CN102875007B - Produce continuous induction melting furnace and the manufacturing process of quartz glass bar - Google Patents
Produce continuous induction melting furnace and the manufacturing process of quartz glass bar Download PDFInfo
- Publication number
- CN102875007B CN102875007B CN201210347839.3A CN201210347839A CN102875007B CN 102875007 B CN102875007 B CN 102875007B CN 201210347839 A CN201210347839 A CN 201210347839A CN 102875007 B CN102875007 B CN 102875007B
- Authority
- CN
- China
- Prior art keywords
- tungsten crucible
- melting furnace
- induction melting
- continuous induction
- quartz glass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention discloses a kind of continuous induction melting furnace and manufacturing process of producing quartz glass bar, comprise the body of heater, the bell that cooperatively interact, tungsten crucible is provided with in body of heater, the outside of tungsten crucible is provided with net with heating function and the insulation sand of connection electrode, fire door place is provided with high temperature brick, water jacket, dust exhaust, tungsten crucible upper end is communicated with feeding device and heat-proof device, and tungsten crucible lower end connects shaped device.Continuous induction melting furnace of the present invention eliminates tungsten crucible internal core rod device, by the shaped device of tungsten crucible bottom, at a certain temperature, draws shaping.Owing to there is no core bar device, there is no bubble, gas line and black core, and the diameter of the quartz glass bar manufactured is large, is widely used in the industries such as semi-conductor, sun power and optical fiber.
Description
Technical field
The present invention relates to a kind of device and manufacturing process of continuous seepage quartz pushrod.
Background technology
Existing continuous induction melting furnace can not produce high-end silica tube rod, there is following defect in the method for producing quartz glass bar: in continuous induction melting furnace, is provided with core bar, by regulating core bar device position, regulates blanking, the mode vacuumized by core bar negative pressure makes pipe become rod, because technique falls behind, small dimension can only be produced, and product there is bubble gas line, owing to there being core bar device, so black core is with by the rod produced, high-quality product cannot be produced, seriously limit its range of application.
Summary of the invention
In view of this, the technical problem to be solved in the present invention is to provide a kind of continuous induction melting furnace and manufacturing process of producing quartz glass bar, and the quartz glass bar of production does not have bubble, gas line and black core.
For solving the problems of the technologies described above, technical scheme of the present invention is achieved in that a kind of continuous induction melting furnace producing quartz glass bar, comprise the body of heater, the bell that cooperatively interact, tungsten crucible is provided with in body of heater, the outside of tungsten crucible is provided with net with heating function and the insulation sand of connection electrode, and fire door place is provided with high temperature brick, water jacket, dust exhaust, described tungsten crucible upper end is communicated with feeding device and deoxygenation disrupter, and tungsten crucible lower end connects shaped device.
Another kind of technical scheme is: a kind of manufacture craft of producing the continuous induction melting furnace of quartz glass bar, and its processing step is as follows:
A, by glass sand through feeding device and deoxygenation disrupter, join continuously in tungsten crucible;
B, quartz sand are heated to 2000 ~ 2400 DEG C and keep, and quartz sand is fully melted, impurity fully volatilizees, bubble dissipates;
When c, quartz sand pass through the shaped device of tungsten crucible lower end, temperature reduces, and the quartzy liquation of fully fusing oozes;
D, then by the control of automatic control system, the quartz pushrod of pull-out diameter 3 ~ 180mm.
Further, its processing step is as follows: in described step b, quartz sand is heated to 2150 ~ 2250 DEG C.
The technique effect that the present invention reaches is as follows: continuous induction melting furnace of the present invention is omitting elements invention, eliminates tungsten crucible internal core rod device, by the shaped device of tungsten crucible bottom, at a certain temperature, draws shaping.Owing to there is no core bar device, there is no bubble, gas line and black core, and the diameter of the quartz glass bar manufactured is large, is widely used in the industries such as semi-conductor, sun power and optical fiber.
Accompanying drawing explanation
Fig. 1 is the structural representation that the present invention produces the continuous induction melting furnace of quartz glass bar.
Embodiment
As shown in Figure 1, for the present invention produces the continuous induction melting furnace of quartz glass bar, comprise the body of heater 4, the bell 3 that cooperatively interact, tungsten crucible 12 is provided with in body of heater 4, the outside of tungsten crucible 12 is provided with net with heating function 11 and the insulation sand 5 of connection electrode 10, and fire door place is provided with high temperature brick 6, water jacket 7, dust exhaust 9, tungsten crucible 12 upper end is communicated with feeding device 1 and deoxygenation disrupter 2, and tungsten crucible lower end connects shaped device 13.Compared with prior art, eliminate core bar device in continuous induction melting furnace, glass sand is directly injected in tungsten crucible 12, draws shaping by shaped device 13.
Use the present invention to produce the continuous induction melting furnace of quartz glass bar, its processing step is as follows:
A, by glass sand through feeding device 1 and deoxygenation disrupter 2, be added in tungsten crucible 12 continuously;
B, quartz sand are heated to 2000 ~ 2400 DEG C and keep, and the optimum temps that quartz sand is heated to is 2150 ~ 2250 DEG C.Quartz sand is fully melted, impurity fully volatilizees, bubble dissipates;
When c, quartz sand pass through the shaped device 13 of tungsten crucible 12 lower end, temperature reduces, and the quartzy liquation of fully fusing oozes;
D, the size then passing through change discharge port and length and supplementary controlled system, the quartz pushrod 8 of pull-out diameter 3 ~ 180mm.Automatic control system is existing equipment, comprises laser diameter measuring instrument, instrument and computer etc., does not repeat them here.
The above, be only preferred embodiment of the present invention, be not intended to limit protection scope of the present invention.
Claims (2)
1. the technique utilizing continuous induction melting furnace to produce quartz glass bar, described continuous induction melting furnace comprises the body of heater, the bell that cooperatively interact, tungsten crucible is provided with in body of heater, the outside of tungsten crucible is provided with net with heating function and the insulation sand of connection electrode, fire door place is provided with high temperature brick, water jacket, dust exhaust, described tungsten crucible upper end is communicated with feeding device and deoxygenation disrupter, and tungsten crucible lower end connects shaped device; It is characterized in that, its processing step is as follows:
A, by glass sand through feeding device and deoxygenation disrupter, join continuously in tungsten crucible;
B, quartz sand are heated to 2000 ~ 2400 DEG C and keep, and quartz sand is fully melted, impurity fully volatilizees, bubble dissipates;
When c, quartz sand pass through the shaped device of tungsten crucible lower end, temperature reduces, and the quartzy liquation of fully fusing oozes;
D, then by the control of automatic control system, the quartz pushrod of pull-out diameter 3 ~ 180mm.
2. technique as claimed in claim 1, it is characterized in that, in described step b, quartz sand is heated to 2150-2250 DEG C.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210347839.3A CN102875007B (en) | 2012-09-19 | 2012-09-19 | Produce continuous induction melting furnace and the manufacturing process of quartz glass bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210347839.3A CN102875007B (en) | 2012-09-19 | 2012-09-19 | Produce continuous induction melting furnace and the manufacturing process of quartz glass bar |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102875007A CN102875007A (en) | 2013-01-16 |
CN102875007B true CN102875007B (en) | 2015-08-05 |
Family
ID=47476571
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210347839.3A Active CN102875007B (en) | 2012-09-19 | 2012-09-19 | Produce continuous induction melting furnace and the manufacturing process of quartz glass bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102875007B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103145324B (en) * | 2013-03-29 | 2015-08-26 | 东海县宝盛石英制品有限公司 | A kind of draw quartz glass bar without core bar continuous induction melting furnace |
EP3656744A1 (en) | 2018-11-23 | 2020-05-27 | Heraeus Conamic UK Limited | On-line annealing of large fused quartz ingots |
CN110903034A (en) * | 2019-12-05 | 2020-03-24 | 南京工业大学东海先进硅基材料研究院 | Preparation method of quartz glass cladding material for optical fiber and continuous melting furnace device |
CN111302605A (en) * | 2020-04-07 | 2020-06-19 | 江苏圣达石英制品有限公司 | Continuous melting furnace for producing quartz glass rod with diameter phi of 600mm and preparation method |
CN111792820B (en) * | 2020-06-24 | 2022-12-23 | 江苏太平洋石英股份有限公司 | Process for producing large-size quartz glass plate by continuous melting method, quartz glass plate and application thereof |
CN112624580B (en) * | 2020-12-03 | 2021-12-14 | 东海县奥兰石英科技有限公司 | Method for removing impurities of optical fiber quartz target rod by continuous melting and intermediate frequency furnace integration method |
CN116573838A (en) * | 2023-03-20 | 2023-08-11 | 内蒙古义通新能源有限公司 | Continuous melting furnace for producing quartz glass rod and manufacturing process |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3764286A (en) * | 1971-04-22 | 1973-10-09 | Gen Electric | Manufacture of elongated fused quartz member |
CN1324773A (en) * | 2000-05-22 | 2001-12-05 | 通用电气公司 | Quartz-smelting furnace |
CN101134634A (en) * | 2006-08-29 | 2008-03-05 | 纪高仁 | Continuous melting furnace and method for producing special-shaped quartz tube and quartz rod |
CN202849240U (en) * | 2012-09-19 | 2013-04-03 | 江苏太平洋石英股份有限公司 | Continuous smelting furnace for producing quartz glass rod |
-
2012
- 2012-09-19 CN CN201210347839.3A patent/CN102875007B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3764286A (en) * | 1971-04-22 | 1973-10-09 | Gen Electric | Manufacture of elongated fused quartz member |
CN1324773A (en) * | 2000-05-22 | 2001-12-05 | 通用电气公司 | Quartz-smelting furnace |
CN101134634A (en) * | 2006-08-29 | 2008-03-05 | 纪高仁 | Continuous melting furnace and method for producing special-shaped quartz tube and quartz rod |
CN202849240U (en) * | 2012-09-19 | 2013-04-03 | 江苏太平洋石英股份有限公司 | Continuous smelting furnace for producing quartz glass rod |
Also Published As
Publication number | Publication date |
---|---|
CN102875007A (en) | 2013-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102875007B (en) | Produce continuous induction melting furnace and the manufacturing process of quartz glass bar | |
CN102627399B (en) | Vertical stretch method and device of optical fiber prefabricating rod | |
JP2009522194A5 (en) | ||
CN102285758B (en) | Production method for large-size optical fiber prefabricated rod | |
CN105217951A (en) | A kind of stretched vertically method and apparatus of preform | |
CN205711031U (en) | A kind of single crystal growing furnace | |
CN104788014A (en) | Optical fiber perform preparation and optical fiber wiredrawing method | |
CN103383911B (en) | A kind of gas discharge lamp tube production technology | |
CN102206040B (en) | Horizontal extension device of optical fiber preform | |
CN103771697A (en) | Sintering method and apparatus for large-size optical fiber preform loose body | |
CN203033872U (en) | Continuous melting furnace capable of continuously producing quartz glass plates | |
CN102219362B (en) | Manufacturing method for major-diameter quartz tube | |
CN202849240U (en) | Continuous smelting furnace for producing quartz glass rod | |
CN103641292B (en) | The continuous induction melting furnace of wall thickness can be controlled in high precision | |
CN104710106B (en) | A kind of induction furnace for preform collapsing | |
CN203360263U (en) | Gas intake system for quartz glass pipe manufacture | |
CN206553386U (en) | A kind of cover-plate glass platinum channel feeder sleeve attemperator | |
CN102745883B (en) | The intermediate frequency furnace that initiatively pressurizes melts the device and method drawing silica glass bar | |
CN108083629A (en) | A kind of outer method of pipe prepares the devices and methods therefor of counter-bending low water peak single mode fiber | |
CN203461947U (en) | Optimized throat of unit furnace | |
CN204939252U (en) | Kiln firing system | |
CN205088107U (en) | Gas smelts a tub combustor | |
CN203429052U (en) | Continuous melting furnace for producing large-size quartz plate | |
CN103030271A (en) | Method and device for producing low polarization mode dispersion optical fiber | |
CN103319072B (en) | Process for producing 4.0 high boron-silicon glass pipe through electric melting continuous method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |