CN102831549A - 一种应用于智能电网三维运行管理系统的杆塔模型系统 - Google Patents
一种应用于智能电网三维运行管理系统的杆塔模型系统 Download PDFInfo
- Publication number
- CN102831549A CN102831549A CN201210262297XA CN201210262297A CN102831549A CN 102831549 A CN102831549 A CN 102831549A CN 201210262297X A CN201210262297X A CN 201210262297XA CN 201210262297 A CN201210262297 A CN 201210262297A CN 102831549 A CN102831549 A CN 102831549A
- Authority
- CN
- China
- Prior art keywords
- shaft tower
- operation management
- pole tower
- management system
- dimensional operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明提出了一种应用于智能电网三维运行管理系统的杆塔模型系统,其中,所述杆塔模型的作成与显示,采用现场拍照,整理后归档,以建模软件按照一定比例进行建模并导出到系统中进行使用;杆塔摆放的旋转角度,通过数学公式进行杆塔旋转角度的自动计算和手动调整相结合;杆塔之间弧垂的模拟:根据杆塔顶端的位置,利用贝赛尔曲线来模拟输电线路的弧垂。本发明的在三维GIS系统中模拟杆塔模型系统,采用多种技术,使得杆塔的本身结构及与其它杆塔的关联性的模拟逼真。
Description
技术领域
本发明属于三维系统领域,具体涉及一种应用于智能电网三维运行管理系统的杆塔模型系统。
背景技术
目前,国内电力企业主要采用传统的二维形式来进行电网的管理运行。该方式只能以平面方式查看出输电线路的状态,并不能直观地看出输电杆塔的挂接信息、电线的真实状态;同时以二维形式来规划路线时,由于地形信息,不仅耗费设计人员的大量精力,而且给施工带来诸多麻烦。
在二维配网GIS系统中,一般用点状或线状等抽象符号表达电力设备,无法直观地显示设备本身的结构和相互间的关联;在三维GIS系统中,模拟真实的输电设备(如杆塔、绝缘子、输电线)是虚拟现实的基本要求,这使得模型本身会变得比较复杂,甚至要进行组合构造。以杆塔为例,不但每个杆塔的高度、塔头有差别,而且其包含的绝缘子也会根据杆塔的类型、方位、旋转角度甚至与其它杆塔的关联性而有不同的表现方式。
发明内容
本发明旨在发明一种应用于智能电网三维运行管理系统的杆塔模型系统,采用多种技术方法,以三维形式逼真地模拟出杆塔模型。
为实现上述发明目的,本发明所采用的技术方案是:
本发明的一种应用于智能电网三维运行管理系统的杆塔模型系统,其中,
所述杆塔模型的作成与显示,采用现场拍照,整理后归档,以建模软件按照一定比例进行建模并导出到系统中进行使用;
杆塔摆放的旋转角度,通过数学公式进行杆塔旋转角度的自动计算和手动调整相结合:首先,根据客户提供的输电线路和杆塔的位置和模型信息,进行坐标系的转换后,计算出每一个杆塔在地球上的精确位置,然后根据前后杆塔与该杆塔形成的向量,计算出角平分线,以及该杆塔上挂接输电线路的状态,综合考虑计算杆塔的旋转角度;
杆塔之间弧垂的模拟:根据杆塔顶端的位置,利用贝赛尔曲线来模拟输电线路的弧垂。
优选的,所述建模所按照的比例为1:1。
优选的,所述建模软件为3DMax。
相对于现有技术,本发明的化工园区二维管线的管理面板系统,具有以下有益的技术效果:
本发明的在三维GIS系统中模拟杆塔模型系统,采用多种技术,使得杆塔的本身结构及与其它杆塔的关联性的模拟逼真。
具体实施方式
本发明的一种应用于智能电网三维运行管理系统的杆塔模型系统,其中:
杆塔模型的作成与显示技术:在二维配网GIS系统中,一般用点状或线状等抽象符号表达电力设备,无法直观地显示设备本身的结构和相互间的关联;在三维GIS系统中,模拟真实的输电设备(如杆塔、绝缘子、输电线)是虚拟现实的基本要求,这使得模型本身会变得比较复杂,甚至要进行组合构造。以杆塔为例,不但每个杆塔的高度、塔头有差别,而且其包含的绝缘子也会根据杆塔的类型、方位、旋转角度甚至与其它杆塔的关联性而有不同的表现方式,因此,采用现场拍照,整理后归档,有建模软件(3DMax等)按照1:1的比例进行建模并导出到系统中进行使用;
杆塔摆放的旋转角度:通过数学公式进行杆塔旋转角度的自动计算和手动调整相结合,保证杆塔与现实状况一致。
根据客户提供的输电线路和杆塔的位置和模型信息,进行坐标系的转换后,计算出每一个杆塔在地球上的精确位置。、
杆塔的角度旋转计算:根据前后杆塔与该杆塔形成的向量,计算出角平分线,以及该杆塔上挂接输电线路的状态,综合考虑计算杆塔的旋转角度。
杆塔之间弧垂的模拟:通过贝赛尔曲线模拟弧垂。根据杆塔顶端的位置,利用贝赛尔曲线来模拟输电线路的弧垂。
上述实施例只是为了说明本发明的技术构思及特点,其目的是在于让本领域内的普通技术人员能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡是根据本发明内容的实质所作出的等效的变化或修饰,都应涵盖在本发明的保护范围内。
Claims (3)
1.一种应用于智能电网三维运行管理系统的杆塔模型系统,其特征在于,
所述杆塔模型的作成与显示,采用现场拍照,整理后归档,以建模软件按照一定比例进行建模并导出到系统中进行使用;
杆塔摆放的旋转角度,通过数学公式进行杆塔旋转角度的自动计算和手动调整相结合:首先,根据客户提供的输电线路和杆塔的位置和模型信息,进行坐标系的转换后,计算出每一个杆塔在地球上的精确位置,然后根据前后杆塔与该杆塔形成的向量,计算出角平分线,以及该杆塔上挂接输电线路的状态,综合考虑计算杆塔的旋转角度;
杆塔之间弧垂的模拟:根据杆塔顶端的位置,利用贝赛尔曲线来模拟输电线路的弧垂。
2.根据权利要求1所述的应用于智能电网三维运行管理系统的杆塔模型系统,其特征在于,所述建模所按照的比例为1:1。
3.根据权利要求1所述的应用于智能电网三维运行管理系统的杆塔模型系统,其特征在于,所述建模软件为3DMax。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210262297XA CN102831549A (zh) | 2012-07-27 | 2012-07-27 | 一种应用于智能电网三维运行管理系统的杆塔模型系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210262297XA CN102831549A (zh) | 2012-07-27 | 2012-07-27 | 一种应用于智能电网三维运行管理系统的杆塔模型系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102831549A true CN102831549A (zh) | 2012-12-19 |
Family
ID=47334668
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210262297XA Pending CN102831549A (zh) | 2012-07-27 | 2012-07-27 | 一种应用于智能电网三维运行管理系统的杆塔模型系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102831549A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103559360A (zh) * | 2013-11-13 | 2014-02-05 | 云南电网公司昭通供电局 | 一种三维架空电力线模型的构建方法及系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102129484A (zh) * | 2010-01-18 | 2011-07-20 | 华北电力科学研究院有限责任公司 | 输电线路数字化平断面图生成方法及装置 |
CN102184570A (zh) * | 2011-04-28 | 2011-09-14 | 广东省电力设计研究院 | 一种三维优化选线系统及其立体场景创建漫游方法及装置 |
CN102411793A (zh) * | 2011-08-10 | 2012-04-11 | 上海福家网络科技有限公司 | 一种三维场景中的物体显示方法 |
-
2012
- 2012-07-27 CN CN201210262297XA patent/CN102831549A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102129484A (zh) * | 2010-01-18 | 2011-07-20 | 华北电力科学研究院有限责任公司 | 输电线路数字化平断面图生成方法及装置 |
CN102184570A (zh) * | 2011-04-28 | 2011-09-14 | 广东省电力设计研究院 | 一种三维优化选线系统及其立体场景创建漫游方法及装置 |
CN102411793A (zh) * | 2011-08-10 | 2012-04-11 | 上海福家网络科技有限公司 | 一种三维场景中的物体显示方法 |
Non-Patent Citations (1)
Title |
---|
兰蕊: "输变电GIS系统中电力线路要素模型库的建立", 《山西大同大学学报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103559360A (zh) * | 2013-11-13 | 2014-02-05 | 云南电网公司昭通供电局 | 一种三维架空电力线模型的构建方法及系统 |
CN103559360B (zh) * | 2013-11-13 | 2017-01-04 | 云南电网公司昭通供电局 | 一种三维架空电力线模型的构建方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106802993B (zh) | 一种在三维场景下电网潮流运行的展现方法 | |
CN104794755B (zh) | 一种高压电缆三维管线场景构建方法 | |
CN104239998A (zh) | 智能电网资源实时运行状态三维可视化展示系统实现方法 | |
CN103066698B (zh) | 在调配系统中自动生成可视化的电网潮流图的实现方法 | |
CN103226841B (zh) | 基于虚拟现实技术的变电站可视化投运方法 | |
CN104166892A (zh) | 一种基于三维设计系统的工程管控方法及系统 | |
CN102169412A (zh) | 电网实时三维可视化系统 | |
CN103093007B (zh) | 输电铁塔三维虚拟装配方法 | |
CN102509330A (zh) | 基于电力gis的变电站虚拟三维系统的应用 | |
CN103337093A (zh) | 一种基于Unity3D着色器实现三维机房实时温场效果的方法 | |
CN104834788B (zh) | 一种500kV杆塔多回多分裂导地线三维模型实时构建方法 | |
CN101520951A (zh) | 特高压输电系统过电压与绝缘配合技术培训系统 | |
KR20130057663A (ko) | Gis 기반의 전력계통 동적 모델링 및 시각화 시스템 및 그 구동 방법 | |
CN107102991A (zh) | 一种三维gis系统中的杆塔参数化建模方法 | |
CN103699960B (zh) | 一种中压配电网运行态势可视化方法 | |
CN104090816A (zh) | 一种特高压钢管塔仿真培训系统及方法 | |
CN105741340B (zh) | 一种用于网页展示的输电线路三维场景仿真方法和系统 | |
CN202221628U (zh) | 混合式变电站电网仿真系统 | |
CN104091514A (zh) | 一种电网调度人员培训仿真系统 | |
CN102877443A (zh) | 一种基于虚拟现实和物联网技术的水闸交互控制系统 | |
Jiang et al. | Virtual reality training environment for electric systems | |
CN102831549A (zh) | 一种应用于智能电网三维运行管理系统的杆塔模型系统 | |
Chen | Cascaded stalling of induction motors in fault-induced delayed voltage recovery (FIDVR) | |
CN106934078B (zh) | 一种配电网物理模拟仿真系统拓扑实现方法 | |
Gao et al. | The Research and Development of Integrated Operation-Maintenance Simulation Training System [J] |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20121219 |