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to construction of diaphragm wall.Beach territory, a kind of river diaphragm wall enters the locking device of rock section, it comprises: one covers and the steel plate in gap between the diaphragm wall connected with expansion bolt and the rock of Foundation Pit wall, described steel plate is provided with one and is positioned at described gap and the Grouting Pipe of passing steel plate body, described Grouting Pipe is provided with switch valve, and port is provided with filter screen.Beach territory, river diaphragm wall enters an enclosure method for rock section, comprising: described locking device is arranged along the gap ring-type between diaphragm wall and rock; When pit earthwork is excavated to this position, use steel plate to get lodged in gap place, steel plate is positioned at the anchoring position of diaphragm wall and rock, in the middle of the expansion bolt then expansive mortar bag being pressed in steel plate anchoring place, is tightened by expansion bolt; Turn on diversion Grouting Pipe, after the freezing by expansion of expansive mortar bag, along the shape nature crimp of seam crossing, form a complete enclosed construction.This invention ensures that the sealing effect of ultra-deep foundation pit.

Description

Beach territory, river diaphragm wall enters locking device and the construction method thereof of rock section
Technical field
The present invention relates to construction of diaphragm wall, particularly relate to structure and construction method that beach territory, river diaphragm wall enters rock section.
Background technology
The soil layer in beach territory, river is along the river drift sand formation, silt clay layer, burning into sand argillic horizon, andesite layer, the Whirlwind tank continuous wall trench underground degree of depth can only reach andesite layer and burning into sand soil layer binding site, because bottom after continuous wall trench underground has the sediment of some, the absolute altitude of andesite layer is uneven, so can there is space at this position diaphragm wall and andesite joint portion, the pressure effect due to outside muddy water after excavation of foundation pit to this position there will be Piping phenomenon.
Summary of the invention
The present invention is intended to address the aforementioned drawbacks, and provides beach territory, a kind of river diaphragm wall to enter enclosed construction and the construction method thereof of rock section.Manufacture craft of the present invention is simple, workable; Ensure that the sealing effect of ultra-deep foundation pit.
For solving the problem, beach territory, a kind of river diaphragm wall enters the locking device of rock section, between the rock that it is arranged on diaphragm wall and Foundation Pit wall, it comprises: the steel plate in gap between a covering diaphragm wall and the rock of Foundation Pit wall, this steel plate is connected with expansion bolt respectively with diaphragm wall and with the rock of Foundation Pit wall, described steel plate is provided with one and is positioned at described gap and the Grouting Pipe of passing steel plate body, and described Grouting Pipe is provided with switch valve, and port is provided with filter screen.
Described beach territory, river diaphragm wall enters the locking device of rock section, it also comprise be arranged on steel plate and diaphragm wall and and the rock of Foundation Pit wall between expansive mortar bag.
Described beach territory, river diaphragm wall enters the locking device of rock section, and described expansive mortar bag is loaded in the car inner tube of a tyre by the expansive cement mortar be stirred to be made.
Beach territory, river diaphragm wall enters an enclosure method for rock section, and it comprises described locking device, and comprises:
Described locking device is arranged along the gap ring-type between diaphragm wall and rock;
When pit earthwork is excavated to this position, use steel plate to get lodged in gap place, steel plate is positioned at the anchoring position of diaphragm wall and rock, in the middle of the expansion bolt then expansive mortar bag being pressed in steel plate anchoring place, is tightened by expansion bolt;
Turn on diversion Grouting Pipe, after the freezing by expansion of expansive mortar bag, along the shape nature crimp of seam crossing, form a complete enclosed construction.
Enclosed construction of the present invention is by steel plate, diversion injected hole, expansive mortar bag forms, steel plate is used to get lodged in gap place, steel plate is positioned at the anchoring position of diaphragm wall and andesite, diaphragm wall is pressed in and andesite steel plate anchoring place two is arranged in the middle of expansion bolt with ready expansive mortar bag, expansion bolt is tightened, turn on diversion Grouting Pipe, the horn mouth place of diversion Grouting Pipe is stamped dense mesh, play the effect of diversion resistance silt, after the freezing by expansion of expansive mortar bag, will along the shape nature crimp of seam crossing, form a complete enclosed construction, as needs slip casting can in the slip casting of diversion injected hole, if do not needed slip casting can valve-off at any time.Manufacture craft of the present invention is simple, workable; Ensure that the sealing effect of ultra-deep foundation pit.
Accompanying drawing explanation
Below, the present invention is further illustrated by reference to the accompanying drawings:
Fig. 1 is schematic diagram of the present invention.
Detailed description of the invention
As shown in Figure 1: beach territory, a kind of river diaphragm wall enters the locking device of rock section, between the rock 2 that it is arranged on diaphragm wall 1 and Foundation Pit wall, it comprises: the steel plate 3 in gap between a covering diaphragm wall 1 and the rock 2 of Foundation Pit wall, this steel plate 3 is connected with expansion bolt 4 respectively with diaphragm wall 1 and with the rock 2 of Foundation Pit wall, described steel plate 3 is provided with one and is positioned at described gap and the Grouting Pipe 5 of passing steel plate 3 body, described Grouting Pipe is provided with switch valve 6, and port is provided with filter screen.
Described beach territory, river diaphragm wall enters the locking device of rock section, it also comprise be arranged on steel plate 3 and diaphragm wall 1 and and the rock 2 of Foundation Pit wall between expansive mortar bag 8.
Described beach territory, river diaphragm wall enters the locking device of rock section, and described expansive mortar bag 8 is loaded in the car inner tube of a tyre by the expansive cement mortar be stirred to be made.
Beach territory, a kind of river diaphragm wall enters the enclosure method of rock section, along the gap ring-type between diaphragm wall and andesite, described locking device is set, steel plate width and diversion injected hole quantity are determined according to gap width and water burst situation, when pit earthwork is excavated to this position, steel plate is used to get lodged in gap place, the anchoring position that steel plate is arranged in diaphragm wall and andesite first loads cycle tube with the expansive cement mortar be stirred, form an expansive mortar bag, then diaphragm wall is pressed in and andesite steel plate anchoring place two is arranged in the middle of expansion bolt, expansion bolt is tightened, turn on diversion Grouting Pipe, the horn mouth place of diversion Grouting Pipe is stamped dense mesh, play the effect of diversion resistance silt, after the freezing by expansion of expansive mortar bag, will along the shape nature crimp of seam crossing, form a complete enclosed construction, as needs slip casting can in the slip casting of diversion injected hole, if do not needed slip casting can valve-off at any time.

Claims (4)

1. beach territory, river diaphragm wall enters the locking device of rock section, between the rock that it is arranged on diaphragm wall and Foundation Pit wall, it is characterized in that, it comprises: the steel plate in gap between a covering diaphragm wall and the rock of Foundation Pit wall, this steel plate is connected with expansion bolt respectively with diaphragm wall and with the rock of Foundation Pit wall, described steel plate is provided with one and is positioned at described gap and the Grouting Pipe of passing steel plate body, and described Grouting Pipe is provided with switch valve, and port is provided with filter screen.
2. beach territory, river according to claim 1 diaphragm wall enters the locking device of rock section, it is characterized in that, it also comprise be arranged on steel plate and diaphragm wall and and the rock of Foundation Pit wall between expansive mortar bag.
3. beach territory, river according to claim 2 diaphragm wall enters the locking device of rock section, it is characterized in that, described expansive mortar bag is loaded in the car inner tube of a tyre by the expansive cement mortar be stirred to be made.
4. river beach territory diaphragm wall enters an enclosure method for rock section, it is characterized in that, it comprises locking device as claimed in claim 1, and comprises:
Described locking device is arranged along the gap ring-type between diaphragm wall and rock;
When pit earthwork is excavated to this position, use steel plate to get lodged in gap place, steel plate is positioned at the anchoring position of diaphragm wall and rock, in the middle of the expansion bolt then expansive mortar bag being pressed in steel plate anchoring place, is tightened by expansion bolt;
Turn on diversion Grouting Pipe, after the freezing by expansion of expansive mortar bag, along the shape nature crimp of seam crossing, form a complete enclosed construction.
CN201110247853.1A 2011-08-26 2011-08-26 Beach territory, river diaphragm wall enters locking device and the construction method thereof of rock section Active CN102953398B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110247853.1A CN102953398B (en) 2011-08-26 2011-08-26 Beach territory, river diaphragm wall enters locking device and the construction method thereof of rock section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110247853.1A CN102953398B (en) 2011-08-26 2011-08-26 Beach territory, river diaphragm wall enters locking device and the construction method thereof of rock section

Publications (2)

Publication Number Publication Date
CN102953398A CN102953398A (en) 2013-03-06
CN102953398B true CN102953398B (en) 2015-09-30

Family

ID=47762740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110247853.1A Active CN102953398B (en) 2011-08-26 2011-08-26 Beach territory, river diaphragm wall enters locking device and the construction method thereof of rock section

Country Status (1)

Country Link
CN (1) CN102953398B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638563A (en) * 2017-02-07 2017-05-10 张继红 Intra-soil bagged water swelling type waterstop belt

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1329689A (en) * 1998-12-10 2002-01-02 卡皮泰克意大利有限责任公司 Method and device for the waterproofing of joints and cracks in hydraulic works, concrete and masonry structures
CN201865122U (en) * 2010-10-18 2011-06-15 中冶成工上海五冶建设有限公司 Wall brushing device for locking notch of continuous wall

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2681889B1 (en) * 1991-09-27 1996-10-18 Hubert Francine SEAL UNDERWATER WITH VERY LARGE TRAVEL IN ALL DIRECTIONS.
KR19990022167U (en) * 1999-03-10 1999-06-25 이옥자 device for stagnant water interception in wall
CN101603298B (en) * 2009-07-02 2011-05-04 中国水电顾问集团华东勘测设计研究院 Dam joint structure and construction method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1329689A (en) * 1998-12-10 2002-01-02 卡皮泰克意大利有限责任公司 Method and device for the waterproofing of joints and cracks in hydraulic works, concrete and masonry structures
CN201865122U (en) * 2010-10-18 2011-06-15 中冶成工上海五冶建设有限公司 Wall brushing device for locking notch of continuous wall

Also Published As

Publication number Publication date
CN102953398A (en) 2013-03-06

Similar Documents

Publication Publication Date Title
CN103334444B (en) A kind of method for blocking of foundation pit dewatering well pressure release type
CN101429764B (en) Infiltration water detection and plugging renovation devices and methods for underground continuous wall groove segment seam
KR101500667B1 (en) steel pipe grouting device and tunnel reinforcement andbarrier grouting method using this
CN104005419B (en) The box culvert structure of sinking method construction and construction method
US20140314494A1 (en) Polymer grouting method for constructing vertical supporting system
CN102383412A (en) Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit
CN101761345A (en) Reinforcement device for tunnel top soil and construction method thereof
CN103291326A (en) Reconstructed bearing layer control technology of large-deformation roadway surrounding rock
CN203213124U (en) Steel sheet pile and cement-mixed pile combined support
CN202689031U (en) Deep foundation pit retaining and protecting retaining wall
CN102535441A (en) Construction method of underground diaphragm wall
CN106522252A (en) Seepage-proofing blocking mechanism and method for deep foundation pit raft dewatering well
CN106284434A (en) The anti-float method of a kind of underground structure and every oozing device
CN204645027U (en) Prose style free from parallelism grouting behind shaft or drift lining strength core composite pile
CN203175569U (en) Steel tube piece tunnel portal water-proof sealing structure in shield-driven tunnel breakthrough
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN104988914A (en) Cast-in-situ bored pile breakage processing method under water area environment
CN104164895A (en) Basement generating no water buoyant force
CN104532867B (en) Multiple chamber steel-pipe pile continuous wall water-stop effect detection method
CN101586341B (en) Water sealing method for civil engineering groundwork
CN105155591B (en) Underground aquatic organism expands layering water-stopping method
CN102953398B (en) Beach territory, river diaphragm wall enters locking device and the construction method thereof of rock section
CN203475486U (en) Basement producing no water buoyancy
CN203559426U (en) Dewatering open caisson of underground structure
CN109537611A (en) A kind of civil air defense constructions and installations pipe well plugging structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant