CN102787817B - 钻井循环系统综合模拟实验装置 - Google Patents
钻井循环系统综合模拟实验装置 Download PDFInfo
- Publication number
- CN102787817B CN102787817B CN201210329359.4A CN201210329359A CN102787817B CN 102787817 B CN102787817 B CN 102787817B CN 201210329359 A CN201210329359 A CN 201210329359A CN 102787817 B CN102787817 B CN 102787817B
- Authority
- CN
- China
- Prior art keywords
- drilling
- pipeline
- simulation
- circulation
- annulus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210329359.4A CN102787817B (zh) | 2012-09-08 | 2012-09-08 | 钻井循环系统综合模拟实验装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210329359.4A CN102787817B (zh) | 2012-09-08 | 2012-09-08 | 钻井循环系统综合模拟实验装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102787817A CN102787817A (zh) | 2012-11-21 |
CN102787817B true CN102787817B (zh) | 2015-02-18 |
Family
ID=47153378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210329359.4A Expired - Fee Related CN102787817B (zh) | 2012-09-08 | 2012-09-08 | 钻井循环系统综合模拟实验装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102787817B (zh) |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321637B (zh) * | 2013-05-14 | 2015-12-02 | 中国海洋石油总公司 | 一种单个岩屑受力分析实验装置及实验方法 |
CN103323212A (zh) * | 2013-06-28 | 2013-09-25 | 西南石油大学 | 一种模拟井筒环空钻井液流动特性的实验装置及方法 |
CN103485738B (zh) * | 2013-10-11 | 2016-07-06 | 西南石油大学 | 一种水平井岩屑运移模拟实验装置及实验方法 |
CN104196518A (zh) * | 2014-07-02 | 2014-12-10 | 中国石油大学(北京) | 井筒环空中气液固三相间滑脱测量设备及方法 |
CN104316103B (zh) * | 2014-09-28 | 2016-08-31 | 中石化胜利石油工程有限公司钻井工艺研究院 | 一种并联式双压钻井液密度和质量流量检测系统 |
CN105628600A (zh) * | 2014-11-06 | 2016-06-01 | 中国石油化工股份有限公司 | 用于评价深井钻井液的润滑性能的实验装置与实验方法 |
CN104897858A (zh) * | 2015-06-17 | 2015-09-09 | 中国海洋石油总公司 | 钻井液井下动态循环模拟系统 |
CN105551362B (zh) * | 2015-12-24 | 2018-08-10 | 中国地质大学(武汉) | 水平定向钻环空岩屑运移综合模拟实验方法及实验装置 |
CN105909235A (zh) * | 2016-06-27 | 2016-08-31 | 中国石油集团渤海钻探工程有限公司 | 井眼清洁工具试验装置及利用其对井眼清洁工具进行性能评价的方法 |
CN106248416A (zh) * | 2016-08-24 | 2016-12-21 | 中国石油集团渤海钻探工程有限公司 | 振动类钻井工具性能检测装置及其用途 |
CN106645791B (zh) * | 2017-02-13 | 2019-03-22 | 常州大学 | 适用于多场耦合条件下的小孔射流测速实验装置 |
CN107219143A (zh) * | 2017-08-04 | 2017-09-29 | 西南石油大学 | 一种实时监测井眼清洁的方法 |
CN107830988A (zh) * | 2017-09-25 | 2018-03-23 | 西南石油大学 | 一种研究钻井作业中钻井液进入环空后压力波传递速度及规律的实验装置 |
CN107893634B (zh) * | 2017-11-16 | 2024-06-04 | 成都理工大学 | 一种用于喷射钻井室内研究的多功能测试与实验平台 |
CN109838214A (zh) * | 2017-11-27 | 2019-06-04 | 中石化石油工程技术服务有限公司 | 一种定向井钻井液携岩效率评价实验装置及实验方法 |
CN108827830B (zh) * | 2018-06-15 | 2023-11-14 | 西南石油大学 | 一种高温高压钻井液流动性能测试装置及方法 |
SG10201907366PA (en) * | 2018-09-17 | 2020-04-29 | Sulzer Management Ag | Multiphase pump |
CN109630045B (zh) * | 2018-12-12 | 2024-03-22 | 重庆科技学院 | 多功能钻井全井段动态循环模拟实验系统 |
CN111236869B (zh) * | 2020-01-10 | 2021-08-10 | 中国石油大学(北京) | 停泵工况下岩屑分布的确定方法、装置和设备 |
CN111827910B (zh) * | 2020-08-11 | 2022-04-19 | 西南石油大学 | 一种探究水平井钻井中岩屑床形成的实验装置及实验方法 |
CN112282729B (zh) * | 2020-10-20 | 2022-03-11 | 中国石油集团渤海钻探工程有限公司 | 一种模拟井眼环境的气测数据检测实验装置 |
CN115217427B (zh) * | 2021-04-15 | 2023-10-03 | 中国石油天然气集团有限公司 | 一种油气勘探气体钻井降尘装置 |
CN113063617B (zh) * | 2021-05-10 | 2024-04-26 | 西南石油大学 | 一种气体钻井模拟卡钻解卡的实验装置及方法 |
CN113686374B (zh) * | 2021-09-03 | 2023-11-17 | 贝兹维仪器(苏州)有限公司 | 一种模拟钻井高频震动旋转的传感器测试装置 |
CN114280099B (zh) * | 2021-12-27 | 2024-02-09 | 中国地质大学(武汉) | 评价潜含水合物下深水钻井液热声特性的实验装置及方法 |
CN114705834B (zh) * | 2022-03-31 | 2023-08-18 | 安徽理工大学 | 模拟气举反循环泥浆悬浮排渣室内试验系统及其试验方法 |
CN115144044B (zh) * | 2022-05-31 | 2024-06-28 | 重庆川仪自动化股份有限公司 | 一种截流式清污的巴歇尔槽及污水计量模拟实验装置 |
CN114893169B (zh) * | 2022-06-09 | 2024-05-10 | 重庆大学 | 一种新型钻孔环空多相流模拟试验方法 |
CN115077829B (zh) * | 2022-06-13 | 2024-08-02 | 北京工业大学 | 一种水平段钻井轴向振动减阻实验装置 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5056596A (en) * | 1988-08-05 | 1991-10-15 | Alberta Oil Sands Technology And Research Authority | Recovery of bitumen or heavy oil in situ by injection of hot water of low quality steam plus caustic and carbon dioxide |
WO2007003953A1 (en) * | 2005-07-06 | 2007-01-11 | Halliburton Energy Services, Inc. | Mixing energy analysis of high-yielding non-newtonian fluids for severe lost circulation prevention |
CN101560870A (zh) * | 2009-05-27 | 2009-10-21 | 西南石油大学 | 泡沫钻井中泡沫基液循环使用系统 |
CN101701520A (zh) * | 2009-12-04 | 2010-05-05 | 中国石油大学(华东) | 深水钻井液循环携岩与井壁稳定模拟实验装置 |
CN101709639A (zh) * | 2009-11-20 | 2010-05-19 | 中国石油大学(华东) | 模拟深水油气开采的井筒多相流动装置 |
CN201635659U (zh) * | 2010-04-01 | 2010-11-17 | 西南石油大学 | 一种气体钻井冲蚀实验装置 |
CN201896615U (zh) * | 2010-11-09 | 2011-07-13 | 中国海洋石油总公司 | 一种用于冲砂洗井的可循环泡沫基液的实验循环装置 |
CN202266253U (zh) * | 2011-10-13 | 2012-06-06 | 张成海 | 空气泡沫钻井模拟试验装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4010642B2 (ja) * | 1998-05-13 | 2007-11-21 | 株式会社東京ソイルリサーチ | 原位置地盤凍結用冷媒の循環装置 |
-
2012
- 2012-09-08 CN CN201210329359.4A patent/CN102787817B/zh not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5056596A (en) * | 1988-08-05 | 1991-10-15 | Alberta Oil Sands Technology And Research Authority | Recovery of bitumen or heavy oil in situ by injection of hot water of low quality steam plus caustic and carbon dioxide |
WO2007003953A1 (en) * | 2005-07-06 | 2007-01-11 | Halliburton Energy Services, Inc. | Mixing energy analysis of high-yielding non-newtonian fluids for severe lost circulation prevention |
CN101560870A (zh) * | 2009-05-27 | 2009-10-21 | 西南石油大学 | 泡沫钻井中泡沫基液循环使用系统 |
CN101709639A (zh) * | 2009-11-20 | 2010-05-19 | 中国石油大学(华东) | 模拟深水油气开采的井筒多相流动装置 |
CN101701520A (zh) * | 2009-12-04 | 2010-05-05 | 中国石油大学(华东) | 深水钻井液循环携岩与井壁稳定模拟实验装置 |
CN201635659U (zh) * | 2010-04-01 | 2010-11-17 | 西南石油大学 | 一种气体钻井冲蚀实验装置 |
CN201896615U (zh) * | 2010-11-09 | 2011-07-13 | 中国海洋石油总公司 | 一种用于冲砂洗井的可循环泡沫基液的实验循环装置 |
CN202266253U (zh) * | 2011-10-13 | 2012-06-06 | 张成海 | 空气泡沫钻井模拟试验装置 |
Non-Patent Citations (7)
Title |
---|
Experimental Study of Cuttings Transport in Directional Wells;P.H.Tomren et al.;《SPE Drilling Engineering》;19860228;第43-55页 * |
Transport of Small Cuttings in Extended Reach Drilling;Mingqin Duan et al.;《2006 SPE International Oil & Gas Conference and Exhibition》;20061207;第1-9页 * |
大位移钻井过程中的岩屑携带特征及其影响因素;杨启恩等;《国外油田工程》;20071031;第23卷(第10期);第21-24页 * |
空气、泡沫钻井技术在大尺寸复杂井眼中的应用;董胜祥等;《西部钻探工程》;20050930(第9期);第153-155页 * |
美国TULSA大学石油工程系定向钻井岩屑输送实验研究成果;张金昌;《探矿工程》;19971231;第94-99页 * |
郭晓乐等.大位移钻井全井段岩屑动态运移规律.《中国石油大学学报(自然科学版)》.2011,第35卷(第1期), * |
陈俊等.水平井段环空携岩的实验研究.《石油大学学报(自然科学版)》.1992,第16卷(第4期), * |
Also Published As
Publication number | Publication date |
---|---|
CN102787817A (zh) | 2012-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102787817B (zh) | 钻井循环系统综合模拟实验装置 | |
US10024142B2 (en) | Selective extraction of fluids from subsurface wells | |
CN106032754B (zh) | 一种基于地下水流速流向测定的煤矿开采防治水方法 | |
Wolf et al. | Evaluation of hydraulic conductivities calculated from multiport‐permeameter measurements | |
CN109630045A (zh) | 多功能钻井全井段动态循环模拟实验系统 | |
CN105865745A (zh) | 一种分层流模拟试验水槽系统 | |
CN109506883B (zh) | 一种异重流体的超重力流场模拟实验装置及方法 | |
CN107238482A (zh) | 华北煤田岩溶陷落柱演化过程试验装置系统 | |
CN105863611A (zh) | 一种多井型多相环空携屑模拟装置 | |
CN104776971A (zh) | 一种气流携液携砂可视化实验装置 | |
CN102979504A (zh) | 复杂结构井井筒油气水三相流体变质量流动的模拟装置 | |
CN101800000B (zh) | 多角度水平分支井天然气开采模拟装置 | |
CN105909235A (zh) | 井眼清洁工具试验装置及利用其对井眼清洁工具进行性能评价的方法 | |
CN207036388U (zh) | 华北煤田岩溶陷落柱演化过程试验装置系统 | |
CN104318843B (zh) | 承压井注水试验装置 | |
CN209145582U (zh) | 粗糙裂缝液固两相径向流动可视化模拟实验装置 | |
CN205477589U (zh) | 煤层气井井筒内排水采气可视化模拟实验装置 | |
US10738551B1 (en) | Real time flow analysis methods and continuous mass balance and wellbore pressure calculations from real-time density and flow measurements | |
CN107761717A (zh) | 灌注桩施工中控制泥浆含砂率的施工方法 | |
CN201517369U (zh) | 多角度水平分支井天然气开采模拟装置 | |
CN209145588U (zh) | 用于模拟钻井全井段动态循环的多功能实验系统 | |
CN204666329U (zh) | 一种气流携液携砂可视化实验装置 | |
EP2617939A1 (en) | Installation for drilling a well into a soil and associated drilling method. | |
CN1666009A (zh) | 确定油井每层藏量质量方法 | |
CN114991690B (zh) | 一种随钻地层压力测试方法与装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Sun Xiaofeng Inventor after: Yan Tie Inventor after: Wang Hongtao Inventor after: Zhao Wanchun Inventor after: Wang Kelin Inventor after: Li Wei Inventor before: Sun Xiaofeng Inventor before: Yan Tie Inventor before: Li Shibin Inventor before: Zhao Wanchun Inventor before: Wang Kelin Inventor before: Li Wei |
|
CB03 | Change of inventor or designer information | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150218 Termination date: 20180908 |
|
CF01 | Termination of patent right due to non-payment of annual fee |