CN102943562A - Adjustable wall connecting rod of steel pipe scaffold - Google Patents

Adjustable wall connecting rod of steel pipe scaffold Download PDF

Info

Publication number
CN102943562A
CN102943562A CN2012105066311A CN201210506631A CN102943562A CN 102943562 A CN102943562 A CN 102943562A CN 2012105066311 A CN2012105066311 A CN 2012105066311A CN 201210506631 A CN201210506631 A CN 201210506631A CN 102943562 A CN102943562 A CN 102943562A
Authority
CN
China
Prior art keywords
adjusting rod
sleeve
steel pipe
connecting rod
wall connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105066311A
Other languages
Chinese (zh)
Inventor
张若美
黄非难
陈启赋
陈辉
雷永龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012105066311A priority Critical patent/CN102943562A/en
Publication of CN102943562A publication Critical patent/CN102943562A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses an adjustable wall connecting rod of a steel pipe scaffold. The adjustable wall connecting rod comprises a sleeve (1), a sealing pin (2), an adjusting rod (3), a connection pipe (4) and a nut (6), wherein the sleeve (1) is pre-embedded inside a concrete structure (9), and is used for sealing the sleeve (1) by using the sealing pin (2); a thread is arranged at one end of the adjusting rod (3), and the adjusting rod (3) is connected with the sleeve (1) through the thread; the other end of the adjusting rod (3) is provided with a sphere; the sphere is inserted inside the hollow connection pipe (4); the connection pipe (4) clamps the sphere, so that the adjusting pipe (3) is connected with the connection pipe (4); a threaded nut is arranged at the end of the adjusting rod with the sphere, and of the end of the adjusting rod with the sphere is locked with the connection pipe (4) through the nut; and the connection pipe (4) and a scaffold vertical rod (7) are fixedly connected through a right angle buckle (8). With the adoption of the adjustable wall connecting rod of the steel pipe scaffold, a steel pipe reserved hole can be prevented from being reserved on the outer wall; and the connection difficulty caused by an inaccurate embedment position (in various directions) can be adjusted, so that the rapid and effective connection can be realized.

Description

The adjustable wall connecting rod of a kind of steel pipe scaffold
Technical field
The present invention relates to the building machinery technical field, in particular the adjustable wall connecting rod of a kind of steel pipe scaffold.
Background technology
Steel tube outer scaffold arranges wall connecting rod and can prevent that scaffold from producing topple under wind load and other horizontal force actions, can form again the intermediate support of scaffold upright rod, is the important guarantee of scaffold stability.
In numerous construction works, arranging of steel tube outer scaffold wall connecting rod generally is to be connected with the external scaffolding vertical rod with steel pipe after adopting common scaffolding steel pipe to encircle first frame column or constructional column again.Will certainly reserve the steel pipe hole to be provided at exterior wall like this, after decoration of exterior wall construction in want first artificial shutoff tight, otherwise easily cause external wall seepage.After exterior-wall heat insulation and during decoration construction the existence because of wall connecting rod can't be constructed in the part, if when exterior wall is designed with logical window then also difficulty remove to install window frame.To this, wall connecting rod is removed first by unit in charge of construction, and is totally unfavorable to the safety of whole support body so again.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of steel pipe scaffold adjustable wall connecting rod for the deficiencies in the prior art.
Technical scheme of the present invention is as follows:
The adjustable wall connecting rod of a kind of steel pipe scaffold, comprise sleeve (1), sealing pin (2), adjusting rod (3), tube connector (4), nut (6), sleeve (1) is embedded in the concrete structure (9), with sealing pin (2) sleeve (1) is sealed; Adjusting rod (3) at one end arranges screw thread, is connected 1 by this screw thread with sleeve) connect; Adjusting rod (3) other end is spheroid, this spheroid inserts tube connector (4) inside of hollow, tube connector (4) blocks this spheroid and realizes that adjusting rod (3) is connected 4 with tube connector) connection, at adjusting rod spheroid one end screw nut is set, by nut and tube connector (4) locking; Tube connector (4) is fixedly connected with by right-angle coupler (8) with scaffold upright rod (7).
The adjustable wall connecting rod of described steel pipe scaffold also comprises taperliner (5),, is installed between nut (6) and the tube connector (4) and regulates when being embedded with deviation at sleeve (1).
The adjustable wall connecting rod of this steel pipe scaffold can be avoided staying the steel pipe hole to be provided at exterior wall; Can regulate the connection difficulty that causes because of pre-buried position inaccurate (all directions), realize effectively connecting fast; Can realize that external scaffolding is connected with the reliable of structure at predetermined any structure position (reinforced concrete structural element); The adjustable wall connecting rod of this steel pipe scaffold makes more neat appearance of external scaffolding after arranging, can also reuse after dismounting, reduces the building operations cost.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the partial enlarged drawing of Fig. 1;
Fig. 3 is the sectional view of taperliner 5;
1 sleeve, 2 sealing pins, 3 adjusting rods, 4 tube connectors, 5 taperliners, 6 nuts, 7 scaffold upright rods, 8 right-angle couplers, 9 concrete structures, 10 concrete structure formworks.
The specific embodiment
Below in conjunction with specific embodiment, the present invention is described in detail.
The adjustable wall connecting rod of steel pipe scaffold comprises sleeve 1, sealing pin 2, and adjusting rod 3, tube connector 4, taperliner 5, nut 6 at concrete structure 9 interior embedded sleeve barrel 1 time, seals with 2 pairs of sleeves 1 of sealing pin, in order to avoid obstruction during construction; Adjusting rod 3 at one end arranges screw thread, is connected connection with sleeve by this screw thread; Adjusting rod 3 other ends are spheroid, and this spheroid inserts tube connector 4 inside of hollow, and tube connector 4 blocks the connection that this spheroid realizes that adjusting rod 3 is connected with tube connector, at adjusting rod spheroid one end screw nut is set, by nut and tube connector 4 lockings; Tube connector 4 is fixedly connected with by right-angle coupler 8 with scaffold upright rod 7.
The adjustable wall connecting rod construction technology of this steel pipe scaffold is as follows:
Time standby concrete structure formwork 10 in pouring concrete structure 9 supports, and prevents that concrete from spilling to the outside, and is with 1 sealing of 2 pairs of sleeves of sealing pin, then that sleeve 1 is pre-buried to assigned address first.Certain hour removes sealing pin 2 behind the structure construction.When being embedded with deviation, by the shown position relation adjusting rod 3, taperliner 5 and nut 6 are installed first, adjusting rod 3 and pre-buried sleeve 1 are coupled together again, rotate taperliner 5 adjusting plays, clamp nut 6 again, connect at last tube connector 4 and scaffold upright rod 7, finish whole connections.Such as pre-buried zero deflection, only need that taperliner 5 is replaced by conventional pads and get final product.
Should be understood that, for those of ordinary skills, can be improved according to the above description or conversion, and all these improvement and conversion all should belong to the protection domain of claims of the present invention.

Claims (2)

1. adjustable wall connecting rod of steel pipe scaffold, it is characterized in that, comprise sleeve (1), sealing pin (2), adjusting rod (3), tube connector (4), nut (6), sleeve (1) is embedded in the concrete structure (9), with sealing pin (2) sleeve (1) is sealed; Adjusting rod (3) at one end arranges screw thread, is connected 1 by this screw thread with sleeve) connect; Adjusting rod (3) other end is spheroid, this spheroid inserts tube connector (4) inside of hollow, tube connector (4) blocks this spheroid and realizes that adjusting rod (3) is connected 4 with tube connector) connection, at adjusting rod spheroid one end screw nut is set, by nut and tube connector (4) locking; Tube connector (4) is fixedly connected with by right-angle coupler (8) with scaffold upright rod (7).
2. the adjustable wall connecting rod of steel pipe scaffold according to claim 1 is characterized in that, also comprises taperliner (5),, is installed between nut (6) and the tube connector (4) and regulates when being embedded with deviation at sleeve (1).
CN2012105066311A 2012-12-03 2012-12-03 Adjustable wall connecting rod of steel pipe scaffold Pending CN102943562A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105066311A CN102943562A (en) 2012-12-03 2012-12-03 Adjustable wall connecting rod of steel pipe scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105066311A CN102943562A (en) 2012-12-03 2012-12-03 Adjustable wall connecting rod of steel pipe scaffold

Publications (1)

Publication Number Publication Date
CN102943562A true CN102943562A (en) 2013-02-27

Family

ID=47726541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105066311A Pending CN102943562A (en) 2012-12-03 2012-12-03 Adjustable wall connecting rod of steel pipe scaffold

Country Status (1)

Country Link
CN (1) CN102943562A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103468277A (en) * 2013-09-30 2013-12-25 中国一冶集团有限公司 Disassembling method of inner scaffold for coke oven building
CN106223597A (en) * 2016-07-22 2016-12-14 中铁城建集团第三工程有限公司 Detachable tapered cup nut wall-connecting piece and construction method thereof
CN107447975A (en) * 2016-05-31 2017-12-08 桂林建筑安装工程有限公司 Exterior wall scaffold tapered cup nut wall-connecting piece
CN109707149A (en) * 2019-01-28 2019-05-03 中核华辰建筑工程有限公司 Scaffold and its building method
CN110863644A (en) * 2019-11-25 2020-03-06 中国十七冶集团有限公司 Novel turnover tool type beam side connecting wall piece fixing device and method
CN111411768A (en) * 2020-04-30 2020-07-14 中国建筑第四工程局有限公司 Pre-buried formula climbs a support fixed knot and constructs
CN115110750A (en) * 2022-04-03 2022-09-27 陈泳燊 Universal wall connecting rod of building scaffold
CN115306138A (en) * 2022-08-19 2022-11-08 李康正 Adjustable wall connecting rod for building scaffold
CN116163509A (en) * 2023-04-23 2023-05-26 徐州鼎博混凝土制品有限公司 Pre-buried ware of concrete building scaffold frame

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08100520A (en) * 1994-09-30 1996-04-16 Natl House Ind Co Ltd Connecting structure of scaffold
US20080179477A1 (en) * 2007-01-31 2008-07-31 Regency Innovations, Llc Scaffolding securement system
CN201714060U (en) * 2010-06-26 2011-01-19 国强建设集团有限公司 Wall connecting mechanism of scaffold
CN201883673U (en) * 2010-12-15 2011-06-29 中建四局第六建筑工程有限公司 Scaffold engineering tool type wall connecting element
CN202170630U (en) * 2011-06-17 2012-03-21 江苏省建筑工程集团有限公司 Embedded fastener to wall for scaffold
CN102773899A (en) * 2012-07-17 2012-11-14 江苏大唐机械有限公司 Blade clamping structure of ring type flaker
CN202945799U (en) * 2012-12-03 2013-05-22 张若美 Adjustable wall connecting rod of steel pipe scaffold

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08100520A (en) * 1994-09-30 1996-04-16 Natl House Ind Co Ltd Connecting structure of scaffold
US20080179477A1 (en) * 2007-01-31 2008-07-31 Regency Innovations, Llc Scaffolding securement system
CN201714060U (en) * 2010-06-26 2011-01-19 国强建设集团有限公司 Wall connecting mechanism of scaffold
CN201883673U (en) * 2010-12-15 2011-06-29 中建四局第六建筑工程有限公司 Scaffold engineering tool type wall connecting element
CN202170630U (en) * 2011-06-17 2012-03-21 江苏省建筑工程集团有限公司 Embedded fastener to wall for scaffold
CN102773899A (en) * 2012-07-17 2012-11-14 江苏大唐机械有限公司 Blade clamping structure of ring type flaker
CN202945799U (en) * 2012-12-03 2013-05-22 张若美 Adjustable wall connecting rod of steel pipe scaffold

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103468277A (en) * 2013-09-30 2013-12-25 中国一冶集团有限公司 Disassembling method of inner scaffold for coke oven building
CN103468277B (en) * 2013-09-30 2015-05-20 中国一冶集团有限公司 Disassembling method of inner scaffold for coke oven building
CN107447975A (en) * 2016-05-31 2017-12-08 桂林建筑安装工程有限公司 Exterior wall scaffold tapered cup nut wall-connecting piece
CN106223597A (en) * 2016-07-22 2016-12-14 中铁城建集团第三工程有限公司 Detachable tapered cup nut wall-connecting piece and construction method thereof
CN106223597B (en) * 2016-07-22 2019-06-14 中铁城建集团第三工程有限公司 Detachable tapered cup nut wall-connecting piece and its construction method
CN109707149A (en) * 2019-01-28 2019-05-03 中核华辰建筑工程有限公司 Scaffold and its building method
CN109707149B (en) * 2019-01-28 2020-11-13 中核华辰建筑工程有限公司 Scaffold and construction method thereof
CN110863644A (en) * 2019-11-25 2020-03-06 中国十七冶集团有限公司 Novel turnover tool type beam side connecting wall piece fixing device and method
CN111411768A (en) * 2020-04-30 2020-07-14 中国建筑第四工程局有限公司 Pre-buried formula climbs a support fixed knot and constructs
CN115110750A (en) * 2022-04-03 2022-09-27 陈泳燊 Universal wall connecting rod of building scaffold
CN115306138A (en) * 2022-08-19 2022-11-08 李康正 Adjustable wall connecting rod for building scaffold
CN116163509A (en) * 2023-04-23 2023-05-26 徐州鼎博混凝土制品有限公司 Pre-buried ware of concrete building scaffold frame

Similar Documents

Publication Publication Date Title
CN102943562A (en) Adjustable wall connecting rod of steel pipe scaffold
CN101892738B (en) Embedded scaffold connecting tube and construction method thereof
CN102797350B (en) Quick detach scaffold
CN202945799U (en) Adjustable wall connecting rod of steel pipe scaffold
CN204266609U (en) Assembled architecture faces limit horizontal protective and chooses net system
CN206309046U (en) A kind of construction safety device
CN202913682U (en) Embedded wall connecting piece
CN107762135B (en) Construction method of scaffold wall connecting piece of building outer wall
CN103243900A (en) Wall connecting assembly of steel pipe scaffold
CN204139578U (en) The pre-buried assembling wall attaching parts of scaffold
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN206707255U (en) Combined type wall attaching parts for external scaffolding
CN203222987U (en) Steel tube scaffold wall connecting assembly
CN203569888U (en) Water-stop split bolt structure capable of being reused
CN203393930U (en) Stairs guard railing
CN206570954U (en) A kind of 4 hole right-angle connectors of application building support
CN104594797A (en) Hydraulic engineering detachable U-shaped crawling ladder and manufacture method thereof
CN113152876A (en) Wall connecting piece for scaffold and mounting method thereof
CN210621480U (en) Bridge building templates link for civil engineering
CN204126244U (en) A kind of exterior wall scaffold detachable wall connecting piece
CN209837658U (en) Special fastener for outer rod of cross brace of fastener type steel pipe scaffold
CN204435917U (en) Frontier defense protection unit is faced in a kind of building structure
CN203514766U (en) Wall connecting piece
CN205804922U (en) A kind of novel embedded tool formula scaffold wall connecting piece
CN210369861U (en) Wall connecting embedded part and scaffold wall connecting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130227