CN102950429A - Preparation method of inching valve body for forklift - Google Patents

Preparation method of inching valve body for forklift Download PDF

Info

Publication number
CN102950429A
CN102950429A CN2012104122085A CN201210412208A CN102950429A CN 102950429 A CN102950429 A CN 102950429A CN 2012104122085 A CN2012104122085 A CN 2012104122085A CN 201210412208 A CN201210412208 A CN 201210412208A CN 102950429 A CN102950429 A CN 102950429A
Authority
CN
China
Prior art keywords
valve body
drill
hour
incubated
heated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104122085A
Other languages
Chinese (zh)
Other versions
CN102950429B (en
Inventor
吕青堂
李文宇
陈栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Huai Shou Machinery Equipment Co., Ltd.
Original Assignee
ANHUI NBO GROUP HYDRAULIC FLUID MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI NBO GROUP HYDRAULIC FLUID MACHINERY Co Ltd filed Critical ANHUI NBO GROUP HYDRAULIC FLUID MACHINERY Co Ltd
Priority to CN201210412208.5A priority Critical patent/CN102950429B/en
Publication of CN102950429A publication Critical patent/CN102950429A/en
Application granted granted Critical
Publication of CN102950429B publication Critical patent/CN102950429B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a preparation method of an inching valve body for a forklift, comprising the following operating steps of: heating the blank casting part of the valve body to 650-760 DEG C, wherein the blank casting part of the inching valve body for the forklift comprises the chemical components in percentage by weight: 0.18-0.27% of C, 1.1-2.0% of Mn, 0.6-1.2% of Si, 0.08-0.15% of V, 0.11-0.2% of Ti, 0.8-2.0% of Cr, 0.5-1.5% of Ni, trace amount to 0.4% of Mo, 0.1-0.8% of W, 0.05-0.07% of Nb, trace amount to 0.23% of Al, trace amount to 0.50% of Cu, not more than 0.030% of P, not more than 0.030% of S and the balance of Fe and inevitable impurities; carrying out heat preservation for 5-6 hours; cooling a furnace to 280-320 DEG C; carrying out heat preservation for 3-5 hours; heating to 650-690 DEG C again; carrying out heat preservation for 32 hours; cooling to 400 DEGC at the rate of 40 DEG C/h; and then cooling to normal temperature at the rate of 20 DEG C/h. Advanced equipment is used in the processing course of an assembly, the cutting strength is strong, the precision is high, the production process is greatly simplified, the yield is greatly improved, and the product performance is stable.

Description

The fork truck preparation method of inching valve valve body
Technical field
The present invention relates to the fork truck preparation method of inching valve valve body.
Background technology
In the prior art, fork truck is with large of inching valve blank-spray paint-large-fine finishining of roughing overall length-roughing valve opening-fine finishining valve opening-fine finishining oil hole-fine finishining oil duct groove-fine finishining screw hole-fine finishining oil sealing plug hole-fine finishining-go acute angle, cleaning-assembling-test-packaging and warehousing.This technical process is too complicated, and the valve body overall performance that processing and manufacturing goes out is bad.
Summary of the invention
The purpose of this invention is to provide a kind of fork truck preparation method of inching valve valve body, assembly has used sophisticated equipment in process; The cutting dynamics is strong, and precision is high, has greatly reduced production technology, make it output and significantly promote, and properties of product is stable.
Technical scheme of the present invention is as follows:
The fork truck preparation method of inching valve valve body includes following operating procedure:
A, fork truck with chemical component weight percentage in the inching valve valve body blank cast member is: C 0.18-0.27%, Mn 1.1-2.0%, Si 0.6-1.2, V 0.08-0.15%, Ti 0.11-0.2%, Cr 0.8-2.0%, Ni 0.5-1.5%, Mo trace~0.40%, W 0.1-0.8%, Nb 0.05-0.07%, Al trace~0.23%, Cu trace~0.50%, P≤0.030%, S≤0.030%, surplus is Fe and inevitably is mingled with matter, the valve body blank spare that will contain said components is heated to 650-760 ℃, is incubated 5-6 hour, and stove is chilled to 280-320 ℃, be incubated 3-5 hour, be heated to again 650-690 ℃, be incubated 32 hours, be cooled to 400 ℃ with 40 ℃/hour, with 20 ℃/hour, be cooled to normal temperature again; Heat treatment is secondary repeatedly;
A, miller order: select the cast iron valve body blank that contains mentioned component content in the material, utilize Special horizontal brank valve body to clamp with back side blank location, the recycling circular peripheral-mill mills large plane, stays 0.3mm allowance to guarantee the poor 0.015mm of being not more than of peripheral thickness;
B, driller's order: select large drill jig of valve body, with large face and the boring of peripheral profile positioning compression;
1), select the 9mm straight shank twist drill to bore 5-9 mm installing holes, and drill through;
2), at two place's oil duct end points and screw place and place, 5-8.2 mm apertures use respectively the drill bit spot-facing of 8.2 straight shank twist drills;
3), the taper drill that utilizes radial drill is with large face and 2-9 mm hole positioning compressions borings, preboring 25 mm holes are 13 mm;
C, borer order: with large face and location, 2-9 mm holes, 30 mm oil sealing holes compress bore hole up;
D, Quenching Treatment: will send into through the valve body after the machining and be heated to 850-890 ℃ in the heat-treatment furnace, and be incubated 2-3 hour; Then, cool off with quenching oil;
E, temper: the valve body after will quenching is sent into and is heated to 300-400 ℃ in the tempering furnace, insulation 50-70min.
Assembly of the present invention has used sophisticated equipment in process; The cutting dynamics is strong, and precision is high, has greatly reduced production technology, make it output and significantly promote, and properties of product is stable.
Assembly of the present invention has used sophisticated equipment in process; The cutting dynamics is strong, and precision is high, has greatly reduced production technology, make it output and significantly promote, and properties of product is stable.
It is as follows that the inching valve that utilizes the present invention to produce carries out experimentation:
Experiment condition: 80 ± 5 ℃ of Fuel temperatures; Experiment is with oily: No. 6 hydraulic transmission oils; Experiment oil pressure: 1.25MPa ~ 1.4MPa; Test period: many 6 minutes, the per minute valve rod back and forth spurred once; Fretting performance test fretting performance requires: valve rod travel: 0 ~ 2 mm; Performance reaches requirement pressure: 1.25 ~ 1.4 MPa; 0.3 ~ 0.6 MPa; 0 ~ 0.15 MPa; The test of fine motion valve rod total travel: total travel 25 ± 1mm, requiring should be without catching phenomenon at total travel inner valve stem self-resetting; The operating physical force that valve rod is pulled out should be 257 ± 16N; In above-mentioned process of the test, do not allowed outer seepage phenomenon; Test oil should guarantee cleannes, more renew oil or Clean-oil behind 400 covers of test.
The specific embodiment
The fork truck preparation method of inching valve valve body includes following operating procedure:
A, fork truck with chemical component weight percentage in the inching valve valve body blank cast member is: C 0.18-0.27%, Mn 1.1-2.0%, Si 0.6-1.2, V 0.08-0.15%, Ti 0.11-0.2%, Cr 0.8-2.0%, Ni 0.5-1.5%, Mo trace~0.40%, W 0.1-0.8%, Nb 0.05-0.07%, Al trace~0.23%, Cu trace~0.50%, P≤0.030%, S≤0.030%, surplus is Fe and inevitably is mingled with matter, the valve body blank spare that will contain said components is heated to 650-760 ℃, is incubated 5-6 hour, and stove is chilled to 280-320 ℃, be incubated 3-5 hour, be heated to again 650-690 ℃, be incubated 32 hours, be cooled to 400 ℃ with 40 ℃/hour, with 20 ℃/hour, be cooled to normal temperature again; Heat treatment is secondary repeatedly;
A, miller order: select the cast iron valve body blank that contains mentioned component content in the material, utilize Special horizontal brank valve body to clamp with back side blank location, the recycling circular peripheral-mill mills large plane, stays 0.3mm allowance to guarantee the poor 0.015mm of being not more than of peripheral thickness;
B, driller's order: select large drill jig of valve body, with large face and the boring of peripheral profile positioning compression;
1), select the 9mm straight shank twist drill to bore 5-9 installing holes, and drill through;
2), at two place's oil duct end points and screw place and place, 5-8.2 apertures use respectively the drill bit spot-facing of 8.2 straight shank twist drills;
3), the taper drill that utilizes radial drill is with large face and 2-9 hole positioning compressions borings, preboring 25 holes are 13;
C, borer order: locate 30 oil sealing holes with large face and 2-9 holes and compress bore hole up
D, Quenching Treatment: will send into through the valve body after the machining and be heated to 850-890 ℃ in the heat-treatment furnace, and be incubated 2-3 hour; Then, cool off with quenching oil;
E, temper: the valve body after will quenching is sent into and is heated to 300-400 ℃ in the tempering furnace, insulation 50-70min.
The detection performance indications are as follows:
Tensile strength sigma b (MPa): 〉=630
Yield strength σ s (MPa): 〉=520
Percentage elongation δ 5 (%): 〉=12
Contraction percentage of area ψ (%): 〉=55
Notched bar impact strength α kv (J/cm2): 〉=52
Hardness:>=190HB.

Claims (1)

1. fork truck is characterized in that with the preparation method of inching valve valve body, includes following operating procedure:
A, fork truck with chemical component weight percentage in the inching valve valve body blank cast member is: C 0.18-0.27%, Mn 1.1-2.0%, Si 0.6-1.2, V 0.08-0.15%, Ti 0.11-0.2%, Cr 0.8-2.0%, Ni 0.5-1.5%, Mo trace~0.40%, W 0.1-0.8%, Nb 0.05-0.07%, Al trace~0.23%, Cu trace~0.50%, P≤0.030%, S≤0.030%, surplus is Fe and inevitably is mingled with matter, the valve body blank spare that will contain said components is heated to 650-760 ℃, is incubated 5-6 hour, and stove is chilled to 280-320 ℃, be incubated 3-5 hour, be heated to again 650-690 ℃, be incubated 32 hours, be cooled to 400 ℃ with 40 ℃/hour, with 20 ℃/hour, be cooled to normal temperature again; Heat treatment is secondary repeatedly;
A, miller order: select the cast iron valve body blank that contains mentioned component content in the material, utilize Special horizontal brank valve body to clamp with back side blank location, the recycling circular peripheral-mill mills large plane, stays 0.3mm allowance to guarantee the poor 0.015mm of being not more than of peripheral thickness;
B, driller's order: select large drill jig of valve body, with large face and the boring of peripheral profile positioning compression;
1), select the 9mm straight shank twist drill to bore 5-9 mm installing holes, and drill through;
2), at two place's oil duct end points and screw place and place, 5-8.2 mm apertures use respectively the drill bit spot-facing of 8.2 mm straight shank twist drills;
3), the taper drill that utilizes radial drill is with large face and 2-9 mm hole positioning compressions borings, preboring 25 mm holes are 13 mm;
C, borer order: with large face and location, 2-9 mm holes, 30 mm oil sealing holes compress bore hole up;
D, Quenching Treatment: will send into through the valve body after the machining and be heated to 850-890 ℃ in the heat-treatment furnace, and be incubated 2-3 hour; Then, cool off with quenching oil;
E, temper: the valve body after will quenching is sent into and is heated to 300-400 ℃ in the tempering furnace, insulation 50-70min.
CN201210412208.5A 2012-10-25 2012-10-25 The fork truck preparation method of inching valve valve body Expired - Fee Related CN102950429B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210412208.5A CN102950429B (en) 2012-10-25 2012-10-25 The fork truck preparation method of inching valve valve body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210412208.5A CN102950429B (en) 2012-10-25 2012-10-25 The fork truck preparation method of inching valve valve body

Publications (2)

Publication Number Publication Date
CN102950429A true CN102950429A (en) 2013-03-06
CN102950429B CN102950429B (en) 2016-04-13

Family

ID=47760133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210412208.5A Expired - Fee Related CN102950429B (en) 2012-10-25 2012-10-25 The fork truck preparation method of inching valve valve body

Country Status (1)

Country Link
CN (1) CN102950429B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104006198A (en) * 2014-05-19 2014-08-27 安徽金大仪器有限公司 High-precision valve resistant to abrasion and corrosion and manufacturing method thereof
CN104004972A (en) * 2014-05-19 2014-08-27 安徽金大仪器有限公司 Low-temperature-resistant and corrosion-resistant deep-sea-use high-strength valve and manufacturing method thereof
CN104723112A (en) * 2013-12-20 2015-06-24 大连津利流体设备开发有限公司 Production method of multifunctional double-block sampling instrument root valve body with support
CN109340425A (en) * 2018-11-06 2019-02-15 张林安 A kind of processing technology of valve body structure
CN109357059A (en) * 2018-11-06 2019-02-19 张林安 A kind of valve body structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4670959A (en) * 1985-12-12 1987-06-09 Rosen Richard A Method and means for adapting plumbing valve stems to desired trim
EP1652950A1 (en) * 2003-07-22 2006-05-03 Sumitomo Metal Industries, Ltd. Martensitic stainless steel
CN101347889A (en) * 2008-06-26 2009-01-21 上海采埃孚转向机有限公司 Method for processing sleeve of vehicle steering valve
CN102310316A (en) * 2011-08-10 2012-01-11 龙工(上海)桥箱有限公司 Method for completing high-precision machining of valve body hole series on machine tool of machining center.
CN102528538A (en) * 2012-02-29 2012-07-04 上海宏功机械科技有限公司 Machining method for valve body, clamping clamp and machining equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4670959A (en) * 1985-12-12 1987-06-09 Rosen Richard A Method and means for adapting plumbing valve stems to desired trim
EP1652950A1 (en) * 2003-07-22 2006-05-03 Sumitomo Metal Industries, Ltd. Martensitic stainless steel
CN101347889A (en) * 2008-06-26 2009-01-21 上海采埃孚转向机有限公司 Method for processing sleeve of vehicle steering valve
CN102310316A (en) * 2011-08-10 2012-01-11 龙工(上海)桥箱有限公司 Method for completing high-precision machining of valve body hole series on machine tool of machining center.
CN102528538A (en) * 2012-02-29 2012-07-04 上海宏功机械科技有限公司 Machining method for valve body, clamping clamp and machining equipment

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴国熙: "《调节阀使用与维修》", 31 May 1999, 化学工业出版社 *
张少宗等: "采油井口阀体材料ZG35CrMo(M)性能研究", 《石油机械》 *
李壮云主编: "《液压元件与系统》", 31 May 1995, 机械工业出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104723112A (en) * 2013-12-20 2015-06-24 大连津利流体设备开发有限公司 Production method of multifunctional double-block sampling instrument root valve body with support
CN104006198A (en) * 2014-05-19 2014-08-27 安徽金大仪器有限公司 High-precision valve resistant to abrasion and corrosion and manufacturing method thereof
CN104004972A (en) * 2014-05-19 2014-08-27 安徽金大仪器有限公司 Low-temperature-resistant and corrosion-resistant deep-sea-use high-strength valve and manufacturing method thereof
CN104004972B (en) * 2014-05-19 2016-04-13 安徽金大仪器有限公司 A kind of deep-sea high strength valve of Low temperature-resistancorrosion-resistant corrosion-resistant and manufacture method thereof
CN109340425A (en) * 2018-11-06 2019-02-15 张林安 A kind of processing technology of valve body structure
CN109357059A (en) * 2018-11-06 2019-02-19 张林安 A kind of valve body structure

Also Published As

Publication number Publication date
CN102950429B (en) 2016-04-13

Similar Documents

Publication Publication Date Title
CN106119723B (en) A kind of production method of the coupling forging raw material of deep-sea oil extracting ship 4130
CN104264060B (en) A kind of high impact toughness, high thermal stability Extrusion Die Steel and preparation method thereof
CN109536691B (en) Preparation method of low-temperature impact resistant CrMo alloy steel forged circle
CN103028912B (en) Steel forging manufacturing method for valve seat of deep-sea oil production equipment
CN102950429A (en) Preparation method of inching valve body for forklift
CN102517502A (en) Disk-shaped roller cutter ring and manufacture method thereof
CN103436803A (en) Processing method for pump head body of five-cylinder plunger pump
CN112281069A (en) Production method of 8630 super-long forge piece for deep sea Christmas tree equipment
CN102936692B (en) Cold punching die mold steel processing method
CN109609856A (en) Optimize the heat treatment process that 42CrMo low-temperature impact absorbs function
CN103317319A (en) Production processing method for edge-digging scissors made of Cr12Mo1V1
CN102586700A (en) High alloy tube piercing plug material and manufacturing method and surface processing method thereof
CN101880836A (en) Boron-containing die steel and heat treatment method thereof
CN104209720A (en) Manufacturing method of heat-resistant rock drill bit
CN106521310B (en) A kind of quartering hammer piston rod steel and its Technology for Heating Processing
CN102989982B (en) Forging method of driving shaft for gearbox
CN102994906B (en) A kind of method of ball valve body
CN104481409A (en) Manufacturing method of rock drill
CN102936693B (en) Drawing die mold steel processing method
CN102950430A (en) Method for producing corrosion-resistant inching valve body
CN103659160A (en) Method for rough turning turbine seal sleeve made of high-temperature alloy GH901
CN111440995B (en) Method for manufacturing small-aperture ring die
CN103692153A (en) Manufacturing method of reaction arm
CN114427017A (en) Heat treatment process of high-strength corrosion-resistant high-alloy cutter
CN106048455B (en) A kind of processing method of mold materials for high intensity forging

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170511

Address after: 232200 west of Xinqiao Road, Xinqiao Industrial Park, Huainan, Shouxian County, Anhui

Patentee after: Anhui Huai Shou Machinery Equipment Co., Ltd.

Address before: 237451 Hu Hu industrial area, Huoqiu County, Anhui, Lu'an

Patentee before: Anhui NBO Group Hydraulic Fluid Machinery Co., Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160413

Termination date: 20201025

CF01 Termination of patent right due to non-payment of annual fee