CN102873762A - Mobile concrete mixing station - Google Patents

Mobile concrete mixing station Download PDF

Info

Publication number
CN102873762A
CN102873762A CN2012103064699A CN201210306469A CN102873762A CN 102873762 A CN102873762 A CN 102873762A CN 2012103064699 A CN2012103064699 A CN 2012103064699A CN 201210306469 A CN201210306469 A CN 201210306469A CN 102873762 A CN102873762 A CN 102873762A
Authority
CN
China
Prior art keywords
main building
slide rail
concrete mixing
mixing plant
mobile concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103064699A
Other languages
Chinese (zh)
Other versions
CN102873762B (en
Inventor
莫劲风
苏赣斌
杨立山
徐坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zoomlion Heavy Industry Science and Technology Co Ltd
Original Assignee
Zoomlion Heavy Industry Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zoomlion Heavy Industry Science and Technology Co Ltd filed Critical Zoomlion Heavy Industry Science and Technology Co Ltd
Priority to CN201210306469.9A priority Critical patent/CN102873762B/en
Publication of CN102873762A publication Critical patent/CN102873762A/en
Application granted granted Critical
Publication of CN102873762B publication Critical patent/CN102873762B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Abstract

The invention provides a mobile concrete mixing station. The mobile concrete mixing station comprises a batching system, a transporting system, a weighing system, a mixing system and a powder bin system, wherein the batching system comprises a batching machine and a batching machine base bracket; the mixing system comprises a main floor and a main floor base bracket; the powder bin system comprises a powder bin and a powder bin base bracket; the first end of the main floor is fixedly connected on the main floor base bracket; detachable connection is adopted between the batching machine and the batching machine base bracket, between the main floor and the main floor base bracket, and between the powder bin and the powder bin base bracket; and the second end of the main floor is suspended. According to the mobile concrete mixing station, the efficiency for mounting and dismounting each part of the concrete mixing station can be quickened, thereby reducing the construction period and construction cost.

Description

Mobile concrete mixing plant
Technical field
The present invention relates to the concrete mixer apparatus field, in particular to a kind of mobile concrete mixing plant.
Background technology
Along with the develop rapidly of concrete construction industry, concrete has obtained original more widely application at construction fields such as highway, bridge, tunnels.And along with the continuous increase of concrete construction region, concrete construction also is applied in some scarcely populated building sites, perhaps has the zone of specific geographic environment.In order to satisfy local construction needs, it is little that concrete mixing plant requires to have floor space, is convenient to the characteristics of dismounting transportation, in order to meet the needs of the working environment of frequent resettlement.
Existing small-sized mixing station is comprised of proportioning machine, aggregate lifting system, powder scale, water scale, additive scale, Double-horizontal-shaft stirring host, stirring main building, spiral, powder storehouse, electric-control system etc.Before the installation, need first the basis to be accomplished fluently, then proportioning machine, stirring main building, powder storehouse, control room are fixed on the basis separately, again with remaining part being fixedly mounted on the corresponding position with bolt one by one, again water, electricity, gas are connected on request, could work the whole time of process need about one week; When transition dismounting must first all be broken into scattered parts too, repeats said process after transporting to new building site again.Therefore, adopt current general small-sized mixing station, the assembling and dissembling speed between each parts is slow, and the mixing plant mounting or dismounting work period is longer, has increased construction cost.
Summary of the invention
The present invention aims to provide a kind of mobile concrete mixing plant, can accelerate the mounting or dismounting efficient between each parts of concrete mixing plant, reduces construction period and construction cost.
To achieve these goals, according to an aspect of the present invention, a kind of mobile concrete mixing plant is provided, comprise feed proportioning system, conveying system, Weighing system, stirring system and powder storehouse system, feed proportioning system comprises proportioning machine and is fixedly installed on the proportioning machine base rack of proportioning machine bottom, stirring system comprises main building and is fixedly installed on the main building base rack of main building bottom, powder storehouse system comprises the powder storehouse and is fixedly installed on the powder storehouse base rack of bottom, powder storehouse, the first end of main building is fixedly connected on the main building base rack, between proportioning machine and the proportioning machine base rack, between main building and the main building base rack, be between powder storehouse and the powder storehouse base rack and removably connect the unsettled setting of the second end of main building.
Further, between proportioning machine base rack and the main building base rack for removably connecting.
Further, main building comprises the main building supporting leg and stirs main building, the main building supporting leg removably is fixedly installed on the first end of main building base rack, the first end that stirs main building removably is fixedly connected on the top of main building supporting leg, stir the unsettled setting of the second end of main building, the second end below of stirring main building is provided with hopper.
Further, conveying system comprises the aggregate lifting device between the discharging opening that is arranged on proportioning machine and the charging aperture that stirs main building, and the aggregate lifting device comprises the slide rail that is obliquely installed and is fixedly connected on the stirring main building and the elevator bucket that is slidably disposed on the slide rail.
Further, slide rail comprises slide rail, middle slide rail and glidepath, and middle slide rail removably is fixedly connected on and stirs on the main building, and the upper end of glidepath removably is connected with middle slide rail, upper slide rail removably is connected with middle slide rail, and the chute surface of upper slide rail, middle slide rail and glidepath flushes.
Further, the upper end of middle slide rail is provided with the first connecting plate, and the lower end of upper slide rail is provided with the second connecting plate, and middle slide rail is fixedly connected with the second connecting plate by the first connecting plate with upper slide rail.
Also be provided with the bearing pin connecting hole on the first connecting plate and the second connecting plate, upper slide rail has the first syndeton of being fixedly connected with middle slide rail and the second syndeton that is connected rotationally with middle slide rail.
Further, the bottom of middle slide rail is provided with the elevator bucket detent mechanism that limits the position of elevator bucket on middle slide rail.
Further, mobile concrete mixing plant also comprises the control room, and the main building supporting leg comprises a plurality of vertical supporting posts, and the control room is fixedly installed between a plurality of vertical supporting posts in the formed spatial accommodation.
Further, the control room offers observation window near on the sidewall of hopper one side.
Further, the connection of the pipeline between feed proportioning system, conveying system, Weighing system, stirring system and the powder storehouse system is the articulation connection.
Further, main building also comprises the stirring host that is fixedly installed on the stirring main building, and stirring host is vertical shaft planet stirring main frame or Double-horizontal-shaft stirring host.
Use technical scheme of the present invention, mobile concrete mixing plant comprises feed proportioning system, conveying system, Weighing system, stirring system and powder storehouse system, feed proportioning system comprises proportioning machine and is fixedly installed on the proportioning machine base rack of proportioning machine bottom, stirring system comprises main building and is fixedly installed on the main building base rack of main building bottom, powder storehouse system comprises the powder storehouse and is fixedly installed on the powder storehouse base rack of bottom, powder storehouse, the first end of main building is fixedly connected on the main building base rack, between proportioning machine and the proportioning machine base rack, between main building and the main building base rack, be between powder storehouse and the powder storehouse base rack and removably connect the unsettled setting of the second end of main building.By the various piece of mixing plant is carried out modularized design, so that the various piece of mixing plant need not to arrange the basis when installing, the base rack that can directly have by itself arranges, therefore when transportation, each several part can be carried out the modularization transportation, and need not disassemble fully, when carrying out Construction Arrangement, only each system need to be fixedly installed by base rack, and assemble and get final product, therefore greatly improve the mounting or dismounting efficient of mobile concrete mixing plant, reduced construction period and construction cost.
Description of drawings
The accompanying drawing that consists of a part of the present invention is used to provide a further understanding of the present invention, and illustrative examples of the present invention and explanation thereof are used for explaining the present invention, do not consist of improper restriction of the present invention.In the accompanying drawings:
Fig. 1 shows the according to an embodiment of the invention stirring system of mobile concrete mixing plant and the syndeton schematic diagram of feed proportioning system;
Fig. 2 shows the according to an embodiment of the invention stirring system of mobile concrete mixing plant and the syndeton schematic diagram of powder storehouse system;
Fig. 3 shows the according to an embodiment of the invention working state structure schematic diagram of the main building of mobile concrete mixing plant;
Fig. 4 shows the according to an embodiment of the invention travel position structural representation of the main building of mobile concrete mixing plant; And
Fig. 5 shows the structure for amplifying schematic diagram according to the L place of Fig. 4.
The specific embodiment
Hereinafter also describe in conjunction with the embodiments the present invention in detail with reference to accompanying drawing.Need to prove that in the situation of not conflicting, embodiment and the feature among the embodiment among the application can make up mutually.
As depicted in figs. 1 and 2, according to embodiments of the invention, mobile concrete mixing plant comprises feed proportioning system 10, conveying system, Weighing system 60, stirring system 20 and powder storehouse system 30, feed proportioning system 10 comprises proportioning machine 11 and is fixedly installed on the proportioning machine base rack 12 of proportioning machine 11 bottoms, stirring system 20 comprises main building 21 and is fixedly installed on the main building base rack 22 of main building 21 bottoms, powder storehouse system 30 comprises powder storehouse 31 and is fixedly installed on the powder storehouse base rack 32 of 31 bottoms, powder storehouse, the first end of main building 21 is fixedly connected on the main building base rack 22, the unsettled setting of the second end of main building 21.
Before the installation, only need to arrange the place sclerosis of mobile concrete mixing plant, then mobile concrete mixing plant is transported to the construction site.After mobile concrete mixing plant is shown up, respectively with main building base rack 22, proportioning machine base rack 12, powder storehouse base rack 32 is put into the position of appointment, then respectively powder storehouse 31 is hung on the powder storehouse base rack 32 also fixing, hang on the proportioning machine base rack 12 proportioning machine 11 also fixing, hang on the main building base rack 22 main building 21 also fixing, afterwards with conveying worm, stair etc. are in place, respectively track and main building 21 platforms are launched, with water, electricity, the pipelines such as gas are connected to corresponding joint, just can make whole mobile concrete mixing plant be in the commissioning test state, whole installation process just can be finished within the short period, owing to need not each system is split, connection directly can be installed by modular each system, and come into operation, therefore, greatly improved the speed of transportation and assembling, improve transition efficient, shortened construction period, reduced construction cost.Equally, when needs are dismantled mobile concrete mixing plant, only need to carry out reverse operating according to above-mentioned steps, just can finish soon dismounting and entrucking transportation.Therefore, the mobile concrete mixing plant of present embodiment has greatly improved installation and removal speed, has improved operating efficiency.
In conjunction with referring to Fig. 3 and shown in Figure 4, preferably, between proportioning machine 11 and the proportioning machine base rack 12, between main building 21 and the main building base rack 22, be between powder storehouse 31 and the powder storehouse base rack 32 and removably connect, between proportioning machine base rack 12 and the main building base rack 22 for removably connecting.Be set to dismountable syndeton between each base rack and each parts, so that the more refinement of the module of each system, structure is less, and it is less to take up room, and is convenient to shipment, also more is convenient to carry out assembly and disassembly.And proportioning machine base rack 12 and main building base rack 22 are directly removably linked together, so that the structure of main building 21 systems is more stable when work, and when travel position, again can be easily with proportioning machine base rack 12 and the 22 separately entruckings of main building base rack, therefore operation is more flexible.
Main building 21 comprises main building supporting leg 211 and stirs main building 212, main building supporting leg 211 removably is fixedly installed on the first end of main building base rack 22, the first end that stirs main building 212 removably is fixedly connected on the top of main building supporting leg 211, stir the unsettled setting of the second end of main building 212, the second end below of stirring main building 212 is provided with hopper 213.The second end that stirs main building 212 is unsettled setting, mainly by realizing fixed support with being connected of main building supporting leg 211.The below of stirring main building 212 is stocking space, after material body production is finished, can be divided into the bulk cargo transportation or directly by the agitator truck transportation etc., only have a side to support owing to stir main building 212, therefore can for the shipment of material body provides larger activity space, load and transport convenient.
Main building 21 also comprises the control room 23 in the vertical supporting post 214 formed spatial accommodations that are arranged on main building supporting leg 211.Control room 23 can be fixedly installed on the main building base rack 22, also can be fixedly connected on the vertical supporting post 214 of main building supporting leg 211, utilizes main building supporting leg 211 to be used as control room 23 supporting legs, support and control chamber 23.In the present embodiment, control room 23 is to be fixedly installed on the vertical supporting post 214 of main building supporting leg 211, and this is fixedly connected with mode for example for welding or be spirally connected.
Control room 23 is arranged in the main building supporting leg 211 formed spatial accommodations, so that control room 23 can utilize main building supporting leg 211 as supporting construction, and need not to arrange independent control room 23 supporting legs, saved section bar, reduced cost.Simultaneously, control room 23 is arranged in the main building supporting leg 211 formed spatial accommodations, need not take independent space, so that the floor space of whole stirring main building 212 structures reduces, more saves the space, transports convenient.
Preferably, main building supporting leg 211 removably is connected respectively with between main building base rack 22 and the stirring main building 212.When stirring main building 212 structures are transported, only need to and stir and dismantle between the main building 212 separately main building base rack 22, main building supporting leg 211, make control room 23 and the transportation of main building supporting leg 211 one, just main building base rack 22, main building supporting leg 211 and stirring main building 212 can be respectively charged in the container and transport, compact conformation, be convenient to dismounting, improved transition efficient.Because the structure after main building base rack 22, main building supporting leg 211 and stirring main building 212 split is all comparatively regular, therefore, it is less to take up room when packing into the container, and can effectively reduce cost of transportation.
In order to keep the stable shape that the space is set in whole control room 23, strengthen the resistance to compression bending resistance of main building supporting leg 211, preferably, main building supporting leg 211 is by vertical supporting post 214 be arranged on the transverse link between a plurality of vertical supporting posts 214, oblique strut and consist of truss structure.Because main building base rack 22 is arranged on the bottom, need to support simultaneously the weight of main building supporting leg 211, control room 23 and stirring main building 212, therefore, main building base rack 22 also can be set to truss structure, to improve the support strength of main building base rack 22.
Control room 23 offers door and window, wherein observation window 231 is arranged on control room 23 near a side of the hopper 213 that stirs main building 212, the height of observation window 231 roughly flushes with the bottom level of hopper 213, so that the blanking situation that stirs main building 212 is observed, assurance can be obtained the work at present status information that stirs main building 212 real-time and accurately, and convenient staff operates.
Preferably, main building supporting leg 211 away from the first end end face that stirs main building 212 and the first end end face of main building base rack 22, the second end end face relative with first end of main building supporting leg 211 and the second end end face that stirs main building 212, the spacing of two opposite flanks of main building supporting leg 211 is identical with the spacing of two opposite flanks of main building base rack 22.This kind set-up mode can reduce to stir the floor space of main building 212 structures further, and makes the layout that stirs main building 212 structures more reasonable, can further improve and stir main building 212 structures in the applicability of narrow space.
Stir the guardrail that main building 212 also includes the aisle and is around in the aisle periphery, the side in the aisle is connected with cat ladder, carries out associative operation so that the staff can climb to stirring main building 212 tops.The bottom of cat ladder is fixedly installed on the ground, also can be fixedly connected on the proportioning machine base rack 12, to guarantee stability and the security of cat ladder.
Main building 21 also comprises the stirring host 215 that is fixedly installed on the stirring main building 212, and wherein stirring host 215 is vertical shaft planet stirring main frame 215 or Double-horizontal-shaft stirring host 215.
Conveying system comprises the aggregate lifting device 40 between the discharging opening that is arranged on proportioning machine 11 and the charging aperture that stirs main building 212, and aggregate lifting device 40 comprises the slide rail that is obliquely installed and is fixedly connected on the stirring main building 212 and the elevator bucket 41 that is slidably disposed on the slide rail.The material body hoisting way that adopts elevator bucket 41 and slide rail to cooperate, and drive elevator bucket 41 by hoist engine and slide up and down along slide rail, material body transportation work in the time of can satisfying wide-angle, reduce further the floor space of main building 21 systems, main building 21 systems can be applied to more in the rugged environment, and adaptability is stronger.This aggregate lifting device 40 also can substitute with oblique belt transmission agency.Conveying system also comprises the conveying worm between the discharging opening that is arranged on powder storehouse 31 and the charging aperture that stirs main building 212, and conveying worm is delivered to stirring system 20 with the material body in the powder storehouse 31, mixes with aggregate, thereby obtains the finished product concrete.
Slide rail comprises slide rail 42, middle slide rail 43 and glidepath 44, and wherein middle slide rail 43 removably is fixedly connected on and stirs on the main building 212, and the upper end of glidepath 44 removably is connected with middle slide rail 43, and the lower end of glidepath 44 is fixedly installed.The lower end of glidepath 44 can be fixedly installed on the basis, ground, also can be fixedly installed on the main building base rack 22.Preferably, glidepath 44 is removably to be connected on the main building base rack 22.When mobile concrete mixing plant is in running order, the upper end of glidepath 44 is connected with middle slide rail 43, forms complete slide rail, and the lower end of glidepath 44 is fixedly connected with main building base rack 22, so that slide rail has stable guide frame, guarantee chain bucket normal hoisting material body on slide rail.When mobile concrete mixing plant is in travel position, the upper end of glidepath 44 therefrom can be pulled down on the slide rail 43, disassemble between the lower end of glidepath 44 and the main building base rack 22, then with glidepath 44 independent entrucking transportations.
Also for removably being connected, and upper slide rail 42, middle slide rail 43 and glidepath 44 flush at the chute surface that is in when being fixedly connected with state, normally slides on chute surface to guarantee elevator bucket 41 between upper slide rail 42 and the middle slide rail 43.The cross sectional shape of slide rail can be Y shape groove or T-slot etc.
In conjunction with referring to shown in Figure 5, the upper end of middle slide rail 43 is provided with the first connecting plate 431, and the lower end of upper slide rail 42 is provided with the second connecting plate 421, and middle slide rail 43 is fixedly connected with the second connecting plate 421 by the first connecting plate 431 with upper slide rail 42.The first connecting plate 431 is fixedly installed on the outer wall of both sides of middle slide rail 43, and the second connecting plate 421 is fixedly installed on the outer wall of both sides of slide rail 42.Also be provided with the bearing pin connecting hole on the first connecting plate 431 and the second connecting plate 421, so that upper slide rail 42 has the first syndeton of being fixedly connected with middle slide rail 43 and the second syndeton that is connected rotationally with middle slide rail 43.In the middle of when being the first syndeton that is fixedly connected with between slide rail 43 and the upper slide rail 42, two the second connecting plates 421 are arranged in the first connecting plate 431, and pass through bolt and fixed, so that upper slide rail 42, middle slide rail 43 and glidepath 44 form complete slide rail, this moment, mobile concrete mixing plant was in running order.When being rotating the second syndeton between central slide rail 43 and the upper slide rail 42, connecting bolt between the first connecting plate 431 and the second connecting plate 421 is dismantled, then will connect by bearing pin between upper slide rail 42 and the middle slide rail 43, so that upper slide rail 42 can rotate with respect to middle slide rail 43, this moment, mobile concrete mixing plant was in travel position.
In the middle of other embodiment, connection between upper slide rail 42 and the middle slide rail 43 can also be a kind of like this form, namely go up between slide rail 42 and the middle slide rail 43 and articulate by the hinge that is arranged on a side, the upper slide rail 42 of the opposite side relative with this side and the link position of middle slide rail 43 are provided with connecting plate, when mobile concrete mixing plant is in running order, the connecting plate of the opposite side of slide rail 42 and middle slide rail 43 is bolted, makes the complete slide rail of formation between slide rail 42, middle slide rail 43 and the glidepath 44.When mobile concrete mixing plant is in travel position, then make between the connecting plate of opposite side of slide rail 42 and middle slide rail 43 separately, and make slide rail 42 wrap page or leaf to turn to opposite side, and set up on middle slide rail 43, thereby reduce the whole height of whole main building 21, so that main building 21 entruckings transportation.
Preferably, the bottom of middle slide rail 43 is provided with elevator bucket 41 detent mechanisms that limit the position of elevator bucket 41 on middle slide rail 43.During work, getting on the right track is connected by bolt and bearing pin with the orbital plane of middle orbit, elevator bucket 41 under hoist engine drives along orbital plane scroll-up/down, improving material; During dismounting, pull down first the aisle guardrail, the aisle is spent folding being fixed up by both sides to central rotation 90, simultaneously elevator bucket 41 is slided to the middle orbit lower end, and fixing in orbit by elevator bucket 41 detent mechanisms, turn on again get on the right track and middle orbit between connecting bolt, will get on the right track along connecting turn clockwise certain angle and fixing of bearing pin, at last whole main building 21 modules are carried out modularization vanning transportation.Elevator bucket 41 detent mechanisms can be connecting bolt, also can for shop bolt etc., correspondingly, be provided with the bolt hole that cooperates with connecting bolt or the pin hole that cooperates with shop bolt at elevator bucket 41.
Preferably, the connection of the pipeline between feed proportioning system 10, conveying system, Weighing system 60, stirring system 20 and the powder storehouse system 30 is the articulation connection.The employing articulation connects, and is a kind of push-in jointing, can improve the efficient of the installation and removal between pipeline and the corresponding joint, has demonstrated fully the characteristics of quick mobile concrete mixing plant.
Weighing system 60 is separately positioned on proportioning machine 11, powder storehouse 31 and stirs in the main building 212, is used for when carrying out concrete-agitating the material body being carried out weighing, in order to the material weight is controlled.
From above description, can find out, the above embodiments of the present invention have realized following technique effect: mobile concrete mixing plant comprises feed proportioning system, conveying system, Weighing system, stirring system and powder storehouse system, feed proportioning system comprises proportioning machine and is fixedly installed on the proportioning machine base rack of proportioning machine bottom, stirring system comprises main building and is fixedly installed on the main building base rack of main building bottom, powder storehouse system comprises the powder storehouse and is fixedly installed on the powder storehouse base rack of bottom, powder storehouse, the first end of main building is fixedly connected on the main building base rack, the unsettled setting of the second end of main building.By the various piece of mixing plant is carried out modularized design, so that the various piece of mixing plant need not to arrange the basis when installing, the base rack that can directly have by itself arranges, therefore when transportation, each several part can be carried out the modularization transportation, and need not disassemble fully, when carrying out Construction Arrangement, only each system need to be fixedly installed by base rack, and assemble and get final product, therefore greatly improve the mounting or dismounting efficient of mobile concrete mixing plant, reduced construction period and construction cost.
Be the preferred embodiments of the present invention only below, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (12)

1. mobile concrete mixing plant, comprise feed proportioning system (10), conveying system, Weighing system (60), stirring system (20) and powder storehouse system (30), it is characterized in that, described feed proportioning system (10) comprises proportioning machine (11) and is fixedly installed on the proportioning machine base rack (12) of described proportioning machine (11) bottom, described stirring system (20) comprises main building (21) and is fixedly installed on the main building base rack (22) of described main building (21) bottom, described powder storehouse system (30) comprises powder storehouse (31) and is fixedly installed on the powder storehouse base rack (32) of bottom, described powder storehouse (31), the first end of described main building (21) is fixedly connected on the described main building base rack (22), between described proportioning machine (11) and the described proportioning machine base rack (12), between described main building (21) and the described main building base rack (22), be between described powder storehouse (31) and the described powder storehouse base rack (32) and removably connect the unsettled setting of the second end of described main building (21).
2. mobile concrete mixing plant according to claim 1 is characterized in that, between described proportioning machine base rack (12) and the described main building base rack (22) for removably connecting.
3. mobile concrete mixing plant according to claim 2, it is characterized in that, described main building (21) comprises main building supporting leg (211) and stirs main building (212), described main building supporting leg (211) removably is fixedly installed on the first end of described main building base rack (22), the first end of described stirring main building (212) removably is fixedly connected on the top of described main building supporting leg (211), the unsettled setting of the second end of described stirring main building (212), the second end below of described stirring main building (212) is provided with hopper (213).
4. mobile concrete mixing plant according to claim 3, it is characterized in that, described conveying system comprises the aggregate lifting device (40) between the charging aperture of the discharging opening that is arranged on described proportioning machine (11) and described stirring main building (212), and described aggregate lifting device (40) comprises the slide rail that is obliquely installed and is fixedly connected on the described stirring main building (212) and is slidably disposed on elevator bucket (41) on the described slide rail.
5. mobile concrete mixing plant according to claim 4, it is characterized in that, described slide rail comprises slide rail (42), middle slide rail (43) and glidepath (44), described middle slide rail (43) removably is fixedly connected on the described stirring main building (212), the upper end of described glidepath (44) removably is connected with described middle slide rail (43), described upper slide rail (42) removably is connected with described middle slide rail (43), described upper slide rail (42), the chute surface of described middle slide rail (43) and described glidepath (44) flushes.
6. mobile concrete mixing plant according to claim 5, it is characterized in that, the upper end of described middle slide rail (43) is provided with the first connecting plate (431), the lower end of described upper slide rail (42) is provided with the second connecting plate (421), and described middle slide rail (43) is fixedly connected with described the second connecting plate (421) by described the first connecting plate (431) with described upper slide rail (42).
7. mobile concrete mixing plant according to claim 6, it is characterized in that, also be provided with the bearing pin connecting hole on described the first connecting plate (431) and described the second connecting plate (421), described upper slide rail (42) has the first syndeton of being fixedly connected with described middle slide rail (43) and the second syndeton that is connected rotationally with described middle slide rail (43).
8. mobile concrete mixing plant according to claim 5 is characterized in that, the bottom of described middle slide rail (43) is provided with the elevator bucket detent mechanism that limits the position of described elevator bucket (41) on described middle slide rail (43).
9. each described mobile concrete mixing plant in 8 according to claim 3, it is characterized in that, described mobile concrete mixing plant also comprises control room (23), described main building supporting leg (211) comprises a plurality of vertical supporting posts (214), and described control room (23) are fixedly installed between described a plurality of vertical supporting posts (214) in the formed spatial accommodation.
10. mobile concrete mixing plant according to claim 9 is characterized in that, described control room (23) offer observation window (231) near on the sidewall of described hopper (213) one sides.
11. mobile concrete mixing plant according to claim 1, it is characterized in that the pipeline connection between described feed proportioning system (10), conveying system, Weighing system (60), stirring system (20) and the powder storehouse system (30) is articulation and connects.
12. each described mobile concrete mixing plant in 8 according to claim 3, it is characterized in that, described main building (21) also comprises the stirring host (215) that is fixedly installed on the described stirring main building (212), and described stirring host (215) is vertical shaft planet stirring main frame or Double-horizontal-shaft stirring host.
CN201210306469.9A 2012-08-24 2012-08-24 Mobile concrete mixing station Active CN102873762B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210306469.9A CN102873762B (en) 2012-08-24 2012-08-24 Mobile concrete mixing station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210306469.9A CN102873762B (en) 2012-08-24 2012-08-24 Mobile concrete mixing station

Publications (2)

Publication Number Publication Date
CN102873762A true CN102873762A (en) 2013-01-16
CN102873762B CN102873762B (en) 2014-12-03

Family

ID=47475390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210306469.9A Active CN102873762B (en) 2012-08-24 2012-08-24 Mobile concrete mixing station

Country Status (1)

Country Link
CN (1) CN102873762B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103231454A (en) * 2013-04-25 2013-08-07 山东建设机械股份有限公司 Foundation-free concrete mixing station
CN103660040A (en) * 2013-12-10 2014-03-26 石家庄铁道大学 Quickly-moving type concrete mixing station
CN103895106A (en) * 2014-04-28 2014-07-02 常州艾布纳机械有限公司 Movable mortar production equipment
CN104118061A (en) * 2014-07-24 2014-10-29 浙江瑞泰耐火材料科技有限公司 Castable batching device
CN105236142A (en) * 2014-06-24 2016-01-13 中联重科股份有限公司 Mixing station and powder bin device thereof
WO2016101199A1 (en) * 2014-12-25 2016-06-30 深圳市为海建材有限公司 Environment-friendly mortar robot
CN106217650A (en) * 2016-09-21 2016-12-14 泰安岳首筑路机械有限公司 Formula concrete mixing plant removed soon by guide rail scale
CN107150414A (en) * 2016-03-03 2017-09-12 珠海力准电子科技有限公司 Towed Concrete Mixing Station
CN109989320A (en) * 2019-04-30 2019-07-09 福建南方路面机械有限公司 A kind of fast assembling asphalt mixing plant
CN112590012A (en) * 2020-12-11 2021-04-02 北京榆构有限公司 Easy dismouting formula concrete mixing plant
CN114055633A (en) * 2021-11-18 2022-02-18 中建三局四川建筑装备有限公司 Modular mobile equipment for producing fluidized self-compacting solidified soil
CN115157454A (en) * 2022-06-22 2022-10-11 宁都县兴业机械制造有限公司 Foundation-free movable concrete mixing plant equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2202628Y (en) * 1994-09-26 1995-07-05 湖南省建材机械厂 Concrete mixer
CN2308673Y (en) * 1997-08-13 1999-02-24 中国建筑二局洛阳建筑工程机械厂 Combined concrete agitation station
DE20203461U1 (en) * 2002-03-04 2003-07-10 Walter Heilit Verkehrswegebau Transportable concrete mixer has bonding agent store and intermediate store, with top parts connecting, overflow and storage chambers
JP2004268407A (en) * 2003-03-07 2004-09-30 Hitachi Constr Mach Co Ltd Ready-mixed concrete manufacturing apparatus
CN101011844A (en) * 2007-01-24 2007-08-08 三一重工股份有限公司 High-performance concrete mixing station
CN101659088A (en) * 2009-09-14 2010-03-03 三一重工股份有限公司 Steel structure mixing station base and implementation method thereof
CN201736350U (en) * 2010-06-02 2011-02-09 青岛科尼乐机械设备有限公司 Module quick-mounting mixing plant
CN201848927U (en) * 2009-12-10 2011-06-01 山东建设机械股份有限公司 Foundation-free concrete mixing station

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2202628Y (en) * 1994-09-26 1995-07-05 湖南省建材机械厂 Concrete mixer
CN2308673Y (en) * 1997-08-13 1999-02-24 中国建筑二局洛阳建筑工程机械厂 Combined concrete agitation station
DE20203461U1 (en) * 2002-03-04 2003-07-10 Walter Heilit Verkehrswegebau Transportable concrete mixer has bonding agent store and intermediate store, with top parts connecting, overflow and storage chambers
JP2004268407A (en) * 2003-03-07 2004-09-30 Hitachi Constr Mach Co Ltd Ready-mixed concrete manufacturing apparatus
CN101011844A (en) * 2007-01-24 2007-08-08 三一重工股份有限公司 High-performance concrete mixing station
CN101659088A (en) * 2009-09-14 2010-03-03 三一重工股份有限公司 Steel structure mixing station base and implementation method thereof
CN201848927U (en) * 2009-12-10 2011-06-01 山东建设机械股份有限公司 Foundation-free concrete mixing station
CN201736350U (en) * 2010-06-02 2011-02-09 青岛科尼乐机械设备有限公司 Module quick-mounting mixing plant

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103231454A (en) * 2013-04-25 2013-08-07 山东建设机械股份有限公司 Foundation-free concrete mixing station
CN103660040A (en) * 2013-12-10 2014-03-26 石家庄铁道大学 Quickly-moving type concrete mixing station
CN103660040B (en) * 2013-12-10 2015-10-28 石家庄铁道大学 Quick mobile concrete mixing plant
CN103895106A (en) * 2014-04-28 2014-07-02 常州艾布纳机械有限公司 Movable mortar production equipment
CN103895106B (en) * 2014-04-28 2016-02-17 常州艾布纳机械有限公司 Packaged type mortar production device
CN105236142A (en) * 2014-06-24 2016-01-13 中联重科股份有限公司 Mixing station and powder bin device thereof
CN104118061A (en) * 2014-07-24 2014-10-29 浙江瑞泰耐火材料科技有限公司 Castable batching device
WO2016101199A1 (en) * 2014-12-25 2016-06-30 深圳市为海建材有限公司 Environment-friendly mortar robot
CN107150414A (en) * 2016-03-03 2017-09-12 珠海力准电子科技有限公司 Towed Concrete Mixing Station
CN106217650A (en) * 2016-09-21 2016-12-14 泰安岳首筑路机械有限公司 Formula concrete mixing plant removed soon by guide rail scale
CN106217650B (en) * 2016-09-21 2018-04-10 泰安岳首筑路机械有限公司 Guide rail scale removes formula concrete mixing plant soon
CN109989320A (en) * 2019-04-30 2019-07-09 福建南方路面机械有限公司 A kind of fast assembling asphalt mixing plant
CN112590012A (en) * 2020-12-11 2021-04-02 北京榆构有限公司 Easy dismouting formula concrete mixing plant
CN114055633A (en) * 2021-11-18 2022-02-18 中建三局四川建筑装备有限公司 Modular mobile equipment for producing fluidized self-compacting solidified soil
CN115157454A (en) * 2022-06-22 2022-10-11 宁都县兴业机械制造有限公司 Foundation-free movable concrete mixing plant equipment
CN115157454B (en) * 2022-06-22 2023-09-01 宁都县兴业机械制造有限公司 Foundation-free movable concrete mixing plant equipment

Also Published As

Publication number Publication date
CN102873762B (en) 2014-12-03

Similar Documents

Publication Publication Date Title
CN102873762B (en) Mobile concrete mixing station
RU2668854C2 (en) System and method of delivering oilfield materials
SA517382219B1 (en) Blender unit with integrated container support frame
CN2515229Y (en) Standard container type bituminous mixture stirring apparatus
RU2015108762A (en) SYSTEM AND METHOD OF DELIVERY OF OIL-PRODUCING MATERIALS
CN202053383U (en) Concrete mixing plant
KR101208629B1 (en) Portable batcher plant
CN101391459A (en) Detachable mobile mixing station capable of loading in container
CN203844003U (en) Vehicle-mounted concrete stirring device with movable gravity center
CN107283644B (en) Underground concrete precast yard
CN106217650A (en) Formula concrete mixing plant removed soon by guide rail scale
CN110653945A (en) Compact modularization concrete mixing equipment
CN201086354Y (en) Fast-assembling portable stirring station
CN201848927U (en) Foundation-free concrete mixing station
AU2021351723A1 (en) Bulk material discharging
CN203004079U (en) Concrete mixing plant with vibratory mixing main machine
CN107618102B (en) Movable modular cement production line
CN205416035U (en) Remove grit feed proportioning system at stirring station
CN205416036U (en) Towed commodity concrete mixing plant
CN102555068A (en) Mobile concrete mixing station
CN201279838Y (en) Main-building structure of mobile asphalt mixture blending plant
CN210758426U (en) Movable concrete mixing system
CN211221421U (en) Hoister module and quick-assembly mixing station
CN102528935A (en) Fast mounting mixing station main building and mixing station with same
CN204800859U (en) Small -size concrete mixing plant

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 415907, Hunan, Hanshou hi tech Industrial Park, Changde Huang Fu neighborhood committee, No. 1, Union Road

Patentee after: ZOOMLION HEAVY INDUSTRY SCIENCE&TECHNOLOGY Co.,Ltd.

Address before: 410013 Yuelu District, Hunan, silver basin Road, No. 361, No.

Patentee before: ZOOMLION HEAVY INDUSTRY SCIENCE&TECHNOLOGY Co.,Ltd.