CN102797496A - 煤矿巷道矸石转载、支护一体机 - Google Patents
煤矿巷道矸石转载、支护一体机 Download PDFInfo
- Publication number
- CN102797496A CN102797496A CN2012102830474A CN201210283047A CN102797496A CN 102797496 A CN102797496 A CN 102797496A CN 2012102830474 A CN2012102830474 A CN 2012102830474A CN 201210283047 A CN201210283047 A CN 201210283047A CN 102797496 A CN102797496 A CN 102797496A
- Authority
- CN
- China
- Prior art keywords
- coal mine
- tunnel
- driving
- gangues
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
“煤矿巷道矸石转载、支护一体机”是一种煤矿炮掘巷道的施工设备,该设备重点优化了装矸及支护工艺的实施。
在巷道掘进施工中装岩、运输、排矸是掘进工作中占循环时间最长的工序。要实现巷道的快速高效掘进,表现十分突出的就是掘进工作面的矸石堆积、排矸不及、临时支护固定困难等。为有效解决上述问题,本发明提供一种能够利用爆破能及时将矸石转载,同时又能为支护作业提供平台的——“煤矿巷道矸石转载、支护一体机”。该发明是在充分分析煤矿掘进爆破作业特点设计而成的。该设备采用散热性能优异的铝青铜板、液压油缸等组合加工而成。本机全系统采用液压系统提供动力,动力输出稳定可适用于相对复杂的地质环境。
Description
技术领域
本发明涉及煤矿巷道掘进的施工设备,尤其涉及炮掘巷道的装矸及巷道支护工序的进行。
背景技术
在采煤机械化技术日趋成熟,而掘进工序相对复杂、机械化程度仍然较低的客观情况下,掘进工的劳动强度大、劳动效率低、收入水平低、危险系数高。最终,导致掘进用工紧张、效率低下,采煤快于掘进、接替紧张的被动局面。巷道掘进是一个多工序交替过程,主要由破岩、装运和支护三大工序组成。目前,破岩方式一般分为人工挖掘、爆破、机械等;装运主要是使用耙矸机、综掘机和铲车等配合矿车、梭车以及链板机(皮带)等多设备混合排矸;支护主要分为临时支护和永久支护,具体表现形式是架棚、锚杆及锚喷支护等。在巷道掘进施工中装岩、运输、排矸是掘进工作中劳动量最大,占循环时间最长(达35%~50%)的工序。掘进装岩运输综合排矸能力的优化,对快速掘进有十分重要的意义。科技迅猛发展令各类新型巷道掘进设备、技术不断涌现,并稳步提升了掘进速度,然而现有的掘进设备适应能力差、性能欠缺、故障率高、维护费用高,且自动化应用程度有限,对煤矿巷道生产掘进速度形成了不良影响。要实现巷道的快速高效掘进,表现十分突出的就是掘进工作面的矸石堆积严重、排矸及验炮工作不能及时进行;临时支护较为笨重、繁琐,固定困难、使用不方便,而且巷道净高超过2.2米后支护作业进行时人员须站在梯子或假平台上施工较为困难。排矸与支护作业不能平行进行、大断面巷道支护困难,严重制约着矿井采掘设备的更新与发展、严重制约着的安全高效矿井的建设。
发明内容
为了有效解决上述生产过程中的问题,本发明提供一种能够利用爆破能及时将矸石转载,同时又能为支护作业提供平台的——“煤矿巷道矸石转载、支护一体机”。本发明是在充分分析煤矿掘进工作面钻眼、微差、台阶爆破法以及井巷掘进爆破作业只有一个狭小的自由面,四面岩体的夹制性很强,一次性起爆药量受到较大的限制,台阶自由面条件等因素的影响,利用微差爆破在碰撞破碎过程中,煤(岩)中的动能降低,导致抛距减小,形成相对集中的爆堆,而且爆堆剖面轮廓线具有Weibull分布函数曲线特征这一特点设计而成的。“煤矿巷道矸石转载、支护一体机”采用散热性能优异的铝青铜板、液压油缸等加工而成,主要由行走部、支撑承载部、稳固部、辅助装载部、转载限位部、前探支护部、液压系统等部件组成。本发明能够实现煤矿掘进巷道的快速装矸、及时支护,最大限度的减少爆破轮廓的裸露时间,提高工作效率。本机全系统采用液压系统提供动力,动力输出稳定可适用于相对复杂的地质环境。本设备的研制成功,必将减少掘进用工、提高掘进效率,为掘进作业提供远程操作平台,具有较为突出的社会效益和经济效益。
附图说明
图1是“煤矿巷道矸石转载、支护一体机”的总构造示意图:
①、行走部,②、支撑承载部,③、稳固部,④、辅助装载部,⑤、转载限位部,⑥、前探支护部;
图2是“煤矿巷道矸石转载、支护一体机”的装载、支护示意图;
图3是“煤矿巷道矸石转载、支护一体机”的转运示意图;
图4是“煤矿巷道矸石转载、支护一体机”的卸载示意图;
具体实施方式
在煤矿巷道掘进过程中使用凿岩台车或多部钻具,严格按照台阶炮孔爆破图表进行打眼,装药后将“煤矿巷道矸石转载、支护一体机”开至迎头并进行稳固(必要时需对稳固单体进行必要的保护,如图2),然后展开转载限位部、进行爆破作业,经初步安全确认后上掩护梁收转载限位部进行永久支护,然后收稳固部进行转运卸载工作(如图3),同时巷道掘进工作面进行打眼、准备下一循环。举例:煤矿巷道矸石转载、支护一体机”的加工设计可根据巷道断面、坡度等客观条件进行单独定做,现以长3米、宽1.5米规格校算其使用效果和设备适应能力(该规格设备运输方便,可不解体进入大部分矿井的掘进工作面)。一、“煤矿巷道矸石转载、支护一体机”自身的重量:
V
铝铜板
=3×1.5×0.05=0.225m
3
,m
铝铜板
=0.225×8.9×10
3
=2.0025×10
3
kg,G
铝铜板
=19.6245KN
二、以常见的岩巷3.0×3.0断面计算岩体重量:(每次循环进度0.8米)
V 矸 =9.621×0.8=7.697m 3 ,m 矸 =20.397×10 3 kg,G 矸 =199.886KN
三、以常见的煤巷3.8×2.6断面计算煤体重量:(每次循环进度0.9米)
V 煤 =11.4×0.9=10.26m 3 ,m 煤 =14.364×10 3 kg,G 煤 =140.7672KN
四、体积及重量均取最大值校算
V 最大 =V 煤 =10.26m 3 ,G 最大 = G 铝铜板 +G 矸 =19.6245+199.886=219.5105KN≈220KN
V 机 =(3+1 增长 )×(1.5+1.5 增宽 )×0.855=10.26m 3 ;
G
承载
= G
最大
×K=220×2=440KN G
每根承载
= G
承载
÷8=440÷8=55KN
G
30
=55÷COS30°=63.5KN
说明:1
增长
为辅助装载部增长估值,1.5
增宽
为转载限位部增宽,0.855为装载高度均值,K为所取的安全系数;
五、“煤矿巷道矸石转载、支护一体机”加工、使用等情况说明
1、主要采用铝青铜板、液压油缸、韧性皮带等,转载限位部由韧性皮带加工;
2、选用支撑力在65KN以上的优质液压油缸,每次爆破时使用稳固部承载重量、严禁液压油缸受力;
3、装载高度控制在0.9m,转运时严禁人员站在“煤矿巷道矸石转载、支护一体机”周围,确保安全;
4、根据以上计算及履带机的爬坡情况,“煤矿巷道矸石转载、支护一体机”可应用于坡度为±30°的巷道掘进;
5、“煤矿巷道矸石转载、支护一体机”与综掘机相比更加适用于硬岩、小断面、坡度变化大、拐弯多等复杂条件下的巷道掘进施工;
6、卸载场应根据排矸条件及巷道情况现场选定,“煤矿巷道矸石转载、支护一体机”须稳固牢靠、人员站位安全,必要时辅助人工卸载。
Claims (1)
1.一种煤矿巷道掘进所使用的装载、支护设备,包括行走部(1),支撑部(2),稳固部(3),辅助装载部(4),转载限位部(5),前探支护部(6)构成,全构件均由液压系统供能。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210283047.4A CN102797496B (zh) | 2012-08-10 | 2012-08-10 | 煤矿巷道矸石转载、支护一体机 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210283047.4A CN102797496B (zh) | 2012-08-10 | 2012-08-10 | 煤矿巷道矸石转载、支护一体机 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102797496A true CN102797496A (zh) | 2012-11-28 |
CN102797496B CN102797496B (zh) | 2014-06-25 |
Family
ID=47196774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210283047.4A Active CN102797496B (zh) | 2012-08-10 | 2012-08-10 | 煤矿巷道矸石转载、支护一体机 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102797496B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2229779A1 (de) * | 1972-06-19 | 1974-01-10 | Rheinstahl Ag | Schildausbau |
DE3808731A1 (de) * | 1988-03-16 | 1989-10-26 | Gutehoffnungshuette Man | Verfahren zum abtransport von in untertaegigem langfrontabbau abgebautem mineralhaltigen gestein und transportgeraete zur durchfuehrung des verfahrens |
CN201206468Y (zh) * | 2008-01-05 | 2009-03-11 | 李君� | 带安全支护装置的双钩杠杆式掘进机 |
CN201513191U (zh) * | 2009-09-14 | 2010-06-23 | 包新 | 巷道临时支护自移式液压支架 |
CN201794609U (zh) * | 2010-09-29 | 2011-04-13 | 常州科林矿山机械有限公司 | 高突矿井煤巷钻装支一体机 |
CN202883003U (zh) * | 2012-08-10 | 2013-04-17 | 张振营 | 煤矿巷道矸石转载、支护一体机 |
-
2012
- 2012-08-10 CN CN201210283047.4A patent/CN102797496B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2229779A1 (de) * | 1972-06-19 | 1974-01-10 | Rheinstahl Ag | Schildausbau |
DE3808731A1 (de) * | 1988-03-16 | 1989-10-26 | Gutehoffnungshuette Man | Verfahren zum abtransport von in untertaegigem langfrontabbau abgebautem mineralhaltigen gestein und transportgeraete zur durchfuehrung des verfahrens |
CN201206468Y (zh) * | 2008-01-05 | 2009-03-11 | 李君� | 带安全支护装置的双钩杠杆式掘进机 |
CN201513191U (zh) * | 2009-09-14 | 2010-06-23 | 包新 | 巷道临时支护自移式液压支架 |
CN201794609U (zh) * | 2010-09-29 | 2011-04-13 | 常州科林矿山机械有限公司 | 高突矿井煤巷钻装支一体机 |
CN202883003U (zh) * | 2012-08-10 | 2013-04-17 | 张振营 | 煤矿巷道矸石转载、支护一体机 |
Also Published As
Publication number | Publication date |
---|---|
CN102797496B (zh) | 2014-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Tu et al. | Present situation of fully mechanized mining technology for steeply inclined coal seams in China | |
Mandal et al. | Evaluating extent and causes of overbreak in tunnels | |
Cai | Rock support in strainburst-prone ground | |
CN104594899A (zh) | 一种沿空掘巷窄煤柱合理宽度的确定方法 | |
CN202883003U (zh) | 煤矿巷道矸石转载、支护一体机 | |
CN102418527B (zh) | 一种缓倾斜极薄沉积型地下铁矿床开采方法 | |
CN110331978A (zh) | 一种环境再造分段中深孔嗣后充填采矿法 | |
CN101302933B (zh) | 一种岩巷综合机械化开拓作业的开拓方法 | |
Macias et al. | D&B versus TBM: Review of the parameters for a right choice of the excavation method | |
Krauze et al. | The mechanized supporting system in tunnelling operations | |
Bullock | Comparison of underground mining methods | |
CN104989402A (zh) | 一种用于石灰岩地下矿山开采的中深孔房柱采矿法 | |
CN102797496B (zh) | 煤矿巷道矸石转载、支护一体机 | |
Rao et al. | Critical analysis of process cycle by numerical modelling for faster development of drives in hard-rock underground mine–a case study | |
Marian | Directions of changes of hard coal output technologies in Poland | |
Yang et al. | Deformation and failure characteristics of the roof in an unsupported area during rapid driving of coal roadway | |
Tuncdemir | Impact hammer applications in Istanbul metro tunnels | |
Mendyka et al. | The design and analisys of driling and bolting rigs for narrow vein exploitation | |
Seedsman | Failure modes and support of coal roofs | |
CN106640163B (zh) | 组合支架盾构式全面采矿法 | |
Krauze et al. | Determining the Stability of a Mobile Manipulator for the Transport and Assembly of Arches in the Yielding Arch Support. Energies 2022, 15, 3170 | |
Lapko et al. | Modern technologies of bolting in weakly metamorphosed rocks: experience and perspectives | |
da Luz et al. | Diagnosis of the production cycle in the small shaft sinking | |
Eremenko et al. | Specific Features of Iron Ore Mining in Gornaya Shoria | |
Golik et al. | Sublevel Stoping with Cemented Paste Backfill in Weak Rock Mass Zones |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221026 Address after: 271000 Room 302, Building 7, Taishan Science and Technology Industrial Park, Yitianmen Street, Beijipo Sub district Office, High tech Zone, Tai'an City, Shandong Province Patentee after: Shandong Zeming Intelligent Equipment Co.,Ltd. Address before: 235,052 Shuoli Mining Technology Section, Duji District, Huaibei City, Anhui Province Patentee before: Zhang Zhenying |