CN102904391A - Method for drawing or penetrating rotor of power generator for nuclear power plant - Google Patents
Method for drawing or penetrating rotor of power generator for nuclear power plant Download PDFInfo
- Publication number
- CN102904391A CN102904391A CN 201110209827 CN201110209827A CN102904391A CN 102904391 A CN102904391 A CN 102904391A CN 201110209827 CN201110209827 CN 201110209827 CN 201110209827 A CN201110209827 A CN 201110209827A CN 102904391 A CN102904391 A CN 102904391A
- Authority
- CN
- China
- Prior art keywords
- rotor
- fixed pulley
- steel wire
- wire rope
- driving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to a method for drawing or penetrating a rotor of a power generator for a nuclear power plant. The method includes looping a steel wire rope on a fixed pulley, connecting two ends of the steel wire rope to a rotor exterior end drawing tool and a crane respectively, and finally completing drawing or penetrating of the rotor by hoisting of the crane. Compared with the prior art, the method has the advantages that labor is saved, labor intensity is reduced, work efficiency is improved, the rotor runs stably, safely and reliably, and can be penetrated without limitation of operation of a low-pressure cylinder of a turbine, the method has wide application range and the like.
Description
Technical field
The present invention relates to a kind of method that extracts rotor, especially relate to the method that a kind of nuclear power house alternator is taken out penetrate rotor.
Background technology
Develop rapidly along with electric utility, the service work of Generator Set is day by day heavy, and the difficult point of generator overhaul and major tasks are to take out to wear generator amature, and the weight of heavy-duty generator rotor weighs 50 to more than 100 tons, technological requirement is high, and difficulty of construction is large.In recent years, high-rating generator is taken out rotor and is adopted slide plate to add the method that slide block or slide plate add dolly more, and the method is safe and reliable and reach its maturity, but general chain block with two 5 tons draws during site operation, labour intensity is large, and it is uneven steady that rotor is advanced, and wholely takes out that to wear the course of work slow.
Summary of the invention
Purpose of the present invention is exactly to provide a kind of in order to overcome the defective that above-mentioned prior art exists and save manpower, reduce the widely nuclear power house alternator method of taking out penetrate rotor of labour intensity, the scope of application.
Purpose of the present invention can be achieved through the following technical solutions:
A kind of nuclear power house alternator is taken out the method for penetrate rotor, it is characterized in that, the method is by being located at steel wire loop on the fixed pulley, and the steel wire rope two ends are connected to rotor encourage in end drafting tool and the driving, finishes the extraction of rotor or penetrates by the lifting of driving.
The method that extracts rotor specifically may further comprise the steps:
(1) in the center of encouraging the end body away from generator a fixed pulley is installed;
(2) encouraging the end drafting tool at rotor installs steel wire rope and is sheathed on the fixed pulley after the steel wire rope solderless wrapped connection is on rotor again;
(3) steel wire rope by the fixed pulley rear-mounted the driving little colluding on;
(4) promote slowly driving, move outside the lifting steadily of rotor along with driving, namely finish the extraction of rotor.
The method that penetrates rotor specifically may further comprise the steps:
(1) in the center of encouraging the end body away from generator a fixed pulley is installed;
(2) at the former exciter of encouraging end body place near generator or the center on brush holder basis another fixed pulley is installed;
(3) encourage the end drafting tool at rotor steel wire rope be installed, this steel wire rope solderless wrapped connection on rotor after first and the fixed pulley on exciter or the brush holder basis link to each other with the fixed pulley of distant place again after being connected;
(4) with steel wire rope by distant place fixed pulley rear-mounted the driving little colluding on;
(5) promote slowly driving, rotor is namely finished penetrating of rotor along with the lifting of driving steadily pushes in the generator unit stator thorax.
Compared with prior art, the present invention has the following advantages:
(1) saves manpower, solve the nervous problem of human resources;
(2) reduce labour intensity, increase work efficiency;
(3) rotor is advanced steadily, and is safe and reliable;
(4) be not subjected to the restriction of steam turbine low-pressure cylinder working during penetrate rotor;
(5) scope of application is extensive, can generally be used for the maintenance of adopting the slide plate method to take out the heavy-duty generator of penetrate rotor.
Description of drawings
Fig. 1 is for extracting the structural representation of rotor;
Fig. 2 is the structural representation that penetrates rotor.
Embodiment
The present invention is described in detail below in conjunction with the drawings and specific embodiments.
Embodiment 1
A kind of method that extracts nuclear power plant's usefulness generator amature specifically may further comprise the steps:
(1) in the center of encouraging the end body away from generator a fixed pulley 4 is installed;
(2) encouraging end drafting tool 1 at rotor installs steel wire rope 3 and is sheathed on the fixed pulley 4 after the steel wire rope solderless wrapped connection is on rotor again;
(3) steel wire rope 3 by fixed pulley 4 rear-mounteds on driving 2 little colluding;
(4) promote slowly driving 2, move outside the lifting steadily of rotor along with driving 2, namely finish the extraction of rotor.
A kind of method that penetrates nuclear power plant's usefulness generator amature specifically may further comprise the steps:
(1) in the center of encouraging the end body away from generator fixed pulley 4 is installed;
(2) at the former exciter of encouraging end body place near generator or the center on brush holder basis the second fixed pulley 5 is installed;
(3) encourage end drafting tool 1 at rotor steel wire rope 3 be installed, these steel wire rope 3 solderless wrapped connections on rotor after first and the second fixed pulley 5 on exciter or the brush holder basis link to each other with the fixed pulley 4 of distant place again after being connected;
(4) with steel wire rope 3 by fixed pulley 4 rear-mounteds on driving 2 little colluding;
(5) promote slowly driving 2, rotor is namely finished penetrating of rotor along with the lifting of driving 2 steadily pushes in the generator unit stator thorax.
Claims (3)
1. method that the nuclear power house alternator is taken out penetrate rotor, it is characterized in that, the method is by being located at steel wire loop on the fixed pulley, and the steel wire rope two ends are connected to rotor encourage in end drafting tool and the driving, finishes the extraction of rotor or penetrates by the lifting of driving.
2. a kind of nuclear power house alternator according to claim 1 method of taking out penetrate rotor is characterized in that, the method that extracts rotor specifically may further comprise the steps:
(1) in the center of encouraging the end body away from generator a fixed pulley is installed;
(2) encouraging the end drafting tool at rotor installs steel wire rope and is sheathed on the fixed pulley after the steel wire rope solderless wrapped connection is on rotor again;
(3) steel wire rope by the fixed pulley rear-mounted the driving little colluding on;
(4) promote slowly driving, move outside the lifting steadily of rotor along with driving, namely finish the extraction of rotor.
3. a kind of nuclear power house alternator according to claim 1 method of taking out penetrate rotor is characterized in that, the method that penetrates rotor specifically may further comprise the steps:
(1) in the center of encouraging the end body away from generator a fixed pulley is installed;
(2) at the former exciter of encouraging end body place near generator or the center on brush holder basis another fixed pulley is installed;
(3) encourage the end drafting tool at rotor steel wire rope be installed, this steel wire rope solderless wrapped connection on rotor after first and the fixed pulley on exciter or the brush holder basis link to each other with the fixed pulley of distant place again after being connected;
(4) with steel wire rope by distant place fixed pulley rear-mounted the driving little colluding on;
(5) promote slowly driving, rotor is namely finished penetrating of rotor along with the lifting of driving steadily pushes in the generator unit stator thorax.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110209827 CN102904391A (en) | 2011-07-25 | 2011-07-25 | Method for drawing or penetrating rotor of power generator for nuclear power plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110209827 CN102904391A (en) | 2011-07-25 | 2011-07-25 | Method for drawing or penetrating rotor of power generator for nuclear power plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102904391A true CN102904391A (en) | 2013-01-30 |
Family
ID=47576484
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110209827 Pending CN102904391A (en) | 2011-07-25 | 2011-07-25 | Method for drawing or penetrating rotor of power generator for nuclear power plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102904391A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104868663A (en) * | 2015-06-12 | 2015-08-26 | 中国神华能源股份有限公司 | Method for withdrawing and penetrating through rotor for power generator |
CN105406660A (en) * | 2015-12-10 | 2016-03-16 | 中船重工电机科技股份有限公司 | In-cabin extracting-installing mechanism for tower fan rotor |
CN107370302A (en) * | 2017-07-06 | 2017-11-21 | 江苏华电仪征热电有限公司 | A kind of instrument and method for being used to lay generator unit stator thorax pad |
CN107544023A (en) * | 2017-07-28 | 2018-01-05 | 中广核核电运营有限公司 | Generator amature, which is taken out, wears TT&C system |
CN112104174A (en) * | 2020-10-09 | 2020-12-18 | 福建太元动力科技有限公司 | Rotor penetrating method based on generator |
CN113872397A (en) * | 2021-10-29 | 2021-12-31 | 中广核核电运营有限公司 | Generator rotor moving method and generator rotor drawing-through method |
-
2011
- 2011-07-25 CN CN 201110209827 patent/CN102904391A/en active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104868663A (en) * | 2015-06-12 | 2015-08-26 | 中国神华能源股份有限公司 | Method for withdrawing and penetrating through rotor for power generator |
CN104868663B (en) * | 2015-06-12 | 2017-08-01 | 中国神华能源股份有限公司 | The method taken out, wear rotor for generator |
CN105406660A (en) * | 2015-12-10 | 2016-03-16 | 中船重工电机科技股份有限公司 | In-cabin extracting-installing mechanism for tower fan rotor |
CN107370302A (en) * | 2017-07-06 | 2017-11-21 | 江苏华电仪征热电有限公司 | A kind of instrument and method for being used to lay generator unit stator thorax pad |
CN107370302B (en) * | 2017-07-06 | 2024-02-06 | 江苏华电仪征热电有限公司 | Tool and method for laying down stator bore liner of generator |
CN107544023A (en) * | 2017-07-28 | 2018-01-05 | 中广核核电运营有限公司 | Generator amature, which is taken out, wears TT&C system |
CN112104174A (en) * | 2020-10-09 | 2020-12-18 | 福建太元动力科技有限公司 | Rotor penetrating method based on generator |
CN113872397A (en) * | 2021-10-29 | 2021-12-31 | 中广核核电运营有限公司 | Generator rotor moving method and generator rotor drawing-through method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102904391A (en) | Method for drawing or penetrating rotor of power generator for nuclear power plant | |
CN102561706A (en) | Internal threading method of space large-span prestressed steel structure steel strand | |
CN104659977A (en) | Sleeving tool and sleeving method | |
CN208825913U (en) | A kind of penstock stiffening ring high efficiency assembly device | |
CN201826262U (en) | Prestress tensioning trolley | |
CN204371545U (en) | A kind of power station impeller apparatus for examination and repair | |
CN203193189U (en) | Portable overhead ground wire lifting device | |
CN104773645A (en) | Tool for lifting bearing end cover of permanent magnet directly-driven wind generator | |
CN201178362Y (en) | Hanging frame for motor rotor disassembling | |
CN203760929U (en) | Tension tower line-tightening steering pulley used during construction of power transmission line tower | |
CN104724615A (en) | Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane | |
CN204304722U (en) | Suit frock | |
CN203855295U (en) | Lever type bearing pad hoisting device | |
CN104242142A (en) | Installation method of suspension type tubular busbar | |
CN202369320U (en) | Carrying frame for motors | |
CN202652016U (en) | Wire-embedding auxiliary device used for large-scale permanent-magnet direct-driven wind power generator stator | |
CN202098670U (en) | Wind turbine tower conveying and elevating auxiliary device | |
CN214652946U (en) | Tool for hoisting movable guide vane of water turbine | |
CN204927902U (en) | Electrical apparatus installation hoisting device of transformer substation | |
CN204886559U (en) | Dive motor is used heat dissipation festival and is contained its dive motor | |
CN204876778U (en) | Wire pole is changed with device that fell | |
CN203065072U (en) | Outdoor substation equipment hoisting device | |
CN204626629U (en) | A kind of dredging machine for drain pipeline | |
CN202084849U (en) | Hand winch for live-line work | |
CN204873456U (en) | Gas turbine hoisting accessory |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130130 |