CN102797423A - 一种钻式采煤机输送钻杆装置 - Google Patents
一种钻式采煤机输送钻杆装置 Download PDFInfo
- Publication number
- CN102797423A CN102797423A CN2012102957672A CN201210295767A CN102797423A CN 102797423 A CN102797423 A CN 102797423A CN 2012102957672 A CN2012102957672 A CN 2012102957672A CN 201210295767 A CN201210295767 A CN 201210295767A CN 102797423 A CN102797423 A CN 102797423A
- Authority
- CN
- China
- Prior art keywords
- cam mechanism
- bed body
- rotor
- track
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
本发明是一种钻式采煤机输送钻杆装置,属于矿山设备领域,包括轨道总成、轨道转子、输送床体、调节手柄、钻具安装座、凸轮机构和安装架;轨道总成、轨道转子、输送床体、调节手柄及钻具安装座组成主体;轨道转子焊接在轨道总成上方,钻具安装座螺母连接凸轮机构上方,凸轮机构固定连接输送床体上方,调节手柄活动连接凸轮机构一起,调节手柄固定连接在轨道总成上方,轨道总成由左轨道架、右轨道架和支腿总成组成,其中支腿总成由且支腿架与支腿座组成,安装架安装设置在凸轮机构一侧;本发明满足在高工作面的巷道高度,降低工人劳动强度,降低巷道掘进高度,减少巷掘进和布置成本。
Description
技术领域
本发明涉及一种钻式采煤机输送钻杆装置,属于矿山设备领域。
背景技术
随着全国薄煤层开采的认知度加强,钻式采煤机也得到了进一步的推广,但是由于钻式采煤机本身的开采方式,造成对换钻杆困难,传统的钻杆输送方式,采用单轨吊运输,由于没有相关的定位措施,且采取了柔性连接,因此钻杆还需要人工辅助装卸钻杆,工人劳动强度大;且使用单轨道,提高了工作面的巷道高度。
发明内容
针对上述现有技术存在的问题,本发明提供一种钻式采煤机输送钻杆装置,能满足在不提高工作面的巷道高度,大大降低工人劳动强度,降低巷道掘进高度,减少巷道掘进和布置成本。
为了实现上述目的,本发明通过以下技术方案实现:一种钻式采煤机输送钻杆装置,包括轨道总成、轨道转子、输送床体、调节手柄、钻具安装座、凸轮机构和安装架;轨道总成、轨道转子、输送床体、调节手柄及钻具安装座组成主体;轨道转子焊接在轨道总成上方,钻具安装座螺母连接凸轮机构上方,凸轮机构固定连接输送床体上方,调节手柄活动连接凸轮机构一起,调节手柄固定连接在轨道总成上方,轨道总成由左轨道架、右轨道架和支腿总成组成,左轨道架和右轨道架通过螺栓与支腿总成连接成为一个整体,其中支腿总成由且支腿架与支腿座组成,支腿架与支腿座上均布置有等距的调节孔,输送床体内设有凸轮机构,安装架安装设置在凸轮机构一侧。
本发明的有益效果是:能满足在不提高了工作面的巷道高度,达到自动运送钻杆的目的,减少了工人劳动强度,同时减少安装、拆卸钻杆时间,从而提高了钻机整体的生产率,该设备结构简单、便于维护使用,节省人员成本,改善了采煤人员的劳动强度和工作环境,同时摒弃了单轨道等辅助运输设备,减少了巷道掘进高度,减少了巷道掘进和布置成本。
附图说明
图1是本发明主视图,
图2是本发明俯视图,
图3是本发明轨道转子剖视图。
图中:1、轨道总成,2、轨道转子,3、输送床体,4、调节手柄,5、钻具安装座,6、左轨道架,7、右轨道架,8、支腿总成,9、支腿架,10、支腿座,11、凸轮机构,12、安装架,13、转子密封轴承,14、转子轴,15、护套。
具体实施方式
下面结合附图对本发明做进一步说明。
如图1,图2所示,一种钻式采煤机输送钻杆装置,包括轨道总成1、轨道转子2、输送床体3、调节手柄4、钻具安装座5、凸轮机构11和安装架12;轨道总成1、轨道转子2、输送床体3、调节手柄4及钻具安装座5组成主体;轨道转子2焊接在轨道总成1上方,钻具安装座5螺母连接凸轮机构11上方,凸轮机构11固定连接输送床体3上方,调节手柄4活动连接凸轮机构11一起,调节手柄4固定连接在轨道总成1上方,轨道总成1由左轨道架6、右轨道架7和支腿总成8组成,左轨道架6和右轨道架7通过螺栓与支腿总成8连接成为一个整体,其中支腿总成8由且支腿架9与支腿座10组成,支腿架9与支腿座10上均布置有等距的调节孔,可以根据钻式采煤机的实际调节高度,作出相应的调节,使输送钻杆装置与钻式采煤机的高度,输送床体3内设有凸轮机构11,安装架12安装设置在凸轮机构11一侧。
轨道总成1中的左轨道架6、右轨道架7内均等距布置有轨道转子2,轨道转子2由一对转子密封轴承13,转子轴14和高强耐磨护套15组成;
凸轮机构11固定连接输送床体3上方,可根据钻头中心高度,通过调节手柄调节安装架12的高度,使待安装钻杆的中心高度与主机钻杆高度保持一致,从而当钻杆输送床体到达待安装位置时,顺利安装钻杆。
工作时,工人先将输送床体3移至设备外,调节调节手柄4位置,通过凸轮机构11使输送床体3高度,使得待安装钻杆组中心高放置与主机钻杆输出轴高度一致,然后工人推动输送床体3,输送床体3在轨道总成1上匀速滑动,由于有此时由轨道转子2支撑整个输送床体3的自重,由于采取了轴承支撑滚动的方式,因此滚动阻力很小,待装钻杆到达指定位置后,主机开始安装钻杆,安装完毕后,再次调节调节手柄4位置,通过凸轮机构11使输送床体3高度下降,顺利退出输送床体3。完成安装钻杆作业。
当钻机工作完毕后,完成一个钻孔的钻采作业,开始退出钻杆作业,工人先将输送床体3放置待接钻杆处,主机开始退钻杆作业,等钻杆退后,直接落在输送床体3内,工人推动输送床体3到拆卸位置,完成拆卸钻杆作业。
Claims (3)
1.一种钻式采煤机输送钻杆装置,其特征在于,包括轨道总成(1)、轨道转子(2)、输送床体(3)、调节手柄(4)、钻具安装座(5)、凸轮机构(11)和安装架(12);轨道总成(1)、轨道转子(2)、输送床体(3)、调节手柄(4)及钻具安装座(5)组成主体;轨道转子(2)焊接在轨道总成(1)上方,钻具安装座(5)螺母连接凸轮机构(11)上方,凸轮机构(11)固定连接输送床体(3)上方,调节手柄(4)活动连接凸轮机构(11)一起,调节手柄(4)固定连接在轨道总成(1)上方,轨道总成(1)由左轨道架(6)、右轨道架(7)和支腿总成(8)组成,左轨道架(6)和右轨道架(7)通过螺栓与支腿总成(8)连接成为一个整体,其中支腿总成(8)由且支腿架(9)与支腿座(10)组成,支腿架(9)与支腿座(10)上均布置有等距的调节孔,输送床体(3)内设有凸轮机构(11),安装架(12)安装设置在凸轮机构(11)一侧。
2.根据权利要求1所述的一种钻式采煤机输送钻杆装置,其特征在于,所述的轨道总成(1)中的左轨道架(6)和右轨道架(7)内均等距布置有轨道转子(2),轨道转子(2)由一对转子密封轴承(13),转子轴(14)和护套(15)组成,转子密封轴承(13)和转子轴(14)紧扣在一起,护套(15)包裹密封轴承(13)和转子轴(14)。
3.根据权利要求1所述的一种钻式采煤机输送钻杆装置,其特征在于,所述的凸轮机构(11)固定连接在输送床体(3)上方。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210295767.2A CN102797423B (zh) | 2012-08-18 | 2012-08-18 | 一种钻式采煤机输送钻杆装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210295767.2A CN102797423B (zh) | 2012-08-18 | 2012-08-18 | 一种钻式采煤机输送钻杆装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102797423A true CN102797423A (zh) | 2012-11-28 |
CN102797423B CN102797423B (zh) | 2015-04-01 |
Family
ID=47196702
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210295767.2A Active CN102797423B (zh) | 2012-08-18 | 2012-08-18 | 一种钻式采煤机输送钻杆装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102797423B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103541671A (zh) * | 2013-11-06 | 2014-01-29 | 重庆大学 | 钻杆组自动装卸平台 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3877583A (en) * | 1974-01-18 | 1975-04-15 | Dolphin International | Pipe racking system |
CN2700296Y (zh) * | 2004-03-12 | 2005-05-18 | 张新广 | 油田井下作业油管输送装置 |
US20100111646A1 (en) * | 2006-06-09 | 2010-05-06 | Columbia Trailer Co., Inc. | Method and apparatus for handling pipe |
CN202117586U (zh) * | 2011-06-02 | 2012-01-18 | 中国地质科学院勘探技术研究所 | 钻杆自装卸摆放架 |
CN202300246U (zh) * | 2011-10-28 | 2012-07-04 | 廊坊富邦德石油机械制造有限公司 | 可升降式拖挂猫道 |
CN203201500U (zh) * | 2012-08-18 | 2013-09-18 | 江苏中机矿山设备有限公司 | 钻式采煤机输送钻杆装置 |
-
2012
- 2012-08-18 CN CN201210295767.2A patent/CN102797423B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3877583A (en) * | 1974-01-18 | 1975-04-15 | Dolphin International | Pipe racking system |
CN2700296Y (zh) * | 2004-03-12 | 2005-05-18 | 张新广 | 油田井下作业油管输送装置 |
US20100111646A1 (en) * | 2006-06-09 | 2010-05-06 | Columbia Trailer Co., Inc. | Method and apparatus for handling pipe |
CN202117586U (zh) * | 2011-06-02 | 2012-01-18 | 中国地质科学院勘探技术研究所 | 钻杆自装卸摆放架 |
CN202300246U (zh) * | 2011-10-28 | 2012-07-04 | 廊坊富邦德石油机械制造有限公司 | 可升降式拖挂猫道 |
CN203201500U (zh) * | 2012-08-18 | 2013-09-18 | 江苏中机矿山设备有限公司 | 钻式采煤机输送钻杆装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103541671A (zh) * | 2013-11-06 | 2014-01-29 | 重庆大学 | 钻杆组自动装卸平台 |
Also Published As
Publication number | Publication date |
---|---|
CN102797423B (zh) | 2015-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101858213B (zh) | 煤巷双平台四臂钻装运锚一体化机 | |
CN201560760U (zh) | 一种履带式四臂凿岩台车 | |
CN109779660B (zh) | 一种隧道施工机组工作站 | |
CN203201500U (zh) | 钻式采煤机输送钻杆装置 | |
CN204295308U (zh) | 钢轨钻孔用的夹具 | |
CN102797423A (zh) | 一种钻式采煤机输送钻杆装置 | |
CN203664737U (zh) | 自动多孔钻 | |
CN101709642B (zh) | 一种履带式四臂凿岩台车 | |
CN110374498A (zh) | 一种履带式薄煤层锚杆钻车 | |
CN107378046A (zh) | 一种数控加工中心用钻斜孔装置 | |
CN106342008B (zh) | 运载火箭贮箱筒段纵环缝焊接装置 | |
CN208528145U (zh) | 一种端梁轴孔钻孔装置 | |
CN109036079B (zh) | 一种模拟开敞式tbm换刀机器人换刀的试验台 | |
CN105881660B (zh) | 高效集装箱木地板钻孔系统 | |
CN204266920U (zh) | 一种自行式液压水井钻机 | |
CN103206232B (zh) | 跟随掘进机同步预支护与锚护的装置 | |
CN107701196A (zh) | 龙门架凿岩掘进车 | |
CN209892257U (zh) | 锚杆台车 | |
CN207701138U (zh) | 龙门架凿岩掘进车 | |
CN209195260U (zh) | 一种带钻杆托架结构的非开挖钻机 | |
CN205445487U (zh) | 一种锚杆钻机安装轨道 | |
CN104354018A (zh) | 一种钢轨钻孔用的工装 | |
CN104308219B (zh) | 一种钢轨用的钻孔装置 | |
CN204294984U (zh) | 一种钢轨用的钻孔装置 | |
CN202417501U (zh) | 运输槽机构侧置窄列式新型扒渣机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220413 Address after: 221000 No.1 Huatai Road, No.3 Industrial Park, Xuzhou hi tech Industrial Development Zone, Jiangsu Province Patentee after: Guoke Zhongmai (Xuzhou) Energy Technology Co.,Ltd. Address before: 221116 No. 28, Huatai Road, Xuzhou high tech Industrial Development Zone, Xuzhou City, Jiangsu Province Patentee before: JIANGSU ZHONGJI MINE EQUIPMENT Co.,Ltd. |