CN102900090A - Non-inclined dry-operation open caisson capable of preventing water burst and land subsidence and construction method thereof - Google Patents
Non-inclined dry-operation open caisson capable of preventing water burst and land subsidence and construction method thereof Download PDFInfo
- Publication number
- CN102900090A CN102900090A CN201110224807XA CN201110224807A CN102900090A CN 102900090 A CN102900090 A CN 102900090A CN 201110224807X A CN201110224807X A CN 201110224807XA CN 201110224807 A CN201110224807 A CN 201110224807A CN 102900090 A CN102900090 A CN 102900090A
- Authority
- CN
- China
- Prior art keywords
- open caisson
- construction
- water burst
- bracket
- lifting gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention discloses a non-inclined dry-operation open caisson capable of preventing water burst and land subsidence and a construction method thereof. The non-inclined dry-operation open caisson capable of preventing the water burst and the land subsidence comprises a wall and a blade edge both made from reinforced concrete, wherein a water stop curtain and an uplift pile are arranged at the four sides of the open caisson; a bracket is arranged at the upper end of the outer wall of the open caisson; and the bracket is connected with the uplift pile by steel supports and lifting devices detached section by section. The construction method comprises the following steps of: firstly performing the construction of the water stop curtain and the uplift pile and then manufacturing the bottommost layer of the open caisson; after the desired strength of concrete is achieved, digging earth from the open caisson; uniformly controlling the lifting devices to sink the open caisson slowly, and then performing the construction of a former layer of open caisson upwards, continuing digging the earth and controlling the open caisson to sink to be at a designed elevation. Compared with the existing working well by using a retaining and protecting method, the non-inclined dry-operation open caisson capable of preventing the water burst and the land subsidence omits a foundation pit support with expensive construction cost, and the construction period is shorted; compared with the conventional open caisson, the non-inclined dry-operation open caisson capable of preventing the water burst and the land subsidence is safer, more environment-friendly, better in construction quality, non-inclined, and capable of performing dry operation without mud pollution; and therefore, the non-inclined dry-operation open caisson capable of preventing the water burst and the land subsidence is suitable for wide urban construction in China.
Description
Technical field
The present invention relates to the building foundation field, relate in particular to the anti-ground of a kind of anti-water burst sink not inclination dry work open caisson and job practices thereof.
Background technology
Along with China's urban construction scale constantly enlarges, the requirement of urban construction improves constantly, and the many pipe networks in city are laid the depths push pipe that goes underground by the earth's surface and laid, and Underground Rail Transit also is widely used.This will be in each access at network of underground, subway continuously excacation well along the line or underground station and station, common all kinds of active well and foundation ditch adopt the churning supporting that adds high pressure of steel concrete diaphragm wall, SMW engineering method, drilled pile more, not only involve great expense, and the duration is very long; The construction of employing drop shaft sinking, though expense is lower, open caisson is different because of underground soil layer property, as easy as rolling off a log inclination is difficult to control its verticality, when underground soil layer contains layer of sand, just can produce quicksand, the outer ground of open caisson is sunk, in the urban construction that network of underground is arranged, just can't use.
Summary of the invention
Technical problem to be solved by this invention is: the anti-ground of a kind of anti-water burst sink not inclination dry work open caisson and job practices thereof are provided, in the city, construct, open caisson does not tilt, can do operation in well fetches earth, without water burst, and prevent that the outer ground of well from sinking, and reduces the urban construction investment, this open caisson construction civilization, mud-less pollution, the duration is short.
The technical solution adopted in the present invention is: the anti-ground of a kind of anti-water burst sink not inclination dry work open caisson and job practices thereof, the same with prior art, the borehole wall that all includes steel concrete, borehole wall lower end is provided with the sword pin, sword pin front end is provided with cuts the mud steel plate, it is characterized in that, the open caisson periphery is provided with water-stop curtain and the uplift pile of controlling well sinking, be provided with bracket in open caisson outer wall upper end, between bracket and uplift pile, support and link to each other a strong point two lifting gears arranged side by side with lifting gear by dismantling section by section steel.
The further technical scheme of the present invention is: described water-stop curtain is cement mixing pile or high-pressure rotary jet grouting pile, and described lifting gear is spiral lift or jack, its specification 50-200 ton, and the described steel of dismantling section by section supports the stroke that every joint highly is equal to lifting gear.
The open caisson load is passed to uplift pile by lifting gear, for saving investment, reduce uplift pile stake number, dismantle section by section steel and support the two lifting gears of employing one post, there is the hole of 50-200mm to be used for passing the rod iron of accepting another lifting gear bearing load at a upper joint support column, namely working as a lifting gear stroke is finished, pierced rod iron at a upper joint steel supported hole, the load of another lifting gear supporting caisson is installed, dismounting is supported without a joint steel above the stroke lifting device, jacking stroke again again sheds the interim lifting gear that supports of being used for, and open caisson again sinks.
The anti-ground of above-mentioned a kind of anti-water burst sink not inclination dry work open caisson construction and job practices thereof comprise following construction sequence successively:
(1), construction open caisson peripheral water stopping curtain;
(2), construction is positioned at the uplift pile of open caisson periphery;
(3), make bottom open caisson, comprise reinforcing bar binding, weldering bracket and sword pin steel plate, formwork, fluid concrete and maintenance;
(4), put the lifting gear of two positioning system of changed liftings at the stake roof panel, connect on the lifting gear and dismantle section by section steel and be supported to bracket;
(5), form removal after the open caisson concrete strength reaches, and cut the earth in the open caisson and outward transport;
(6), along with the continuous taking-up of soil in the well, the unified regulation and control of lifting gear adopt stepper motor or manually-operated control open caisson vertically, not tilt to sink at a slow speed;
(8), continue upwards to make the last layer caisson wall by prior art, comprise reinforcing bar binding, weldering bracket, formwork, fluid concrete and maintenance;
(9), continue to cut the earth downwards with the regulation and control well sinking to design elevation.
The anti-ground of a kind of anti-water burst sink not inclination dry work open caisson and job practices thereof compared with prior art, have obvious superiority: compare with the method for support construction of working shaft, save the pattern foundation pit supporting structure and the support engineering engineering time that involve great expense; Compare with the construction of conventional drop shaft sinking, this open caisson construction is safer, environmental protection, do not tilt, do operation, mud-less pollution, and construction quality is better, and it is applicable to the vast urban construction of China.
The invention will be further described below in conjunction with accompanying drawing and the specific embodiment.
Description of drawings
Fig. 1 is embodiment of the invention schematic diagram.
Drawing explanation: 1. the assorted soil layer in earth's surface, 2. the sword pin cut the mud steel plate, 3. sword pin, 4. the open caisson outer wall is 5. dismantled section by section steel and is supported, 6. bracket, 7. open caisson yet to be built, 8. lifting gear, 9. uplift pile, 10. mud, 11. water-stop curtains, 12. layers of sand, 13. silt clay layers.
The specific embodiment
Embodiment as shown in Figure 1, the anti-ground of a kind of anti-water burst sinks not, and the enforcement of inclination dry work open caisson is: construct first open caisson peripheral water stopping curtain (11) and uplift pile (9), make again reinforcing bar binding, the weldering bracket (6) of one deck of the end of open caisson and cut mud steel plate (2), formwork, fluid concrete (3,4) and maintenance; At open caisson concrete (3,4) intensity reaches the rear demoulding, the upper installation of two lifting gears (8) on uplift pile (9) stake top is dismantled section by section steel and is supported (5) to bracket (6), in open caisson (4), cut the earth and outward transport, continuous taking-up along with soil in the well, lifting gear (8) adopts stepper motor or manually-operated, unified control open caisson vertically, do not tilt, sink at a slow speed.Last layer caisson wall (7) continues upwards construction by prior art, continues downward shoveling sedimentation open caisson, makes well sinking to design elevation.
Claims (3)
1. the anti-ground of an anti-water burst not inclination dry work open caisson that sinks, the borehole wall that includes steel concrete, borehole wall lower end is provided with the sword pin, sword pin front end is provided with cuts the mud steel plate, it is characterized in that the open caisson periphery is provided with water-stop curtain and the uplift pile of controlling well sinking, be provided with bracket in open caisson outer wall upper end, between bracket and uplift pile, support and link to each other a strong point two lifting gears arranged side by side with lifting gear by dismantling section by section steel.
2. the anti-ground of a kind of anti-water burst according to claim 1 not inclination dry work open caisson that sinks, it is characterized in that: described water-stop curtain is high-pressure slip-casting or cement mixing pile or high-pressure rotary jet grouting pile, described lifting gear is spiral lift or jack, its specification 50-200 ton, the described steel of dismantling section by section supports the stroke that every joint highly is equal to lifting gear.
3. the anti-ground of an anti-water burst not job practices of inclination dry work open caisson of sinking is characterized in that may further comprise the steps successively:
(1), construction open caisson peripheral water stopping curtain;
(2), construction is positioned at the uplift pile of open caisson periphery;
(3), make bottom open caisson, comprise reinforcing bar binding, weldering bracket and sword pin steel plate, formwork, fluid concrete and maintenance;
(4), put the lifting gear of two positioning system of changed liftings at the stake roof panel, connect on the lifting gear and dismantle section by section steel and be supported to bracket;
(5), form removal after the open caisson concrete strength reaches, and cut the earth in the open caisson and outward transport;
(6), along with the continuous taking-up of soil in the well, the unified regulation and control of lifting gear adopt stepper motor or manually-operated control open caisson vertically, not tilt to sink at a slow speed;
(8), continue upwards to make the last layer caisson wall by prior art, comprise reinforcing bar binding, weldering bracket, formwork, fluid concrete and maintenance;
(9), continue to cut the earth downwards with the regulation and control well sinking to design elevation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110224807XA CN102900090A (en) | 2011-07-29 | 2011-07-29 | Non-inclined dry-operation open caisson capable of preventing water burst and land subsidence and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110224807XA CN102900090A (en) | 2011-07-29 | 2011-07-29 | Non-inclined dry-operation open caisson capable of preventing water burst and land subsidence and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102900090A true CN102900090A (en) | 2013-01-30 |
Family
ID=47572556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110224807XA Pending CN102900090A (en) | 2011-07-29 | 2011-07-29 | Non-inclined dry-operation open caisson capable of preventing water burst and land subsidence and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102900090A (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195158A (en) * | 2013-04-03 | 2013-07-10 | 济南城建集团有限公司 | Municipal drainage pipeline slurry balance pipe-jacking construction method |
CN103205978A (en) * | 2013-04-18 | 2013-07-17 | 成军 | High-permeability zone under-water-level elevator foundation pit open caisson moulding bed construction method |
CN103758140A (en) * | 2014-02-18 | 2014-04-30 | 中国十九冶集团有限公司 | Deep foundation pit slope supporting body water inrush source point drainage method and device |
CN104032764A (en) * | 2014-06-13 | 2014-09-10 | 上海市基础工程集团有限公司 | Press-in type sunk well reaction system |
CN105133643A (en) * | 2015-07-29 | 2015-12-09 | 同济大学 | Construction method for shaft type underground garage |
CN105239598A (en) * | 2015-10-21 | 2016-01-13 | 嘉库智能停车系统(上海)有限公司 | Integral sinking construction method for well-type full-automatic stereo garage |
CN105735337A (en) * | 2016-03-17 | 2016-07-06 | 王燏斌 | Bridge deep water open caisson foundation construction method |
CN105970985A (en) * | 2016-05-27 | 2016-09-28 | 广州中国科学院工业技术研究院 | Sunk well for muddy water mud flat and mounting method thereof |
CN106088126A (en) * | 2016-06-30 | 2016-11-09 | 中国五冶集团有限公司 | A kind of open caisson deviation rectification construction method |
CN107476325A (en) * | 2017-08-11 | 2017-12-15 | 中国化学工程第六建设有限公司 | The open caisson construction method of sewage disposal |
CN107829441A (en) * | 2016-09-15 | 2018-03-23 | 邹宗煊 | It is a kind of do not influence surrounding enviroment draw hole caisson structure and its construction method |
CN107989056A (en) * | 2016-10-27 | 2018-05-04 | 温州荣强海洋科技有限公司 | Draw hole caisson structure in a kind of wall for not influencing surrounding enviroment |
CN108086340A (en) * | 2017-12-29 | 2018-05-29 | 上海建工二建集团有限公司 | Open caisson construction structure and construction method thereof |
CN108086163A (en) * | 2017-12-28 | 2018-05-29 | 中国葛洲坝集团第二工程有限公司 | Concrete open caisson high-pressure rotary-spray antiseepage cofferdam construction method |
CN108487847A (en) * | 2018-03-28 | 2018-09-04 | 华北水利水电大学 | The pull-type gate of telescopic column |
CN109252533A (en) * | 2018-09-17 | 2019-01-22 | 中国冶集团有限公司 | Well sinking control system and its construction method |
CN109972644A (en) * | 2019-03-12 | 2019-07-05 | 杭州市市政工程集团有限公司 | Pushing tow open caisson device and its construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1064125A (en) * | 1991-02-13 | 1992-09-02 | 王志刚 | The job practices of settling open caisson by digging grooves and equipment |
KR100651671B1 (en) * | 2005-12-20 | 2006-12-01 | 주식회사 동경 | Construction method using caisson |
CN101418573A (en) * | 2008-01-24 | 2009-04-29 | 丁慈鑫 | Caisson structure and method for smoothly and accurately sinking caisson structure into earth surface |
CN101503879A (en) * | 2009-03-10 | 2009-08-12 | 中国第一冶金建设有限责任公司 | Pre-control method for preventing inclination of sinking well |
CN101565946A (en) * | 2009-04-24 | 2009-10-28 | 丁慈鑫 | Internal supporting pile for supporting sinking well structure in construction of sinking wells |
CN202280066U (en) * | 2011-07-29 | 2012-06-20 | 邹宗煊 | Water-burst-proof ground-subsidence-proof non-inclination dry work sinking well |
-
2011
- 2011-07-29 CN CN201110224807XA patent/CN102900090A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1064125A (en) * | 1991-02-13 | 1992-09-02 | 王志刚 | The job practices of settling open caisson by digging grooves and equipment |
KR100651671B1 (en) * | 2005-12-20 | 2006-12-01 | 주식회사 동경 | Construction method using caisson |
CN101418573A (en) * | 2008-01-24 | 2009-04-29 | 丁慈鑫 | Caisson structure and method for smoothly and accurately sinking caisson structure into earth surface |
CN101503879A (en) * | 2009-03-10 | 2009-08-12 | 中国第一冶金建设有限责任公司 | Pre-control method for preventing inclination of sinking well |
CN101565946A (en) * | 2009-04-24 | 2009-10-28 | 丁慈鑫 | Internal supporting pile for supporting sinking well structure in construction of sinking wells |
CN202280066U (en) * | 2011-07-29 | 2012-06-20 | 邹宗煊 | Water-burst-proof ground-subsidence-proof non-inclination dry work sinking well |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195158B (en) * | 2013-04-03 | 2014-12-10 | 济南城建集团有限公司 | Municipal drainage pipeline slurry balance pipe-jacking construction method |
CN103195158A (en) * | 2013-04-03 | 2013-07-10 | 济南城建集团有限公司 | Municipal drainage pipeline slurry balance pipe-jacking construction method |
CN103205978A (en) * | 2013-04-18 | 2013-07-17 | 成军 | High-permeability zone under-water-level elevator foundation pit open caisson moulding bed construction method |
CN103205978B (en) * | 2013-04-18 | 2014-12-10 | 南通英雄建设集团有限公司 | High-permeability zone under-water-level elevator foundation pit open caisson moulding bed construction method |
CN103758140B (en) * | 2014-02-18 | 2016-02-10 | 中国十九冶集团有限公司 | Deep foundation pit slope supporting body water inrush source point drainage method and device |
CN103758140A (en) * | 2014-02-18 | 2014-04-30 | 中国十九冶集团有限公司 | Deep foundation pit slope supporting body water inrush source point drainage method and device |
CN104032764A (en) * | 2014-06-13 | 2014-09-10 | 上海市基础工程集团有限公司 | Press-in type sunk well reaction system |
CN105133643B (en) * | 2015-07-29 | 2017-07-28 | 同济大学 | A kind of construction method of well shaft type underground parking garage |
CN105133643A (en) * | 2015-07-29 | 2015-12-09 | 同济大学 | Construction method for shaft type underground garage |
CN105239598A (en) * | 2015-10-21 | 2016-01-13 | 嘉库智能停车系统(上海)有限公司 | Integral sinking construction method for well-type full-automatic stereo garage |
CN105735337A (en) * | 2016-03-17 | 2016-07-06 | 王燏斌 | Bridge deep water open caisson foundation construction method |
CN105970985B (en) * | 2016-05-27 | 2020-12-04 | 广州中国科学院工业技术研究院 | Open caisson for silt water area mudflat and installation method thereof |
CN105970985A (en) * | 2016-05-27 | 2016-09-28 | 广州中国科学院工业技术研究院 | Sunk well for muddy water mud flat and mounting method thereof |
CN106088126A (en) * | 2016-06-30 | 2016-11-09 | 中国五冶集团有限公司 | A kind of open caisson deviation rectification construction method |
CN107829441A (en) * | 2016-09-15 | 2018-03-23 | 邹宗煊 | It is a kind of do not influence surrounding enviroment draw hole caisson structure and its construction method |
CN107989056A (en) * | 2016-10-27 | 2018-05-04 | 温州荣强海洋科技有限公司 | Draw hole caisson structure in a kind of wall for not influencing surrounding enviroment |
CN107476325A (en) * | 2017-08-11 | 2017-12-15 | 中国化学工程第六建设有限公司 | The open caisson construction method of sewage disposal |
CN108086163A (en) * | 2017-12-28 | 2018-05-29 | 中国葛洲坝集团第二工程有限公司 | Concrete open caisson high-pressure rotary-spray antiseepage cofferdam construction method |
CN108086340A (en) * | 2017-12-29 | 2018-05-29 | 上海建工二建集团有限公司 | Open caisson construction structure and construction method thereof |
WO2019128155A1 (en) * | 2017-12-29 | 2019-07-04 | 上海建工二建集团有限公司 | Open caisson construction structure and method |
CN108086340B (en) * | 2017-12-29 | 2020-02-14 | 上海建工二建集团有限公司 | Open caisson construction structure and construction method thereof |
JP2020522635A (en) * | 2017-12-29 | 2020-07-30 | 上海建工二建集団有限公司Shanghai Construction No.2 (Group) Co., Ltd. | Open caisson construction structure and construction method |
CN108487847A (en) * | 2018-03-28 | 2018-09-04 | 华北水利水电大学 | The pull-type gate of telescopic column |
CN109252533A (en) * | 2018-09-17 | 2019-01-22 | 中国冶集团有限公司 | Well sinking control system and its construction method |
CN109972644A (en) * | 2019-03-12 | 2019-07-05 | 杭州市市政工程集团有限公司 | Pushing tow open caisson device and its construction method |
CN109972644B (en) * | 2019-03-12 | 2024-02-23 | 杭州市市政工程集团有限公司 | Open caisson device for pushing and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102900090A (en) | Non-inclined dry-operation open caisson capable of preventing water burst and land subsidence and construction method thereof | |
CN101560770B (en) | Novel deep building foundation pit supporting system | |
CN103321244B (en) | Sand foundation existing building sets up the construction method of basement | |
CN111236241B (en) | Weak water-rich stratum subway foundation pit reinforcing excavation method based on half-cover excavation method | |
CN101701461B (en) | Method for constructing energy-saving underground tube structure | |
CN103290847A (en) | Inner oblique beam supporting structure for oversized-area deep foundation pit and construction method | |
CN102660955A (en) | Quick construction method for foundation pit slope support | |
CN102359112A (en) | Method for bracing foundation pit by using steel box piles | |
CN202280066U (en) | Water-burst-proof ground-subsidence-proof non-inclination dry work sinking well | |
CN103572764A (en) | Ultra-deep manual hole digging pile dado water stop structure and construction method thereof | |
CN202144598U (en) | Sunk type underground structure | |
CN206428707U (en) | A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation | |
CN105464079A (en) | Forming construction method of long-spiral pore-forming pile-slab-pile supporting and anti-seepage continuous wall | |
CN111734309A (en) | Guiding device for construction of SMW method pile, and SMW method pile construction equipment and method | |
CN209923935U (en) | Co-location combined pile wall supporting structure in upper-soft and lower-hard stratum | |
CN203160254U (en) | Pit support structure | |
CN203795434U (en) | Portal type bamboo joint mortar pile building envelope | |
CN102235008B (en) | Engineering pile deviation preventing structure of soft soil foundation and pretreatment method | |
CN117364789A (en) | Soft soil deep foundation pit supporting structure for building construction and supporting construction method thereof | |
CN204059341U (en) | Bamboo joint type mortar pile | |
CN103711123B (en) | The construction method of bamboo joint type mortar pile | |
CN105714832B (en) | A kind of large size prefabricated building enclosure of deep basal pit and construction method | |
CN111139855A (en) | Bottom concrete caisson capable of self-weight forced landing and construction method | |
CN112252312B (en) | Construction method for enhancing integral stress performance of PHC pipe pile | |
CN211690402U (en) | Bottom concrete caisson capable of self-weight forced landing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130130 |