CN102861973A - Roof steel structure manufacturing technique of railway vehicles - Google Patents

Roof steel structure manufacturing technique of railway vehicles Download PDF

Info

Publication number
CN102861973A
CN102861973A CN2012103520687A CN201210352068A CN102861973A CN 102861973 A CN102861973 A CN 102861973A CN 2012103520687 A CN2012103520687 A CN 2012103520687A CN 201210352068 A CN201210352068 A CN 201210352068A CN 102861973 A CN102861973 A CN 102861973A
Authority
CN
China
Prior art keywords
welding
top board
guide rail
steel structure
head plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103520687A
Other languages
Chinese (zh)
Other versions
CN102861973B (en
Inventor
丁亚萍
孙犁
刘晓良
谢绍兴
朱健军
路万甲
范钦磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Nanjing Puzhen Co Ltd
Original Assignee
CSR Nanjing Puzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSR Nanjing Puzhen Co Ltd filed Critical CSR Nanjing Puzhen Co Ltd
Priority to CN201210352068.7A priority Critical patent/CN102861973B/en
Publication of CN102861973A publication Critical patent/CN102861973A/en
Application granted granted Critical
Publication of CN102861973B publication Critical patent/CN102861973B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laser Beam Processing (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention relates to a roof steel structure manufacturing technique of railway vehicles, which comprises the following steps of: making a middle head plate, forming a side head plate, forming a head plate bent arm, forming hanging iron, overturning the head plates, welding the side head plate with the middle head plate and checking the roof steel structure, wherein the middle head plate is welded with the side head plate through gas metal arc welding, the weld is automatically welded by a welding buggy, a welding gun can locally swing on the welding buggy, a walking rail is an aluminum alloy walking rail, and the rail is adsorbed on the head plate through a magnet device to realize automatic mechanical welding. The welding device is used for improving the production efficiency of the roof steel structure, reducing the welding deformation, reducing the labor intensity of workers and improving the production environment. The middle head plate is manufactured in the following manner: welding each three head plates to a middle head plate module through plasma welding, and welding the middle head plate module at a roof reverse installation working position. The combined welding mode both reduces the manual welding quantity and avoids the problem of tire dropping difficulty in integral welding.

Description

Trolley coach steel structure of car roof manufacturing process
Technical field
The present invention relates to a kind of trolley coach steel structure of car roof manufacturing process.
Background technology
At present the main manufacturing process flow of steel structure of car body roof is: middle top board makings → side top board composition → top board camber beam composition, hang iron composition → top board upset → side top board and middle top board welds → delivers for a check.Wherein instead fill the 2mm steel plate that the upper top board structure of station consists of 16 or 17 about 1.5m * 3m and be welded; and the formal dress station upside top board after top board upset and middle top board are about 26m lengthwise weld seam along whole vehicle commander's direction; all with the form of lap joint; adopt manually-operated semi-automatic gas shielded arc welding method to weld; labour intensity is large; welding deformation is large and be difficult to control, and production efficiency is low.
Gas metal-arc welding is a kind of energy-efficient, low hydrogen type welding method, uses widely at home, is called a kind of important melting method.Along with the manufacturing high speed development of railway transportation equipment, increasing solder technology adopts automatic welding technique, improves working conditions, and enhances productivity, and the manufacture level of enterprise frees enterprise from labor-intensive production.And the side top board in the car body steel structure of car roof and middle top board are along the lengthwise weld seam of whole vehicle commander's direction; still adopt manually-operated semi-automatic gas shielded arc welding method to weld; for improving car body welding quality and efficient; need a kind of manufacturing new technology; further enhance productivity, reduce welding deformation.
Summary of the invention
Technical problem to be solved by this invention is, overcomes the above-mentioned deficiency of prior art, and a kind of trolley coach steel structure of car roof manufacturing process is provided.
In order to solve above technical problem; trolley coach steel structure of car roof manufacturing process provided by the invention; it is characterized in that: gas metal-arc welding is adopted in the welding of middle top board and side top board; it utilizes a kind of welder to realize; described welder forms and comprises: welding system; guide rail; the walking dolly that can move along guide rail; dolly is provided be used to opening rail wheel and makes it prop up the rail wheel arrangement of clutch of guide rail; described guide rail bottom interval is equipped with for the magnet arrangement that guide rail is adsorbed on the top board; described dolly is provided with can be along the welding torch position guiding mechanism of guide rail vertical direction adjusting; the outer end of described welding torch position guiding mechanism is fixed with welding gun oscillation mechanism; be provided with the welding gun clip for the described welding system welding gun of clamping on the described welding gun oscillation mechanism, the welding method step is as follows:
The first step, side top board and middle top board overlap joint;
Second step, guide rail is adsorbed on the middle top board weld seam of described guide rail parallel between middle top board and side top board by magnet arrangement;
The 4th goes on foot, is fixed on the guide rail by the wheel of rail wheel arrangement of clutch with walking dolly;
The 3rd goes on foot, passes through the welding torch position guiding mechanism regulates welding torch position, makes welding gun aim at described weld seam;
The angle of the 5th step, adjustment welding gun angle of inclination and welding gun and weld seam makes its suitable automatic welding;
The 6th step, the dolly speed of welding is set is 11.4-13.5 mm/s, and adjustments welding current is 120-160A, adjustment weldingvoltage 21-25V;
The 7th step, dolly begin automatically to stop arc by the speed of welding walking that sets after being welded to the setting weld length, and automatic stopping.
The present invention further improves and is:
1, described the 7th the step in, dolly in welding process according to laser designation weld seam deviation manual fine-tuning welding torch position.
2, middle top board manufacture method is: carry out PLASMA ARC WELDING take 3 curved plates as one group, top board module in the formation turns round middle top board module to the anti-station that fills of roof to fall and will be welded to connect between the top board module in each behind the tire, finally forms elongated middle top board.
3, described welding torch position guiding mechanism comprises slide bar, the slide block that is mated, and locking device.
4, on the described guide rail disassembling handle that separates with top board for magnet arrangement is installed.
5, described welder also has the welding gun water-cooling system.
6, the magnet arrangement of described welder is a kind of in electromagnet, the permanent magnet.
Beneficial effect of the present invention is as follows:
The weld seam that the present invention is directed between top board and the side top board uses welding tractor to carry out automatic welding, welding gun can locally swing on welding tractor, the walking track can adopt aluminium alloy walking track, and track is adsorbed on the top board by magnet arrangement, realizes the machine automatization welding.Use welder to improve the production efficiency of coach roof steel construction, reduce welding deformation, and reduced workman's labour intensity, improve production environment.The automatic welding that top and side overhead welding stitched during enforcement by this scheme can realize has improved the side top board and has got welding quality.
Simultaneously, the manufacturing of middle top board first with top board module in forming by Plasma Welding between per 3, and then is placed the anti-station that fills of roof and is welded.This Combination Welding form had both reduced artificial welding capacity, had also avoided simultaneously the integral solder tire hard problem that falls.
Description of drawings
Fig. 1 is the embodiment of the invention one structural representation.
The specific embodiment
Trolley coach steel structure of car roof manufacturing process comprises: middle top board making → side top board composition → top board camber beam forms, hang iron composition → top board upset → side top board and middle top board welds → delivers for a check.Wherein, gas metal-arc welding is adopted in the welding of middle top board and side top board; it utilizes a kind of welder to realize; welder comprises: welding system; the welding gun water-cooling system; guide rail 2; the walking dolly 4 that can move along guide rail; dolly is provided be used to opening rail wheel and makes it prop up the rail wheel arrangement of clutch of guide rail; the guide rail bottom interval is equipped with for this example of magnet arrangement 3(that guide rail is adsorbed on the top board and adopts electromagnet; also and select permanent magnet); dolly is provided with can be along the welding torch position guiding mechanism 6 of guide rail 2 vertical direction adjusting; the outer end of welding torch position guiding mechanism 6 is fixed with welding gun oscillation mechanism 7, is provided with the welding gun clip 8 for the described welding system welding gun of clamping on the welding gun oscillation mechanism 7.1 is tooth on the guide rail among the figure.
The welding method step is as follows:
The first step, side top board and middle top board overlap joint;
Second step, guide rail is adsorbed on the middle top board weld seam of described guide rail parallel between middle top board and side top board by magnet arrangement;
The 4th goes on foot, is fixed on the guide rail by the wheel of rail wheel arrangement of clutch with walking dolly;
The 3rd goes on foot, passes through the welding torch position guiding mechanism regulates welding torch position, makes welding gun aim at described weld seam;
The angle of the 5th step, adjustment welding gun angle of inclination and welding gun and weld seam makes its suitable automatic welding;
The 6th step, the dolly speed of welding is set is 11.4-13.5 mm/s, and adjustments welding current is 120-160A, adjustment weldingvoltage 21-25V;
The 7th step, dolly begin automatically to stop arc by the speed of welding walking that sets after being welded to the setting weld length, and automatic stopping.In this step, dolly can be according to laser designation weld seam deviation manual fine-tuning welding torch position in welding process.
Middle top board manufacture method is: carry out PLASMA ARC WELDING take 3 curved plates as one group, top board module in the formation turns round middle top board module to the anti-station that fills of roof to fall and will be welded to connect between the top board module in each behind the tire, finally forms elongated middle top board.Adopt automanual gas shielded arc welding to connect between the middle top board module.
As shown in Figure 1, the welding torch position guiding mechanism of welder comprises slide bar, the slide block that is mated, and locking device.The disassembling handle that separates with top board for magnet arrangement is installed on the guide rail.
In addition to the implementation, the present invention can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of requirement of the present invention.

Claims (7)

1. trolley coach steel structure of car roof manufacturing process; it is characterized in that: gas metal-arc welding is adopted in the welding of middle top board and side top board; it utilizes a kind of welder to realize; described welder forms and comprises: welding system; guide rail; the walking dolly that can move along guide rail; dolly is provided be used to opening rail wheel and makes it prop up the rail wheel arrangement of clutch of guide rail; described guide rail bottom interval is equipped with for the magnet arrangement that guide rail is adsorbed on the top board; described dolly is provided with can be along the welding torch position guiding mechanism of guide rail vertical direction adjusting; the outer end of described welding torch position guiding mechanism is fixed with welding gun oscillation mechanism; be provided with the welding gun clip for the described welding system welding gun of clamping on the described welding gun oscillation mechanism, the welding method step is as follows:
The first step, side top board and middle top board overlap joint;
Second step, guide rail is adsorbed on the middle top board weld seam of described guide rail parallel between middle top board and side top board by magnet arrangement;
The 4th goes on foot, is fixed on the guide rail by the wheel of rail wheel arrangement of clutch with walking dolly;
The 3rd goes on foot, passes through the welding torch position guiding mechanism regulates welding torch position, makes welding gun aim at described weld seam;
The angle of the 5th step, adjustment welding gun angle of inclination and welding gun and weld seam makes its suitable automatic welding;
The 6th step, the dolly speed of welding is set is 11.4-13.5 mm/s, and adjustments welding current is 120-160A, adjustment weldingvoltage 21-25V;
The 7th step, dolly begin automatically to stop arc by the speed of welding walking that sets after being welded to the setting weld length, and automatic stopping.
2. trolley coach steel structure of car roof manufacturing process according to claim 1 is characterized in that: in described the 7th step, dolly in welding process according to laser designation weld seam deviation manual fine-tuning welding torch position.
3. trolley coach steel structure of car roof manufacturing process according to claim 1, it is characterized in that: middle top board manufacture method is: carry out PLASMA ARC WELDING take 3 curved plates as one group, top board module in the formation, middle top board module is turned round to the anti-station that fills of roof to fall and will be welded to connect between the top board module in each behind the tire, finally form elongated middle top board.
4. trolley coach steel structure of car roof manufacturing process according to claim 1, it is characterized in that: described welding torch position guiding mechanism comprises slide bar, the slide block that is mated, and locking device.
5. trolley coach steel structure of car roof manufacturing process according to claim 1 is characterized in that: the disassembling handle that separates with top board for magnet arrangement is installed on the described guide rail.
6. trolley coach steel structure of car roof manufacturing process according to claim 1, it is characterized in that: described welder also has the welding gun water-cooling system.
7. trolley coach steel structure of car roof manufacturing process according to claim 1 is characterized in that: the magnet arrangement of described welder is a kind of in electromagnet, the permanent magnet.
CN201210352068.7A 2012-09-20 2012-09-20 Roof steel structure manufacturing technique of railway vehicles Active CN102861973B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210352068.7A CN102861973B (en) 2012-09-20 2012-09-20 Roof steel structure manufacturing technique of railway vehicles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210352068.7A CN102861973B (en) 2012-09-20 2012-09-20 Roof steel structure manufacturing technique of railway vehicles

Publications (2)

Publication Number Publication Date
CN102861973A true CN102861973A (en) 2013-01-09
CN102861973B CN102861973B (en) 2015-03-04

Family

ID=47441248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210352068.7A Active CN102861973B (en) 2012-09-20 2012-09-20 Roof steel structure manufacturing technique of railway vehicles

Country Status (1)

Country Link
CN (1) CN102861973B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103753072A (en) * 2014-01-08 2014-04-30 无锡汉神电气有限公司 Welding trolley with flexible guide rail
CN104096955A (en) * 2013-04-11 2014-10-15 中色十二冶金建设有限公司 Aluminum busbar narrow-gap special MIG (Metal-Inert Gas) welding machine
CN103342141B (en) * 2013-07-29 2016-01-13 江西博能上饶客车有限公司 The electromagnetism hanging device of mini-bus car load Top Skin
CN105834547A (en) * 2016-05-28 2016-08-10 广州科勒尔制冷设备有限公司 Automatic welding equipment for galvanized ice molds
CN106238971A (en) * 2016-08-16 2016-12-21 广东广都电扶梯部件有限公司 Escalator frame and the welding method of base plate
CN106425194A (en) * 2016-08-15 2017-02-22 广东广都电扶梯部件有限公司 Escalator frame and bottom plate welding method
CN107825016A (en) * 2017-10-20 2018-03-23 中船黄埔文冲船舶有限公司 A kind of building berth closes up greatly vertical weld automatic soldering device
CN114264787A (en) * 2021-12-22 2022-04-01 抚顺市特种设备监督检验所 Phased array detection device and detection method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6494307B1 (en) * 1997-09-08 2002-12-17 Weld Tooling Corporation Flexible track and carriage system
WO2007090404A1 (en) * 2006-02-06 2007-08-16 Force Technology Carriage for automating welding, brazing, cutting and surface treatment processes
CN101913018A (en) * 2010-08-17 2010-12-15 申巧言 Gas metal arc welding stand welding machine and method for controlling oscillation and motion thereof
CN101941123A (en) * 2009-07-03 2011-01-12 中国北车集团大同电力机车有限责任公司 Method for fillet welding in overhead position for welding tractor
CN202283623U (en) * 2011-11-07 2012-06-27 南车眉山车辆有限公司 Automatic welding device for box car roof camber beam weld
CN202283624U (en) * 2011-11-07 2012-06-27 南车眉山车辆有限公司 Automatic welding device for weld joint of Z-shaped side beam of roof and roof plate of covered wagon

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6494307B1 (en) * 1997-09-08 2002-12-17 Weld Tooling Corporation Flexible track and carriage system
WO2007090404A1 (en) * 2006-02-06 2007-08-16 Force Technology Carriage for automating welding, brazing, cutting and surface treatment processes
CN101941123A (en) * 2009-07-03 2011-01-12 中国北车集团大同电力机车有限责任公司 Method for fillet welding in overhead position for welding tractor
CN101913018A (en) * 2010-08-17 2010-12-15 申巧言 Gas metal arc welding stand welding machine and method for controlling oscillation and motion thereof
CN202283623U (en) * 2011-11-07 2012-06-27 南车眉山车辆有限公司 Automatic welding device for box car roof camber beam weld
CN202283624U (en) * 2011-11-07 2012-06-27 南车眉山车辆有限公司 Automatic welding device for weld joint of Z-shaped side beam of roof and roof plate of covered wagon

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
上海伊道自动化焊接设备有限公司: "CO2气体保护自动焊接小车作业指南", 《豆丁网》, 10 March 2012 (2012-03-10) *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104096955A (en) * 2013-04-11 2014-10-15 中色十二冶金建设有限公司 Aluminum busbar narrow-gap special MIG (Metal-Inert Gas) welding machine
CN104096955B (en) * 2013-04-11 2017-07-28 中色十二冶金建设有限公司 Aluminium busbar narrow gap MIG special welding machines
CN103342141B (en) * 2013-07-29 2016-01-13 江西博能上饶客车有限公司 The electromagnetism hanging device of mini-bus car load Top Skin
CN103753072A (en) * 2014-01-08 2014-04-30 无锡汉神电气有限公司 Welding trolley with flexible guide rail
CN105834547A (en) * 2016-05-28 2016-08-10 广州科勒尔制冷设备有限公司 Automatic welding equipment for galvanized ice molds
CN106425194A (en) * 2016-08-15 2017-02-22 广东广都电扶梯部件有限公司 Escalator frame and bottom plate welding method
CN106238971A (en) * 2016-08-16 2016-12-21 广东广都电扶梯部件有限公司 Escalator frame and the welding method of base plate
CN107825016A (en) * 2017-10-20 2018-03-23 中船黄埔文冲船舶有限公司 A kind of building berth closes up greatly vertical weld automatic soldering device
CN114264787A (en) * 2021-12-22 2022-04-01 抚顺市特种设备监督检验所 Phased array detection device and detection method

Also Published As

Publication number Publication date
CN102861973B (en) 2015-03-04

Similar Documents

Publication Publication Date Title
CN102861973B (en) Roof steel structure manufacturing technique of railway vehicles
CN102773592B (en) Method for welding carbon steel medium plate
CN102049591B (en) Dissimilar metal spot welding system of light metal and coated steel and welding method thereof
CN204470767U (en) Based on the modified node method of automatic submerged arc welding machine when welding H profile steel
CN102896398A (en) Aluminum alloy arc spot welding method based on CMT (Cold Metal Transmission Welding) and welding system
CN104043914B (en) Hollow piston lever of reducer laser weld special active agent and its preparation method and application
CN105364269A (en) Fusion welding method for copper plates and alloys thereof
CN101564790A (en) Gas protection welding process for offshore steel structure
CN104139229B (en) Form the welding method of T junction
CN201427536Y (en) High-intensity abrasion-proof steel plate car hopper
CN105345322B (en) Full carrying van side carriage plate welding procedure
CN104551339A (en) Welding method of boiler economizer
CN202763260U (en) Railway coach roof steel structure welding device
CN102528239B (en) Automatic welding method and positioning device of small side wall of concave-bottom double-layer transport vehicle
CN103370163A (en) Gas shielded arc welding method and welding apparatus
CN105269167B (en) It is complete to carry van-type front part of the carriage plate weld technique
CN106270956A (en) A kind of orthotropic plate U angle of rib weld seam transverse presentation symmetry mariages complex welding method
CN107096982A (en) Suitable for H profile steel submerged-arc welding welding gun positioner
CN109435619B (en) Cab stabilizer bar and assembling process thereof
CN103386539A (en) Track-free submerged arc automatic welding method and device
CN203410514U (en) Frame structure and mining dump vehicle
CN216263970U (en) Welding device for double-sided automatic fillet welding of U-shaped stiffening rib
CN104551406A (en) Activity-enhanced MAG composite welding method for side beam of railway vehicle
CN208787732U (en) Cross structure submerged arc welding carriage hanger
CN210908471U (en) Iron tower foot robot welding set

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 210031 Nanjing province high tech Industrial Development Zone, Taishan Park, North Pearl Road, No. 68

Patentee after: CRRC NANJING PUZHEN CO., LTD.

Address before: 210031 Nanjing province high tech Industrial Development Zone, Taishan Park, North Pearl Road, No. 68

Patentee before: CSR NANJING PUZHEN Vehicles Co., Ltd.