CN102900069A - 灰土、防渗膜整片复合地基结构 - Google Patents
灰土、防渗膜整片复合地基结构 Download PDFInfo
- Publication number
- CN102900069A CN102900069A CN201210383675XA CN201210383675A CN102900069A CN 102900069 A CN102900069 A CN 102900069A CN 201210383675X A CN201210383675X A CN 201210383675XA CN 201210383675 A CN201210383675 A CN 201210383675A CN 102900069 A CN102900069 A CN 102900069A
- Authority
- CN
- China
- Prior art keywords
- foundation
- antiseepage film
- building
- lime earth
- earth layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Road Paving Structures (AREA)
- Foundations (AREA)
Abstract
一种灰土、防渗膜整片复合地基结构,包括埋于地表的用于建设变电站的建、构筑物基础,所述建、构筑物基础的四周被地基处理土层包围,所述建、构筑物基础的底部呈方形,建、构筑物基础的下部是上层三七灰土层,上层三七灰土层的下部依次是第一防渗膜、下层三七灰土层和第二防渗膜,所述第一防渗膜、第二防渗膜整片铺设在所述建、构筑物基础的底部,并且延伸出所述建、构筑物基础的底部。该地基结构用于Ⅲ级及以上或可处理湿陷性黄土层厚度大于3米的自重湿陷性黄土地区变电工程的整片地基处理。该地基结构可代替强夯法、挤密法、预浸水法等湿陷性黄土的地基处理方法,具有施工可行性高、质量验收和检测手段成熟等优势,可极大地降低地基处理费用,提高地基可靠度。
Description
技术领域
本发明是一种灰土、防渗膜整片复合地基结构,应用于变电工程的地基处理结构。
背景技术
坐落于湿陷性黄土地区的变电站,都面临如何消除黄土地基湿陷性的问题,而消除黄土湿陷性可以从两个方面入手,一方面是通过各种技术手段(换土、挤密等)来改善黄土的岩土体性质,从黄土本身解决问题;另一方面则是消除能引起黄土湿陷性的决定性因素—水。常用的地基处理方法主要有垫层法、强夯法、挤密法、预浸水法等。这几种常规地基处理方法,在湿陷性黄土地区普遍都存在着工程造价高、地基改良后可靠度低等缺点。由于客观因素的影响,在甘肃境内主要应用垫层法或挤密法来消除黄土的湿陷性,垫层法规范规定可处理厚度为1-3米的湿陷性黄土,而挤密法可以处理厚度为5-15米的湿陷性黄土。
国际上土工防渗膜的应用可追溯到20世纪30年代,首先用于游泳池和灌溉渠道防渗,然后发展到土石坝、水闸、垃圾堆积场防渗处理及其他土建工程。20 世纪80年代以后,土工合成材料的应用又有了新的飞跃,产品型式不断革新,各种复合型、组合型土工合成材料不断涌现。如今,用土工防渗膜系统作为长期措施替代传统的衬砌法对大坝等水工建筑物进行防渗处理已被工程界广泛接受。许多国家还将土工合成材料在某些特殊工程上的应用列为施工标准和重要考察指标,众多的国家和技术组织都将土工合成材料写入了规范,说明它已得到工程界一致的认同。
在自重湿陷性黄土比较厚的地区挤密法虽处理效果较好,但是西北地区的黄土层较厚,挤密法需要处理的方量过大,工程总体花费很高,不符合经济合理的原则。既然改变湿陷性黄土整体的岩土体性质相对困难,那我们就要从消除水对湿陷性黄土的影响这方面来入手,采用铺设土工材料等方法阻止地表水和地下水入渗。
发明内容
本发明的目的是提供一种灰土、防渗膜整片复合地基结构,解决上述问题。
本发明的目的通过以下技术方案来具体实现:
灰土、防渗膜整片复合地基结构,包括埋于地表的用于建设变电站的建、构筑物基础,所述建、构筑物基础的四周被地基处理土层包围,所述建、构筑物基础的底部呈方形,建、构筑物基础的下部是上层三七灰土层,上层三七灰土层的下部依次是第一防渗膜、下层三七灰土层和第二防渗膜,所述第一防渗膜、第二防渗膜整片铺设在所述建、构筑物基础的底部,并且延伸出所述建、构筑物基础的底部。
所述三七灰土层、第一防渗膜、下层三七灰土层、第二防渗膜的外边缘与变电站外墙基础外缘的距离至少为地基处理土层厚度的一半,并且不小于2.5m。
所述上层三七灰土层的厚度为2.5-4m。
所述第一防渗膜、下层三七灰土层和第二防渗膜的厚度之和为0.25-0.3m。
所述下层三七灰土层的压实系数不小于0.95。
所述上层三七灰土层的压实系数不小于0.97。
本发明的有益效果是,该地基结构用于Ⅲ级及以上或可处理湿陷性黄土层厚度大于3米的自重湿陷性黄土地区变电工程的整片地基处理。
该地基结构可代替强夯法、挤密法、预浸水法等湿陷性黄土的地基处理方法,具有施工可行性高、质量验收和检测手段成熟等优势,可极大地降低地基处理费用,提高地基可靠度。
第一防渗膜被上下两层三七灰土保护,具有较好的抗腐蚀性和抗变形性能,可起到很好的阻水作用。上下两层防渗膜可很好地提高阻水可靠度。
附图说明
下面根据附图和实施例对本发明作进一步详细说明。
图1是本发明实施例所述灰土、防渗膜整片复合地基结构的剖视结构图。
图2是第一防渗膜、第二防渗膜的平面结构图。
具体实施方式
如图1-2所示,本发明实施例所述灰土、防渗膜整片复合地基结构,包括埋于地表的用于建设变电站的建、构筑物基础1,所述建、构筑物基础1的四周被地基处理土层6包围,所述建、构筑物基础1的底部呈方形,建、构筑物基础1的下部是上层三七灰土层2,上层三七灰土层2的下部依次是第一防渗膜3、下层三七灰土层4和第二防渗膜5,所述第一防渗膜3、第二防渗膜5整片铺设在所述建、构筑物基础1的底部,并且延伸出所述建、构筑物基础1的底部。
所述三七灰土层2、第一防渗膜3、下层三七灰土层4、第二防渗膜5的外边缘与变电站外墙基础外缘的距离至少为地基处理土层厚度的一半,并且不小于2.5m。
所述上层三七灰土层2的厚度为2.5-4m。
所述第一防渗膜3、下层三七灰土层4和第二防渗膜5的厚度之和为0.25-0.3m。
所述下层三七灰土层4的压实系数不小于0.95。
所述上层三七灰土层2的压实系数不小于0.97。
本发明的有益效果是,该地基结构用于Ⅲ级及以上或可处理湿陷性黄土层厚度大于3米的自重湿陷性黄土地区变电工程的整片地基处理。
该地基结构可代替强夯法、挤密法、预浸水法等湿陷性黄土的地基处理方法,具有施工可行性高、质量验收和检测手段成熟等优势,可极大地降低地基处理费用,提高地基可靠度。
第一防渗膜被上下两层三七灰土保护,具有较好的抗腐蚀性和抗变形性能,可起到很好的阻水作用。上下两层防渗膜可很好地提高阻水可靠度。
Claims (6)
1.灰土、防渗膜整片复合地基结构,包括埋于地表的用于建设变电站的建、构筑物基础,所述建、构筑物基础的四周被地基处理土层包围,其特征在于,所述建、构筑物基础的底部呈方形,建、构筑物基础的下部是上层三七灰土层,上层三七灰土层的下部依次是第一防渗膜、下层三七灰土层和第二防渗膜,所述第一防渗膜、第二防渗膜整片铺设在所述建、构筑物基础的底部,并且延伸出所述建、构筑物基础的底部。
2.如权利要求1所述的灰土、防渗膜整片复合地基结构,其特征在于,所述三七灰土层、第一防渗膜、下层三七灰土层、第二防渗膜的外边缘与变电站外墙基础外缘的距离至少为地基处理土层厚度的一半,并且不小于2.5m。
3.如权利要求1所述的灰土、防渗膜整片复合地基结构,其特征在于,所述上层三七灰土层的厚度为2.5-4m。
4.如权利要求1所述的灰土、防渗膜整片复合地基结构,其特征在于,所述第一防渗膜、下层三七灰土层和第二防渗膜的厚度之和为0.25-0.3m。
5.如权利要求1所述的灰土、防渗膜整片复合地基结构,其特征在于,所述下层三七灰土层的压实系数不小于0.95。
6.如权利要求1所述的灰土、防渗膜整片复合地基结构,其特征在于,所述上层三七灰土层的压实系数不小于0.97。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210383675.XA CN102900069B (zh) | 2012-10-11 | 2012-10-11 | 灰土、防渗膜整片复合地基结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210383675.XA CN102900069B (zh) | 2012-10-11 | 2012-10-11 | 灰土、防渗膜整片复合地基结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102900069A true CN102900069A (zh) | 2013-01-30 |
CN102900069B CN102900069B (zh) | 2015-05-27 |
Family
ID=47572536
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210383675.XA Expired - Fee Related CN102900069B (zh) | 2012-10-11 | 2012-10-11 | 灰土、防渗膜整片复合地基结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102900069B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005076414A (ja) * | 2003-09-03 | 2005-03-24 | Mikio Umeoka | 建物基礎地盤の改良工法 |
CN201546234U (zh) * | 2009-12-04 | 2010-08-11 | 中国水电顾问集团北京勘测设计研究院 | 用于大厚度自重湿陷性黄土地区风力发电机地基基础结构 |
CN201581417U (zh) * | 2009-10-30 | 2010-09-15 | 北京高能时代环境技术股份有限公司 | 一种用于湿陷性黄土地区的土工膜防渗结构 |
CN202380454U (zh) * | 2011-12-13 | 2012-08-15 | 河南省电力勘测设计院 | 厂房素土桩与支盘灌注桩结合处理湿陷性黄土地基 |
CN202850013U (zh) * | 2012-10-11 | 2013-04-03 | 甘肃省电力公司电力经济技术研究院 | 灰土、防渗膜整片复合地基结构 |
-
2012
- 2012-10-11 CN CN201210383675.XA patent/CN102900069B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005076414A (ja) * | 2003-09-03 | 2005-03-24 | Mikio Umeoka | 建物基礎地盤の改良工法 |
CN201581417U (zh) * | 2009-10-30 | 2010-09-15 | 北京高能时代环境技术股份有限公司 | 一种用于湿陷性黄土地区的土工膜防渗结构 |
CN201546234U (zh) * | 2009-12-04 | 2010-08-11 | 中国水电顾问集团北京勘测设计研究院 | 用于大厚度自重湿陷性黄土地区风力发电机地基基础结构 |
CN202380454U (zh) * | 2011-12-13 | 2012-08-15 | 河南省电力勘测设计院 | 厂房素土桩与支盘灌注桩结合处理湿陷性黄土地基 |
CN202850013U (zh) * | 2012-10-11 | 2013-04-03 | 甘肃省电力公司电力经济技术研究院 | 灰土、防渗膜整片复合地基结构 |
Non-Patent Citations (1)
Title |
---|
罗宇生等: "土(或灰土)垫层处理湿陷性黄土地基的效果", 《陕西建筑》 * |
Also Published As
Publication number | Publication date |
---|---|
CN102900069B (zh) | 2015-05-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204059332U (zh) | 一种混凝土预制管桩与堆载预压软土地基处理装置 | |
CN102926376B (zh) | 一种围海造地区域软土地基处理方法 | |
CN207092159U (zh) | 一种膨胀土地区地下室建筑物抗浮结构 | |
CN105926393A (zh) | 一种利用气泡混合轻质土进行路堤填筑的方法 | |
CN103147614A (zh) | 多层结构水池及其构建方法 | |
CN109162291A (zh) | 大厚度湿陷性黄土区风机基础地基结构及其施工方法 | |
CN202850013U (zh) | 灰土、防渗膜整片复合地基结构 | |
CN109778625A (zh) | 一种渣土类建筑废弃物填筑的高速公路路基结构 | |
CN102071689A (zh) | 既有隧道近旁静压桩的优化施工方法 | |
CN101967819B (zh) | 一种用于变电站软土地基施工的强夯置换综合法 | |
CN203307829U (zh) | 一种用于地下工程防水设施的外盲沟 | |
CN106337422B (zh) | 一种处理湿陷性黄土地区填方地基的方法 | |
CN202850012U (zh) | 灰土、防渗膜局部复合地基结构 | |
CN102900069B (zh) | 灰土、防渗膜整片复合地基结构 | |
CN102900070B (zh) | 灰土、防渗膜局部复合地基结构 | |
CN201943060U (zh) | 一种河床深厚覆盖层闸坝基础的加固结构 | |
CN209179047U (zh) | 大厚度湿陷性黄土区风机基础地基结构 | |
CN114444319A (zh) | 一种黄土地下病害体危险性评价方法 | |
CN202925540U (zh) | 一种围海造地区域软土地基处理装置的布设结构 | |
Li et al. | Analysis of influence of seepage on stability of foundation pit | |
CN203583304U (zh) | 一种碳酸盐岩填方地基滞水结构 | |
CN220352534U (zh) | 一种用于道路施工的抗疏力防变形高填方体 | |
Yang et al. | High fill embankment of collapsible loess settlement observation and research | |
CN106365402A (zh) | 玻璃钢化粪池的安装方法 | |
CN100564686C (zh) | 利用聚苯乙烯泡沫塑料在上埋式构筑物中进行减荷的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150527 Termination date: 20201011 |
|
CF01 | Termination of patent right due to non-payment of annual fee |