CN102839629A - 一种扰动河床防渗治理的方法及结构 - Google Patents

一种扰动河床防渗治理的方法及结构 Download PDF

Info

Publication number
CN102839629A
CN102839629A CN2012102959199A CN201210295919A CN102839629A CN 102839629 A CN102839629 A CN 102839629A CN 2012102959199 A CN2012102959199 A CN 2012102959199A CN 201210295919 A CN201210295919 A CN 201210295919A CN 102839629 A CN102839629 A CN 102839629A
Authority
CN
China
Prior art keywords
antiseepage
riverbed
impervious barrier
seepage
proof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102959199A
Other languages
English (en)
Other versions
CN102839629B (zh
Inventor
王更雨
王金安
袁崇亮
焦申华
祁建中
唐君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YAOJIE COAL ELECTRICITY GROUP CO Ltd
University of Science and Technology Beijing USTB
Original Assignee
YAOJIE COAL ELECTRICITY GROUP CO Ltd
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YAOJIE COAL ELECTRICITY GROUP CO Ltd, University of Science and Technology Beijing USTB filed Critical YAOJIE COAL ELECTRICITY GROUP CO Ltd
Priority to CN201210295919.9A priority Critical patent/CN102839629B/zh
Publication of CN102839629A publication Critical patent/CN102839629A/zh
Application granted granted Critical
Publication of CN102839629B publication Critical patent/CN102839629B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本发明属于矿山领域,涉及河床防渗治理结构。防渗治理结构主要是在受扰动的河床上设置四元防渗结构,自下而上分四层,依次铺设:河床加固层、防渗垫层、防渗层及防渗保护层。该设计充分考虑了工程地质、环境特征以及复合土工膜的技术特点,使得扰动河床防渗治理效果好,治理成本更低。

Description

一种扰动河床防渗治理的方法及结构
技术领域
本发明属于矿山领域,涉及河床防渗治理方法,特别涉及一种用于矿山开采后扰动河床的四元防渗方法及结构。
 
背景技术
当要进行“三下”开采时,由于矿山开采所扰动的地层和地表塌陷影响范围将波及到河流流域,工作面开采形成的导水裂隙带和地表塌陷会导致河水倒灌到井下,给工作面生产和安全构成严重威胁,因此需要对扰动河床进行防渗治理工程。目前主要采取的河流防渗措施有人工引渠防渗、防渗膜防渗、注浆防渗、新型信息化防渗、帷幕灌浆、砌石防渗、沥青材料防渗、水泥土防渗、铺设排水管材防渗等。这些防渗方法虽然都能取得一定的防渗效果,但各有利弊,它们仅仅考虑了方法本身的防渗性能,而较少地考虑材料本身的受力及材料的腐蚀保护性问题,因此当河床底部受拉力产生裂缝的情况下,上述方法的防渗效果不佳,并且治理成本较高。
 
发明内容
本发明的目的是为了解决扰动河床防渗问题,提供一种以利用防渗膜为主的四元结构防渗结构及方法。
本发明提供一种用于扰动河床防渗治理的结构,该结构自下而上分四层,依次为:河床加固层、防渗垫层、防渗层、防渗保护层;
所述河床加固层,是通过河床的加固,限制河床因地下采动引起的变形,保证河床的整体性;
所述防渗垫层,位于所述防渗层下侧,可以防止下部破坏物对防渗层的损伤,同时可吸收部分河床局部变形,保证河床的整体性;
所述防渗层,其中防渗膜采用高强防渗土工膜,作为防渗结构的关键层,高强防渗土工膜除了具有防渗功能外,还需具有足够的厚度、强度、耐寒、耐热及耐紫外线老化性能;
所述防渗保护层,位于防渗层上侧,防止防渗层直接与水面接触,有固定防渗层、保护防渗层的功能,同时还起到维护河床生态的效果。
进一步地,所述防渗层中的高强防渗土工膜为“QH-120渠道布”。
进一步地,所述防渗垫层采用袋装砾石,袋装砾石长800mm,宽500mm,厚150mm,砾石袋间用细砂找平;砾石袋采用具有一定强度、抗紫外线老化和耐磨耐腐蚀的涤纶布料制做。
进一步地,所述防渗保护层采用预制混凝土方砖,方砖采用C20细石混凝土预制,内配8号铅丝,铅丝外露120mm,方砖铺装时应将露头铅丝向上弯折,避免刺穿防渗膜,方砖拼接到位后将方砖之间对应的铅丝相互连接拧紧,然后将拧紧后的铅丝接头嵌入砖缝内,缝内用粗砂填实;方砖与防渗膜之间设3mm厚泡沫塑料防护层。
进一步地,所述河床加固层采用单层双向塑料土工格栅。
本发明具有以下有益效果:(1)防渗性能好。 “QH-120渠道布具有良好的防渗性能,并且具有耐拉、耐压、耐磨、耐老化、耐腐蚀等优良特点,使其在含一定程度的矿、石等尖锐材料的物质环境仍能正常使用;(2)对防渗层保护性能好。在防渗层上、下分别有防渗保护层和防渗垫层能从各个方面对防渗层起到保护作用,避免河水的直接冲刷及沙石对其的损害;(3)可以提高河床整体性。四元结构中的河床加固层可以提高河床完整性,减少河床变形,从而使河床防渗工程事半功倍;(4)可维护性强。考虑防渗设施的长期使用要求,设计采用的“QH-120渠道布不仅具有很强的抗老化效果,同时也便于修补;(5)社会效益好。首先,四元结构本身未造成周边环境的破坏,维护了原有的生态系统;其次,施工未采用大型施工设备,不会对河道周边产生施工破坏;最后,治理施工需大量的人工投入,给周边创造了一定的就业机会,有助于维系矿群关系。
 
附图说明
图1是河道四元防渗结构横断面图;
图2是河道土工膜防渗搭接预留回折样图;
图3是河道保护层方砖铺设示意图
图4是河道保护层混凝土方砖详图。
 
具体实施方式
某矿区目前正在启动开采的3229工作面,开采后受扰动的地层和地表塌陷影响范围将波及到金沙河流域,且后续工作面开采都将在金沙河下和附近区域内进行。由于本区第四系地层较薄,大部分地层以基岩为主。工作面开采形成的导水裂隙带和地表塌陷区边缘裂缝贯通,会导致金沙河水倒灌到井下,给工作面生产和安全构成严重威胁,因此采用四元结构对金沙河进行防渗治理。
防渗结构自下而上分四层,依次为:河床加固层、防渗垫层、防渗层、防渗保护层。下面结合图1~ 4对本发明做进一步详细描述:
(1)加固层。加固层主要起加固河床,提高河床完整性功能。设计采用铺设单层双向塑料土工格栅(TGSG30-30)加固河床,提高河床的整体性。塑料土工格栅铺设工艺简单,且便于与土工膜铺设的衔接。
(2)防渗垫层。防渗工程中细砂、中砂是防渗垫层的最佳材料。然而现场无较近砂源,同时考虑本工程河道整形势必产生大量的砾石。本着就地取材,废物利用的原则。设计采用袋装砾石作为防渗垫层、保护层。袋装砾石可以防止尖锐砾石破坏防渗层,同时下部袋装砾石铺设防渗垫层便于河道成型,上部袋装砾石铺设防渗保护层增大了保护层的整体性,提高了防渗保护层的防冲刷性能。
设计袋装砾石长800mm,宽500mm,厚150mm,砾石袋间用细砂找平;砾石袋采用具有一定强度、抗紫外线老化和耐磨耐腐蚀的涤纶布料(型号:100D-150CM)制做。
其位于防渗层下侧,可以防止下部破坏物对防渗层的损伤,同时可吸收部分河床局部变形,保证河床的整体性。
(3)防渗层。采用高强防渗土工膜作为防渗膜,作为防渗结构的关键层,高强防渗土工膜除了具有防渗功能外,还需具有足够的厚度、强度、耐寒、耐热及耐紫外线老化性能。厚度为1.2mm,选定“QH-120渠道布”作为本工程的防渗层。相对普通防渗土工膜,这种材料具有耐拉、耐压、耐磨、耐老化、耐腐蚀等优良特点,使其在含一定程度的矿、石等尖锐材料的物质环境仍能正常使用。防渗膜铺设时(参见图2),应在中心部分设置350mm预留回折长度,并且在两膜连接处焊接接缝应达到100mm,以保证防渗膜的防渗效果。
(4)防渗保护层。位于防渗层上侧,防止防渗层直接与水面接触,有固定防渗层、保护防渗层的功能,同时还起到维护河床生态的效果。采用预制混凝土方砖(600mm×400mm×80mm),方砖采用C20细石混凝土预制,内配8号铅丝,铅丝外露120mm(具体配筋方式见图4(A,B,C)),方砖沿河流向依次铺设,每行方砖错开半块砖长,即300mm(参见图3),除此以外,铺装时应将露头铅丝向上弯折,避免刺穿防渗膜,方砖拼接到位后将方砖之间对应的铅丝相互连接拧紧,然后将拧紧后的铅丝接头嵌入砖缝内,缝内用粗砂填实;方砖与防渗膜之间设3mm厚泡沫塑料防护层。
(5)工程布置。四元结构防渗处理的起点位于三号井新工业场地三号桥,终点至金沙河菜籽湾桥上游30米处,全长3.2公里;同时对金沙河该段流域内的四条支流(王子良沟、朱藏沟、黑岭子沟等)局部进行防渗处理并引入主河道中。
以上所述仅为本发明示意性的具体实施方式,并非用以限定本发明的范围。任何本领域的技术人员,在不脱离本发明的构思和原则的前提下所作的等同变化与修改,均应属于本发明保护的范围。

Claims (5)

1.一种用于扰动河床防渗治理的结构,其特征在于:该结构自下而上分四层,依次为:河床加固层、防渗垫层、防渗层、防渗保护层;
所述河床加固层,是通过河床的加固,限制河床因地下采动引起的变形,保证河床的整体性;
所述防渗垫层,位于所述防渗层下侧,可以防止下部破坏物对防渗层的损伤,同时可吸收部分河床局部变形,保证河床的整体性;
所述防渗层,其中防渗膜采用高强防渗土工膜,作为防渗结构的关键层,高强防渗土工膜除了具有防渗功能外,还需具有足够的厚度、强度、耐寒、耐热及耐紫外线老化性能;
所述防渗保护层,位于防渗层上侧,防止防渗层直接与水面接触,有固定防渗层、保护防渗层的功能,同时还起到维护河床生态的效果。
2.如权利要求1所述的结构,其特征在于:所述防渗层中的高强防渗土工膜为“QH-120渠道布”。
3.如权利要求1或2所述的结构,其特征在于:所述防渗垫层采用袋装砾石,袋装砾石长800mm,宽500mm,厚150mm,砾石袋间用细砂找平;砾石袋采用具有一定强度、抗紫外线老化和耐磨耐腐蚀的涤纶布料制做。
4.如权利要求1或2所述的结构,其特征在于:所述防渗保护层采用预制混凝土方砖,方砖采用C20细石混凝土预制,内配8号铅丝,铅丝外露120mm,方砖铺装时应将露头铅丝向上弯折,避免刺穿防渗膜,方砖拼接到位后将方砖之间对应的铅丝相互连接拧紧,然后将拧紧后的铅丝接头嵌入砖缝内,缝内用粗砂填实;方砖与防渗膜之间设3mm厚泡沫塑料防护层。
5.如权利要求1或3所述的结构,其特征在于:所述河床加固层采用单层双向塑料土工格栅。
CN201210295919.9A 2012-08-17 2012-08-17 一种扰动河床防渗治理的方法及结构 Expired - Fee Related CN102839629B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210295919.9A CN102839629B (zh) 2012-08-17 2012-08-17 一种扰动河床防渗治理的方法及结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210295919.9A CN102839629B (zh) 2012-08-17 2012-08-17 一种扰动河床防渗治理的方法及结构

Publications (2)

Publication Number Publication Date
CN102839629A true CN102839629A (zh) 2012-12-26
CN102839629B CN102839629B (zh) 2015-05-20

Family

ID=47367331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210295919.9A Expired - Fee Related CN102839629B (zh) 2012-08-17 2012-08-17 一种扰动河床防渗治理的方法及结构

Country Status (1)

Country Link
CN (1) CN102839629B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195019A (zh) * 2013-04-27 2013-07-10 清华大学 一种河流净化系统
CN103774627A (zh) * 2014-01-26 2014-05-07 河海大学 灌区防渗型生态渠道的构建方法
CN106351330A (zh) * 2016-08-29 2017-01-25 西安长庆科技工程有限责任公司 一种土筑事故应急缓冲池的施工方法
CN106968222A (zh) * 2017-05-15 2017-07-21 王杰 一种水利工程耐侵蚀沟渠护坡
CN107100170A (zh) * 2017-05-22 2017-08-29 中国水利水电第十二工程局有限公司 块石垫层找平施工方法
CN107687155A (zh) * 2017-09-27 2018-02-13 长江勘测规划设计研究有限责任公司 一种库盆防渗抗抬动结构及布置方法
CN109025449A (zh) * 2018-08-07 2018-12-18 孙孝仁 一种储水库
CN109338909A (zh) * 2018-11-20 2019-02-15 广东工业大学 一种整体式桥墩加固结构及其施工方法
CN110004886A (zh) * 2019-05-15 2019-07-12 中国电建集团中南勘测设计研究院有限公司 沥青混凝土心墙基座施工方法及其结构
CN110552320A (zh) * 2018-06-01 2019-12-10 中冶天工集团有限公司 一种防止复合防渗膜浮起破坏的方法
CN111101483A (zh) * 2019-12-24 2020-05-05 昆山市水利设计院有限公司 农田防渗型生态渠道的构建方法
CN114737523A (zh) * 2022-04-12 2022-07-12 中国长江电力股份有限公司 一种水垫塘渗水来源的确定方法和装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1507901A1 (ru) * 1987-05-11 1989-09-15 Отдел Водного Хозяйства Промпредприятий Всесоюзного Научно-Исследовательского Института Водоснабжения, Канализации, Гидротехнических Сооружений И Инженерной Гидрогеологии "Водгео" Способ предотвращени фильтрации из содержащего растворенные загр зн ющие вещества водоема и устройство дл его осуществлени
CN1042206A (zh) * 1988-10-27 1990-05-16 李启海 一种挡水建筑物的地基防渗方法
CN101070698A (zh) * 2007-06-28 2007-11-14 北京市水利科学研究所 天然河流膨润土夹层减渗方法
CN101096844A (zh) * 2007-06-28 2008-01-02 北京市水利科学研究所 干旱地区砂砾石河流生态修复的河道减渗方法
CN201074314Y (zh) * 2007-05-14 2008-06-18 江苏省水利科学研究所 水库库底防渗结构

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1507901A1 (ru) * 1987-05-11 1989-09-15 Отдел Водного Хозяйства Промпредприятий Всесоюзного Научно-Исследовательского Института Водоснабжения, Канализации, Гидротехнических Сооружений И Инженерной Гидрогеологии "Водгео" Способ предотвращени фильтрации из содержащего растворенные загр зн ющие вещества водоема и устройство дл его осуществлени
CN1042206A (zh) * 1988-10-27 1990-05-16 李启海 一种挡水建筑物的地基防渗方法
CN201074314Y (zh) * 2007-05-14 2008-06-18 江苏省水利科学研究所 水库库底防渗结构
CN101070698A (zh) * 2007-06-28 2007-11-14 北京市水利科学研究所 天然河流膨润土夹层减渗方法
CN101096844A (zh) * 2007-06-28 2008-01-02 北京市水利科学研究所 干旱地区砂砾石河流生态修复的河道减渗方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王春燕等: "复合土工膜在南水北调工程中的防渗应用", 《水利科技与经济》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195019A (zh) * 2013-04-27 2013-07-10 清华大学 一种河流净化系统
CN103195019B (zh) * 2013-04-27 2016-02-10 清华大学 一种河流净化系统及用该系统净化水质的方法
CN103774627A (zh) * 2014-01-26 2014-05-07 河海大学 灌区防渗型生态渠道的构建方法
CN106351330A (zh) * 2016-08-29 2017-01-25 西安长庆科技工程有限责任公司 一种土筑事故应急缓冲池的施工方法
CN106968222A (zh) * 2017-05-15 2017-07-21 王杰 一种水利工程耐侵蚀沟渠护坡
CN107100170A (zh) * 2017-05-22 2017-08-29 中国水利水电第十二工程局有限公司 块石垫层找平施工方法
CN107687155A (zh) * 2017-09-27 2018-02-13 长江勘测规划设计研究有限责任公司 一种库盆防渗抗抬动结构及布置方法
CN110552320A (zh) * 2018-06-01 2019-12-10 中冶天工集团有限公司 一种防止复合防渗膜浮起破坏的方法
CN109025449A (zh) * 2018-08-07 2018-12-18 孙孝仁 一种储水库
CN109338909A (zh) * 2018-11-20 2019-02-15 广东工业大学 一种整体式桥墩加固结构及其施工方法
CN110004886A (zh) * 2019-05-15 2019-07-12 中国电建集团中南勘测设计研究院有限公司 沥青混凝土心墙基座施工方法及其结构
CN111101483A (zh) * 2019-12-24 2020-05-05 昆山市水利设计院有限公司 农田防渗型生态渠道的构建方法
CN114737523A (zh) * 2022-04-12 2022-07-12 中国长江电力股份有限公司 一种水垫塘渗水来源的确定方法和装置
CN114737523B (zh) * 2022-04-12 2023-07-07 中国长江电力股份有限公司 一种水垫塘渗水来源的确定方法和装置

Also Published As

Publication number Publication date
CN102839629B (zh) 2015-05-20

Similar Documents

Publication Publication Date Title
CN102839629B (zh) 一种扰动河床防渗治理的方法及结构
CN105041325B (zh) 一种高压富水特大断层软弱角砾岩隧道的施工方法
CN108756894B (zh) 隧道微三台阶上部核心土施工工法
CN103883328B (zh) 分离式隧道下穿高陡v型冲沟偏压段的半盖半暗施工方法
CN104196537A (zh) 一种三条平行的超小净距地铁隧道施工方法
CN109595029B (zh) 坚硬顶板条件下采空区局部充填支撑结构体及其构筑方法
CN203961994U (zh) 土压平衡盾构机下穿已运营盾构隧道的暗挖隧道结构
CN109024487A (zh) 一种寒区库岸边坡防渗抗冻的防护系统及其施工方法
CN102359659B (zh) 钢筋混凝土顶管施工中优化管道设计的方法
CN104612696B (zh) 大断面暗挖地铁车站在粉细砂层中穿越高架桥柱洞法施工方法
Tu et al. Excavation and kinematic analysis of a shallow large-span tunnel in an up-soft/low-hard rock stratum
CN209924998U (zh) 一种浅覆土盾构隧道下穿道路加固保护结构
CN204940315U (zh) 一种用于富水地区大型竖井的止水系统
CN109162298A (zh) 一种富水区综合管廊的施工方法
CN106522981B (zh) 穿越采空区隧道的支护方法
CN105019919A (zh) 用于传输流体的隧洞及其施工方法
CN102619521B (zh) 一种立井基岩段井壁结构的施工方法
CN103542174B (zh) 一种煤矿塌陷区管道敷设方法
WO2023202455A1 (zh) 一种带接茬止水结构和注浆系统的单层井壁及其施工方法
CN107701229A (zh) 露天采矿堆填治理与地下首中段采空区充填排水协同方法
CN105133719B (zh) 一种快速治理雨水管错位漏砂、涌砂的施工方法
CN103999592A (zh) 一种防止酸性矿区废石场植被退化的方法
CN116104530A (zh) 导流洞不良地质灾害施工方法
CN204532379U (zh) 地铁区间隧道废水泵房预埋排水管构造
CN107269930A (zh) 波纹管在砂石系统中替代胶带机混凝土廊道的施工工法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520

Termination date: 20170817

CF01 Termination of patent right due to non-payment of annual fee