CN101709639A - 模拟深水油气开采的井筒多相流动装置 - Google Patents

模拟深水油气开采的井筒多相流动装置 Download PDF

Info

Publication number
CN101709639A
CN101709639A CN 200910230496 CN200910230496A CN101709639A CN 101709639 A CN101709639 A CN 101709639A CN 200910230496 CN200910230496 CN 200910230496 CN 200910230496 A CN200910230496 A CN 200910230496A CN 101709639 A CN101709639 A CN 101709639A
Authority
CN
China
Prior art keywords
gas
temperature
flow
pit shaft
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200910230496
Other languages
English (en)
Other versions
CN101709639B (zh
Inventor
孙宝江
高永海
李�昊
李明忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
CNPC Offshore Engineering Co Ltd
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN 200910230496 priority Critical patent/CN101709639B/zh
Publication of CN101709639A publication Critical patent/CN101709639A/zh
Application granted granted Critical
Publication of CN101709639B publication Critical patent/CN101709639B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及一种模拟深水油气开采的井筒多相流动装置。其技术方案是:模拟海洋低温环境的条件由环境温度保持流动系统完成,高压流动环境的液体部分主要由水罐、高压水泵、流动液温度控制系统和流量计连接组成,气体部分主要由气体压缩机、高压气罐、干燥器和气体流量计连接组成,气液混合通过气泡发生器完成,然后流经控制阀进入主井筒;模拟天然气水合物分解注入气体经过控制系统、气体注入管线进入主井筒;混合液经回流管线进入气液分离罐完成循环。有益效果是:能够模拟1000米水深条件下的深水低温的油气开采,进而研究深水流动条件下井筒内的多相流动规律,建立深水井筒多相流动态力学模型及计算方法。

Description

模拟深水油气开采的井筒多相流动装置
一、技术领域:
本发明涉及一种超临界管路天然气流动模拟和测试实验平台,特别涉及一种能够模拟高温高压超临界状态条件下的模拟深水油气开采的井筒多相流动装置。
二、背景技术:
随着陆地油气资源的日趋减少,石油和天然气勘探开发转向海洋已成必然趋势。水下采油技术的发展不仅使深海石油开采成为可能,同时大大降低了深海采油成本,深水和超深水海域的油气钻采技术正成为各国研究开发的热点。目前,国外的最大钻井水深已超过3000米,而我国深海海域油气资源的勘探开发仍处在初期阶段,深海钻探能力仅达600米。为了安全高效开发深海海洋油气资源,迫切需要加强深海油气钻采理论与技术研究,因此,深水油气钻井与开采的技术都将面临着严峻的挑战。当水深达到2000ft(约600m)以上时,环境温度将下降至40°F(4.4℃)左右,因而深水钻采设备将处于高压和低温条件之下。当井筒或海底管线暴露在如此低温的环境中,管线内流体的热量将大量散失,温度会迅速降低。泥浆或原油的流变性将发生变化,粘度明显增加,天然气水合物、蜡等固态物质也可能在钻柱、井筒或管道中析出并沉积。这些不利因素必然会影响钻采系统的正常运行,在某些严重情况下,甚至会导致严重的事故。深水多相流的传热及流动规律是深水钻采技术研发的理论基础,近年来,各相关单位虽也建立了一些实验装置,但这些装置一般都只能在常压和绝热条件下进行实验研究,还存在着设备老化、实验参数窄、仪表精度低等不足,已无法满足深水条件下多相流研究工作的需要。目前这方面的设备研发较少,模拟深水油气开采的井筒多相流动装置未见报道。
三、发明内容:
本发明的目的就是针对现有技术存在的上述缺陷,提供一种模拟深水油气开采的井筒多相流动装置,能够模拟1000米水深条件下的深水低温油气开采的井筒多相流动模拟实验装置,进而可以研究深水流动条件下井筒内的多相流动规律,建立深水井筒多相流动态力学模型及计算方法,为深水油气钻探中井筒流动计算和工程设计奠定基础。
其技术方案是:模拟海洋低温环境的条件由环境温度保持流动系统完成,高压流动环境由主井筒的背压控制系统来完成;高压流动环境的液体部分主要由水罐、高压水泵、流动液温度控制系统和流量计连接组成,气体部分主要由气体压缩机、高压气罐、干燥器和气体流量计连接组成,气液混合通过气泡发生器完成,然后流经控制阀进入主井筒;模拟天然气水合物分解注入气体经过控制系统、气体注入管线进入主井筒;混合液经回流管线进入气液分离罐完成循环。
上述的环境温度保持流动系统由制冷机组、冷却水箱、泵、环空流动井筒、回水管线、温度控制器、温度传感器和计算机控制系统组成,环境水温可调可控,制冷是通过换热器实现的,温度由温度控制器通过计算机来控制,通过温度控制保持模拟深水的低温流动环境条件。
上述的流动液温度控制系统,系统注入水的温度可调可控,水罐内的水由加热棒加热,温度由温度控制器通过计算机控制,保证井筒入口处循环水温度恒定,用以研究热传导规律。
上述的模拟天然气水合物分解注入气体的控制系统控制通过注入管线的气体注入量,以模拟井筒内天然气水合物分解对井筒内多相流动规律的影响规律。
上述的主井筒为高压井筒,其高为14m,外循环环空流动井筒的外径160mm,内径为154mm;外管外径140mm,外管内径130mm,承压可达10MPa;内管外径55mm。
本发明的有益效果是:可实现深水环境条件(低温、高压)下的复杂多相流现象的模拟,是深水油气钻采技术研究必不可少的重要工具。该设备可实现:(1)高压条件下水合物形成和释放多相流瞬态模拟试验;(2)低温条件下多相流传热和流动试验;(3)水合物生成条件模拟以及抑制剂的评价和筛选;(4)高压及中低压下圆形管道气液模拟试验。该设备的建成将形成一个综合的深水油气流动模拟实验平台,成为国内深水多相流研究的重要基地。
四、附图说明:
附图1是本发明的结构示意图;
上图中:水罐(1)、高压水泵(2)、流量计(3)、气体压缩机(4)、高压气罐(5)、干燥器(6)、气体流量计(7)、气泡发生器(8)、控制阀(9),主井筒(10)、回流管线(11)、气液分离罐(12)、背压控制系统(13)、控制系统(14)、气体注入管线(15)、制冷机组(16)、冷却水箱(17)、泵(18)、环空流动井筒(19)、回水管线(20)、温度控制器(21、21’)、温度传感器(22、22’、22”),计算机控制系统(23)、加热棒(24)、换热器(25)。
五、具体实施方式:
实施例1:结合附图1,对本发明作进一步详细的描述(深水条件下井筒液体流动热传导模拟):
模拟海洋低温环境的条件由环境温度保持流动系统完成,高压流动环境由主井筒的背压控制系统13来完成;高压流动环境的液体部分主要由水罐1、高压水泵2、流动液温度控制系统和流量计3连接组成,气体部分主要由气体压缩机4、高压气罐5、干燥器6和气体流量计7连接组成,气液混合通过气泡发生器8完成,然后流经控制阀9进入主井筒10;模拟天然气水合物分解注入气体经过控制系统14、气体注入管线15进入主井筒10;混合液经回流管线11进入气液分离罐12完成循环。
其中,环境温度保持流动系统由制冷机组16、冷却水箱17、泵18、环空流动井筒19、回水管线20、温度控制器21、温度传感器22和计算机控制系统23组成,环境水温可调可控,制冷是通过换热器25实现的,温度由温度控制器21通过计算机23来控制,通过温度控制保持模拟深水的低温流动环境条件。
流动液温度控制系统,系统注入水的温度可调可控,水罐内的水由加热棒24加热,温度由温度控制器21通过计算机23控制,保证井筒入口处循环水温度恒定,用以研究热传导规律。
模拟天然气水合物分解注入气体的控制系统14控制通过注入管线15的气体注入量,以模拟井筒内天然气水合物分解对井筒内多相流动规律的影响规律。
上述的主井筒10为高压井筒,其高为14m,外循环环空流动井筒19的外径160mm,内径为154mm;外管外径140mm,外管内径130mm,承压可达10MPa;内管外径55mm,可以模拟1000米深水的环境压力和温度条件。
本发明用于研究深水钻井时无气体产出条件下井筒热传导规律时:
高压气体压缩机4、高压气罐5、干燥器6、气体流量控制器7、模拟天然气水合物分解注入气体经过控制系统14、气体注入管线15、空隙率测量计15、不需要工作。高压水流由水罐1、高压水泵2、流量控制器3,流经气泡发生器(气液两相混合器)8、高压井筒10、回流管线11、气液分离罐12、背压控制系统13流动,压差计16用于测量流动压差。温度传感器22可以测量沿程的温度变化,以便计算分析。制冷机组16、冷却水箱17、泵18、环空流动井筒19、回水管线20、温度控制器21、温度传感器22,计算机控制系统23等工作,通过温度控制保持模拟深水的低温流动环境条件。
实施例2:本发明应用于深水条件下井筒气液流动热传导模拟,用于研究深水钻井时有气体产出条件下井筒热传导规律。
其技术方案是:上述其他结构不变,模拟天然气水合物分解注入气体经过控制系统14、气体注入管线15、不需要工作。高压气体由压缩机4、高压气罐5、干燥器6、气体流量控制器7进入气液两相混合器8,高压水流由水罐1、高压水泵2、流量控制器3,流经气泡发生器8与气体混合、进入高压井筒10、回流管线11、气液分离罐12、背压控制系统13流动,压差计16用于测量流动压差。空隙率测量计15给出空隙率数值,以计算含气量,温度传感器22”、22’可以测量沿程的温度变化,以便计算分析。制冷机组16、冷却水箱17、泵18、环空流动井筒19、回水管线20、温度控制器21、温度传感器22,计算机控制系统23等工作,通过温度控制保持模拟深水的低温流动环境条件。
实施例3:结合附图1,对本发明作进一步详细的描述(天然气水合物相变对多相流动规律变化的影响模拟):
同实施例2,只是模拟天然气水合物分解注入气体经过控制系统14、气体注入管线15同时开始工作,就可以实现。

Claims (5)

1.一种模拟深水油气开采的井筒多相流动装置,其特征是:
模拟海洋低温环境的条件由环境温度保持流动系统完成,高压流动环境由主井筒的背压控制系统(13)来完成;高压流动环境的液体部分主要由水罐(1)、高压水泵(2)、流动液温度控制系统和流量计(3)连接组成,气体部分主要由气体压缩机(4)、高压气罐(5)、干燥器(6)和气体流量计(7)连接组成,气液混合通过气泡发生器(8)完成,然后流经控制阀(9)进入主井筒(10);模拟天然气水合物分解注入气体经过控制系统(14)、气体注入管线(15)进入主井筒(10);混合液经回流管线(11)进入气液分离罐(12)完成循环。
2.根据权利要求1所述的模拟深水油气开采的井筒多相流动装置,其特征是:所述的环境温度保持流动系统由制冷机组(16)、冷却水箱(17)、泵(18)、环空流动井筒(19)、回水管线(20)、温度控制器(21)、温度传感器(22)和计算机控制系统(23)组成,环境水温可调可控,制冷是通过换热器(25)实现的,温度由温度控制器(21’)通过计算机(23)来控制,通过温度控制保持模拟深水的低温流动环境条件。
3.根据权利要求1所述的模拟深水油气开采的井筒多相流动装置,其特征是:所述的流动液温度控制系统,系统注入水的温度可调可控,水罐内的水由加热棒(24)加热,温度由温度控制器(21)通过计算机(23)控制,保证井筒入口处循环水温度恒定,用以研究热传导规律。
4.根据权利要求1所述的模拟深水油气开采的井筒多相流动装置,其特征是:所述的模拟天然气水合物分解注入气体的控制系统(14)控制通过注入管线(15)的气体注入量,以模拟井筒内天然气水合物分解对井筒内多相流动规律的影响规律。
5.根据权利要求1所述的模拟深水油气开采的井筒多相流动装置,其特征是:所述的主井筒(10)为高压井筒,其高为14m,外循环环空流动井筒(19)的外径160mm,内径为154mm;外管外径140mm,外管内径130mm,承压达10MPa;内管外径55mm。
CN 200910230496 2009-11-20 2009-11-20 模拟深水油气开采的井筒多相流动装置 Active CN101709639B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910230496 CN101709639B (zh) 2009-11-20 2009-11-20 模拟深水油气开采的井筒多相流动装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910230496 CN101709639B (zh) 2009-11-20 2009-11-20 模拟深水油气开采的井筒多相流动装置

Publications (2)

Publication Number Publication Date
CN101709639A true CN101709639A (zh) 2010-05-19
CN101709639B CN101709639B (zh) 2013-08-21

Family

ID=42402445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910230496 Active CN101709639B (zh) 2009-11-20 2009-11-20 模拟深水油气开采的井筒多相流动装置

Country Status (1)

Country Link
CN (1) CN101709639B (zh)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606139A (zh) * 2012-03-02 2012-07-25 中国石油大学(华东) 水下井口系统加载试验装置及其试验方法
CN102606136A (zh) * 2012-04-01 2012-07-25 中国石油大学(华东) 随钻测井值响应规律模拟实验装置
CN102787817A (zh) * 2012-09-08 2012-11-21 东北石油大学 钻井循环系统综合模拟实验装置
CN103485738A (zh) * 2013-10-11 2014-01-01 西南石油大学 一种水平井岩屑运移模拟实验装置及实验方法
CN104196518A (zh) * 2014-07-02 2014-12-10 中国石油大学(北京) 井筒环空中气液固三相间滑脱测量设备及方法
CN104405345A (zh) * 2014-10-20 2015-03-11 中国科学院广州能源研究所 一种可渗透边界层天然气水合物开采模拟实验装置
CN104675366A (zh) * 2014-12-31 2015-06-03 中国石油大学(北京) 一种高温高压井筒模拟装置
CN104821129A (zh) * 2015-04-22 2015-08-05 中国石油大学(华东) 一种钻井井控模拟教学实验装置
CN105822264A (zh) * 2016-03-18 2016-08-03 西南石油大学 天然气水合物层钻井井筒水合物动态分解位置检测方法
CN106401580A (zh) * 2016-11-28 2017-02-15 中国石油大学(北京) 复杂内边界多热源举升井筒多相流动实验装置
CN106894810A (zh) * 2017-02-22 2017-06-27 中国石油大学(华东) 深水气井测试期间水合物沉积规律的监测装置及方法
CN107727360A (zh) * 2017-11-03 2018-02-23 山东省科学院海洋仪器仪表研究所 一种流型发生器
CN107781156A (zh) * 2017-11-30 2018-03-09 青岛海洋地质研究所 水合物开采过程中气体对离心泵性能影响的测试系统及方法
CN108481650A (zh) * 2018-03-28 2018-09-04 青岛科技大学 一种卧式超临界流体发泡设备
CN109599021A (zh) * 2018-11-02 2019-04-09 广州海洋地质调查局 一种地质储层径向流模拟装置
CN109637328A (zh) * 2018-12-19 2019-04-16 青岛理工大学 深水可燃冰降压试采三维模拟试验调温高压水供给系统
CN109681198A (zh) * 2019-01-25 2019-04-26 大连理工大学 一种针对不同类型天然气水合物储层的多方式开采模拟装置及方法
CN109765265A (zh) * 2019-01-24 2019-05-17 中国石油大学(华东) 测量深水气井环空测试液保温性能的装置及方法
CN110847883A (zh) * 2018-07-24 2020-02-28 中国石油天然气股份有限公司 一种井口装置抬升高度预测方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5589642A (en) * 1994-09-13 1996-12-31 Agar Corporation Inc. High void fraction multi-phase fluid flow meter
CN101560880B (zh) * 2009-05-15 2012-12-19 中国石油大学(华东) 超临界井筒多相流动实验装置

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606139A (zh) * 2012-03-02 2012-07-25 中国石油大学(华东) 水下井口系统加载试验装置及其试验方法
CN102606139B (zh) * 2012-03-02 2014-08-06 中国石油大学(华东) 水下井口系统加载试验装置及其试验方法
CN102606136A (zh) * 2012-04-01 2012-07-25 中国石油大学(华东) 随钻测井值响应规律模拟实验装置
CN102787817B (zh) * 2012-09-08 2015-02-18 东北石油大学 钻井循环系统综合模拟实验装置
CN102787817A (zh) * 2012-09-08 2012-11-21 东北石油大学 钻井循环系统综合模拟实验装置
CN103485738A (zh) * 2013-10-11 2014-01-01 西南石油大学 一种水平井岩屑运移模拟实验装置及实验方法
CN104196518A (zh) * 2014-07-02 2014-12-10 中国石油大学(北京) 井筒环空中气液固三相间滑脱测量设备及方法
CN104405345A (zh) * 2014-10-20 2015-03-11 中国科学院广州能源研究所 一种可渗透边界层天然气水合物开采模拟实验装置
CN104405345B (zh) * 2014-10-20 2017-01-18 中国科学院广州能源研究所 一种可渗透边界层天然气水合物开采模拟实验装置
CN104675366A (zh) * 2014-12-31 2015-06-03 中国石油大学(北京) 一种高温高压井筒模拟装置
CN104675366B (zh) * 2014-12-31 2017-05-10 中国石油大学(北京) 一种高温高压井筒模拟装置
CN104821129A (zh) * 2015-04-22 2015-08-05 中国石油大学(华东) 一种钻井井控模拟教学实验装置
CN105822264A (zh) * 2016-03-18 2016-08-03 西南石油大学 天然气水合物层钻井井筒水合物动态分解位置检测方法
CN105822264B (zh) * 2016-03-18 2018-08-17 西南石油大学 天然气水合物层钻井井筒水合物动态分解位置检测方法
CN106401580A (zh) * 2016-11-28 2017-02-15 中国石油大学(北京) 复杂内边界多热源举升井筒多相流动实验装置
CN106401580B (zh) * 2016-11-28 2023-07-18 中国石油大学(北京) 复杂内边界多热源举升井筒多相流动实验装置
CN106894810A (zh) * 2017-02-22 2017-06-27 中国石油大学(华东) 深水气井测试期间水合物沉积规律的监测装置及方法
CN107727360A (zh) * 2017-11-03 2018-02-23 山东省科学院海洋仪器仪表研究所 一种流型发生器
CN107781156A (zh) * 2017-11-30 2018-03-09 青岛海洋地质研究所 水合物开采过程中气体对离心泵性能影响的测试系统及方法
CN107781156B (zh) * 2017-11-30 2023-10-20 青岛海洋地质研究所 水合物开采过程中气体对离心泵性能影响的测试系统及方法
CN108481650A (zh) * 2018-03-28 2018-09-04 青岛科技大学 一种卧式超临界流体发泡设备
CN110847883A (zh) * 2018-07-24 2020-02-28 中国石油天然气股份有限公司 一种井口装置抬升高度预测方法
CN109599021A (zh) * 2018-11-02 2019-04-09 广州海洋地质调查局 一种地质储层径向流模拟装置
CN109637328A (zh) * 2018-12-19 2019-04-16 青岛理工大学 深水可燃冰降压试采三维模拟试验调温高压水供给系统
CN109637328B (zh) * 2018-12-19 2020-08-28 青岛理工大学 深水可燃冰降压试采三维模拟试验调温高压水供给系统
CN109765265A (zh) * 2019-01-24 2019-05-17 中国石油大学(华东) 测量深水气井环空测试液保温性能的装置及方法
CN109681198A (zh) * 2019-01-25 2019-04-26 大连理工大学 一种针对不同类型天然气水合物储层的多方式开采模拟装置及方法

Also Published As

Publication number Publication date
CN101709639B (zh) 2013-08-21

Similar Documents

Publication Publication Date Title
CN101709639B (zh) 模拟深水油气开采的井筒多相流动装置
CN104500031B (zh) 天然气水合物地层钻井模拟装置
US10095819B2 (en) Simulation experiment system and simulation method of entire natural gas hydrate exploitation process
CN101560880B (zh) 超临界井筒多相流动实验装置
CN112459760B (zh) 一种二氧化碳蓄能复合压裂实验装置
Gamadi et al. Compositional simulation evaluation of EOR potential in shale oil reservoirs by cyclic natural gas injection
CN106522928B (zh) 一种酸化压裂后停泵测井口压降不稳定试井方法
CN110630228A (zh) 评价co2/n2置换法开采水合物时井筒出砂与防砂的装置及方法
CN102865066A (zh) 含天然气水合物相变的深水井筒多相流动实验装置及方法
CN1332195C (zh) 高温高压岩心动态损害评价试验仪
CN211201912U (zh) 评价co2/n2置换法开采水合物时井筒出砂与防砂的装置
CN107956470A (zh) 一种气基痕量化学示踪剂及利用其测量气井各段产气贡献量的方法
CN203271733U (zh) 一种用于评价气体钻井过程中井壁稳定性的测试装置
CN2682411Y (zh) 高温高压岩心动态损害评价试验仪
CN103195401A (zh) 地层条件下煤储层增产改造实验装置
Wan et al. A feasibility study of producing natural gas from subsea hydrates with horizontal snake wells
CN110929447A (zh) 一种稠化酸酸化过程中井筒温度场数值计算方法
CN203175525U (zh) 地层条件下煤储层增产改造实验装置
CN202748299U (zh) 油井堵头挂环腐蚀测试装置
Zhang et al. Calculation model of bottom hole flowing pressure of double-layer combined production in coalbed methane wells
CN204703861U (zh) 一种井下节流气井井筒模拟实验装置
CN104453796B (zh) 一种气井智能排水采气装置
Zhang et al. Storage ratio of CO2 miscible flooding in Chang 8 reservoir of H block in Ordos Basin under different injection methods
Kunju et al. Experimental Investigation of Absorption and Desorption of Gas in Riser During MPD Well Control
Liu et al. Experimental study of flow patterns and pressure drops of heavy oil-water-gas vertical flow

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CNPC OFFSHORE ENGINEERING CO., LTD.

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 257061 PETROLEUM ENGINEERING COLLEGE, NO.739, BEIYI ROAD, DONGYING DISTRICT, DONGYING CITY, SHANDONG PROVINCE TO: 257061 NO.739, BEIYI ROAD, DONGYING DISTRICT, DONGYING CITY, SHANDONG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20100906

Address after: 257061 No. 739, North Road, Dongying District, Shandong, Dongying

Applicant after: China Petroleum University (East China)

Co-applicant after: CNPC Offshore Engineering Company Limited

Address before: 257061 School of petroleum engineering, No. 739 North Road, Dongying District, Shandong, Dongying

Applicant before: China Petroleum University (East China)

C14 Grant of patent or utility model
GR01 Patent grant