CN102912805A - Cement mixing pile structure for side slope solidification - Google Patents

Cement mixing pile structure for side slope solidification Download PDF

Info

Publication number
CN102912805A
CN102912805A CN2012104776830A CN201210477683A CN102912805A CN 102912805 A CN102912805 A CN 102912805A CN 2012104776830 A CN2012104776830 A CN 2012104776830A CN 201210477683 A CN201210477683 A CN 201210477683A CN 102912805 A CN102912805 A CN 102912805A
Authority
CN
China
Prior art keywords
diaphragm wall
cement mixing
continuous walls
mixing pile
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104776830A
Other languages
Chinese (zh)
Other versions
CN102912805B (en
Inventor
殷德顺
周玄机
王保田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201210477683.0A priority Critical patent/CN102912805B/en
Publication of CN102912805A publication Critical patent/CN102912805A/en
Application granted granted Critical
Publication of CN102912805B publication Critical patent/CN102912805B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a cement mixing pile structure for side slope solidification, comprising first continuous walls, second continuous walls and third continuous walls, wherein the first continuous walls are cement mixing pile continuous walls and are arranged at intervals along the direction of a side slope; the second continuous walls are also cement mixing pile continuous walls and arranged between two adjacent first continuous walls; the second continuous walls are arches which are convex to the top of the slope; and the third continuous walls are chemical churning pile continuous walls which are arranged at the bottom of the side slope and integrally connected with the lower ends of the first continuous wall. Compared with the prior art, the cement mixing pile structure has the advantage that the first, second and third continuous walls are organically connected into a whole and soft soil is enclosed in the structure formed by the first and second continuous walls so that the deformation of the soil along the direction of the slope is effectively decreased.

Description

The cement mixing pilework that is used for slope reinforcement
Technical field
The present invention relates to civil engineering, the technical fields such as water conservancy are particularly useful for the soft soil slope ground and process.
Background technology
Cement mixing pile is comparatively common in the engineering of soft soil foundation, uses very extensive.It is by special mixing pile machine the curing compound such as cement and foundation soil to be forced to stir on the spot to form cement earth pile, is used for strengthening soft foundation, strengthens the slide ability of side slope.
But, in the design of cement mixing pile, must take into full account the supporting capacity of stake and foundation soil, make engineering design and construction costs aspect all be tending towards reasonable.Mostly the cement mixing pile of at present slope reinforcement employing is quincuncial arrangement.In the quincuncial arrangement cement mixing pile, every pile all isolates, and not interaction between stake and the stake does not produce structure effect, is similar to " the bean curd contact pin " situation.Therefore, when the reinforcing soft soil side slope, the cement mixing pile foundation of quincuncial arrangement still easily produces larger horizontal distortion.
In view of above reason, be necessary that in the situation that identical replacement ratio the arrangement form of innovation cement mixing pile increases stake and a stake interaction, the distortion of being reinforced weak soil to reduce.
Summary of the invention
Technical problem to be solved by this invention be for the cement mixing pile quincuncial arrangement deficiency, propose a kind of novel cement mixing pile arrangement form, thereby more be conducive to the stable of soft soil slope.
The following technical scheme of the present invention:
A kind of cement mixing pilework for slope reinforcement is characterized in that: comprise the first diaphragm wall, the second diaphragm wall and the 3rd diaphragm wall, described the first diaphragm wall is the cement mixing pile diaphragm wall, and the first diaphragm wall moves towards the interval setting along side slope; Described the second diaphragm wall also is the cement mixing pile diaphragm wall, and this second diaphragm wall is arranged between two adjacent the first diaphragm walls, and described the second diaphragm wall is shaped as arch and domedly pushes up to the slope; Described the 3rd diaphragm wall is the rotary churning pile diaphragm wall, and this rotary churning pile diaphragm wall is arranged on the sloping end of side slope and connects into an integral body with described the first diaphragm wall lower end.
The present invention is interconnected to form structure between the first cement mixing pile diaphragm wall, the second arch cement mixing pile diaphragm wall (laterally) and the third high intensity rotary churning pile diaphragm wall (laterally) of side slope trend.Use this cement mixing pile arrangement form can solve existing ground process in the situation of quincunx " the bean curd contact pin " that lays out pile, mould in the ground of state effect at stream especially more obvious.
Compared with prior art, the invention has the beneficial effects as follows:
1. in cement mixing pile of the present invention is arranged, the first diaphragm wall, the second diaphragm wall and the 3rd diaphragm wall three be organic to connect into an integral body, weak soil is closed in the structure of the first diaphragm wall and the formation of the second diaphragm wall, thereby has effectively reduced the distortion along slope aspect of the soil body.
2. because the existence of the second diaphragm wall arch, make and form mutual squeezing action between the diaphragm wall, the deformation force along slope aspect of the soil body acts directly on the arch of the second diaphragm wall, then be delivered on the first diaphragm wall, again because the first diaphragm wall lower end is the 3rd rotary churning pile diaphragm wall, so it is stressed to have formed an integral body, more be conducive to the safety of whole ruggedized construction.
3. soft foundation acts on the power on the cement mixing pile, and the structure that forms by cement mixing pile is delivered on the high-pressure rotary jet grouting pile, more is conducive to bring into play the high-pressure rotary jet grouting pile effect, also is conducive to security control.
Description of drawings
Fig. 1 is that slope reinforcement structure of the present invention is arranged schematic diagram.
Fig. 2 is ruggedized construction phantom drawing of the present invention.
Wherein: 1, the first diaphragm wall, the 2, second diaphragm wall, the 3, the 3rd diaphragm wall, 4, sloping bottom surface, 5, sloping end face.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is elaborated:
As shown in Figure 1, the agitation pile structure of slope reinforcement of the present invention, comprise cement mixing pile the first diaphragm wall 1 and cement mixing pile the second diaphragm wall 2, wherein the first diaphragm wall 1 is pushed up to sloping bottom application worker by the slope along domatic trend, construction the second diaphragm wall 2 between adjacent two first diaphragm walls 1, wherein the second diaphragm wall 2 be shaped as arch, the domed of arch pushes up to the slope, spacing between the sagitta of the second diaphragm wall 2 and the first diaphragm wall 1 designs according to concrete side slope geological conditions.Adopting the 3rd diaphragm wall 3 in the lower end of the first diaphragm wall 1 is that the rotary churning pile diaphragm wall connects, and makes the first diaphragm wall, the second diaphragm wall and the 3rd diaphragm wall become an organic whole.
The present invention's the second diaphragm wall is measured the stake position that each arch stake is made in setting-out according to the shape of the arch stake that designs, and paints the method for drawing a circle and locating with slotting bamboo chip plate, ground.
According to setting-out stake position construct, the cement mixing pile driving construction is as follows:
(1) implements to stir for the first time behind the agitation pile location;
(2) promote mixer, stir on the limit, becomes whitewashing;
(3) implement to stir for the second time;
(4) again promote mixer, stir on the limit, becomes whitewashing;
(5) stir pile.
Want accurately location, stake position, is arch so that the stake that construction forms interconnects, with the progress of construction, check at any time position, stake position, in case skew occurs in the stake position or pile body occurs tilting, cause between stake and the stake discontinuous, each stake is linked to each other mutually side by side, form continuous cement mixing pile diaphragm wall.Figure below is the part that this reinforcement means forms structure.

Claims (1)

1. cement mixing pilework that is used for slope reinforcement, it is characterized in that: comprise the first diaphragm wall, the second diaphragm wall and the 3rd diaphragm wall, described the first diaphragm wall is the cement mixing pile diaphragm wall, and the first diaphragm wall moves towards the interval along side slope and arranges; Described the second diaphragm wall also is the cement mixing pile diaphragm wall, and this second diaphragm wall is arranged between two adjacent the first diaphragm walls, and described the second diaphragm wall is shaped as arch and domedly pushes up to the slope; Described the 3rd diaphragm wall is the rotary churning pile diaphragm wall, and this rotary churning pile diaphragm wall is arranged on the sloping end of side slope and connects into an integral body with described the first diaphragm wall lower end.
CN201210477683.0A 2012-11-22 2012-11-22 For the cement mixing pilework of slope reinforcement Expired - Fee Related CN102912805B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210477683.0A CN102912805B (en) 2012-11-22 2012-11-22 For the cement mixing pilework of slope reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210477683.0A CN102912805B (en) 2012-11-22 2012-11-22 For the cement mixing pilework of slope reinforcement

Publications (2)

Publication Number Publication Date
CN102912805A true CN102912805A (en) 2013-02-06
CN102912805B CN102912805B (en) 2016-02-03

Family

ID=47611355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210477683.0A Expired - Fee Related CN102912805B (en) 2012-11-22 2012-11-22 For the cement mixing pilework of slope reinforcement

Country Status (1)

Country Link
CN (1) CN102912805B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487240A (en) * 2018-04-23 2018-09-04 大连中交理工交通技术研究院有限公司 Churning method is molded lattice foundation
CN112627204A (en) * 2020-12-28 2021-04-09 中水北方勘测设计研究有限责任公司 Reinforcing structure of unstable side slope and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0288080A (en) * 1988-09-26 1990-03-28 Takashi Mori Light irradiation medical curing tool
JPH0988080A (en) * 1995-09-22 1997-03-31 Kensetsu Kiso Eng Co Ltd Sheathing structure
CN2466217Y (en) * 2000-03-20 2001-12-19 彭高培 Combined top bracing self-supporting supporting structure
CN201459742U (en) * 2009-05-15 2010-05-12 苟卫东 Arch-shaped protection system
CN102444133A (en) * 2011-09-20 2012-05-09 河海大学 Soil cement long wall continuous arch structure for slope reinforcement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0288080A (en) * 1988-09-26 1990-03-28 Takashi Mori Light irradiation medical curing tool
JPH0988080A (en) * 1995-09-22 1997-03-31 Kensetsu Kiso Eng Co Ltd Sheathing structure
CN2466217Y (en) * 2000-03-20 2001-12-19 彭高培 Combined top bracing self-supporting supporting structure
CN201459742U (en) * 2009-05-15 2010-05-12 苟卫东 Arch-shaped protection system
CN102444133A (en) * 2011-09-20 2012-05-09 河海大学 Soil cement long wall continuous arch structure for slope reinforcement

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴俊等: "搅拌桩长墙连拱联合梅花形布置在复合地基加固中的应用", 《治淮》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487240A (en) * 2018-04-23 2018-09-04 大连中交理工交通技术研究院有限公司 Churning method is molded lattice foundation
CN112627204A (en) * 2020-12-28 2021-04-09 中水北方勘测设计研究有限责任公司 Reinforcing structure of unstable side slope and construction method thereof

Also Published As

Publication number Publication date
CN102912805B (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN204608536U (en) A kind of high-fill roadbed structure
CN103711135B (en) Anti-slide pile of jointed arch structure
CN103046559A (en) Built-in steel reinforcement framework chain protection concrete block
CN203174619U (en) Reverse raft concrete terrace
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN202809613U (en) Double-trapezoid-shaped self-locking slope-protecting concrete block
CN207295729U (en) Annular pile supporting construction
CN200964585Y (en) All-bushing perfusion stake bitten cement earth stake
CN102912805A (en) Cement mixing pile structure for side slope solidification
CN206143806U (en) Novel prefabricated assembled retaining wall
CN202830673U (en) Existing embankment heightening structure for limited using land area
CN202430726U (en) Cross-shaped self-locking slope-protecting concrete block
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
CN202830952U (en) Novel soft soil foundation structure
CN102888855A (en) Combined balance weight retaining wall
CN102704462A (en) Composite treatment grouped piles for soft foundation
CN202689013U (en) Reinforcing structure for slope loose accumulation body
CN202298602U (en) Stiff composite pile
CN206110140U (en) A vertical solid that adds that is used for weak soil foundation ditch to put slope excavation greatly
CN104088253A (en) Ecological concrete component with four connected sphere and production method thereof
CN204023489U (en) The compound bearing platform type sheet pile structure of a kind of pile foundation-flexible reinforcement bed course
CN203668926U (en) Foundation for tapered concrete piles
CN207812470U (en) A kind of plastic sheet pile with injected hole
CN103912005A (en) Foundation structure
KR101065726B1 (en) Prefabricated retaining wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203

Termination date: 20191122

CF01 Termination of patent right due to non-payment of annual fee