CN102847786B CN201110183621.4A CN201110183621A CN102847786B CN 102847786 B CN102847786 B CN 102847786B CN 201110183621 A CN201110183621 A CN 201110183621A CN 102847786 B CN102847786 B CN 102847786B
Authority
CN
China
Prior art keywords
die
module
metalwork
cut
punching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110183621.4A
Other languages
Chinese (zh)
Other versions
CN102847786A (en
Inventor
王哲英
马明旭
王哲锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Ji Zhi Intellectual Property Service Co ltd
Original Assignee
Shenyang University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang University of Technology filed Critical Shenyang University of Technology
Priority to CN201110183621.4A priority Critical patent/CN102847786B/en
Publication of CN102847786A publication Critical patent/CN102847786A/en
Application granted granted Critical
Publication of CN102847786B publication Critical patent/CN102847786B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides the process for stamping that a kind of seriation porous complexity patches metalwork, it is characterized in that: the concrete steps of the method are as follows: (1), get metalwork base material, is then positioned over metalwork base material one-level and rushes and under the blanking die of dispersion hole, disperse punching and locating hole; (2), will disperse the metalwork after punching to move in secondary punching shaving die module, punching is carried out in residue position, hole, simultaneously two groups of corresponding limits that there is no arc incision on die-cut lower band feeding direction and have the cutting shoulder of circular arc one side; (3), do not have the symmetrical side of arc incision to carry out bending to two after die-cut; (4), the limit on the die-cut opposite that has arc incision; (5), to having the limit of arc incision and the limit on opposite thereof to carry out bending after die-cut; (6), the coupling part of cutting-off part and band; The present invention has increased the adaptability of mould, thereby has improved production efficiency, has extended die life.

Description

Seriation porous complexity patches process for stamping and the particular manufacturing craft thereof of metalwork
Technical field
The present invention relates to a class seriation porous complexity in electronic product and patch extrustion of metals technical field of mold, be specifically related to punching and be bent into the high-accuracy modularization progressive die of one.
Background technology
Patch metalwork for a class seriation porous complexity in electronic product at present, can adopt traditionally 3 kinds of methods: (1) many covers single dies are gone out multiple holes, and then with a secondary single die this product that is shaped. (2), according to shape of product feature, adopt many cover compound die substeps to be shaped. (3) adopt multi-station progressive die, first go out locating hole and multiple hole, then local blanking, is then shaped, final cutting, thus process this product.
In (1), (2) technique, its major defect is above: through the transmission of multiple moulds, product size and morpheme error consistency are poor, and therefore quality and forming accuracy are all difficult to ensure, and operation is long, and efficiency is low, and cost is high. For (3) technique, adopt multistation once to go out multiple holes and locating hole, easily cause the stress at some position of product to concentrate, thereby produce inhomogeneous deformation, and then affect the precision of product, reduced die life simultaneously. Although different station completes punching in a secondary mould, blanking, is shaped and cuts off, complex-shaped owing to patching metalwork, mould station is numerous, and template length is corresponding increase also, for monoblock type formwork structure in the time manufacturing other product of the same type, due to the variation of product profile and forming dimension, each mould parts all needs to redesign, and manufactures and assembling, increase die change, the difficulty of maintenance and maintenance, cannot realize the quick-replaceable of mold parts, has increased the manufacturing expense of mould simultaneously.
Summary of the invention
Goal of the invention: the invention provides a kind of seriation porous complexity and patch process for stamping and the particular manufacturing craft thereof of metalwork, its objective is the existing product size of solution drilling method in the past and morpheme error consistency is poor, quality and forming accuracy are all difficult to ensure, operation is long, efficiency is low, cost is high, easily cause the stress at some position of product concentrate so that affect product precision and die life low problem.
Technical scheme: the present invention is achieved by the following technical solutions:
Seriation porous complexity patches a process for stamping for metalwork, it is characterized in that: the concrete steps of the method are as follows:
(1), get metalwork base material, base material is carried out to surperficial cleaning, then metalwork base material being positioned over to one-level rushes to rush under the blanking die of dispersion hole and disperses punching and locating hole, punching disperses the concrete form of punching to be: to preset Kong Weiwei benchmark, disperse punching at interval of position, a hole;
(2), will disperse the metalwork after punching to move in secondary punching shaving die module, punching is carried out in residue position, hole, simultaneously two groups of corresponding limits that there is no arc incision on die-cut lower band feeding direction and have the cutting shoulder of circular arc one side; Pilot pin by two plug screw formulas in this step is accurately located metalwork base material;
(3), continue moving metal part to one-level bending mould module, in one-level bending mould module, do not have the symmetrical side of arc incision to carry out bending to two after die-cut; In this step, by gathering sill floating roof device, metalwork base material is led and floating roof;
(4), make metalwork move into the die-cut module of secondary, the limit on the die-cut opposite that has arc incision;
(5), enter secondary bending mould module, to having the limit of arc incision and the limit on opposite thereof to carry out bending after die-cut; At this moment at the another side of bending metals part base material, limit portion adopts the pilot pin that has the two plug screw formulas that can lock, leads and floating roof to metalwork base material by elastic guide groove floating roof device in middle part;
(6), enter cut-out die module, the coupling part of cutting-off part and band.
Implement the particular manufacturing craft that seriation porous complexity as above patches the process for stamping of metalwork, it is characterized in that: described mould comprises that one-level rushes the blanking die of dispersion hole, secondary punching shaving die module, one-level bending mould module, the die-cut module of secondary, secondary bending mould module and cut off die module;
Described one-level is rushed blanking die, secondary punching shaving die module, one-level bending mould module, the die-cut module of secondary, the secondary bending mould module of dispersion hole and is cut off all unified being arranged in template of die module;
Described one-level rush the blanking die, secondary punching shaving die module, one-level bending mould module, the die-cut module of secondary, secondary bending mould module of dispersion hole and cut off die module below make the metalwork base material stepping mechanism that step pitch is sent in accordance with regulations for transmitting metalwork base material;
One-level is rushed on the blanking die of dispersion hole, at interval of position, a hole, piercing punch is set, in secondary punching shaving die module, be provided with one-level and rush the punch that the punch location interval on the blanking die of dispersion hole arranges, limit, the both sides portion of secondary bending mould module is provided with the pilot pin of the two plug screw formulas that can lock metalwork base material, and the middle part of secondary bending mould module is provided with leads and the elastic guide groove floating roof device of floating roof to metalwork base material.
In described secondary punching shaving die module, be provided with the pilot pin that metalwork base material is carried out to pinpoint pair of plug screw formula.
Advantage and effect: the process for stamping that the invention provides a kind of seriation porous complexity and patch metalwork, in order to overcome existing shortcoming in original method, the invention provides a kind of high-accuracy modularization progressive die manufacturing process that porous complexity patches the punching of metalwork and is bent into one that relates to. The method mould used adopts high-accuracy modular formwork structure, each punching press station designs respectively independently formwork structure, and by suitably arranging idle station, can the be shaped complicated metalwork of porous of seriation of this mould, increase the adaptability of mould, thereby improve production efficiency, extended die life. By punching and blanking being carried out on band to dispersion treatment, punching and blanking divide symmetrical shaping several times, at every turn more targeted, concerning this mold, punch disperses, Center of Pressure, near mold center, has extended die life, is difficult for producing stress and concentrates and inhomogeneous deformation concerning product. Adopt crooked position to carry out on two stations of being separated by, diastrophic degree relaxes, and surface of the work is difficult for scratch, and mold work condition is greatly improved, and has improved the service life of mould. Meanwhile, operation disperses the product Shape decomposition of original complexity to become several unit, die point simple shape, and mould manufacture is simple and be convenient to the replacing after wearing and tearing.
The invention provides a kind of efficient feasible easy method of making the complicated metalwork of seriation porous, i.e. punching and be bent into the high-accuracy modularization progressive die manufacturing process of one.
Principle of the present invention and effect are as follows: (1) this mould adopts high-accuracy modular formwork structure, each punching press station designs respectively independently formwork structure, by suitable arrangement idle station, can the be shaped complicated metalwork of porous of seriation of this mould, increase the adaptability of mould, thereby improve production efficiency, extend die life (2) and adopted punching to be alternately distributed the method in hole, punching and blanking is carried out to dispersion treatment at band, punching and blanking divide symmetrical shaping several times, at every turn more targeted, concerning this mold, punch disperses, Center of Pressure is near mold center, extend die life, concerning product, being difficult for producing stress concentrates and inhomogeneous deformation. (3) adopt crooked position to carry out on two stations of being separated by, diastrophic degree relaxes, and surface of the work is difficult for scratch, and mold work condition is greatly improved, and has improved the service life of mould. meanwhile, operation disperses the product Shape decomposition of original complexity to become several unit, die point simple shape, and mould manufacture is simple and be convenient to the replacing after wearing and tearing.
Compared with the prior art, tool has the following advantages in the present invention:
1, the each station of the present invention designs respectively independently mould structure, when product size changes, as long as suitably change the mould structure of each module and suitably arrange idle station, the complicated metalwork of porous of seriation just can be shaped, increase the adaptability of mould, thereby improved production efficiency, extended die life.
2, the present invention has overcome monoblock type formwork structure in the time manufacturing other product of the same type, due to the variation of product profile and forming dimension, each mould parts all needs to redesign, manufacture and assembling, increased die change, the difficulty of maintenance and maintenance, cannot realize the quick-replaceable of mold parts, increase the manufacturing expense of mould simultaneously.
3, the present invention adopts punching to be alternately distributed the method in hole, be that punching and blanking carries out dispersion treatment at band, punching and blanking divide symmetrical shaping several times, at every turn more targeted, concerning this mold, punch disperses, and Center of Pressure is near mold center, extend die life, concerning product, be difficult for producing stress and concentrate and inhomogeneous deformation.
4, adopt crooked position to carry out on two stations of being separated by, diastrophic degree relaxes, and surface of the work is difficult for scratch, and mold work condition is greatly improved, and has improved the service life of mould. Meanwhile, operation disperses the product Shape decomposition of original complexity to become several unit, die point simple shape, and mould manufacture is simple and be convenient to the replacing after wearing and tearing.
5, the present invention is a kind of efficient feasible easy method of making the complicated metalwork of seriation porous, can under the high velocity ram machine of 200 tons and 125 tons, carry out punching, rushes fast 250 beats/min, and production efficiency doubles. The accuracy of manufacture of mould stepping accuracy and manufactured parts can reach 3um, and spare part is used interchangeably, and is suitable for the production of tandem product. Die life sharpening is once more than 1,000,000 jig frequencies, and greatly improve entire life. Be alternately distributed hole and the method for the station bending of being separated by by punching, reduced to a great extent workpiece inhomogeneous deformation, ensure the qualification rate of continuous punching, a die trial qualification rate can reach 90% simultaneously.
Implementation of the present invention is: the modularization progressive die that a class seriation porous complexity patches metalwork specifically comprises mould bases, one-level is rushed the blanking die module of dispersion hole, secondary punching and one-level shaving die module, one-level bending mould module, secondary shaving die module, secondary bending mould module, cuts off die module, and each mold module all designs independently formwork structure. 1. wherein the selection of mould bases, according to the blade clearance of mould, quality of fit and mould complexity, adopts ball interference guiding mould bases. In mould, guiding mechanism adopts the guiding mechanism of ball interference, has ensured the precision of guide. 2. wherein one-level is rushed the blanking die module of dispersion hole, in technique, adopt punching to be alternately distributed the method in hole, its main purpose is to make material stressed evenly, be out of shape more even, ensure punching quality, concerning die module, punch distribution disperses in addition, and Center of Pressure, near mold center, has extended die life. This module is also designed with the technique of rushing locating hole, and this fabrication hole matches with the pilot pin of subsequent module, ensures the stepping accuracy of mould and the precision of automatic feed mechanism. This module is also designed with device for discharging, adopts 4 groups of springs as elastic tripper. 3 wherein secondary punching die module and one-level shaving die modules, adopt the method for rushing all the other and be alternately distributed hole in its technique, its objective is and ensure that material deformation is even. Also be designed with on die-cut band feeding direction two groups without circular lance Symmetry Edge simultaneously and have the technique of circular arc one side cutting shoulder, its objective is and ensure that material deformation is even. On mould, be designed with in addition the pilot pin of the two plug screw formulas that can lock, ensure positioning precision. The board-like elastic tripper of elasticity discharging of this module. 4 one-level bending moulds, adopt the opposite side along feeding direction symmetric curvature part in its technique, ensure the balance of structure. On mould, middle part is designed with gathering sill floating roof device, and this elastic device is with the double action of guiding and floating roof workpiece. 5 secondary edgers wherein, mainly complete the die-cut limit, opposite that has arc incision, its objective is and ensure that material deformation is even. On mould, be designed with in addition the pilot pin of the two plug screw formulas that can lock, ensure positioning precision. 6 secondary bending mould modules. Carry out bending to having the limit of arc incision and the limit on opposite thereof after die-cut, limit portion adopts the pilot pin that has the two plug screw formulas that can lock, middle part design is with the elastic guide groove floating roof device of guiding and floating roof workpiece, both ensured guide precision guaranteed the floating roof of bool. 7 cut off die module, the coupling part of cutting-off part and band, and patrix is by punch retainer, and punch and backing plate form, and counterdie is made up of die and backing plate. 8 stress, this mould adopts modular formwork structure, each punching press station designs respectively independently formwork structure, be punch retainer, punch and backing plate, the stripper that each group of die module designs respectively patrix, the die of counterdie and counterdie backing plate, and by suitably arranging idle station, can the be shaped complicated metalwork of porous of seriation of this mould, increase the adaptability of mould, thereby improved production efficiency, extended die life.
Brief description of the drawings:
Fig. 1 is metalwork matrix structure schematic diagram of the present invention;
Fig. 2 is dispersion punching stock layout schematic diagram of the present invention;
Fig. 3 is modularization progressive die schematic diagram of the present invention;
Fig. 4 is the pilot pin structural representation of two plug screw formulas;
Fig. 5 is the structural representation of elastic guide groove floating roof device.
Detailed description of the invention:Below in conjunction with accompanying drawing, the present invention is done to a nearly step explanation:
The invention provides the process for stamping that a kind of seriation porous complexity patches metalwork, as shown in Figure 2, the shape of combined process design and product and dimensional requirement, the stock layout process program of having worked out part, its process flow is: rush dispersion hole and locating hole-----rushes all the other dispersion hole and the die-cut two corresponding limits without arc incision and has circular arc side cutting shoulder that------the die-cut opposite side that has arc incision is---to having the dual-side of arc incision and opposite side to carry out the coupling part of bending-----cutting-off part and band after die-cut for bending two opposite side without arc incision.
Each station designs respectively independently mould structure as shown in Figure 3, and described mould comprises that one-level rushes the blanking die 1 of dispersion hole, secondary punching shaving die module 2, one-level bending mould module 3, the die-cut module 4 of secondary, secondary bending mould module 5 and cut off die module 6;
Described one-level is rushed blanking die 1, secondary punching shaving die module 2, one-level bending mould module 3, the die-cut module 4 of secondary, the secondary bending mould module 5 of dispersion hole and is cut off all unified being arranged on pressure plare of die module 6;
Described one-level rush the blanking die 1, secondary punching shaving die module 2, one-level bending mould module 3, the die-cut module 4 of secondary, secondary bending mould module 5 of dispersion hole and cut off die module 6 below make the metalwork base material stepping mechanism that step pitch is sent in accordance with regulations for transmitting metalwork base material;
One-level is rushed on the blanking die 1 of dispersion hole, at interval of position, a hole, piercing punch is set, in secondary punching shaving die module 2, be provided with one-level and rush the punch that the punch location interval on the blanking die 1 of dispersion hole arranges, limit, the both sides portion of secondary bending mould module 5 is provided with the pilot pin of the two plug screw formulas that can lock metalwork base material, and the middle part of secondary bending mould module 5 is provided with leads and the elastic guide groove floating roof device 9 of floating roof to metalwork base material.
In described secondary punching shaving die module, be provided with the pilot pin that metalwork base material is carried out to pinpoint pair of plug screw formula.
The each mold module of this device all designs independently formwork structure. When product size changes, as long as suitably change the mould structure of each module and suitably arrange idle station, the complicated metalwork of porous of the seriation that just can be shaped, has increased the adaptability of mould, thereby has improved production efficiency, has extended die life.
The concrete steps of process for stamping that seriation porous complexity of the present invention patches metalwork are as follows:
(1), get metalwork base material, base material is carried out to surperficial cleaning, then metalwork base material being positioned over to one-level rushes to rush under the blanking die of dispersion hole and disperses punching and locating hole, punching disperses the concrete form of punching to be: to preset Kong Weiwei benchmark, disperse punching at interval of position, a hole; In technique, adopt this punching to be alternately distributed the method in hole, its main purpose is to make material stressed evenly, be out of shape more evenly, ensures punching quality, the punch dispersion that distributes concerning die module in addition, and Center of Pressure, near mold center, has extended die life. This module is also designed with the technique of rushing locating hole, and this fabrication hole matches with the pilot pin of subsequent module, ensures the stepping accuracy of mould and the precision of automatic feed mechanism. This module is also designed with device for discharging, adopts 4 groups of springs as elastic tripper.
(2), will disperse the metalwork after punching to move in secondary punching shaving die module, punching is carried out in residue position, hole, simultaneously two groups of corresponding limits that there is no arc incision on die-cut lower band feeding direction and have the cutting shoulder of circular arc side, the so-called corresponding limit that there is no arc incision, namely two limits do not arrange arc incision relatively and all; Pilot pin by two plug screw formulas in this step is accurately located metalwork base material; In technique, adopt and rush all the other and be alternately distributed the method in hole and sweep away two groups of Symmetry Edges on band feeding direction simultaneously, its objective is and ensure that material deformation is even. On mould, be designed with in addition the pilot pin of the two plug screw formulas that can lock, as shown in Figure 4, ensure positioning precision. The board-like elastic tripper of elasticity discharging of this module.
(3), in one-level bending mould module, first do not have the symmetrical side of arc incision to carry out bending to two after die-cut; Doing is like this stress balance that ensures metalwork matrix structure. On mould, middle part is designed with gathering sill floating roof device, and as shown in Figure 5, this gathering sill floating roof device is the double action with guiding and floating roof bool as elastic device.
(4), enter the die-cut module of secondary, the limit on the die-cut opposite that has arc incision one side, namely remaining the last item limit, carries out substep by both sides opposite side respectively die-cut, its objective is and ensures that material deformation is even.
(5), enter secondary bending mould module, the side and the opposite side thereof that after die-cut, have arc incision are carried out to bending; The another side of bending metals part base material, limit portion adopts the pilot pin that has the two plug screw formulas that can lock, and lead and floating roof to metalwork base material by elastic guide groove floating roof device in middle part;
(6), enter cut-out die module, the coupling part of cutting-off part and band; Patrix is made up of punch retainer, punch and backing plate, and counterdie is made up of die and backing plate.
When the present invention uses, there is enough intensity in order to ensure die, the dispersion that the operation of progressive die will be tried one's best, institute is porose should be not die-cut on same station, first punching backlash profile. Hole is alternately disperseed die-cutly can avoid concentrating of stamping-out stress, improve service life and the also corresponding raising of production efficiency of mould. Adopt crooked position to carry out on two stations of being separated by, diastrophic degree relaxes, and surface of the work is difficult for scratch, and mold work condition is greatly improved, and has improved the service life of mould. Meanwhile, operation disperses the product Shape decomposition of original complexity to become several unit, die point simple shape, and mould manufacture is simple and be convenient to the replacing after wearing and tearing.

Claims (2)

1. seriation porous complexity patches a process for stamping for metalwork, it is characterized in that: the concrete steps of the method are as follows:
(1), get metalwork base material, base material is carried out to surperficial cleaning, then metalwork base material being positioned over to one-level rushes to rush under the blanking die of dispersion hole and disperses punching and locating hole, punching disperses the concrete form of punching to be: to preset Kong Weiwei benchmark, disperse punching at interval of position, a hole;
(2), will disperse the metalwork after punching to move in secondary punching shaving die module, punching is carried out in residue position, hole, simultaneously two groups of corresponding limits that there is no arc incision on die-cut lower band feeding direction and have the cutting shoulder of circular arc one side; Pilot pin by two plug screw formulas in this step is accurately located metalwork base material;
(3), continue moving metal part to one-level bending mould module, in one-level bending mould module, do not have the symmetrical side of arc incision to carry out bending to two after die-cut; In this step, by gathering sill floating roof device, metalwork base material is led and floating roof;
(4), make metalwork move into the die-cut module of secondary, the limit on the die-cut opposite that has arc incision;
(5), enter secondary bending mould module, to having the limit of arc incision and the limit on opposite thereof to carry out bending after die-cut; At this moment at the another side of bending metals part base material, limit portion adopts the pilot pin that has the two plug screw formulas that can lock, leads and floating roof to metalwork base material by elastic guide groove floating roof device in middle part;
(6), enter cut-out die module, the coupling part of cutting-off part and band.
2. implement the claims the particular manufacturing craft that seriation porous complexity described in 1 patches the process for stamping of metalwork, it is characterized in that: described mould comprises that one-level rushes the blanking die of dispersion hole (1), secondary punching shaving die module (2), one-level bending mould module (3), the die-cut module of secondary (4), secondary bending mould module (5) and cut off die module (6);
Described one-level is rushed blanking die (1), secondary punching shaving die module (2), one-level bending mould module (3), the die-cut module of secondary (4), the secondary bending mould module (5) of dispersion hole and is cut off all unified being arranged in template of die module (6);
The below that rushes blanking die (1), secondary punching shaving die module (2), one-level bending mould module (3), the die-cut module of secondary (4), secondary bending mould module (5) and the cut-out die module (6) of dispersion hole in described one-level is to transmit metalwork base material to make the metalwork base material stepping mechanism that step pitch is sent in accordance with regulations;
The blanking die (1) that one-level is rushed dispersion hole above arranges piercing punch at interval of position, a hole, in secondary punching shaving die module (2), be provided with one-level and rush the punch that the punch location interval on the blanking die (1) of dispersion hole arranges, limit, the both sides portion of secondary bending mould module (5) is provided with the pilot pin of the two plug screw formulas that can lock metalwork base material, and the middle part of secondary bending mould module (5) is provided with leads and the elastic guide groove floating roof device (9) of floating roof to metalwork base material;
In described secondary punching shaving die module, be provided with the pilot pin that metalwork base material is carried out to pinpoint pair of plug screw formula.
CN201110183621.4A 2011-07-01 2011-07-01 Seriation porous complexity patches process for stamping and the particular manufacturing craft thereof of metalwork Expired - Fee Related CN102847786B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110183621.4A CN102847786B (en) 2011-07-01 2011-07-01 Seriation porous complexity patches process for stamping and the particular manufacturing craft thereof of metalwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110183621.4A CN102847786B (en) 2011-07-01 2011-07-01 Seriation porous complexity patches process for stamping and the particular manufacturing craft thereof of metalwork

Publications (2)

Publication Number Publication Date
CN102847786A CN102847786A (en) 2013-01-02
CN102847786B true CN102847786B (en) 2016-06-08

Family

ID=47394991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110183621.4A Expired - Fee Related CN102847786B (en) 2011-07-01 2011-07-01 Seriation porous complexity patches process for stamping and the particular manufacturing craft thereof of metalwork

Country Status (1)

Country Link
CN (1) CN102847786B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107597961A (en) * 2017-06-05 2018-01-19 安徽宏远机械制造有限公司 A kind of full-automatic continuous stamping process of electric motor assembly
CN112934746A (en) * 2021-03-05 2021-06-11 昆山睿翔讯通通信技术有限公司 Automatic production equipment for metal antenna

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2033714U (en) * 1988-07-02 1989-03-08 国家机械工业委员会北京机械工业自动化研究所 Stepped die set for draw-ring
US5005396A (en) * 1988-10-05 1991-04-09 Sollac Method and device for forming a sheet-metal blank in particular for making a cathode tube mask, and cathode tube mask obtained according to this method
CN1733384A (en) * 2005-07-13 2006-02-15 兰州理工大学 Punching-pressing composite mould
CN1927496A (en) * 2006-06-15 2007-03-14 兰州理工大学 Composite cold stamping mold
CN201346595Y (en) * 2008-12-17 2009-11-18 奇瑞汽车股份有限公司 Composite cold-punching mould

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2033714U (en) * 1988-07-02 1989-03-08 国家机械工业委员会北京机械工业自动化研究所 Stepped die set for draw-ring
US5005396A (en) * 1988-10-05 1991-04-09 Sollac Method and device for forming a sheet-metal blank in particular for making a cathode tube mask, and cathode tube mask obtained according to this method
CN1733384A (en) * 2005-07-13 2006-02-15 兰州理工大学 Punching-pressing composite mould
CN1927496A (en) * 2006-06-15 2007-03-14 兰州理工大学 Composite cold stamping mold
CN201346595Y (en) * 2008-12-17 2009-11-18 奇瑞汽车股份有限公司 Composite cold-punching mould

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于Pro/E的液晶显示器支架的冲压工艺与模具设计;王哲英等;《机械设计与制造》;20090228(第2期);全文 *
智能卡板的冲压工艺与级进模设计;王哲英等;《锻压技术》;20101231;第35卷(第6期);第92-94页 *

Also Published As

Publication number Publication date
CN102847786A (en) 2013-01-02

Similar Documents

Publication Publication Date Title
CN201410532Y (en) Continuous stamping mould structure of hardware pieces such as knife and scissors
CN101829724B (en) Small hole rapid molding process
CN203426279U (en) Continuous stamping die for manufacturing backboard communication connector terminal
CN201895039U (en) Deep drawing transfer die for automobile shock absorber parts
CN201644636U (en) Elastic part progressive die for electronic scale
CN102847786B (en) Seriation porous complexity patches process for stamping and the particular manufacturing craft thereof of metalwork
CN104858300A (en) Strip-shaped LED filament support continuous punching mould
CN105033048B (en) Vehicle connecting plate part forming mold and forming method
CN207494323U (en) Thicken the manufacturing equipment of tooth shape chain board
CN203804089U (en) Machining equipment for metal process parts
CN108356144A (en) A kind of process for stamping and mold for air bag substrate production
CN102397945A (en) Trimming and punching die
CN108262396A (en) A kind of membrane clip chain couples the automatic continuous process for stamping and forming of attached plate
CN202270853U (en) Punching and lancing die for bottom plate of gear box of grass mower
CN102019319A (en) Mold structure of L-shaped connecting sheet for cable bridge
CN205200330U (en) Safety belt fixation nut reinforcing plate upgrades mould
CN201760930U (en) Compound die for simultaneously half cutting and through cutting multilayer material
CN205519409U (en) But pressure spring of one shot forming extension spring is quick -witted
CN205032569U (en) Make continuous stamping die of backplate communication connector shielding piece
CN103752721A (en) Metalwork piece machining process and machining device
CN210788848U (en) Mold core-replaceable spacer machining mold
CN209124718U (en) A kind of reinforced pipe fitting metal parts molding die
CN200954529Y (en) Flatcar shuttle-hub grade mould
CN112893629A (en) Cold stamping die capable of being continuously processed
CN113399542A (en) High-speed net punching die for lead-acid battery grid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201130

Address after: 226600 169 Li Fa FA Road, Chengdong Town, Haian City, Nantong, Jiangsu.

Patentee after: Nantong Ji Zhi Intellectual Property Service Co.,Ltd.

Address before: Shen Liaoning Road 110870 in Liaoning province Shenyang City Economic and Technological Development Zone No. 111

Patentee before: SHENYANG University OF TECHNOLOGY

CF01 Termination of patent right due to non-payment of annual fee