CN102852344A - Construction method for dismounting high-rise cast-in-place concrete building - Google Patents
Construction method for dismounting high-rise cast-in-place concrete building Download PDFInfo
- Publication number
- CN102852344A CN102852344A CN2012102932302A CN201210293230A CN102852344A CN 102852344 A CN102852344 A CN 102852344A CN 2012102932302 A CN2012102932302 A CN 2012102932302A CN 201210293230 A CN201210293230 A CN 201210293230A CN 102852344 A CN102852344 A CN 102852344A
- Authority
- CN
- China
- Prior art keywords
- floor
- building
- dismounting
- floors
- ejecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a construction method for dismounting a high-rise cast-in-place concrete building. The construction method comprises the following steps of: (1) carrying out security checking calculation on bearing capability according to a load applied to a building structure when a building dismounting machine carries out dismounting operation among floors; arranging ejecting and supporting structures between the adjacent floors from a floor to be constructed to the bottom, wherein the ejecting and supporting structures are respectively ejected and fastened against an upper floor plate and a lower floor plate; and the quantity of floors in need of arranging the ejecting and supporting structures, and the quantity and the arrangement positions of the ejecting and supporting structures can be determined according to data obtained through the security checking calculation; (2) building a protection facility and erecting a passageway; (3) hoisting, assembling and debugging the building dismounting machine; and (4) crushing and dismounting the floors by using the floor dismounting machine. With the adoption of the construction method for dismounting the high-rise cast-in-place concrete building, provided by the invention, the bearing capabilities of a plurality of layers of floors are overlapped by using the ejecting and supporting structures, so as to provide the security for a large-size machine to do upstairs operation. The difficult problem that the large-size machine cannot be used for dismounting the high-rise building can be solved.
Description
Technical field
The invention belongs to the demolishing buildings technical field, be specifically related to a kind of high-rise cast-in-situ concrete building demolition job practices.
Background technology
Projects has three kinds of forms such as demolition blasting, mechanical removal and manual demolition usually, the demolition blasting mode has removes that efficient is high, the duration is short, social influence is large, the attention rate advantages of higher, but the simultaneous risk is high, coordinate difficulty large, surrounding enviroment are required the shortcoming such as height.Usually in the situation that Government-Leading, surrounding enviroment better, coordinate the difficulty less, easily cause that media and the masses pay close attention to and adopt, in the comparatively harsh business district, city of condition, relatively less employing; Manual demolition, because the workman utilizes small mechanical equipment to remove, strong adaptability is applicable to any place situation, shortcoming is that work efficiency is low, long in time limit, expense is high, labour protection and safety management requirement are high; Mechanical removal, long-armed tear open building machine (long-armed hydraulic shear) remove now comparatively general in remove in the city, mainly for median low structure, according to incompletely statistics, after floor surpasses 28m, do not allow big machinery to go upstairs, can only cooperate to finish dismounting work by artificial and small-sized machine.When highrise building is removed, because the gravity of big machinery self is far longer than the former design holding capacity of floor, when big machinery was removed operation at high-storey, meeting can not bear its gravity because of floor and service load caves in, and causes casualties and mechanical failure.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of city, safe and reliable high-rise cast-in-situ concrete building machinery Demolition Construction method not using demolition blasting and manual demolition.
In order to solve the problems of the technologies described above, the invention provides a kind of high-rise cast-in-situ concrete building demolition job practices, may further comprise the steps:
(1) when tearing building machinery open remove operation in floor, the load to building structure applies carries out the safety checking computations to its supporting capacity; From floor to be onstructed down, arrange between the contiguous floors and shore structure, the described structure of shoring holds out against respectively upper and lower floor; Required layout is shored the number of floor levels of structure and is shored quantity and the installation position of structure, is determined by the data that described safety checking computations obtain;
(2) setting up of the upper and lower passage of building of protective equipment, and construction material and lower waste residue passage;
(3) tear broken-up and hanging and assembling and the debugging of building machinery open;
(4) tear building machinery open floor is carried out demolition reduction; When floor is removed, sprinkled water synchronously in the position of removing;
According to above-mentioned construction sequence from top to bottom layering remove floor; The waste residue passage slag that falls under when removing, utilizing; Dregs in time transports out of.In step (1), need to build the number of floor levels of shoring structure and calculate gained according to floor supporting capacity data, by shoring the setting of structure, the mode of multi-layer construction structure approximate " stack " is combined, compare singlestory building structure (particularly floor), its supporting capacity has obtained greatly strengthening, avoid because the building structure supporting capacity is not enough, cause tear open building machinery in construction because of reason generation security incidents such as flooring cave in, for big machinery provides a safe and reliable working platform when highrise building is removed work; Lower waste residue passage in the step (2) is so that the waste residue that the dismounting floor produces in time transports out of, and the waste residue that has reduced upper strata floor dismounting generation is deposited in the active force that on lower floor's floor lower floor's floor is produced; Broken-up and hanging and assembling and debugging to tearing building machinery open in the step (3) are to begin operation from top layer for convenient upstairs in the medium-and-large-sized mechanical energy of whole dismounting work, also can be by other hanging methods the whole disposable top layer that hangs on building of building machine of tearing open; Tearing open when building machinery is removed floor in the step (4) and sprinkle water synchronously, is when preventing from constructing, and the excessive contaminated environment of airborne dust has also avoided airborne dust to affect staff's normal operation simultaneously.
Compared with prior art, the present invention accepts ground with the gravity of big machinery (long-armed building machine, the large excavator of tearing open) from floor by shoring structure (wood supports, hydraulic pressure is shored, steel beam structure), the supporting capacity of multilayer floor is stacked up, for big machinery provides safe operating environment, solved the difficult problem that big machinery can not be removed high-rise building, because the work of big machinery, removing with respect to artificial or small-sized machine provides operating efficiency greatly, has shortened the duration; Set up between contiguous floors and shore structure, can realize support to big machinery by the supporting device two ends being held out against floor, whole working procedure is simple, and is with low cost; The arranging of construction material passage and lower waste residue passage solved the timely transportation of entering of machinery and waste residue.
As the further restriction of technical solution of the present invention, in order to increase the safety of big machinery, can adopt orderly release when in described step (4), floor being removed, order is floor, nonbearing wall, beam, load bearing wall, post successively.
The specific embodiment
The invention provides a kind of high-rise cast-in-situ concrete building demolition job practices, may further comprise the steps:
(1) when tearing building machinery open remove operation in floor, the load to building structure applies carries out the safety checking computations to its supporting capacity; From floor to be onstructed down, arrange between the contiguous floors and shore structure, the described structure of shoring holds out against respectively upper and lower floor; Required layout is shored the number of floor levels of structure and is shored quantity and the installation position of structure, is determined by the data that described safety checking computations obtain;
(2) setting up of the upper and lower passage of building of protective equipment, and construction material and lower waste residue passage;
(3) tear broken-up and hanging and assembling and the debugging of building machinery open;
(4) tear building machinery open floor is carried out demolition reduction; When floor is removed, sprinkled water synchronously in the position of removing;
According to above-mentioned construction sequence from top to bottom layering remove floor; The waste residue passage slag that falls under when removing, utilizing; Dregs in time transports out of.
Embodiment one:
Before carrying out mechanical removal, around main building, set up in advance double construction guard fender and walkway frame, the building body is formed closed.At first water waters floor and the body of wall of floor, when preventing from constructing, and the excessive contaminated environment of airborne dust; Adopt again small-sized machine to be (3 * 4) m in two sizes of the strong supporting location cutting of each layer
2Otch (can consider to adopt elevator shaft), at otch chute, hoist engine are installed again, make it form up and down up and down transport passage for transporting of waste passage and facility.
Behind lower channel on the protection of finishing laying necessity and waste passage and the facility, employing tear open the building machine with floor, wall, beam, post carry out fragmentation (eaves, balcony, external staircase etc. in Demolition Construction easily unstability outer choose member can utilize manually first removed), fragmentation is sprayed water simultaneously; Then adopt oxygen, acetylene welder cutting reinforcing bar; Utilize at last the lower waste residue passage slag that falls, carry out the depositing dust spray in the time of scarfing cinder.After removing dregs, remove this layer scaffold, protective screening.Adopt excavator filling, the slag field of self-tipping type automobile from bottom shipment building waste to government's appointment.
Impact force when preventing that column from collapsing damages structure, and the column collapse direction should be chosen on the position of lower floor's beam or wall; The reinforcing bar of column cut-off parts is stripped out, the structure muscle of reciprocal reinforcing bar and both sides is cut off, break to collapse direction.Rum point arranges building waste or straw bag, carries out the buffering precautions against earthquakes.
Above-described only is preferred embodiment of the present invention, should be understood that for a person skilled in the art, not breaking away under the prerequisite of the present invention, can also make some distortion and improvement, these can not affect effect of the invention process and practical applicability.
Claims (2)
1. high-rise cast-in-situ concrete building demolition job practices is characterized in that: may further comprise the steps:
(1) load that building structure is applied when tearing building machinery open remove operation in floor carries out the safety checking computations to its supporting capacity; From floor to be onstructed down, arrange between the contiguous floors and shore structure, the described structure of shoring holds out against respectively upper and lower floor; Required layout is shored the number of floor levels of structure and is shored quantity and the installation position of structure, is determined by the data that described safety checking computations obtain;
(2) setting up of the upper and lower passage of building of protective equipment, and construction material and lower waste residue passage;
(3) tear broken-up and hanging and assembling and the debugging of building machinery open;
(4) tear building machinery open floor is carried out demolition reduction; When floor is removed, sprinkled water synchronously in the position of removing;
According to above-mentioned construction sequence from top to bottom layering remove floor; The waste residue passage slag that falls under when removing, utilizing; Dregs in time transports out of.
2. the cast-in-place frame of high level according to claim 1 is cut building big machinery Demolition Construction method, it is characterized in that: the order to the dismounting of floor in described step (4) is floor, nonbearing wall, beam, load bearing wall, post successively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210293230.2A CN102852344B (en) | 2012-08-17 | 2012-08-17 | Construction method for dismounting high-rise cast-in-place concrete building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210293230.2A CN102852344B (en) | 2012-08-17 | 2012-08-17 | Construction method for dismounting high-rise cast-in-place concrete building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102852344A true CN102852344A (en) | 2013-01-02 |
CN102852344B CN102852344B (en) | 2014-11-05 |
Family
ID=47399284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210293230.2A Expired - Fee Related CN102852344B (en) | 2012-08-17 | 2012-08-17 | Construction method for dismounting high-rise cast-in-place concrete building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102852344B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926976A (en) * | 2016-03-31 | 2016-09-07 | 大连久鼎祥瑞特种工程技术研究院有限公司 | Method for non-blasting rapid directional demolition of building |
CN106907020A (en) * | 2017-04-14 | 2017-06-30 | 金陵科技学院 | A kind of recycling machinery for building |
CN107419918A (en) * | 2017-07-27 | 2017-12-01 | 上海二十冶建设有限公司 | A kind of Historical Buildings periphery single-layer frame retains method for dismounting |
CN107642251A (en) * | 2017-09-20 | 2018-01-30 | 江山(福建)建设工程有限公司 | A kind of high-rise cast-in-place concrete building demolition construction method |
CN108518083A (en) * | 2018-03-27 | 2018-09-11 | 五冶集团上海有限公司 | The Demolition Construction method of main sintering building |
JP2018178634A (en) * | 2017-04-19 | 2018-11-15 | 株式会社Tom | Permanent form, method of forming bundle column, and method of dismantling building |
CN110512895A (en) * | 2019-08-22 | 2019-11-29 | 温州金茂建设有限公司 | A kind of high-rise cast-in-place concrete building demolition construction method |
CN113027167A (en) * | 2021-03-19 | 2021-06-25 | 中建八局天津建设工程有限公司 | Environment-friendly demolition method for high-rise building |
CN113482398A (en) * | 2021-06-30 | 2021-10-08 | 上海宝冶集团有限公司 | Gravity overturning building dismantling construction method |
CN113833309A (en) * | 2021-09-29 | 2021-12-24 | 山东建筑大学 | Construction method for mechanically dismantling building group and application |
CN114397844A (en) * | 2022-01-12 | 2022-04-26 | 厦门安科科技有限公司 | Control method and control device of building dismantling machine based on multi-channel interaction |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH116310A (en) * | 1997-06-18 | 1999-01-12 | Ohbayashi Corp | Demolition method of multi-story building |
CN1511216A (en) * | 2001-05-22 | 2004-07-07 | 西松建设株式会社 | Building demolishing method |
CN101967888A (en) * | 2010-10-20 | 2011-02-09 | 江苏江中集团有限公司 | Multidirectional multi-fold blasting method for high-rise building with frame-shear structure |
-
2012
- 2012-08-17 CN CN201210293230.2A patent/CN102852344B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH116310A (en) * | 1997-06-18 | 1999-01-12 | Ohbayashi Corp | Demolition method of multi-story building |
CN1511216A (en) * | 2001-05-22 | 2004-07-07 | 西松建设株式会社 | Building demolishing method |
CN101967888A (en) * | 2010-10-20 | 2011-02-09 | 江苏江中集团有限公司 | Multidirectional multi-fold blasting method for high-rise building with frame-shear structure |
Non-Patent Citations (1)
Title |
---|
张锋: "续建高层建筑的拆除改建施工技术", 《建筑施工》, 31 October 2002 (2002-10-31) * |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926976B (en) * | 2016-03-31 | 2018-09-04 | 大连久鼎祥瑞特种工程技术研究院有限公司 | The method of non-explosion slewing demolition of buildings |
CN105926976A (en) * | 2016-03-31 | 2016-09-07 | 大连久鼎祥瑞特种工程技术研究院有限公司 | Method for non-blasting rapid directional demolition of building |
CN106907020A (en) * | 2017-04-14 | 2017-06-30 | 金陵科技学院 | A kind of recycling machinery for building |
JP2018178634A (en) * | 2017-04-19 | 2018-11-15 | 株式会社Tom | Permanent form, method of forming bundle column, and method of dismantling building |
CN107419918A (en) * | 2017-07-27 | 2017-12-01 | 上海二十冶建设有限公司 | A kind of Historical Buildings periphery single-layer frame retains method for dismounting |
CN107419918B (en) * | 2017-07-27 | 2019-06-14 | 上海二十冶建设有限公司 | A kind of Historical Buildings periphery single-layer frame retains method for dismounting |
CN107642251A (en) * | 2017-09-20 | 2018-01-30 | 江山(福建)建设工程有限公司 | A kind of high-rise cast-in-place concrete building demolition construction method |
CN108518083B (en) * | 2018-03-27 | 2020-09-11 | 五冶集团上海有限公司 | Dismantling construction method of sintering main workshop |
CN108518083A (en) * | 2018-03-27 | 2018-09-11 | 五冶集团上海有限公司 | The Demolition Construction method of main sintering building |
CN110512895A (en) * | 2019-08-22 | 2019-11-29 | 温州金茂建设有限公司 | A kind of high-rise cast-in-place concrete building demolition construction method |
CN113027167A (en) * | 2021-03-19 | 2021-06-25 | 中建八局天津建设工程有限公司 | Environment-friendly demolition method for high-rise building |
CN113482398A (en) * | 2021-06-30 | 2021-10-08 | 上海宝冶集团有限公司 | Gravity overturning building dismantling construction method |
CN113482398B (en) * | 2021-06-30 | 2023-02-28 | 上海宝冶集团有限公司 | Gravity overturning building dismantling construction method |
CN113833309A (en) * | 2021-09-29 | 2021-12-24 | 山东建筑大学 | Construction method for mechanically dismantling building group and application |
CN114397844A (en) * | 2022-01-12 | 2022-04-26 | 厦门安科科技有限公司 | Control method and control device of building dismantling machine based on multi-channel interaction |
CN114397844B (en) * | 2022-01-12 | 2023-05-09 | 厦门安科科技有限公司 | Control method and control device of building dismantling machine based on multi-channel interaction |
Also Published As
Publication number | Publication date |
---|---|
CN102852344B (en) | 2014-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102852344B (en) | Construction method for dismounting high-rise cast-in-place concrete building | |
CN107119584A (en) | A kind of method for dismounting of concrete rigid frame arch bridge | |
CN105926669A (en) | Construction method of subway station | |
CN106088478A (en) | Tilt strength steel concrete cylinder construction method | |
CN113152928B (en) | Dismantling method for super high-rise building | |
JP2007016432A (en) | Demolition and curing unit, and construction method for demolishing skyscraper by using it | |
CN113833309A (en) | Construction method for mechanically dismantling building group and application | |
CN107254974A (en) | A kind of skyscraper removes device and its method quickly removed using the device | |
CN107419918A (en) | A kind of Historical Buildings periphery single-layer frame retains method for dismounting | |
CN106679519A (en) | Static blasting demolition method for interior reinforced concrete supports | |
CN107642251A (en) | A kind of high-rise cast-in-place concrete building demolition construction method | |
CN203961238U (en) | Bolt anchor slab adjustable tool formula builder's jack | |
CN112983047A (en) | Static cutting demolition method suitable for blasting demolition | |
CN112431439A (en) | Mechanized crushing and dismantling method for low-rise building | |
CN110685459B (en) | Breaking hammer dismantling construction method for dismantling hoist bent from lower part | |
CN110485752B (en) | High-rise building dismantling method and machine | |
CN105569375B (en) | Large and complex steel structure cell body protective demolition and installation method | |
JPH1130038A (en) | Demolition/construction method of building and curing body used therefor | |
CN112727147A (en) | Outdoor suspended step dismantling method | |
CN114961335B (en) | Demolition construction method for large-span reinforced concrete support beam | |
CN103243912A (en) | Multilayer no-board frame structure constructing method | |
CN205654063U (en) | Tower crane concrete cap's safety protection platform is demolishd in high altitude | |
CN112923820B (en) | Perforation charge explosion method suitable for blasting demolition of middle upright column | |
CN104963344B (en) | The deep basal pit underground construction method that concrete supporting removal and structure construction are synchronously carried out | |
US11988004B2 (en) | Method for the disassembly of tower of a wind power plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141105 Termination date: 20180817 |
|