CN102864920A - Planar tight abutted seam large-area aluminium plate ceiling construction method - Google Patents
Planar tight abutted seam large-area aluminium plate ceiling construction method Download PDFInfo
- Publication number
- CN102864920A CN102864920A CN2011102439429A CN201110243942A CN102864920A CN 102864920 A CN102864920 A CN 102864920A CN 2011102439429 A CN2011102439429 A CN 2011102439429A CN 201110243942 A CN201110243942 A CN 201110243942A CN 102864920 A CN102864920 A CN 102864920A
- Authority
- CN
- China
- Prior art keywords
- ceiling
- construction method
- plate
- ceiling construction
- plane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention provides a planar tight abutted seam large-area aluminium plate ceiling construction method. The ceiling construction method comprises the following steps of: dividing a construction section; positioning and measuring; mounting primary and secondary keels; processing a ceiling plate; mounting connecting pieces; mounting the ceiling plate; and checking the ceiling plate. The ceiling construction method effectively solves the problems that several times of adjusting and checking are required to keep unification of gaps, waste is caused as a plate size has to be changed when an accumulated error is larger and the rate of the progress is slower in the traditional ceiling. The ceiling construction method is used for achieving the purposes of making sizes of plates uniform, shortening processing period, realizing one-time in-place mounting and saving labor cost.
Description
Technical field
The present invention relates to the large plate aluminium sheet of the close piece large tracts of land in a kind of plane ceiling construction method.
Background technology
Gapless when " close piece " aluminium sheet ceiling construction is the aluminium sheet splicing.During the traditional handicraft furred ceiling, all leave the above flexible space of 10-20mm between plate and the plate, however the aluminium sheet of traditional handicraft lifting, flexible gap size is difficult to control, and cumulative errors are large.In the situation that the large whole impression of area requires, be difficult to reach the effect of design.Adopt large tracts of land aluminium sheet furred ceiling " close piece " job practices, effectively control cumulative errors, improve this engineering whole impression quality, increase work efficiency.Also reduced simultaneously mounting cost.
Summary of the invention
Provide following technical scheme in order to overcome the technical problem that exists in the prior art, to the invention provides:
The large plate aluminium sheet of the close piece large tracts of land in a kind of plane large tracts of land ceiling construction method is characterized in that described method step is:
A) construction section is divided: according to drawing, the ceiling construction work plane is divided, constuction joint is located at the structure junction, utilize structural joint that work plane is cut apart;
B) location survey: according to ready-portioned construction section, utilize transit with the control point pilot measurement of every shrinkage joint to the location keel of furred ceiling work plane, and carry out on the ground the unwrapping wire anchor point and carry out fender pile;
C) primary and secondary skeletal frame is installed: according to the form of structure that design drawing requires, and the zinc-plated square tube main joist of connected mode lifting 40*40;
D) ceiling board processing: determine the ceiling board size according to each section size, machining accuracy, materials arrival check;
E) installation of connector: select dissimilar connected modes according to the furred ceiling scheme, calculate the connection supporting capacity;
Whether F) the installation of ceiling board: the position line during according to measurement is hung two-way control line, and first examination is hung, and the plate sample is led the way, and presses again large tracts of land expansion of tab order, measure at any time installing plate simultaneously and conform to and the degree of deviation with setting-out point;
G) ceiling board check and correction.
As the preferred technical solution of the present invention, among the described step C, fastener or fastener mode are adopted in the connection of primary and secondary skeletal frame, work as after the keel lifting is finished and it are carried out strict check and correction, the absolute altitude planeness.
The beneficial effect that the present invention brings is: adopts this method to efficiently solve and had been the unification of maintenance slit in the furred ceiling in the past, and be through adjusting several times check and correction; The board dimension of having to change when cumulative errors are larger causes waste, the slower contradiction of progress simultaneously, and the size that is used for plate is unified, and the process-cycle shortens, and one-time-reach-place is installed, and has saved labour cost.
Description of drawings
Fig. 1 is furred ceiling aluminium sheet and keel connection diagram
Fig. 2 is the flexible schematic diagram of processing of aluminium sheet lap gap
The specific embodiment
Below in conjunction with accompanying drawing preferred embodiment of the present invention is elaborated, thereby so that advantages and features of the invention can be easier to be it will be appreciated by those skilled in the art that protection scope of the present invention is made more explicit defining.
The large plate aluminium sheet of the close piece in a kind of plane large tracts of land ceiling construction method, described method step is:
A) construction section is divided: according to drawing, the ceiling construction work plane is divided, constuction joint is located at the structure junction, utilize structural joint that work plane is cut apart;
B) location survey: according to ready-portioned construction section, utilize transit with the control point pilot measurement of every shrinkage joint to the location keel of furred ceiling work plane, and carry out on the ground the unwrapping wire anchor point and carry out fender pile;
C) primary and secondary skeletal frame is installed: according to the form of structure that design drawing requires, and the zinc-plated square tube main joist of connected mode lifting 40*40;
D) ceiling board processing: determine the ceiling board size according to each section size, machining accuracy, materials arrival check;
E) installation of connector: select dissimilar connected modes according to the furred ceiling scheme, calculate the connection supporting capacity; As depicted in figs. 1 and 2.
Whether F) the installation of ceiling board: the position line during according to measurement is hung two-way control line, and first examination is hung, and the plate sample is led the way, and presses again large tracts of land expansion of tab order, measure at any time installing plate simultaneously and conform to and the degree of deviation with setting-out point;
G) ceiling board check and correction.
Among the described step C, fastener or fastener mode are adopted in the connection of primary and secondary skeletal frame, work as after the keel lifting is finished and it are carried out strict check and correction, the absolute altitude planeness.
The above; it only is one of the specific embodiment of the present invention; but protection scope of the present invention is not limited to this; any those of ordinary skill in the art are in the disclosed technical scope of the present invention; variation or the replacement that can expect without creative work all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain that claims were limited.
Claims (2)
1. the large plate aluminium sheet of the close piece in plane large tracts of land ceiling construction method is characterized in that described method step is:
A) construction section is divided: according to drawing, the ceiling construction work plane is divided, constuction joint is located at the structure junction, utilize structural joint that work plane is cut apart;
B) location survey: according to ready-portioned construction section, utilize transit with the control point pilot measurement of every shrinkage joint to the location keel of furred ceiling work plane, and carry out on the ground the unwrapping wire anchor point and carry out fender pile;
C) primary and secondary skeletal frame is installed: according to the form of structure that design drawing requires, and the zinc-plated square tube main joist of connected mode lifting 40*40;
D) ceiling board processing: determine the ceiling board size according to each section size, machining accuracy, materials arrival check;
E) installation of connector: select dissimilar connected modes according to the furred ceiling scheme, calculate the connection supporting capacity;
Whether F) the installation of ceiling board: the position line during according to measurement is hung two-way control line, and first examination is hung, and plate is itched and led the way, and presses again large tracts of land expansion of tab order, measure at any time installing plate simultaneously and conform to and the degree of deviation with setting-out point;
G) ceiling board check and correction.
2. the large plate aluminium sheet of the close piece in a kind of plane according to claim 1 large tracts of land ceiling construction method, it is characterized in that among the described step C, fastener or fastener mode are adopted in the connection of primary and secondary skeletal frame, work as after the keel lifting is finished and it is carried out strict check and correction, the absolute altitude planeness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102439429A CN102864920A (en) | 2011-08-24 | 2011-08-24 | Planar tight abutted seam large-area aluminium plate ceiling construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102439429A CN102864920A (en) | 2011-08-24 | 2011-08-24 | Planar tight abutted seam large-area aluminium plate ceiling construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102864920A true CN102864920A (en) | 2013-01-09 |
Family
ID=47444027
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102439429A Pending CN102864920A (en) | 2011-08-24 | 2011-08-24 | Planar tight abutted seam large-area aluminium plate ceiling construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102864920A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111549967A (en) * | 2020-04-23 | 2020-08-18 | 江苏兴业智慧建筑科技有限公司 | Novel ceiling board connecting structure and construction process thereof |
CN114086712A (en) * | 2021-11-12 | 2022-02-25 | 中铁建设集团(杭州)建设有限公司 | Alternate construction method for splicing aluminum veneers in high and large space |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4457249A (en) * | 1980-07-11 | 1984-07-03 | K B Weecan Marine | Method of fabricating an integral shell formed body and the body formed thereby |
CN101575892A (en) * | 2009-03-26 | 2009-11-11 | 北京市建筑工程装饰有限公司 | Large-area lower edge nested aluminum plate curved hung ceiling with high punching rate and construction method thereof |
-
2011
- 2011-08-24 CN CN2011102439429A patent/CN102864920A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4457249A (en) * | 1980-07-11 | 1984-07-03 | K B Weecan Marine | Method of fabricating an integral shell formed body and the body formed thereby |
CN101575892A (en) * | 2009-03-26 | 2009-11-11 | 北京市建筑工程装饰有限公司 | Large-area lower edge nested aluminum plate curved hung ceiling with high punching rate and construction method thereof |
Non-Patent Citations (3)
Title |
---|
彭艳等: "大面积铝合金吊顶施工工法", 《建筑技术》 * |
王长贵: "体育馆大面积铝扣板吊顶施工工艺", 《安徽建筑》 * |
蹇强等: "铝板吊顶施工技术", 《中国新技术新产品》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111549967A (en) * | 2020-04-23 | 2020-08-18 | 江苏兴业智慧建筑科技有限公司 | Novel ceiling board connecting structure and construction process thereof |
CN114086712A (en) * | 2021-11-12 | 2022-02-25 | 中铁建设集团(杭州)建设有限公司 | Alternate construction method for splicing aluminum veneers in high and large space |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103774853A (en) | Installation construction method for curtain wall with hyperbolic metal veneer | |
CN203640309U (en) | Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame | |
CN105019665A (en) | Method for mounting long-span structure beam based on total station | |
CN103498523A (en) | Floor system | |
CN102102444A (en) | Assembling and positioning construction method of large steel casting members | |
CN104196231A (en) | Concrete floor aluminum alloy template and construction method thereof | |
CN103088843B (en) | Pipe gallery embedded iron parts construction method of installation | |
CN102864920A (en) | Planar tight abutted seam large-area aluminium plate ceiling construction method | |
CN203213372U (en) | F-shaped hanging piece and suspended ceiling system employing same | |
CN202299020U (en) | A unit pottery pipe decoration curtain wall member | |
CN104060841B (en) | Large-span steel girder construction method of installation | |
CN203701066U (en) | Soil pressure meter position-adjustable fixed installation device | |
CN204024088U (en) | The fast-positioning device of workshop steel column sectional lifting docking | |
CN111746753A (en) | Method for mounting box leg web plate of container ship | |
CN104563525B (en) | A kind of box steel arch beam Integral horizontal type group is to method | |
CN103184743B (en) | Template flange | |
CN203113563U (en) | Unit-typed curtain wall | |
CN203145274U (en) | Purlin for steel-structure buildings | |
CN204435632U (en) | A kind of double curved surface metal curtain wall | |
CN105064643B (en) | The cladding accurate installation method of building stones hanging part for board of R types | |
CN211317106U (en) | Add axillary plate template mounting detection ruler | |
CN104989015A (en) | Heat insulation installation structure for novel stone curtain wall | |
CN210217179U (en) | Steel skirting line decorated by exposed bolts | |
CN211597203U (en) | Connection structure and precast concrete wallboard system | |
CN105421780A (en) | Construction method of prefabricated concrete structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 215000 Xiangcheng District, Jiangsu Province, Yang Cheng Road, No. 98, No. Applicant after: Suzhou Suming Decoration Co., Ltd. Address before: 215000 Xiangcheng District, Jiangsu Province, Yang Cheng Road, No. 98, No. Applicant before: Suzhou Suming Decoration Co.,Ltd. |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130109 |