CN2515229Y - Standard container type bituminous mixture stirring apparatus - Google Patents
Standard container type bituminous mixture stirring apparatus Download PDFInfo
- Publication number
- CN2515229Y CN2515229Y CN 01279595 CN01279595U CN2515229Y CN 2515229 Y CN2515229 Y CN 2515229Y CN 01279595 CN01279595 CN 01279595 CN 01279595 U CN01279595 U CN 01279595U CN 2515229 Y CN2515229 Y CN 2515229Y
- Authority
- CN
- China
- Prior art keywords
- module
- modules
- finished product
- weighing
- asphalt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Road Paving Machines (AREA)
Abstract
The utility model relates to an asphalt mixture mixing equipment in a standard container type, and is essentially used for road surface building engineering such as the high-class asphalt highway, the airport, and the municipal engineering. The utility model is characterized in that the utility model is composed of a plurality of modules which are functionally divided and respectively comprise a proportioning system, a drying system, a system for hoisting, screening, storing and measuring hot aggregate storages, a mixture mixing system, a hot oil conducting supply system, an asphalt supply system, a powder supply system, a dust pelletizing system, and a finished product bin, and each module is provided with a section steel frame in international standard container specifications, standard angle pieces for fixing standard containers are respectively welded on eight angular positions of each frame, the rest modules are connected by a parallel mode or a lap fold mode except a batcher and a central control room, and two modules are accurately connected by bridge yards which are specially used for fixing containers and the positions for double-head single cones to be put at the angle pieces. The design proposal can lead each module to be crossed over and fixed like the container, which is convenient for transporting and mounting.
Description
Technical field
The utility model relates to a kind of asphalt mixing plant that is mainly used in the road surfaces build engineerings such as high-grade bituminous highway, airport, municipal administration.
Background of invention
The asphalt mixing plant of domestic production at present, can be divided into several assemblies by its function, the appearance and size of each assembly differs, and easily occurs superelevation, super wide, overlength problem in highway and railway transportation, particularly is subjected to the traffic condition restriction when equipment exports.In addition, equipment when mounted, need fetch water the mud ground base with fixed equipment, and the connector between each assembly is many, install cumbersome, time-consuming especially, the effort of the removal of equipment transition, this is the problem that asphalt mixing plant is shown in the Expressway Construction increasingly competitive, that construction period is generally short.
The utility model content
The technical problem that the utility model technology will solve is the defective that exists in the above-mentioned prior art, and a kind of road and rail transportation, easier standard container formula asphalt mixing plant of installation be convenient to is provided.
The technical solution of the utility model is a kind of standard container formula asphalt mixing plant, comprise feed proportioning system, drying system, hot aggregate promotes, screening, store, metering system, the compound stirring system, the conduction oil feed system, asphalt feeding system, the powder feed system, dust pelletizing system and finished product bin, it is characterized in that it is by having comprised that respectively the said system of having divided by its function and the module of feed bin form, each module all has the structural steel frame of an ISO Standard for Container, be welded with the fixedly standard corner fitting of usefulness of standard container respectively in the position, eight angles of each framework, the connection of intermodule comprises that erectting arranged side by side or tired stacking puts dual mode, in erectting connection, two module sides and contacting on the corner fittings of end face are fixed with the bridge sign indicating number, in tired folded the connection, two modules corner fittings of four jiaos of contact surfaces up and down position with the single awl of double end respectively, per two module standard frameworks that join are fixed by bolt again, and all having under the module standard base of frame corner fittings that all contact with ground increases the carrying of contact surface backing plate.This design scheme can make the vanning of module image set equally stack and fix, and is convenient to transportation.The utility model it can be by comprising measurer respectively, drying, the conduction oil feed system, powder is supplied with, vibrosieve, hot aggregate bin, system is mixed and stirred in weighing, central control room, two dedusters, two asphalt tanks, 15 modules of two finished product bins and building body underframe are formed, wherein three modules of two asphalt tanks and powder jar are erect and are connected to one group side by side, two finished product bin modules are erect and are connected to one group side by side, the conduction oil feed system, drying, tired the stacking of four modules of two dedusters is changed to one group, vibrosieve, hot aggregate bin, system is mixed and stirred in weighing, tired the stacking of four modules of building body underframe is changed to one group, hot elevator is divided into four sections, and place an end of these four modules respectively, the other end in these four modules, be furnished with the trolley track of transhipment finished product material in the top of two finished product bin modules and the building body underframe respectively, the butt joint of the each several part of hot elevator and trolley track was fixing when module connected, measurer module and drying intermodule have the belt conveyer of gathering materials, drying module and a deduster intermodule, asphalt tank module and conduction oil feed system intermodule, system module and asphalt tank module are mixed and stirred in weighing, powder jar module, the appended separately pipeline of another deduster intermodule joins, and the central control room module has cable to be connected with each intermodule.
The utility model compared with prior art its beneficial effect is: 1. container-type structure design completely, make the equipment shipping rapidly, safety.Existing asphalt mixing plant connects platform, railing, ladder, cleaning shaft, pitch pipeline, hot oil pipeline, fuel line and finished product bin track etc. and need case separately or tie up transportation when delivery between each assembly.Because kind, specification are various, this has just brought very big difficulty to delivery.Simultaneously, when the superelevation in the equipment, super wide part transportation, even need special vehicle to solve, also easily cause the distortion of structural member in transit, directly influence the installation of equipment.And the container-type asphalt mixing plant that the utility model provides, each module is the standard container design, and the protection of general frame is arranged.During delivery, equipment can be loaded on container ship, container truck or railway freight-car transportation, also is not subjected to the restriction of road conditions in transit.2. install, debug easy.The installation of existing asphalt mixing plant need be laid the foundations, and equipment is fixed on the ground.And when assembling, various pipelines, track are installed respectively and interconnect part, after some test can only wait the building site all to install, just can carry out, so caused certain hidden danger, and the Installation and Debugging time is longer, equipment need last 1-2 month from being installed to production.The container-type asphalt mixing plant that the utility model provides does not then need ground, can begin to install as long as ground dealt with slightly.Connection between the module and fixing very easy only needs the single awl of double end, bridge sign indicating number and bolt.All tests all can be carried out in factory.Equipment is from being installed to formal production less than 7 days.3. equipment overall compact, floor space is little.The module of drying module, conduction oil feed system module and dust pelletizing system is superimposed in the utility model, and drying, conduction oil feed system, dust pelletizing system three parts all need be separately fixed on the ground in the existing asphalt mixing plant.The utility model will be divided into four sections up to 14 meters hot elevator in design, and place vibrosieve, hot aggregate bin, weighing to mix and stir the left part of system, four modules in building body bottom respectively, simultaneously, the trolley track of transhipment finished product material also places the right part of these four modules respectively.When equipment was installed, after these four module stacks, hot elevator and trolley track can directly dock, both fix can, the haul dolly is through between a plurality of modules again, and track has sweep, the vertical-lift part is also arranged, fully shorten the distance between agitated kettle and the finished product bin.And agitated kettle and the trolley track between the finished product bin in the existing asphalt mixing plant are the skew lines types, and horizontal range has more than 20 meters.4. the equipment transition is quick.The modularized design of container-type, make equipment removal, the transition easy as the installation of equipment, can improve efficiency of construction effectively, effectively guarantee the construction period of unit in charge of construction.
Description of drawings
Fig. 1 is the utility model measurer modular structure schematic diagram.
Fig. 2 is the utility model drying modular structure schematic diagram.
Fig. 3 is the utility model deduster modular structure schematic diagram.
Fig. 4 is the utility model deduster modular structure schematic diagram.
Fig. 5 is the utility model conduction oil feed system modular structure schematic diagram.
Fig. 6 is the utility model asphalt tank modular structure schematic diagram.
Fig. 7 is the utility model powder jar modular structure schematic diagram.
Fig. 8 is the utility model vibrosieve modular structure schematic diagram.
Fig. 9 is the utility model hot aggregate bin modular structure schematic diagram.
Figure 10 mixes and stirs the system module structural representation for the utility model weighing.
Figure 11 is the utility model building body underframe modular structure schematic diagram.
Figure 12 is the utility model finished product bin modular structure schematic diagram.
Figure 13 is the utility model finished product bin modular structure schematic diagram.
Figure 14 is the utility model central control room modular structure schematic diagram.
Figure 15 is the utility model structural representation.
Figure 16 is Figure 15 vertical view.
Wherein: the 1-belt conveyer that gathers materials; The 2-belt feeder; The 3-hopper; The 4-friction drive device; The 5-charging aperture; The 6-cylindrical shell; 7-aggregate feed box; The 8-burner; 9-primary dust removing device; 10-secondary sack cleaner; 11-reverse gas cleaning mechanism; 12-primary dust removing helical conveyor; 13-reclaims the powder weighing helical conveyor; 14-primary dust removing ash bucket; 15-two-stage dust removal ash bucket; 16-two-stage dust removal helical conveyor; The 17-burner; 18-conduction oil body of heater; The 19-expansion drum; 20-asphalt tank tank body; 21-heat-conducting oil heating pipe; 22-powder tank; 23-plate valve; The 24-filler screw conveyer; 25-powder material loading pipeline; 26-hot elevator top; The 27-vibrosieve; The 28-upper track; 29-hot elevator middle part; The 30-hot aggregate bin; 31-middle part track; The pneumatic emptying door of 32-; 33-flash mouth; 34-hot elevator middle part; 35-powder weighing bucket; 36-additive bucket; The 37-aggregate weighing hopper; 38-pitch scale hooper; 39-powder feeding spiral organ; The 40-agitated kettle; 41-middle part track; 42-hot elevator bottom; 43-haul dolly; The 44-base track; The 45-track; 46-finished product bin top valve; 47-finished product bin warehouse; 48-finished product bin emptying door; The 49-track; 50-finished product bin top valve; 51-finished product bin warehouse; 52-finished product bin emptying door; 53-haul truck; The 54-belt conveyer that gathers materials; The 55-standard container is the standard corner fitting of usefulness fixedly; The 56-standard corner fitting; The 57-standard corner fitting; The 58-standard corner fitting; The 59-standard corner fitting; 60-asphalt tank module; 61-measurer module; 62-drying module; 63-deduster module; 64-deduster module; 65-conduction oil feed system module; 66-asphalt tank module; 67-powder jar module; 68-vibrosieve module; 69-hot aggregate bin module; System module is mixed and stirred in the 70-weighing; 71-building body underframe module; 72-finished product bin module; 73-finished product bin module; 74-central control room module; The structural steel frame of 75-ISO Standard for Container; The 76-structural steel frame; The 77-structural steel frame; The 78-structural steel frame; The 79-structural steel frame; The 81-structural steel frame; The 82-structural steel frame; The 83-structural steel frame; The 84-structural steel frame; The 85-structural steel frame; The 86-structural steel frame; The 87-structural steel frame; The 88-structural steel frame; The 89-structural steel frame; The 91-standard container is the standard corner fitting of usefulness fixedly; The 92-standard corner fitting; The 93-standard corner fitting; The 94-standard corner fitting; The 95-standard corner fitting; The 96-standard corner fitting; The 97-standard corner fitting; The 98-standard corner fitting; The 99-standard corner fitting.
The specific embodiment
As Figure 15, shown in 16, the utility model comprises feed proportioning system, drying system, hot aggregate promotes, screening, store, metering system, the compound stirring system, the conduction oil feed system, asphalt feeding system, the powder feed system, dust pelletizing system and finished product bin, and be divided into measurer module 61 by its function, drying module 62, conduction oil feed system module 65, powder supplying module 67, vibrosieve module 68, hot aggregate bin module 69, system module 70 is mixed and stirred in weighing, central control room module 74, two deduster modules 63 and 64, two asphalt tank modules 56 and 66, two finished product bin modules 72 and 73 and building body underframe module 71 totally ten five modules.Each module all has an ISO Standard for Container, and (totally three kinds of dimensions: structural steel frame 12192 * 2438 * 2896,12192 * 2438 * 2591,6058 * 2438 * 2591) is welded with the fixedly standard corner fitting of usefulness of standard container respectively in the position, eight angles of each framework.The connection of module is divided into four groups, three modules of two asphalt tanks and powder jar are erect and are connected to one group side by side, two finished product bin modules are erect and are connected to one group side by side, conduction oil feed system, drying, tired the stacking of four modules of two dedusters are changed to one group, and system is mixed and stirred in vibrosieve, hot aggregate bin, weighing, tired the stacking of four modules of building body underframe is changed to one group.In erectting connection, two module sides and contacting on the corner fittings of end face are fixed with the bridge sign indicating number, in tired folded the connection, two modules corner fittings of four jiaos of contact surfaces up and down position with the single awl of double end respectively, per two module standard frameworks that join are fixed by bolt again, and all having under the module standard base of frame corner fittings that all contact with ground increases the carrying of contact surface backing plate.
As shown in Figure 1, measurer module 61 comprises the belt conveyer 1 that gathers materials, belt feeder 2, hopper 3.Four hoppers 3 on framework 81 tops are adorned the aggregate of four kinds of gratings respectively, and the proportioning of four kinds of aggregates is to finish by the belt feeder 2 under each hopper of computer control, and the aggregate after slightly joining is carried by the following conveyor 1 that gathers materials.When installing in the building site, the modular type steel frame needs 10 supporting legs of assembling for 81 times, makes module and ground keep certain height, and there is striker plate at the hopper edge, assembling when equipment is installed.
As shown in Figure 2, drying module 62 comprises drying 6, has the support roller of 4, four driven by motor of four friction drive devices to be fixed on the lower frame 82 below, in the support cylindrical body of drying cylinder, makes cylindrical shell with certain rotational speed.One end of cylindrical shell is a charging aperture 5, and the other end is furnished with the burner 8 of automatic control, and jet flames in cylindrical shell heats, dries aggregate, and is furnished with infrared radiation thermometer to the aggregate automatic temperature measurement after heating.The other end of cylindrical shell is a feed box 7, is from then on sent by the aggregate after drying 6 oven dry.Drying module and measurer intermodule have and tilt to gather materials belt conveyor 54, and the aggregate after slightly joining is directly delivered to drying charging aperture 5 by the inclination belt conveyor 54 that gathers materials.
As shown in Figure 3, deduster module 63 comprises primary dust removing device 9 and secondary sack cleaner 10, be metal cabinet, be fixed on framework 83 bottoms, the metal cabinet two ends withstands on the inboard of framework 83 respectively, adding strong stability, secondary sack cleaner 10 inside be furnished with 768 can anti-250 ℃ of high temperature dust-removal cloth-bag, deduster 10 tops are provided with reverse gas cleaning mechanism 11, to remove the dust on the cloth bag.Deduster module 63 has pipeline to be connected with 62 of drying modules, and the flue gas that drying 6 is discharged directly enters in the secondary sack cleaner 10 by pipeline and filters, and directly is discharged into aerial again after 9 dedustings of primary dust removing device.
As shown in Figure 4, deduster module 64 comprises primary dust removing ash bucket 14, two-stage dust removal ash bucket 15, be fixed on framework 84 upper ends, and with the bottom connection of deduster module 63, dust under deduster 9, the 10 two-stage dust removal and filtrations, through dedusting ash bucket 14,15, be delivered to by primary dust removing helical conveyor 12 and two-stage dust removal helical conveyor 16 respectively and reclaim powder weighing helical conveyor 13.
As shown in Figure 5, conduction oil feed system module 65 comprises an expansion drum 19 on burner 17, heat-conducting oil furnace 18 and top thereof.This system is fixed on the underframe 85, is heated by the conduction oil in 17 pairs of heat-conducting oil furnace 18 bodies of heater of the burner that can control automatically, is used for pitch is heated to desired temperature.
As shown in Figure 6, two asphalt tank modules 60 and 66 comprise a cylindrical asphalt tank 20 separately, in order to store pitch.Asphalt tank 20 tank bodies are fixed with framework 86 welding respectively up and down.Heat-conducting oil heating pipe 21 is arranged at the bottom in the asphalt tank, and with conduction oil feed system module 65 between have pipeline to be connected.Flow in the heat-conducting oil heating pipe 21 in the asphalt tank by hot oil pump by the conduction oil after the conduction oil feed system heating, the circulating heat conduction oil of high temperature heats pitch indirectly.This indirect heating to asphalt performance without any destruction.On the pitch tank deck guardrail is arranged, assembling when equipment is installed.
As shown in Figure 7, powder supplying module 67 comprises the powder jar 22 on top, and a plate valve drain hole 23 is arranged at the tank body bottom, and filler screw conveyer 24 is arranged under it, and powder is transported in the tank body of powder jar 22 through new powder material loading pipeline 25.
As shown in Figure 8, vibrosieve module 68 its middle parts are vibrosieves 27, are fixed by welding in framework 88 bottoms, and its effect is that aggregate is sieved more accurately, and there is the screen cloth of three and half formulas its inside, is driven the vibration of screen cloth by the rotation of double-eccentric shaft.Totally four kinds of screen clothes, the aggregate size that can sieve out is: 0~4.5 millimeter, 4.5~11.2 millimeters, 1 1.2~22 millimeters, 22~40 millimeters.Discharge by the waste material mouth greater than 40 millimeters aggregates.The both ends of vibrosieve module are respectively hot elevator top 26 and haul dolly upper track 28.
As shown in Figure 9, hot aggregate bin module 69 its middle parts are hot aggregate bins 30, weld fixing up and down with framework 89, and connect together with the vibrosieve module 68 that is positioned at above it, four magazines 30 under four kinds of screen clothes store four kinds of aggregates respectively, and each have pneumatic emptying door 32 and flash mouth 33, qualified aggregate is by emptying door 32 blowings, and underproof aggregate is discharged through flash mouth 33.The both ends of hot aggregate bin module are respectively hot elevator middle part 29 and haul dolly middle part track 31.
As shown in figure 10, it is that system is mixed and stirred in weighing that system module 70 its middle parts are mixed and stirred in weighing, comprises powder weighing bucket 35, additive bucket 36, pitch scale hooper 38, aggregate weighing hopper 37, powder spiral organ 39, agitated kettle 40.This module has pipeline to link to each other with asphalt tank module 60 and 66, powder jar module 67,64 of deduster modules.Be heated to pitch after the uniform temperature by the asphalt tank in the asphalt tank module 20 through bitumenpump, be transported in the pitch scale hooper 38 by connecting pipe, powder is by the filler screw conveyer 24 in the powder jar module, be transported to powder weighing bucket 35 by connecting pipe, aggregate is sent to aggregate weighing hopper 37 by the emptying door in the hot aggregate bin module 32.After pitch, powder, aggregate carry out proportioning through pitch scale hooper 38, powder weighing bucket 35, aggregate weighing hopper 37 ratio according to the rules respectively, powder is sent into agitated kettle 40 through powder feeding spiral organ 39, pitch, aggregate directly enter agitated kettle 40, fully stir in agitated kettle 40.From additive bucket 36, add additive in the whipping process to compound.By the dust under 9, the 10 two-stage dust removal and filtrations of the deduster in the deduster module 63, in deduster module 64, reclaim powder weighing helical conveyor 13, directly enter agitated kettle 40 by connecting pipe and carry out second use.The both ends that system module is mixed and stirred in weighing are respectively hot elevator middle part 34 and haul dolly middle part track 41.
As shown in figure 11, building body underframe module 71 is positioned at weighing and mixes and stirs system module 70 times, and the one end is hot elevator bottom 42, and the middle part and the other end are haul dolly 43 and base track 44.
The utility model will be divided into four sections up to 14 meters hot elevator, and place vibrosieve respectively, hot aggregate bin, system is mixed and stirred in weighing, one end of four modules in body bottom, building, four modules 68,69,70, after 71 stacks connect, place the hot elevator top 26 of four modules respectively, hot elevator middle part 29, hot elevator middle part 34, hot elevator bottom 42 is connected and has formed the hot elevator of long tubular, by the ring-like strand bar of computer-controlled motor-driven in it, 88 little hoppers on the chain are moved up and down, after aggregate after the oven dry that feed box 7 is sent from the drying module is sent to hot elevator bottom 42, promote and send into vibrosieve 27 in the vibrosieve module topmost by the small powder bucket.
Shown in Figure 12,13, two finished product bin modules 72 and 73 comprise a finished product bin 47 and 51 separately, are separately fixed in the framework 77,78, and capacity is respectively 45 tons and 55 tons.Top, storehouse valve 46 and 50 is arranged respectively at finished product bin 47 and 51 top, and emptying door 48 and 52 are arranged at the bottom, and external surface plays the effect of insulation with mineral wool and galvanized sheet iron capping.In equipment is installed, after two finished product bin modules connect side by side, the framework of two module bottom contacts can be removed (during transportation, dismountable framework is connected with whole by bolt), form the parking space of haul truck 53, as shown in figure 15.Haul trolley track 45,49 is arranged respectively at the top of two finished product bin modules.
The utility model is arranged in vibrosieve, hot aggregate bin, weighing with the haul trolley track and mixes and stirs an end of system module 68,69,70 and the bottom of building body bottom module 71, the top of two finished product bin modules 72,73, after each module connects, the track 45,49 that is distributed in six upper track 28, middle part track 31, middle part track 41, base track 44 and finished product bin tops in the module directly docks, and forms the orbit of haul dolly 43.Dumper moves by computer-controlled driven by motor rope traction.After agitated kettle 40 is finished once stirring, the finished product material is put into following dumper 43, promote along trolley track.Arrive first the top of reaching product feed bin 47, top, storehouse valve 46 is opened automatically, the finished product material is poured in finished product bin 47 warehouses automatically, after finished product feed bin 47 is filled, dolly moves to the top of finished product bin 51 automatically, equally, top, storehouse valve 50 is opened automatically, and the finished product material is poured in finished product bin 51 warehouses automatically.When need transported the finished product compound to building site, two emptying doors 48,52 of two feed bins bottom were opened blowing, packed into to be stopped at haul truck 53 under the feed bin.
As shown in figure 14, central control room module 74 is house structures of container-type, and inside is provided with electric control cabinet and console, and is connected with cable between each module, equipment is carried out whole operation control.
The utility model adopts modular design, and the standard of ISO freight container has been adopted in each module configuration design, the position, eight angles of each module is welded with the fixedly corner fittings of usefulness of standard container respectively, and this design can make the vanning of module image set equally stack and fix.On the general structure of equipment, except that measurer and central control room, all the other assembly modules connect with folded dual mode arranged side by side or tired, and in the position of corner fittings two modules are accurately linked together with fixed set vanning special-purpose bridge sign indicating number and the single awl of double end, and on the module frame of per two connections, use several bolt simultaneously, make the connection of intermodule more firm.
The utility model is just the same with general pressure fixed asphalt mixing plant at intermittence aspect technological process.Shown in Figure 15,16, various aggregates in the measurer module 61 require to be sent in the drying module 62 to dry according to certain grating, the vibrosieve that enters module 68 middle parts through the formed hot material Hoisting System of the left-half stack of module 68,69,70,71 sieves again, enter the hot aggregate bin at module 69 middle parts then, enter the aggregate weighing hopper at module 70 middle parts according to the ratio requirement of computer settings, the powder in the module 67 also is the powder weighing bucket that directly enters module 70 middle parts according to the ratio requirement of setting.Pitch in the module 60,66 is through directly entering the pitch scale hooper at module 70 middle parts according to the ratio requirement of setting after the heating of module 65.After fully stirring, the agitated kettle that last three kinds of materials all enter into module 70 middle parts promptly formed the finished product bituminous mixture.The track of transhipment finished product trolley is through module 71, the top of the right half of module 70,69,68 and module 72,73, and dolly can in time be delivered to the finished product material and be incubated storage in the finished product bin like this.The truck of haul can load the finished product material under finished product bin, fortune is to the building site.The running of complete equipment is by module 14 Automatic Control.
Container-type modularized design design of the present utility model also may be used on the stabilized soil stirring equipment.Can form by five 40 feet standard container (12192 * 2438 * 2896), first is left aggregate bucket, second is right aggregate bucket, the 3rd is left filler bin, the 4th is right filler bin, the 5th is main frame, comprising agitator, powder conveyer, aggregate belt weighing feeder, water system, additive feed system.Laterally adopt between the container bridge sign indicating number and and bolt, vertical direction adopts the single awl of double end to be connected with bolt, can become a footless standard container formula stabilized soil stirring equipment.
Claims (10)
1, a kind of standard container formula asphalt mixing plant, comprise feed proportioning system, drying system, hot aggregate promotes, screening, store, metering system, the compound stirring system, the conduction oil feed system, asphalt feeding system, the powder feed system, dust pelletizing system and finished product bin, it is characterized in that it is by having comprised that respectively above-mentioned each system that divided by its function and the module of feed bin form, each module all has the structural steel frame of an ISO Standard for Container, be welded with the fixedly standard corner fitting of usefulness of standard container respectively in the position, eight angles of each framework, the connected mode of intermodule comprises erectting side by side puts with tired stacking, and connects the location with fixed set vanning special connecting piece.
2, a kind of standard container formula asphalt mixing plant according to claim 1, it is characterized in that in erectting connection, two module sides and contacting on the corner fittings of end face are fixed with the bridge sign indicating number, in tired folded the connection, two modules corner fittings of four jiaos of contact surfaces up and down position with the single awl of double end respectively, per two module standard frameworks that join are fixed by bolt again, and all having under the module standard base of frame corner fittings that all contact with ground increases the carrying of contact surface backing plate.
3, a kind of standard container formula asphalt mixing plant according to claim 1 and 2, it is characterized in that it is by comprising measurer respectively, drying, the conduction oil feed system, powder is supplied with, vibrosieve, hot aggregate bin, system is mixed and stirred in weighing, central control room, two dedusters, two asphalt tanks, 15 modules of two finished product bins and building body underframe are formed, wherein two asphalt tanks and three modules (60 of powder jar, 66,67)) setting is connected to one group side by side, two finished product bin modules (72,73) setting is connected to one group side by side, the conduction oil feed system, drying, four modules (65 of two dedusters, 62,64,63) tired successively from bottom to up stacking is changed to one group, vibrosieve, hot aggregate bin, system is mixed and stirred in weighing, four modules (68 of building body underframe, 69,70,71) tired successively from top to bottom stacking is changed to one group.
4, a kind of standard container formula asphalt mixing plant according to claim 3, it is characterized in that hot elevator is divided into four sections, and place vibrosieve, hot aggregate bin, weighing to mix and stir an end of system, four modules of building body underframe respectively, each module is distributed in the each several part butt joint of four hot elevators in the module when connecting fixing, forms the hot elevator of long tubular.
5, a kind of standard container formula asphalt mixing plant according to claim 3, it is characterized in that in the top of system, the other end of four modules of building body underframe, two finished product bin modules and building body underframe module are mixed and stirred in vibrosieve, hot aggregate bin, weighing, being furnished with trolley track respectively, module is distributed in the each several part butt joint of the trolley track in each module when connecting fixing, forms the trolley track that transports the finished product material.
6, a kind of standard container formula asphalt mixing plant according to claim 3, it is characterized in that between measurer module (61) and drying module (62) belt conveyer of gathering materials (54) being arranged, between drying module (62) and deduster module (63), asphalt tank module 960,66) and conduction oil feed system module (65) between, weighing mixes and stirs pipeline appended separately between system module (70) and asphalt tank module (60,66), powder jar module (67), deduster module (64) and joins, central control room module (74) has cable to be connected with each intermodule.
7, a kind of standard container formula asphalt mixing plant according to claim 3, it is characterized in that measurer module (61) comprises the belt conveyer that gathers materials (1), belt feeder (2), hopper (3), drying module 62 comprises drying (6), four friction drive devices (4) are arranged below it, the support roller of four driven by motor is fixed on the lower frame (82), one end of cylindrical shell is charging aperture (5), the other end is furnished with the burner (8) of automatic control, and be furnished with the infrared radiation thermometer of aggregate automatic temperature measurement after the heating, the other end of cylindrical shell is feed box (7), drying module and measurer intermodule have to tilt to gather materials belt conveyor (54) to drying charging aperture (5), deduster module (63) comprises primary dust removing device (9) and secondary sack cleaner (10), be metal cabinet, be fixed on framework (83) bottom, the metal cabinet two ends withstands on the inboard of framework (83) respectively, secondary sack cleaner (10) inside be furnished with 768 can anti-250 ℃ of high temperature dust-removal cloth-bag, deduster (10) top is provided with reverse gas cleaning mechanism (11), there is pipeline to be connected between deduster module (63) and drying module (62), deduster module (64) comprises primary dust removing ash bucket (14), two-stage dust removal ash bucket (15), be fixed on framework (84) upper end, and with the bottom connection of deduster module (63), be positioned at deduster (9,10) under, dedusting ash bucket (14, primary dust removing helical conveyor (12) and two-stage dust removal helical conveyor (16) are arranged respectively 15), and primary dust removing helical conveyor (12) and two-stage dust removal helical conveyor (16) pass to and reclaim powder weighing helical conveyor (13).
8, a kind of standard container formula asphalt mixing plant according to claim 3, it is characterized in that conduction oil feed system module (65) comprises burner (17), one expansion drum (19) on heat-conducting oil furnace (18) and top thereof, this system is fixed on the underframe (85), two asphalt tank modules (60) and (66) comprise a cylindrical asphalt tank (20) separately, asphalt tank (20) tank body is fixed with framework (86) welding respectively up and down, heat-conducting oil heating pipe (21) is arranged at the bottom in the asphalt tank, and with conduction oil feed system module (65) between have pipeline to be connected.
9, a kind of standard container formula asphalt mixing plant according to claim 3, it is characterized in that its middle part of vibrosieve module (68) is vibrosieve (27), be fixed by welding in framework (88) bottom, there is the screen cloth of three and half formulas its inside, screen cloth has 0~4.5 millimeter, 4.5~11.2 millimeters, 11.2~22 millimeters, 22~40 millimeters four kinds, its middle part of hot aggregate bin module (69) is hot aggregate bin (30), weld fixing up and down with framework (89), and connect together with the vibrosieve module (68) that is positioned at above it, under four kinds of screen clothes of vibrosieve (27) four magazines of hot aggregate bin (30), they each have pneumatic emptying door (32) and flash mouth (33), be that system module (70) is mixed and stirred in weighing below the hot aggregate bin module, its middle part is that system is mixed and stirred in weighing, comprise powder weighing bucket (35), additive bucket (36), pitch scale hooper (38), aggregate weighing hopper (37), powder spiral organ (39), agitated kettle (40), this module and asphalt tank module (60 and 66), powder jar module (67), there is pipeline to link to each other between deduster module (64).
10, a kind of standard container formula asphalt mixing plant according to claim 3, it is characterized in that two finished product bin modules (72 and 73) comprise a finished product bin (47,51) separately, be separately fixed in the framework (77,78), top, storehouse valve (46,50) is arranged respectively at the top of finished product bin (47,51), emptying door (48,52) is arranged at the bottom, external surface is with mineral wool and galvanized sheet iron capping, in equipment is installed, after two finished product bin modules connect side by side, the framework of two module bottom contacts is removed, formed the parking space of haul truck (53).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01279595 CN2515229Y (en) | 2001-12-27 | 2001-12-27 | Standard container type bituminous mixture stirring apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01279595 CN2515229Y (en) | 2001-12-27 | 2001-12-27 | Standard container type bituminous mixture stirring apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2515229Y true CN2515229Y (en) | 2002-10-09 |
Family
ID=33682791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 01279595 Expired - Lifetime CN2515229Y (en) | 2001-12-27 | 2001-12-27 | Standard container type bituminous mixture stirring apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2515229Y (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100503972C (en) * | 2006-11-02 | 2009-06-24 | 沙庆林 | Construction method for cement stabilized granular base layer and asphalt mixture surface layer |
CN100585079C (en) * | 2004-12-03 | 2010-01-27 | 格林安株式会社 | Method for continuous on-site recycling of an asphalt mixture layer of a pavement and a motor-driven vehicle system therefor |
CN102359051A (en) * | 2011-10-11 | 2012-02-22 | 无锡雪桃集团有限公司 | Indoor asphalt mixture stirring device |
CN102535636A (en) * | 2011-12-14 | 2012-07-04 | 郎溪县恒云工程机械有限公司 | H-type steel module assembly structure for asphalt mixing plant |
CN102926310A (en) * | 2012-11-29 | 2013-02-13 | 廊坊德基机械科技股份有限公司 | Energy-saving finished material conveying system |
CN103638767A (en) * | 2013-12-10 | 2014-03-19 | 湖南三一路面机械有限公司 | Asphalt mixture mixing station and dust recycling system thereof |
CN104493981A (en) * | 2014-12-08 | 2015-04-08 | 深圳市为海建材有限公司 | Environment-friendly mortar robot |
CN104499407A (en) * | 2014-12-22 | 2015-04-08 | 长安大学 | Asphalt mixing station with heat preservation layers |
WO2016101199A1 (en) * | 2014-12-25 | 2016-06-30 | 深圳市为海建材有限公司 | Environment-friendly mortar robot |
CN106758691A (en) * | 2016-12-09 | 2017-05-31 | 吉林省公路机械有限公司 | A kind of asphalt station cold burden system dust removing device |
CN107380781A (en) * | 2017-06-15 | 2017-11-24 | 东莞市高铂塑料机械有限公司 | A kind of transporting something containerized formula bin system |
CN107520969A (en) * | 2017-10-31 | 2017-12-29 | 中材建设有限公司 | Modularized container type proportioning station |
CN107618102A (en) * | 2017-10-31 | 2018-01-23 | 中材建设有限公司 | Moveable modularization cement producing line |
CN108018756A (en) * | 2017-11-28 | 2018-05-11 | 郎溪县恒云工程机械有限公司 | Container-type environment-friendly type asphalt mixing plant |
CN108221563A (en) * | 2018-03-14 | 2018-06-29 | 山推建友机械股份有限公司 | A kind of intermittent plantmix's cold asphalt rehabilitation equipment |
CN108532416A (en) * | 2018-06-08 | 2018-09-14 | 无锡雪桃集团有限公司 | A kind of urbanization environment-friendly type asphalt mixing plant |
EP3540123A1 (en) * | 2018-03-15 | 2019-09-18 | Ermont | Asphalt mixing plant |
CN111794046A (en) * | 2020-06-11 | 2020-10-20 | 福建省铁拓机械股份有限公司 | Stepped stirring method for asphalt mixture |
CN112478818A (en) * | 2020-12-11 | 2021-03-12 | 石柱土家族自治县茶园建筑材料有限公司 | Cold material supply system |
-
2001
- 2001-12-27 CN CN 01279595 patent/CN2515229Y/en not_active Expired - Lifetime
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100585079C (en) * | 2004-12-03 | 2010-01-27 | 格林安株式会社 | Method for continuous on-site recycling of an asphalt mixture layer of a pavement and a motor-driven vehicle system therefor |
CN100503972C (en) * | 2006-11-02 | 2009-06-24 | 沙庆林 | Construction method for cement stabilized granular base layer and asphalt mixture surface layer |
CN102359051A (en) * | 2011-10-11 | 2012-02-22 | 无锡雪桃集团有限公司 | Indoor asphalt mixture stirring device |
CN102359051B (en) * | 2011-10-11 | 2013-09-18 | 无锡雪桃集团有限公司 | Indoor asphalt mixture stirring device |
CN102535636A (en) * | 2011-12-14 | 2012-07-04 | 郎溪县恒云工程机械有限公司 | H-type steel module assembly structure for asphalt mixing plant |
CN102926310A (en) * | 2012-11-29 | 2013-02-13 | 廊坊德基机械科技股份有限公司 | Energy-saving finished material conveying system |
CN103638767A (en) * | 2013-12-10 | 2014-03-19 | 湖南三一路面机械有限公司 | Asphalt mixture mixing station and dust recycling system thereof |
CN104493981A (en) * | 2014-12-08 | 2015-04-08 | 深圳市为海建材有限公司 | Environment-friendly mortar robot |
CN104493981B (en) * | 2014-12-08 | 2016-04-20 | 深圳市为海建材有限公司 | Environment-friendlymortar mortar robot |
CN104499407A (en) * | 2014-12-22 | 2015-04-08 | 长安大学 | Asphalt mixing station with heat preservation layers |
CN104499407B (en) * | 2014-12-22 | 2016-04-20 | 长安大学 | A kind of bituminous mixing plant with insulation layer |
WO2016101199A1 (en) * | 2014-12-25 | 2016-06-30 | 深圳市为海建材有限公司 | Environment-friendly mortar robot |
CN106758691A (en) * | 2016-12-09 | 2017-05-31 | 吉林省公路机械有限公司 | A kind of asphalt station cold burden system dust removing device |
CN107380781A (en) * | 2017-06-15 | 2017-11-24 | 东莞市高铂塑料机械有限公司 | A kind of transporting something containerized formula bin system |
CN107520969A (en) * | 2017-10-31 | 2017-12-29 | 中材建设有限公司 | Modularized container type proportioning station |
CN107618102A (en) * | 2017-10-31 | 2018-01-23 | 中材建设有限公司 | Moveable modularization cement producing line |
CN107618102B (en) * | 2017-10-31 | 2021-11-02 | 中材建设有限公司 | Movable modular cement production line |
CN108018756B (en) * | 2017-11-28 | 2019-10-29 | 郎溪县恒云工程机械有限公司 | Container-type environment-friendly type asphalt mixing plant |
CN108018756A (en) * | 2017-11-28 | 2018-05-11 | 郎溪县恒云工程机械有限公司 | Container-type environment-friendly type asphalt mixing plant |
CN108221563A (en) * | 2018-03-14 | 2018-06-29 | 山推建友机械股份有限公司 | A kind of intermittent plantmix's cold asphalt rehabilitation equipment |
EP3540123A1 (en) * | 2018-03-15 | 2019-09-18 | Ermont | Asphalt mixing plant |
FR3078982A1 (en) * | 2018-03-15 | 2019-09-20 | Ermont | PRODUCTION CENTER OF ENROBES |
US11459709B2 (en) | 2018-03-15 | 2022-10-04 | Ermont | Asphalt mixing plant |
CN108532416A (en) * | 2018-06-08 | 2018-09-14 | 无锡雪桃集团有限公司 | A kind of urbanization environment-friendly type asphalt mixing plant |
CN111794046A (en) * | 2020-06-11 | 2020-10-20 | 福建省铁拓机械股份有限公司 | Stepped stirring method for asphalt mixture |
CN112478818A (en) * | 2020-12-11 | 2021-03-12 | 石柱土家族自治县茶园建筑材料有限公司 | Cold material supply system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2515229Y (en) | Standard container type bituminous mixture stirring apparatus | |
CN102873762B (en) | Movable concrete mixing plant | |
US4619531A (en) | Batching plant | |
US10005106B2 (en) | Modular batch plant for granular products | |
CN211993592U (en) | Integrated foldable vehicle-mounted movable mixing station conveying device | |
CN103895106B (en) | Packaged type mortar production device | |
CN101391459A (en) | Detachable mobile mixing station capable of loading in container | |
CN104988835B (en) | Modular asphalt cold-regeneration stirring equipment | |
CN209125989U (en) | A kind of production line for magnesia carbon brick product | |
CN107142817A (en) | A kind of modified pitch production line | |
CN108607195A (en) | A kind of stabilizing fly ash processing unit | |
CN110103343A (en) | A kind of water surely expects Automatic Production System | |
CN205416036U (en) | Towed commodity concrete mixing plant | |
CN203876052U (en) | Moveable mortar production equipment | |
US4594046A (en) | Mobile apparatus for mixing and loading concrete | |
CN112030670B (en) | Equipment and process for preparing asphalt mixture | |
CN210758426U (en) | Movable concrete mixing system | |
CN212119886U (en) | Automatic blending blanking machine for powder coating production | |
CN2848661Y (en) | Multifunction concrete agitating transporting car | |
US4793388A (en) | Apparatus for treating flowable materials | |
CN1079316C (en) | Mobile batching plant | |
CN108145845B (en) | Construction method of concrete for engineering | |
CN201833931U (en) | Semi-trailer type mortar vehicle | |
CN111229114A (en) | Automatic blending blanking machine for powder coating production | |
CN2283563Y (en) | Compound concrete producing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CX01 | Expiry of patent term |
Expiration termination date: 20111227 Granted publication date: 20021009 |