CN102943562A - Adjustable wall connecting rod of steel pipe scaffold - Google Patents
Adjustable wall connecting rod of steel pipe scaffold Download PDFInfo
- Publication number
- CN102943562A CN102943562A CN2012105066311A CN201210506631A CN102943562A CN 102943562 A CN102943562 A CN 102943562A CN 2012105066311 A CN2012105066311 A CN 2012105066311A CN 201210506631 A CN201210506631 A CN 201210506631A CN 102943562 A CN102943562 A CN 102943562A
- Authority
- CN
- China
- Prior art keywords
- adjusting rod
- sleeve
- steel pipe
- connecting rod
- wall connecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses an adjustable wall connecting rod of a steel pipe scaffold. The adjustable wall connecting rod comprises a sleeve (1), a sealing pin (2), an adjusting rod (3), a connection pipe (4) and a nut (6), wherein the sleeve (1) is pre-embedded inside a concrete structure (9), and is used for sealing the sleeve (1) by using the sealing pin (2); a thread is arranged at one end of the adjusting rod (3), and the adjusting rod (3) is connected with the sleeve (1) through the thread; the other end of the adjusting rod (3) is provided with a sphere; the sphere is inserted inside the hollow connection pipe (4); the connection pipe (4) clamps the sphere, so that the adjusting pipe (3) is connected with the connection pipe (4); a threaded nut is arranged at the end of the adjusting rod with the sphere, and of the end of the adjusting rod with the sphere is locked with the connection pipe (4) through the nut; and the connection pipe (4) and a scaffold vertical rod (7) are fixedly connected through a right angle buckle (8). With the adoption of the adjustable wall connecting rod of the steel pipe scaffold, a steel pipe reserved hole can be prevented from being reserved on the outer wall; and the connection difficulty caused by an inaccurate embedment position (in various directions) can be adjusted, so that the rapid and effective connection can be realized.
Description
Technical field
The present invention relates to the building machinery technical field, in particular the adjustable wall connecting rod of a kind of steel pipe scaffold.
Background technology
Steel tube outer scaffold arranges wall connecting rod and can prevent that scaffold from producing topple under wind load and other horizontal force actions, can form again the intermediate support of scaffold upright rod, is the important guarantee of scaffold stability.
In numerous construction works, arranging of steel tube outer scaffold wall connecting rod generally is to be connected with the external scaffolding vertical rod with steel pipe after adopting common scaffolding steel pipe to encircle first frame column or constructional column again.Will certainly reserve the steel pipe hole to be provided at exterior wall like this, after decoration of exterior wall construction in want first artificial shutoff tight, otherwise easily cause external wall seepage.After exterior-wall heat insulation and during decoration construction the existence because of wall connecting rod can't be constructed in the part, if when exterior wall is designed with logical window then also difficulty remove to install window frame.To this, wall connecting rod is removed first by unit in charge of construction, and is totally unfavorable to the safety of whole support body so again.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of steel pipe scaffold adjustable wall connecting rod for the deficiencies in the prior art.
Technical scheme of the present invention is as follows:
The adjustable wall connecting rod of a kind of steel pipe scaffold, comprise sleeve (1), sealing pin (2), adjusting rod (3), tube connector (4), nut (6), sleeve (1) is embedded in the concrete structure (9), with sealing pin (2) sleeve (1) is sealed; Adjusting rod (3) at one end arranges screw thread, is connected 1 by this screw thread with sleeve) connect; Adjusting rod (3) other end is spheroid, this spheroid inserts tube connector (4) inside of hollow, tube connector (4) blocks this spheroid and realizes that adjusting rod (3) is connected 4 with tube connector) connection, at adjusting rod spheroid one end screw nut is set, by nut and tube connector (4) locking; Tube connector (4) is fixedly connected with by right-angle coupler (8) with scaffold upright rod (7).
The adjustable wall connecting rod of described steel pipe scaffold also comprises taperliner (5),, is installed between nut (6) and the tube connector (4) and regulates when being embedded with deviation at sleeve (1).
The adjustable wall connecting rod of this steel pipe scaffold can be avoided staying the steel pipe hole to be provided at exterior wall; Can regulate the connection difficulty that causes because of pre-buried position inaccurate (all directions), realize effectively connecting fast; Can realize that external scaffolding is connected with the reliable of structure at predetermined any structure position (reinforced concrete structural element); The adjustable wall connecting rod of this steel pipe scaffold makes more neat appearance of external scaffolding after arranging, can also reuse after dismounting, reduces the building operations cost.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the partial enlarged drawing of Fig. 1;
Fig. 3 is the sectional view of taperliner 5;
1 sleeve, 2 sealing pins, 3 adjusting rods, 4 tube connectors, 5 taperliners, 6 nuts, 7 scaffold upright rods, 8 right-angle couplers, 9 concrete structures, 10 concrete structure formworks.
The specific embodiment
Below in conjunction with specific embodiment, the present invention is described in detail.
The adjustable wall connecting rod of steel pipe scaffold comprises sleeve 1, sealing pin 2, and adjusting rod 3, tube connector 4, taperliner 5, nut 6 at concrete structure 9 interior embedded sleeve barrel 1 time, seals with 2 pairs of sleeves 1 of sealing pin, in order to avoid obstruction during construction; Adjusting rod 3 at one end arranges screw thread, is connected connection with sleeve by this screw thread; Adjusting rod 3 other ends are spheroid, and this spheroid inserts tube connector 4 inside of hollow, and tube connector 4 blocks the connection that this spheroid realizes that adjusting rod 3 is connected with tube connector, at adjusting rod spheroid one end screw nut is set, by nut and tube connector 4 lockings; Tube connector 4 is fixedly connected with by right-angle coupler 8 with scaffold upright rod 7.
The adjustable wall connecting rod construction technology of this steel pipe scaffold is as follows:
Time standby concrete structure formwork 10 in pouring concrete structure 9 supports, and prevents that concrete from spilling to the outside, and is with 1 sealing of 2 pairs of sleeves of sealing pin, then that sleeve 1 is pre-buried to assigned address first.Certain hour removes sealing pin 2 behind the structure construction.When being embedded with deviation, by the shown position relation adjusting rod 3, taperliner 5 and nut 6 are installed first, adjusting rod 3 and pre-buried sleeve 1 are coupled together again, rotate taperliner 5 adjusting plays, clamp nut 6 again, connect at last tube connector 4 and scaffold upright rod 7, finish whole connections.Such as pre-buried zero deflection, only need that taperliner 5 is replaced by conventional pads and get final product.
Should be understood that, for those of ordinary skills, can be improved according to the above description or conversion, and all these improvement and conversion all should belong to the protection domain of claims of the present invention.
Claims (2)
1. adjustable wall connecting rod of steel pipe scaffold, it is characterized in that, comprise sleeve (1), sealing pin (2), adjusting rod (3), tube connector (4), nut (6), sleeve (1) is embedded in the concrete structure (9), with sealing pin (2) sleeve (1) is sealed; Adjusting rod (3) at one end arranges screw thread, is connected 1 by this screw thread with sleeve) connect; Adjusting rod (3) other end is spheroid, this spheroid inserts tube connector (4) inside of hollow, tube connector (4) blocks this spheroid and realizes that adjusting rod (3) is connected 4 with tube connector) connection, at adjusting rod spheroid one end screw nut is set, by nut and tube connector (4) locking; Tube connector (4) is fixedly connected with by right-angle coupler (8) with scaffold upright rod (7).
2. the adjustable wall connecting rod of steel pipe scaffold according to claim 1 is characterized in that, also comprises taperliner (5),, is installed between nut (6) and the tube connector (4) and regulates when being embedded with deviation at sleeve (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012105066311A CN102943562A (en) | 2012-12-03 | 2012-12-03 | Adjustable wall connecting rod of steel pipe scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012105066311A CN102943562A (en) | 2012-12-03 | 2012-12-03 | Adjustable wall connecting rod of steel pipe scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102943562A true CN102943562A (en) | 2013-02-27 |
Family
ID=47726541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012105066311A Pending CN102943562A (en) | 2012-12-03 | 2012-12-03 | Adjustable wall connecting rod of steel pipe scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102943562A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103468277A (en) * | 2013-09-30 | 2013-12-25 | 中国一冶集团有限公司 | Disassembling method of inner scaffold for coke oven building |
CN106223597A (en) * | 2016-07-22 | 2016-12-14 | 中铁城建集团第三工程有限公司 | Detachable tapered cup nut wall-connecting piece and construction method thereof |
CN107447975A (en) * | 2016-05-31 | 2017-12-08 | 桂林建筑安装工程有限公司 | Exterior wall scaffold tapered cup nut wall-connecting piece |
CN109707149A (en) * | 2019-01-28 | 2019-05-03 | 中核华辰建筑工程有限公司 | Scaffold and its building method |
CN110863644A (en) * | 2019-11-25 | 2020-03-06 | 中国十七冶集团有限公司 | Novel turnover tool type beam side connecting wall piece fixing device and method |
CN111411768A (en) * | 2020-04-30 | 2020-07-14 | 中国建筑第四工程局有限公司 | Pre-buried formula climbs a support fixed knot and constructs |
CN115110750A (en) * | 2022-04-03 | 2022-09-27 | 陈泳燊 | Universal wall connecting rod of building scaffold |
CN115306138A (en) * | 2022-08-19 | 2022-11-08 | 李康正 | Adjustable wall connecting rod for building scaffold |
CN116163509A (en) * | 2023-04-23 | 2023-05-26 | 徐州鼎博混凝土制品有限公司 | Pre-buried ware of concrete building scaffold frame |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08100520A (en) * | 1994-09-30 | 1996-04-16 | Natl House Ind Co Ltd | Connecting structure of scaffold |
US20080179477A1 (en) * | 2007-01-31 | 2008-07-31 | Regency Innovations, Llc | Scaffolding securement system |
CN201714060U (en) * | 2010-06-26 | 2011-01-19 | 国强建设集团有限公司 | Wall connecting mechanism of scaffold |
CN201883673U (en) * | 2010-12-15 | 2011-06-29 | 中建四局第六建筑工程有限公司 | Scaffold engineering tool type wall connecting element |
CN202170630U (en) * | 2011-06-17 | 2012-03-21 | 江苏省建筑工程集团有限公司 | Embedded fastener to wall for scaffold |
CN102773899A (en) * | 2012-07-17 | 2012-11-14 | 江苏大唐机械有限公司 | Blade clamping structure of ring type flaker |
CN202945799U (en) * | 2012-12-03 | 2013-05-22 | 张若美 | Adjustable wall connecting rod of steel pipe scaffold |
-
2012
- 2012-12-03 CN CN2012105066311A patent/CN102943562A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08100520A (en) * | 1994-09-30 | 1996-04-16 | Natl House Ind Co Ltd | Connecting structure of scaffold |
US20080179477A1 (en) * | 2007-01-31 | 2008-07-31 | Regency Innovations, Llc | Scaffolding securement system |
CN201714060U (en) * | 2010-06-26 | 2011-01-19 | 国强建设集团有限公司 | Wall connecting mechanism of scaffold |
CN201883673U (en) * | 2010-12-15 | 2011-06-29 | 中建四局第六建筑工程有限公司 | Scaffold engineering tool type wall connecting element |
CN202170630U (en) * | 2011-06-17 | 2012-03-21 | 江苏省建筑工程集团有限公司 | Embedded fastener to wall for scaffold |
CN102773899A (en) * | 2012-07-17 | 2012-11-14 | 江苏大唐机械有限公司 | Blade clamping structure of ring type flaker |
CN202945799U (en) * | 2012-12-03 | 2013-05-22 | 张若美 | Adjustable wall connecting rod of steel pipe scaffold |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103468277A (en) * | 2013-09-30 | 2013-12-25 | 中国一冶集团有限公司 | Disassembling method of inner scaffold for coke oven building |
CN103468277B (en) * | 2013-09-30 | 2015-05-20 | 中国一冶集团有限公司 | Disassembling method of inner scaffold for coke oven building |
CN107447975A (en) * | 2016-05-31 | 2017-12-08 | 桂林建筑安装工程有限公司 | Exterior wall scaffold tapered cup nut wall-connecting piece |
CN106223597A (en) * | 2016-07-22 | 2016-12-14 | 中铁城建集团第三工程有限公司 | Detachable tapered cup nut wall-connecting piece and construction method thereof |
CN106223597B (en) * | 2016-07-22 | 2019-06-14 | 中铁城建集团第三工程有限公司 | Detachable tapered cup nut wall-connecting piece and its construction method |
CN109707149A (en) * | 2019-01-28 | 2019-05-03 | 中核华辰建筑工程有限公司 | Scaffold and its building method |
CN109707149B (en) * | 2019-01-28 | 2020-11-13 | 中核华辰建筑工程有限公司 | Scaffold and construction method thereof |
CN110863644A (en) * | 2019-11-25 | 2020-03-06 | 中国十七冶集团有限公司 | Novel turnover tool type beam side connecting wall piece fixing device and method |
CN111411768A (en) * | 2020-04-30 | 2020-07-14 | 中国建筑第四工程局有限公司 | Pre-buried formula climbs a support fixed knot and constructs |
CN115110750A (en) * | 2022-04-03 | 2022-09-27 | 陈泳燊 | Universal wall connecting rod of building scaffold |
CN115306138A (en) * | 2022-08-19 | 2022-11-08 | 李康正 | Adjustable wall connecting rod for building scaffold |
CN116163509A (en) * | 2023-04-23 | 2023-05-26 | 徐州鼎博混凝土制品有限公司 | Pre-buried ware of concrete building scaffold frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102943562A (en) | Adjustable wall connecting rod of steel pipe scaffold | |
CN101892738B (en) | Embedded scaffold connecting tube and construction method thereof | |
CN102797350B (en) | Quick detach scaffold | |
CN202945799U (en) | Adjustable wall connecting rod of steel pipe scaffold | |
CN204266609U (en) | Assembled architecture faces limit horizontal protective and chooses net system | |
CN206309046U (en) | A kind of construction safety device | |
CN202913682U (en) | Embedded wall connecting piece | |
CN107762135B (en) | Construction method of scaffold wall connecting piece of building outer wall | |
CN103243900A (en) | Wall connecting assembly of steel pipe scaffold | |
CN204139578U (en) | The pre-buried assembling wall attaching parts of scaffold | |
CN205976447U (en) | Scaffold frame of connecting with straight screw sleeve links wall spare | |
CN206707255U (en) | Combined type wall attaching parts for external scaffolding | |
CN203222987U (en) | Steel tube scaffold wall connecting assembly | |
CN203569888U (en) | Water-stop split bolt structure capable of being reused | |
CN203393930U (en) | Stairs guard railing | |
CN206570954U (en) | A kind of 4 hole right-angle connectors of application building support | |
CN104594797A (en) | Hydraulic engineering detachable U-shaped crawling ladder and manufacture method thereof | |
CN113152876A (en) | Wall connecting piece for scaffold and mounting method thereof | |
CN210621480U (en) | Bridge building templates link for civil engineering | |
CN204126244U (en) | A kind of exterior wall scaffold detachable wall connecting piece | |
CN209837658U (en) | Special fastener for outer rod of cross brace of fastener type steel pipe scaffold | |
CN204435917U (en) | Frontier defense protection unit is faced in a kind of building structure | |
CN203514766U (en) | Wall connecting piece | |
CN205804922U (en) | A kind of novel embedded tool formula scaffold wall connecting piece | |
CN210369861U (en) | Wall connecting embedded part and scaffold wall connecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130227 |