CN102787593A - 真空联合堆载预压堆载土体局部滑移处理方法 - Google Patents
真空联合堆载预压堆载土体局部滑移处理方法 Download PDFInfo
- Publication number
- CN102787593A CN102787593A CN2012102801077A CN201210280107A CN102787593A CN 102787593 A CN102787593 A CN 102787593A CN 2012102801077 A CN2012102801077 A CN 2012102801077A CN 201210280107 A CN201210280107 A CN 201210280107A CN 102787593 A CN102787593 A CN 102787593A
- Authority
- CN
- China
- Prior art keywords
- slip region
- original
- soil body
- diaphragm seal
- loading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明公开了一种真空联合堆载预压堆载土体局部滑移处理方法,包括以下步骤:一)在滑移土体一侧增设反压体,平衡滑移土体引起的软土隆起;二)将发生滑移区域的原堆载土方卸载;三)去除原有密封膜及原有滤水支管和原有主管,并对被切断的原有滤水支管和原有主管进行封堵;四)形成独立的抽真空系统;五)在发生滑移区域重新铺设密封膜;六)在发生滑移区域重新堆载土体。本发明简便易行、效率高、安全可靠,在很大程度上降低了施工成本,提高了工作效率,节省了人力、物力和财力。
Description
技术领域
本发明涉及真空联合堆载预压方法,特别是涉及一种真空联合堆载预压堆载土体局部滑移处理方法。
背景技术
道路真空联合堆载预压在堆载期间出现土方局部滑移时,一般采取将整个密封区段的真空装置及密封膜等重新施工的方法,施工成本高,施工工期长,因此需要研究新的真空联合堆载预压堆载局部滑移处理方法。
发明内容
本发明为解决公知技术中存在的技术问题而提供一种真空联合堆载预压堆载土体局部滑移处理方法。
本发明为解决公知技术中存在的技术问题所采取的技术方案是:一种真空联合堆载预压堆载土体局部滑移处理方法,包括以下步骤:
一)在滑移土体一侧增设反压体,平衡滑移土体引起的软土隆起;
二)将发生滑移区域的堆载土方卸载,露出原有密封膜;
三)去除发生滑移区域的原有密封膜及其下面埋设于中粗砂垫层内的原有滤水支管和原有主管,并对被切断的未发生滑移区域的原有滤水支管和原有主管进行封堵;
四)形成独立的抽真空系统:在发生滑移区域按照原设计要求重新打设排水板和密封墙,并使重新打设的密封墙与原有密封墙搭接,然后,重新铺设中粗砂垫层,并在重新铺设的中粗砂垫层内埋设滑移区滤水支管和滑移区主管,滑移区滤水支管的一端与滑移区主管的进水端连接,滑移区主管的出水端与滑移区真空泵连接,滑移区滤水支管的另一端均处于封堵状态;
五)在发生滑移区域重新铺设密封膜,并使重新铺设的密封膜与相邻未发生滑移区域的原有密封膜粘接,重新铺设的密封膜在与相邻未发生滑移区域的原有密封膜粘接处应设有预留量;
六)在发生滑移区域重新堆载土体。
在所述步骤五)中,重新铺设的密封膜在与相邻未发生滑移区域的原有密封膜粘接处设有至少4m的预留量。
本发明具有的优点和积极效果是:1)减少了滑移处理工程量,施工速度快,费用低;2)发生滑移区域设置独立的抽真空系统,不影响其余部分抽真空的效果;3)密封膜粘接处预留发生不均匀沉降时的储备量,能够有效防止密封膜被再次拉断的问题发生;4)本发明适用于所有真空联合堆载预压滑移处理;5)本发明简便易行、效率高、安全可靠,在很大程度上降低了施工成本,提高了工作效率,节省了人力、物力和财力。
附图说明
图1是本发明土体滑移原理剖面示意图;
图2是本发明挖掘机挖除发生滑移区域堆载土的剖面示意图;
图3是本发明用于封堵滤水支管和主管的塞子的示意图;
图4是本发明应用的剖面示意图。
图中:1、滑移土体,2、反压体,3、密封墙,4-1、主管,4-2、滤水支管,5、密封膜,6、塑料排水板,7、挖掘机,8、堆载土体,8-1、发生滑移区域的原堆载土方,9、真空泵,10、塞子。
具体实施方式
为能进一步了解本发明的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:
请参阅图1~图4,一种真空联合堆载预压堆载土体局部滑移处理方法,包括以下步骤:
一)在滑移土体1一侧增设反压体2,平衡滑移土体1引起的软土隆起;
在本实施例中,通过在滑移土体1一侧抛填开山石形成反压体2。
二)将发生滑移区域的原堆载土方8-1卸载,露出原有密封膜;
在本实施例中,采用KATO—HD802III挖掘机将7卸载发生滑移区域的原堆载土方8-1。
三)去除发生滑移区域的原有密封膜及其下面埋设于中粗砂垫层内的原有滤水支管和原有主管,并对被切断的未发生滑移区域的原有滤水支管和原有主管进行封堵;
在本实施例中,被切断的原有滤水支管和原有主管采用水泥砂浆制成的塞子10封堵,并用胶水粘牢。
四)形成独立的抽真空系统:在发生滑移区域按照原设计要求重新打设排水板6和密封墙3,并使重新打设的密封墙3与原有密封墙搭接,然后,重新铺设中粗砂垫层,并在重新铺设的中粗砂垫层内埋设滑移区滤水支管4-2和滑移区主管4-1,滑移区滤水支管4-2的一端与滑移区主管4-1的进水端连接,滑移区主管4-1的出水端与滑移区真空泵9连接,滑移区滤水支管4-2的另一端处于封堵状态;
在本实施例中,滑移区滤水支管4-2采用水泥砂浆制成的塞子10封堵,并用胶水粘牢。真空泵9选用射流式,电机功率不小于7.5KW,泵后真空压力不应小于96KPa,每800m2处理面积安装一台真空泵9。
五)在发生滑移区域重新铺设密封膜5,并使重新铺设的密封膜5与相邻未发生滑移区域的原有密封膜粘接,重新铺设的密封膜5在与相邻未发生滑移区域的原有密封膜粘接处应设有预留量;
在本实施例中,重新铺设的密封膜5在与相邻未发生滑移区域的原有密封膜粘接处设有至少4m的预留量,以确保在发生不均匀沉降时,密封膜5的完好。
六)在发生滑移区域重新堆载土体8。
在发生滑移区域重新抽真空前,应在膜下真空度达到80KPa的条件下,连续试抽气10次,确认无漏气。重新抽真空时,在膜下真空度达到设计要求后,进行施工,在进行施工时,要注意:在膜下真空度、基础位移和沉降速率均满足设计要求的前提下,应时时关注反压体的稳定情况。
尽管上面结合附图对本发明的优选实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可以作出很多形式,这些均属于本发明的保护范围之内。
Claims (2)
1.一种真空联合堆载预压堆载土体局部滑移处理方法,其特征在于,包括以下步骤:
一)在滑移土体一侧增设反压体,平衡滑移土体引起的软土隆起;
二)将发生滑移区域的原堆载土方卸载,露出原有密封膜;
三)去除发生滑移区域的原有密封膜及其下面埋设于中粗砂垫层内的原有滤水支管和原有主管,并对被切断的未发生滑移区域的原有滤水支管和原有主管进行封堵;
四)形成独立的抽真空系统:在发生滑移区域按照原设计要求重新打设排水板和密封墙,并使重新打设的密封墙与原有密封墙搭接,然后,重新铺设中粗砂垫层,并在重新铺设的中粗砂垫层内埋设滑移区滤水支管和滑移区主管,滑移区滤水支管的一端与滑移区主管的进水端连接,滑移区主管的出水端与滑移区真空泵连接,滑移区滤水支管的另一端均处于封堵状态;
五)在发生滑移区域重新铺设密封膜,并使重新铺设的密封膜与相邻未发生滑移区域的原有密封膜粘接,重新铺设的密封膜在与相邻未发生滑移区域的原有密封膜粘接处应设有预留量;
六)在发生滑移区域重新堆载土体。
2.根据权利要求1所述的真空联合堆载预压堆载土体局部滑移处理方法,其特征在于,在所述步骤五)中,重新铺设的密封膜在与相邻未发生滑移区域的原有密封膜粘接处设有至少4m的预留量。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210280107.7A CN102787593B (zh) | 2012-08-07 | 2012-08-07 | 真空联合堆载预压堆载土体局部滑移处理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210280107.7A CN102787593B (zh) | 2012-08-07 | 2012-08-07 | 真空联合堆载预压堆载土体局部滑移处理方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102787593A true CN102787593A (zh) | 2012-11-21 |
CN102787593B CN102787593B (zh) | 2014-06-25 |
Family
ID=47153167
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210280107.7A Active CN102787593B (zh) | 2012-08-07 | 2012-08-07 | 真空联合堆载预压堆载土体局部滑移处理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102787593B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103866754A (zh) * | 2012-12-12 | 2014-06-18 | 中国二十冶集团有限公司 | 应用于软土地基处理的真空联合堆载预压施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55122914A (en) * | 1979-03-15 | 1980-09-22 | Fudo Constr Co Ltd | Method for early improvement of soft ground |
JPS61158511A (ja) * | 1984-12-28 | 1986-07-18 | Fudo Constr Co Ltd | 複合材より成る軟弱地盤改良杭および改良工法 |
JP3855195B2 (ja) * | 2002-07-10 | 2006-12-06 | 清水建設株式会社 | 真空圧密工法 |
CN101033614A (zh) * | 2006-03-10 | 2007-09-12 | 天津港湾工程研究所 | 水下真空预压加固软基技术方法 |
-
2012
- 2012-08-07 CN CN201210280107.7A patent/CN102787593B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55122914A (en) * | 1979-03-15 | 1980-09-22 | Fudo Constr Co Ltd | Method for early improvement of soft ground |
JPS61158511A (ja) * | 1984-12-28 | 1986-07-18 | Fudo Constr Co Ltd | 複合材より成る軟弱地盤改良杭および改良工法 |
JP3855195B2 (ja) * | 2002-07-10 | 2006-12-06 | 清水建設株式会社 | 真空圧密工法 |
CN101033614A (zh) * | 2006-03-10 | 2007-09-12 | 天津港湾工程研究所 | 水下真空预压加固软基技术方法 |
Non-Patent Citations (1)
Title |
---|
谢非等: "塑料排水板堆载预压法在软基处理中的应用", 《地下空间与工程学报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103866754A (zh) * | 2012-12-12 | 2014-06-18 | 中国二十冶集团有限公司 | 应用于软土地基处理的真空联合堆载预压施工方法 |
CN103866754B (zh) * | 2012-12-12 | 2016-06-01 | 中国二十冶集团有限公司 | 应用于软土地基处理的真空联合堆载预压施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102787593B (zh) | 2014-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587352B (zh) | 一种软土地基的热排水固结处理装置及其处理方法 | |
CN102330424B (zh) | 一种吹填软土的复式真空管井真空预压加固方法 | |
CN104652413B (zh) | 一种新型的滩涂淤泥路基处理方法 | |
CN201165659Y (zh) | 直排式真空预压法加固软土地基结构 | |
CN107419717A (zh) | 增压复式真空预压软土地基处理施工装置及工艺 | |
CN104775443B (zh) | 一种井点降水方法及装置 | |
CN104120711B (zh) | 一种堆载预压联合真空预压软基加固处理结构及方法 | |
CN102733371A (zh) | 一种密闭直抽分段式真空预压地基处理方法 | |
CN110195430A (zh) | 一种多维密封空间真空引水反堆压软基处理施工方法 | |
CN102767157A (zh) | 模袋充淤泥真空预压筑堤方法 | |
CN103225306A (zh) | 一种邻近水源基坑开挖过程中防止基坑渗漏的方法 | |
CN103669330A (zh) | 超声波真空预压法 | |
CN103866777A (zh) | 一种用于濒海区域较浅基坑的轻型井点降水施工方法 | |
CN102787593B (zh) | 真空联合堆载预压堆载土体局部滑移处理方法 | |
Liu et al. | Ground improvement of dredged fills with two improved vacuum preloading methods: Case study | |
CN102704458A (zh) | 一种软地基无砂垫层真空-堆载联合预压加固装置及方法 | |
CN202347513U (zh) | 以袋装砂井作为竖向排水通道的超软土浅表层快速加固系统 | |
CN101229951B (zh) | 底部低真空抽取淤泥堆场表面水方法 | |
CN101144273B (zh) | 用于真空预压固结的带顶盒的土工塑料排水板 | |
CN106013044A (zh) | 一种气冲排水双面真空预压加固深厚软土地基的方法 | |
CN103352458B (zh) | 膜下可控式真空负压井高效吸水固结法 | |
CN102912787B (zh) | 粉细砂垫层滤管加密的真空预压方法 | |
CN102140793B (zh) | 滤管踩入式真空排水加固超软土技术方法 | |
CN207659955U (zh) | 一种适用于软基处理的新型直排式真空预压装置 | |
CN204676518U (zh) | 基坑降水保护系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |