CN102832707A - Misoperation-preventive locking logic automatic test system for intelligent transformer substation - Google Patents

Misoperation-preventive locking logic automatic test system for intelligent transformer substation Download PDF

Info

Publication number
CN102832707A
CN102832707A CN2012102632971A CN201210263297A CN102832707A CN 102832707 A CN102832707 A CN 102832707A CN 2012102632971 A CN2012102632971 A CN 2012102632971A CN 201210263297 A CN201210263297 A CN 201210263297A CN 102832707 A CN102832707 A CN 102832707A
Authority
CN
China
Prior art keywords
misoperation
goose
locking logic
misoperation locking
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102632971A
Other languages
Chinese (zh)
Inventor
高磊
宋亮亮
袁宇波
陈久林
卜强生
王建明
沈海平
张小易
黄浩声
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Wuxi Power Supply Co of Jiangsu Electric Power Co
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Wuxi Power Supply Co of Jiangsu Electric Power Co
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Wuxi Power Supply Co of Jiangsu Electric Power Co, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN2012102632971A priority Critical patent/CN102832707A/en
Publication of CN102832707A publication Critical patent/CN102832707A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Abstract

The invention discloses a misoperation-preventive locking logic automatic test system for an intelligent transformer substation, comprising a data layer, a business layer and a presentation layer, wherein the data layer comprises a GOOSE (Generic Object Oriented Substation Event) message receiving and sending module for receiving a GOOSE signal, a switch and disconnecting link deflection signal and a switching value signal from a monitoring system of the intelligent transformer substation and sending the received data to a comparison and analysis module of the business layer, and an SCD (Science Citation Database) file parsing module for analyzing the GOOSE signal from the system of the intelligent transformer substation; and the business layer comprises a standard library for storing an input misoperation-preventive locking logic database, and the comparison and analysis module used for performing real-time logical operation by different switch and disconnecting link position combinations received from the GOOSE message receiving and sending module according to the input misoperation-preventive locking logic database, comparing the standard output result with the locking result fed back by a monitoring device and verifying validity of the misoperation-preventive locking logic of the monitoring device. The system can verify the validity and integrity of the misoperation-preventive locking logic of the monitoring device.

Description

Intelligent substation anti-misoperation locking logic Auto-Test System
Technical field
The present invention relates to a kind of intelligent substation anti-misoperation locking logic testing system, belong to the power automation technical field.
Background technology
Compare with traditional transformer station, intelligent substation is carrying out great technological innovation aspect collection, information sharing and the Equipment Control of facility information.The secondary device of tradition transformer station is the distributed collection mode, and every equipment is independently gathered corresponding data; Intelligent substation has greatly been brought into play network advantage; Adopt the mode of concentrating collection, data sharing; Switching value, analogue collection module are transferred to apparatus body, be passed to protection equipment or high speed Ethernet exchange machine, realized once collection, data sharing through after the digitized processing.Facility switching amount signal acquisition module---intelligent terminal is the interface equipment of secondary device and primary equipment, is the intelligent assembly of primary equipment.The position signalling of intelligent substation Switch equipment by the intelligent terminal digitized processing after Ethernet switch is passed to supervisory control system; The control command of supervisory control system also is passed to intelligent terminal through switch and carries out, so switch becomes the mutual data platform of facility information.The digitlization of facility information, standardization, network turn to substation secondary device brand-new test platform are provided, and also will promote the secondary device test to digitlization, automation direction development.
The checking of monitoring system of electric substation anti-misoperation locking logic function and the position signalling of Switch equipment are closely related; And integration testing or field test initial stage; Because primary equipment debugging is accomplished as yet can't practical operation; Position signalling also will be through the patch simulation, and the workload that test is prepared is very big.
The debugging of tradition transformer station anti-misoperation locking logic generally will verify through analog switch disconnecting link position, and not only workload is big to accomplish the various combination of whole switch tools position, and omits easily.
Intelligent substation switch tool position is uploaded to supervisory control system by intelligent terminal through digitized GOOSE signal; Digitized signal can be simulated by computer program fully; Therefore develop the computer program of a cover simulation position signalling; Can accomplish the anti-misoperation locking logic checking work of supervisory control system automatically through the combination of diverse location, improve the efficient and the correctness of supervisory control system debugging, examination greatly.The virtual intelligent terminal platform of this cover can not only satisfy the checking work of supervisory control system guidance command and position signalling, can also satisfy the proving test requirement of anti-misoperation locking logic function.
Because it all is standardized having adopted IEC-61850 standard, infomational message between the equipment and communication protocol, the contact between the equipment is described by configuration file (SCD file), and the Content of Communication between the equipment is the GOOSE message of standard.Through resolving the SCD file,, can realize the function of virtual intelligent terminal according to the GOOSE packet parsing and the transmission data of standard.
The anti-misoperation locking logic has a series of electric blocking principles, is regular governed.According to the latching logic storehouse, send different switch, disconnecting link position grouping based on virtual intelligent terminal platform, the locking information of returning according to supervisory control system again can be accomplished the batch of monitoring system of electric substation anti-misoperation locking logic and verify automatically.
Summary of the invention
Technical problem to be solved by this invention provides a kind of intelligent substation anti-misoperation locking logic Auto-Test System, can accomplish the anti-misoperation locking logic checking work of supervisory control system automatically.
For solving the problems of the technologies described above, the present invention provides a kind of intelligent substation anti-misoperation locking logic Auto-Test System, it is characterized in that, comprises data Layer, operation layer and presentation layer,
Said data Layer comprises:
GOOSE packet sending and receiving module: receive GOOSE signal, switch tool displacement signal from the intelligent substation supervisory control system; And supervisory control system is transmitted back in corresponding switch tool position prevent logical calculated as five, simultaneously the data that received are sent to the comparative analysis module of operation layer;
SCD document analysis module: be used to resolve from the intelligent substation supervisory control system to the GOOSE signal;
Said operation layer comprises:
Java standard library: the anti-misoperation locking logical data base that is used to store input;
Comparative analysis module: utilize different switches, the disconnecting link position grouping received from GOOSE packet sending and receiving module; And according to the input the anti-misoperation locking logical data base carry out real-time logical operation; With the locking result contrast that standard is exported result and measure and control device feedback, the correctness and the integrality of checking measure and control device anti-misoperation locking logic.
Said presentation layer comprises: switch yard equipment figure driver module is used to represent actual switch tool position; The report automatically-generating module, being used for output monitoring system does not have anti-judged result.
Principle of the present invention: exploitation simulated intelligence terminal platform software.The partial function of simulated field intelligent terminal assembly; Realize subscribing to GOOSE signal, switch tool displacement, transmit button amount semiotic function; With five anti-locking result contrasts of calculating output result and measure and control device feedback, the correctness and the integrality of checking measure and control device anti-misoperation locking logic.
Intelligent substation switch tool position is uploaded to supervisory control system by intelligent terminal through digitized GOOSE signal; Digitized signal can be simulated by computer program fully; The computer program of a cover simulation position signalling therefore capable of using; Can accomplish the anti-misoperation locking logic checking work of supervisory control system automatically through the combination of diverse location, the efficient and the correctness of improve the supervisory control system debugging, checking and accepting.The checking work of supervisory control system guidance command and position signalling can not only be satisfied, the proving test requirement of anti-misoperation locking logic function can also be satisfied.Because it all is standardized having adopted IEC-61850 standard, infomational message between the equipment and communication protocol, the contact between the equipment is described by configuration file (SCD file), and the Content of Communication between the equipment is the GOOSE message of standard.Through resolving the SCD file,, can realize the function of virtual intelligent terminal according to the GOOSE packet parsing and the transmission data of standard.In addition, the anti-misoperation locking logic has a series of electric blocking principles, is regular governed.According to the latching logic database, send different switch, disconnecting link position grouping based on virtual intelligent terminal platform, the locking information of returning according to supervisory control system again can be accomplished the batch of monitoring system of electric substation anti-misoperation locking logic and verify automatically.
The beneficial effect that the present invention reached: the present invention is through the simulated intelligence terminal platform; Possess the GOOSE of subscription signal, switch tool displacement, transmit button amount semiotic function; Receive the control command of supervisory control system through network, and supervisory control system is transmitted back in corresponding switch, disconnecting link position, carry out real-time logical operation according to the anti-misoperation locking logical base of importing; With the locking result contrast that standard is exported result and measure and control device feedback, the correctness and the integrality of checking measure and control device anti-misoperation locking logic.
Description of drawings
Fig. 1 is an anti-misoperation locking logic testing systems soft ware framework map of the present invention;
Fig. 2 is an anti-misoperation locking logic testing systems soft ware flow chart of the present invention.
Embodiment
Intelligent substation anti-misoperation locking logic Auto-Test System of the present invention comprises data Layer, operation layer and presentation layer,
Said data Layer comprises:
GOOSE packet sending and receiving module: receive GOOSE signal, switch tool displacement, transmit button amount signal from the intelligent substation supervisory control system; And the data that received are sent to the comparative analysis module of operation layer;
SCD document analysis module: be used to resolve from the intelligent substation supervisory control system to the GOOSE signal;
Said operation layer comprises:
Java standard library: the anti-misoperation locking logical data base that is used to store input;
Comparative analysis module: utilize different switches, the disconnecting link position grouping received from GOOSE packet sending and receiving module; And according to the input the anti-misoperation locking logical data base carry out real-time logical operation; With the locking result contrast that standard is exported result and measure and control device feedback, the correctness and the integrality of checking measure and control device anti-misoperation locking logic.
Test macro of the present invention has proposed intelligent substation anti-misoperation locking logic testing new method and means, and efficient and the integrality that improves test played an important role.
Below disclose the present invention with preferred embodiment, so it is not in order to restriction the present invention, and all employings are equal to replacement or the technical scheme that obtained of equivalent transformation mode, all drop within protection scope of the present invention.

Claims (2)

1. an intelligent substation anti-misoperation locking logic Auto-Test System is characterized in that comprising data Layer, operation layer and presentation layer;
Said data Layer comprises:
GOOSE packet sending and receiving module: receive GOOSE signal, switch tool displacement signal from the intelligent substation supervisory control system; And supervisory control system is transmitted back in corresponding switch, disconnecting link position do five anti-logical calculated, simultaneously the data that received are sent to the comparative analysis module of operation layer;
SCD document analysis module: be used to resolve from the intelligent substation supervisory control system to the GOOSE signal;
Said operation layer comprises:
Java standard library: the anti-misoperation locking logical data base that is used to store input;
Comparative analysis module: utilize different switches, the disconnecting link position grouping received from GOOSE packet sending and receiving module; And according to the input the anti-misoperation locking logical data base carry out real-time logical operation; With the locking result contrast that standard is exported result and measure and control device feedback, the correctness and the integrality of checking measure and control device anti-misoperation locking logic.
2. intelligent substation anti-misoperation locking logic Auto-Test System according to claim 1 is characterized in that:
Said presentation layer comprises: switch yard equipment figure driver module is used to represent actual switch tool position; The report automatically-generating module, being used for output monitoring system does not have anti-judged result.
CN2012102632971A 2012-07-27 2012-07-27 Misoperation-preventive locking logic automatic test system for intelligent transformer substation Pending CN102832707A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102632971A CN102832707A (en) 2012-07-27 2012-07-27 Misoperation-preventive locking logic automatic test system for intelligent transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102632971A CN102832707A (en) 2012-07-27 2012-07-27 Misoperation-preventive locking logic automatic test system for intelligent transformer substation

Publications (1)

Publication Number Publication Date
CN102832707A true CN102832707A (en) 2012-12-19

Family

ID=47335721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102632971A Pending CN102832707A (en) 2012-07-27 2012-07-27 Misoperation-preventive locking logic automatic test system for intelligent transformer substation

Country Status (1)

Country Link
CN (1) CN102832707A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103439592A (en) * 2013-06-27 2013-12-11 国家电网公司 Method for intelligently testing intelligent substation on site
CN103647353A (en) * 2013-12-25 2014-03-19 南京国电南自电网自动化有限公司 Instation signal based comparison method of remote transmission point tables
CN105843217A (en) * 2016-04-29 2016-08-10 国网浙江省电力公司绍兴供电公司 Associate locking logic offline verification system and method of intelligent transformer station measuring and control device
CN106327043A (en) * 2015-07-02 2017-01-11 北京东土科技股份有限公司 Data processing method, system and apparatus in substation integration
CN106843041A (en) * 2017-01-10 2017-06-13 珠海优特电力科技股份有限公司 The anti-error logical formula automation generation system and method for electrical equipment
CN111913976A (en) * 2020-08-11 2020-11-10 广东电网有限责任公司广州供电局 Secondary operation locking loop operation and maintenance management system
CN111934433A (en) * 2020-08-28 2020-11-13 中域高科(武汉)信息技术有限公司 Automatic rechecking method, device, equipment and system for transformer substation monitoring background
CN112784697A (en) * 2020-12-31 2021-05-11 海南电网有限责任公司海口供电局 Digital image-based transformer substation five-prevention logic verification method
CN113433412A (en) * 2021-07-29 2021-09-24 广东电网有限责任公司 Measurement and control five-prevention function detection device and system
CN114825619A (en) * 2022-04-02 2022-07-29 济南法诺商贸有限公司 Regulation and control integrated anti-error control system and control method based on smart power grid

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101776913A (en) * 2009-12-25 2010-07-14 广东电网公司电力科学研究院 Five-prevention logic testing method and system of transformer substation
CN101887269A (en) * 2010-05-26 2010-11-17 广东电网公司电力科学研究院 Five-prevention logic test method of 61850 transformer substation and system thereof
CN102141950A (en) * 2011-04-18 2011-08-03 国电南瑞科技股份有限公司 Method for checking interlock logics of intelligent substation measuring and controlling device
CN102157983A (en) * 2011-04-01 2011-08-17 南京南瑞继保电气有限公司 GOOSE (generic object oriented substation event)-based five-prevention locking method of measuring and controlling device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101776913A (en) * 2009-12-25 2010-07-14 广东电网公司电力科学研究院 Five-prevention logic testing method and system of transformer substation
CN101887269A (en) * 2010-05-26 2010-11-17 广东电网公司电力科学研究院 Five-prevention logic test method of 61850 transformer substation and system thereof
CN102157983A (en) * 2011-04-01 2011-08-17 南京南瑞继保电气有限公司 GOOSE (generic object oriented substation event)-based five-prevention locking method of measuring and controlling device
CN102141950A (en) * 2011-04-18 2011-08-03 国电南瑞科技股份有限公司 Method for checking interlock logics of intelligent substation measuring and controlling device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王凤等: "青海省电力公司用电信息采集系统主站建设方案研究", 《电力信息化》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103439592B (en) * 2013-06-27 2016-12-28 国家电网公司 A kind of intelligent substation site intelligent method of testing
CN103439592A (en) * 2013-06-27 2013-12-11 国家电网公司 Method for intelligently testing intelligent substation on site
CN103647353A (en) * 2013-12-25 2014-03-19 南京国电南自电网自动化有限公司 Instation signal based comparison method of remote transmission point tables
CN103647353B (en) * 2013-12-25 2015-10-28 南京国电南自电网自动化有限公司 A kind of comparison method based on the teletransmission point table of signal in station
CN106327043A (en) * 2015-07-02 2017-01-11 北京东土科技股份有限公司 Data processing method, system and apparatus in substation integration
CN105843217B (en) * 2016-04-29 2018-08-10 国网浙江省电力公司绍兴供电公司 Intelligent substation measure and control device joins latching logic off-line verification system and method
CN105843217A (en) * 2016-04-29 2016-08-10 国网浙江省电力公司绍兴供电公司 Associate locking logic offline verification system and method of intelligent transformer station measuring and control device
CN106843041A (en) * 2017-01-10 2017-06-13 珠海优特电力科技股份有限公司 The anti-error logical formula automation generation system and method for electrical equipment
CN111913976A (en) * 2020-08-11 2020-11-10 广东电网有限责任公司广州供电局 Secondary operation locking loop operation and maintenance management system
CN111934433A (en) * 2020-08-28 2020-11-13 中域高科(武汉)信息技术有限公司 Automatic rechecking method, device, equipment and system for transformer substation monitoring background
CN111934433B (en) * 2020-08-28 2021-11-02 中域高科(武汉)信息技术有限公司 Automatic rechecking method, device, equipment and system for transformer substation monitoring background
CN112784697A (en) * 2020-12-31 2021-05-11 海南电网有限责任公司海口供电局 Digital image-based transformer substation five-prevention logic verification method
CN113433412A (en) * 2021-07-29 2021-09-24 广东电网有限责任公司 Measurement and control five-prevention function detection device and system
CN114825619A (en) * 2022-04-02 2022-07-29 济南法诺商贸有限公司 Regulation and control integrated anti-error control system and control method based on smart power grid

Similar Documents

Publication Publication Date Title
CN102832707A (en) Misoperation-preventive locking logic automatic test system for intelligent transformer substation
CN101887269B (en) Five-prevention logic test method of 61850 transformer substation and system thereof
CN103414251B (en) A kind of substation network communication analogue system based on IEC61850
CN103904779B (en) A kind of full station intelligent terminal analogue means of intelligent substation and using method thereof
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN202218067U (en) Automated intelligent information pointing system of electric power system
CN103412208A (en) Intelligent substation electric telecontrol device closed loop test method
CN105302121A (en) Sequential control operation order automatic anti-error check method based on simulation IED device
CN103616592A (en) Relay protection real-time digital dynamic simulation test system based on IEC 61850
CN108923953A (en) A kind of virtual main station system of power remote machine debugging
CN204291050U (en) A kind of dispatching and monitoring information check system
CN103926917A (en) Intelligent transformer substation master control device testing system and method
CN109861860B (en) Method and system for establishing virtual-real link mapping relationship of intelligent substation
CN105447247A (en) Method and system for checking regulation and control information
CN103779962A (en) Intelligent telecontrol machine based method for converting 61850 model to CIM model
CN109613906B (en) Third-generation intelligent substation measurement and control submachine test system and application method thereof
CN103676661B (en) Multifunction emulation verifies system and its emulation verification method
CN106681313B (en) Stability control system function test method and system
CN103837785A (en) Feeder automation detection and simulation system
CN110989547A (en) Detection method and system for intelligent substation one-key sequence control system
CN102497033A (en) Substation operation visualization realization method and system thereof
CN105680441B (en) Simulation based on stimulated replacement technology is to a device
CN110768372A (en) IEC61850 standard-based protection information system source end modeling method
CN105785170B (en) A kind of data flow panorama display device and method towards intelligent substation
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121219