CN102798792A - Method and device for verifying connection configuration of transformer substation virtual terminal - Google Patents
Method and device for verifying connection configuration of transformer substation virtual terminal Download PDFInfo
- Publication number
- CN102798792A CN102798792A CN2012102502164A CN201210250216A CN102798792A CN 102798792 A CN102798792 A CN 102798792A CN 2012102502164 A CN2012102502164 A CN 2012102502164A CN 201210250216 A CN201210250216 A CN 201210250216A CN 102798792 A CN102798792 A CN 102798792A
- Authority
- CN
- China
- Prior art keywords
- identifier
- ied
- empty terminal
- connection configuration
- configuration information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210250216.4A CN102798792B (en) | 2012-07-18 | 2012-07-18 | Method and device for verifying connection configuration of transformer substation virtual terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210250216.4A CN102798792B (en) | 2012-07-18 | 2012-07-18 | Method and device for verifying connection configuration of transformer substation virtual terminal |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102798792A true CN102798792A (en) | 2012-11-28 |
CN102798792B CN102798792B (en) | 2015-03-18 |
Family
ID=47197955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210250216.4A Active CN102798792B (en) | 2012-07-18 | 2012-07-18 | Method and device for verifying connection configuration of transformer substation virtual terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102798792B (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103530738A (en) * | 2013-10-25 | 2014-01-22 | 国家电网公司 | Input virtual terminal management method and system |
CN103544352A (en) * | 2013-10-30 | 2014-01-29 | 国家电网公司 | Virtual terminal connection imaging method based on security coding device (SCD) document |
CN104063765A (en) * | 2014-07-03 | 2014-09-24 | 国电南瑞科技股份有限公司 | SCD file management method for intelligent substation |
CN104569715A (en) * | 2014-12-15 | 2015-04-29 | 国电南瑞科技股份有限公司 | Device-test-set-based method for debugging connection of intelligent transformer substation virtual terminator |
CN104618064A (en) * | 2015-02-13 | 2015-05-13 | 广州供电局有限公司 | Monitoring method and device for static information based on CRC (Cyclic Redundancy Check) inspection |
CN104933244A (en) * | 2015-06-15 | 2015-09-23 | 国网四川省电力公司技能培训中心 | Connection visualization method of matrix virtual terminal of intelligent substation |
WO2015139473A1 (en) * | 2014-03-18 | 2015-09-24 | 国家电网公司 | Method for managing and controlling system configuration document in intelligent substation |
CN105184189A (en) * | 2015-08-26 | 2015-12-23 | 国家电网公司 | Online control and management system for intelligent substation SCD file |
CN105227350A (en) * | 2015-08-31 | 2016-01-06 | 河北省电力建设调整试验所 | Based on the intelligent substation IED configuration file management-control method of CRC check code |
CN106202149A (en) * | 2016-06-22 | 2016-12-07 | 南京南瑞继保电气有限公司 | A kind of IEC61850 model file conversion method |
CN109213976A (en) * | 2018-09-13 | 2019-01-15 | 国网江苏省电力有限公司检修分公司 | The female poor reorganization and expansion configuration file otherness comparative approach of intelligent substation, system and equipment |
CN112838570A (en) * | 2020-12-30 | 2021-05-25 | 国网江苏省电力有限公司检修分公司 | Relay protection debugging system and debugging method |
CN113467852A (en) * | 2021-05-31 | 2021-10-01 | 中国电力科学研究院有限公司 | Configuration and verification method and system for cross-interval protection configuration file of intelligent substation |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1941017A (en) * | 2004-09-27 | 2007-04-04 | Bft股份公司 | Method of communication and home automation installation for its implementation |
US20080183406A1 (en) * | 2007-01-30 | 2008-07-31 | Myongji University Industry And Academia Cooperation Foundation | Online IED Fault Diagnosis Device and Method for Substation Automation System Based on IEC61850 |
CN101706816A (en) * | 2009-12-22 | 2010-05-12 | 广东电网公司电力科学研究院 | Method for detecting digitized transformer station model |
CN102360398A (en) * | 2011-10-11 | 2012-02-22 | 广东省电力设计研究院 | IEC61850-based CAD electric power graphic generation analysis method |
-
2012
- 2012-07-18 CN CN201210250216.4A patent/CN102798792B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1941017A (en) * | 2004-09-27 | 2007-04-04 | Bft股份公司 | Method of communication and home automation installation for its implementation |
US20080183406A1 (en) * | 2007-01-30 | 2008-07-31 | Myongji University Industry And Academia Cooperation Foundation | Online IED Fault Diagnosis Device and Method for Substation Automation System Based on IEC61850 |
CN101706816A (en) * | 2009-12-22 | 2010-05-12 | 广东电网公司电力科学研究院 | Method for detecting digitized transformer station model |
CN102360398A (en) * | 2011-10-11 | 2012-02-22 | 广东省电力设计研究院 | IEC61850-based CAD electric power graphic generation analysis method |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103530738A (en) * | 2013-10-25 | 2014-01-22 | 国家电网公司 | Input virtual terminal management method and system |
CN103544352B (en) * | 2013-10-30 | 2016-07-06 | 国家电网公司 | Empty terminal based on SCD file connects graphic method |
CN103544352A (en) * | 2013-10-30 | 2014-01-29 | 国家电网公司 | Virtual terminal connection imaging method based on security coding device (SCD) document |
WO2015139473A1 (en) * | 2014-03-18 | 2015-09-24 | 国家电网公司 | Method for managing and controlling system configuration document in intelligent substation |
CN104063765A (en) * | 2014-07-03 | 2014-09-24 | 国电南瑞科技股份有限公司 | SCD file management method for intelligent substation |
CN104569715A (en) * | 2014-12-15 | 2015-04-29 | 国电南瑞科技股份有限公司 | Device-test-set-based method for debugging connection of intelligent transformer substation virtual terminator |
CN104569715B (en) * | 2014-12-15 | 2017-08-29 | 国电南瑞科技股份有限公司 | A kind of method that virtual terminals of intelligent substation connection is debugged based on device experiment collection |
CN104618064A (en) * | 2015-02-13 | 2015-05-13 | 广州供电局有限公司 | Monitoring method and device for static information based on CRC (Cyclic Redundancy Check) inspection |
CN104618064B (en) * | 2015-02-13 | 2018-07-24 | 广州供电局有限公司 | Static information monitoring method based on CRC check and device |
CN104933244A (en) * | 2015-06-15 | 2015-09-23 | 国网四川省电力公司技能培训中心 | Connection visualization method of matrix virtual terminal of intelligent substation |
CN104933244B (en) * | 2015-06-15 | 2017-10-31 | 国网四川省电力公司技能培训中心 | Intelligent substation matrix form void terminal connection method for visualizing |
CN105184189A (en) * | 2015-08-26 | 2015-12-23 | 国家电网公司 | Online control and management system for intelligent substation SCD file |
CN105184189B (en) * | 2015-08-26 | 2018-05-04 | 国家电网公司 | The online managing and control system of intelligent substation SCD file |
CN105227350A (en) * | 2015-08-31 | 2016-01-06 | 河北省电力建设调整试验所 | Based on the intelligent substation IED configuration file management-control method of CRC check code |
CN106202149A (en) * | 2016-06-22 | 2016-12-07 | 南京南瑞继保电气有限公司 | A kind of IEC61850 model file conversion method |
CN106202149B (en) * | 2016-06-22 | 2019-07-23 | 南京南瑞继保电气有限公司 | A kind of IEC61850 model file conversion method |
CN109213976A (en) * | 2018-09-13 | 2019-01-15 | 国网江苏省电力有限公司检修分公司 | The female poor reorganization and expansion configuration file otherness comparative approach of intelligent substation, system and equipment |
CN112838570A (en) * | 2020-12-30 | 2021-05-25 | 国网江苏省电力有限公司检修分公司 | Relay protection debugging system and debugging method |
CN112838570B (en) * | 2020-12-30 | 2024-04-16 | 国网江苏省电力有限公司检修分公司 | Relay protection debugging system and debugging method |
CN113467852A (en) * | 2021-05-31 | 2021-10-01 | 中国电力科学研究院有限公司 | Configuration and verification method and system for cross-interval protection configuration file of intelligent substation |
CN113467852B (en) * | 2021-05-31 | 2024-04-09 | 中国电力科学研究院有限公司 | Configuration and verification method and system for inter-interval protection configuration file of intelligent substation |
Also Published As
Publication number | Publication date |
---|---|
CN102798792B (en) | 2015-03-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102798792B (en) | Method and device for verifying connection configuration of transformer substation virtual terminal | |
CN102005818B (en) | Method for detecting consistency of SCD (System Configuration Document) and IED (Intelligent Electronic Device) model on line | |
WO2015139473A1 (en) | Method for managing and controlling system configuration document in intelligent substation | |
US20150294037A1 (en) | System and method for automated substation design and configuration | |
CN105227350A (en) | Based on the intelligent substation IED configuration file management-control method of CRC check code | |
CN105048632A (en) | Smart substation IED configuration information and SCD file consistency detection system and method | |
CN105186690B (en) | Relay protection device constant value remote operation method | |
CN105098986A (en) | Relay protection device constant value online monitoring system and method thereof | |
CN103414251A (en) | Substation network communication simulation system based on IEC 61850 | |
CN103326469A (en) | Method and device for monitoring GOOSE communication status of intelligent substation | |
CN102981087A (en) | Interface system for RTDS and intelligent relaying protection device | |
CN102983541A (en) | Relay protection constant value remote modification system | |
CN104394020A (en) | Automatic fault processing and safety control system and method for power information collection device | |
CN104579748A (en) | SCD (substation configuration description) online checking network analysis method and system | |
CN113259155A (en) | Access method, device, gateway, medium and electronic equipment of Internet of things equipment | |
CN106599058B (en) | RCD file model verification method and device | |
US20170075923A1 (en) | Distribution management system | |
CN106855850A (en) | Based on portable equipment intelligent substation secondary void terminal figure reality symbol detection method | |
CN105356614A (en) | Universal debugging method applied to distribution network automation | |
CN105099810A (en) | Communication test method and system for sampling value interface | |
CN109802487A (en) | A kind of main plant stand source maintenance function implementation method and device | |
CN104299172A (en) | Power grid weak link comprehensive recognition method | |
CN104579817A (en) | Communication loop test method based on GOOSE (generic object-oriented substation event) logics | |
CN115175023B (en) | Photovoltaic inverter-based method, system and device for reading meter of internet of things | |
CN102880988A (en) | Topology comparison-based method and device for importing substation model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 510600 No. 75 Meihua Road, Guangzhou, Guangdong, Yuexiu District Patentee after: ELECTRICAL POWER DISPATCHING & CONTROL CENTER OF GUANGDONG POWER GRID Co.,Ltd. Patentee after: NR ELECTRIC Co.,Ltd. Address before: 510600 No. 75 Meihua Road, Guangzhou, Guangdong, Yuexiu District Patentee before: GUANGDONG POWER GRID POWER DISPATCHING CONTROL CENTER Patentee before: NR ELECTRIC Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220728 Address after: 510600 No. 75 Meihua Road, Guangzhou, Guangdong, Yuexiu District Patentee after: ELECTRICAL POWER DISPATCHING & CONTROL CENTER OF GUANGDONG POWER GRID Co.,Ltd. Address before: 510600 No. 75 Meihua Road, Guangzhou, Guangdong, Yuexiu District Patentee before: ELECTRICAL POWER DISPATCHING & CONTROL CENTER OF GUANGDONG POWER GRID Co.,Ltd. Patentee before: NR ELECTRIC Co.,Ltd. |