CN102780219A - Method for discriminating wind power digestion capability from multiple dimensions based on wind power operation simulation - Google Patents

Method for discriminating wind power digestion capability from multiple dimensions based on wind power operation simulation Download PDF

Info

Publication number
CN102780219A
CN102780219A CN201210154906XA CN201210154906A CN102780219A CN 102780219 A CN102780219 A CN 102780219A CN 201210154906X A CN201210154906X A CN 201210154906XA CN 201210154906 A CN201210154906 A CN 201210154906A CN 102780219 A CN102780219 A CN 102780219A
Authority
CN
China
Prior art keywords
wind
powered electricity
electricity generation
load
dissolving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210154906XA
Other languages
Chinese (zh)
Other versions
CN102780219B (en
Inventor
徐乾耀
康重庆
张宁
夏清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
State Grid Corp of China SGCC
State Grid Jibei Electric Power Co Ltd
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN201210154906.XA priority Critical patent/CN102780219B/en
Publication of CN102780219A publication Critical patent/CN102780219A/en
Priority to HK13105713.0A priority patent/HK1177990A1/en
Application granted granted Critical
Publication of CN102780219B publication Critical patent/CN102780219B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Wind Motors (AREA)

Abstract

The invention discloses a method for discriminating wind power digestion capability from multiple dimensions based on wind power operation simulation, belonging to the field of electric power system operation and control. The method includes the steps of: simulating the timing sequence outputs of a wind power station by making use of the technology of simulating the operations of multiple wind power stations according to the measured wind data; and according to the simulated timing sequence outputs of the wind power station and the discrimination cluster of annual wind power digestion capacity, discriminating the wind power digestion capacity from multiple dimensions by taking the peak shaving ability, the frequency regulating ability, the load tracking ability, the rapid reserve ability and the network transmission ability as the constraint conditions. The method can help the dispatching, operating and control workers of an electric power system precisely predict the wind power volume which can be accepted by the electric power system in the future from multiple dimensions, and then help the workers set out a wind power digestion plan so to realize high-efficiency utilization of the wind power. The method exhibits great practical significance and has a good application prospect.

Description

Based on the various dimensions wind-powered electricity generation of the wind-powered electricity generation operation simulation ability method of discrimination of dissolving
Technical field
The invention belongs to power system operation and control field, particularly based on the various dimensions wind-powered electricity generation of the wind-powered electricity generation operation simulation ability method of discrimination of dissolving.
Background technology
Since the eighties in last century, oil crisis, climate change, energy problem become international focus, are that the clean energy resource of representative is fast-developing with the wind energy, become important alternative energy source at a specified future date.Greatly developing regenerative resource is the important component part of China's energy development strategy.Wind power technology is ripe, is one of regenerative resource of tool business development potentiality.Usually, wind-powered electricity generation is exerted oneself and is shown the characteristic that is different from conventional power supply: randomness, fluctuation, uncertainty.These characteristics are that the safe operation of electric power system has brought severe challenge with stable control; Therefore provide scientific methods realizing the dissolve differentiation of ability of electric power system wind-powered electricity generation, the wind-powered electricity generation ability of dissolving will be as the important indicator of each function links such as the operation of electric power system, scheduling, control.
The prerequisite that the wind-powered electricity generation of electric power system is dissolved is the dissolve differentiation of ability of electric power system wind-powered electricity generation, promptly determines year, the admissible wind-powered electricity generation scale of electric power system monthly, day degree; At present a kind of wind-powered electricity generation based on wind-powered electricity generation operation simulation ability method of discrimination of dissolving is the historical typical wind-powered electricity generation power curve to electric power system, considers that with deterministic computational methods the wind-powered electricity generation factor differentiates the wind-powered electricity generation ability of dissolving, and its key step is:
1) chooses some the typical wind-powered electricity generation power curves of history;
2) calculate the adjustable space of each confinement dimension of electric power system according to the unit regulating power;
3) can admit the wind-powered electricity generation power curve that selects according to the size judgement of adjustable space;
4) wind-powered electricity generation that multiple proportions adjustment wind-powered electricity generation power curve, the wind-powered electricity generation power curve in the time of can being admitted by electric power system just the are regarded as electric power system ability of dissolving.
This method exists not enough:
1) the wind-powered electricity generation power curve participates in the process that the wind-powered electricity generation ability of dissolving differentiates with deterministic method, does not consider randomness, fluctuation and uncertainty that wind-powered electricity generation is exerted oneself;
2) the typical wind-powered electricity generation power curve of selecting for use can not characterize whole scenes (randomness, fluctuation and probabilistic different expression form) that wind-powered electricity generation is exerted oneself;
3) fail to take into full account the influence of wind-electricity integration for each side factors such as electric power system peak regulation, frequency modulation, subsequent use, Steam Generator in Load Follow and networks;
4) comprehensively do not hold for the situation of dissolving behind the following wind-electricity integration, can not guarantee that wind-powered electricity generation moves within certain ratio of dissolving;
And from the angle of the control strategy of wind-electricity integration, the current measure of taking only relates to the control of closing down of wind-powered electricity generation unit itself, does not cooperate the start-stop with conventional rack, is limiting electric power system the dissolve controlled original paper and the controlled range of wind-powered electricity generation.Under the open state that conventional unit is confirmed, can't dissolve too much wind-powered electricity generation when exerting oneself when electric power system, closed portion wind-powered electricity generation machine consists of unique possible strategy, thereby has wasted part wind-powered electricity generation resource.
In sum; Need one to overlap more science and the comprehensive wind-powered electricity generation ability method of discrimination of dissolving; And take into account electric power system peak modulation capacity, fm capacity, factors such as marginal capacity, load-following capacity and network delivery ability fast, consider the wind-powered electricity generation power producing characteristics: the instrument that provides quick differentiation wind-powered electricity generation to dissolve ability for scheduling, operation, the control personnel of electric power system.
Disclose at present a kind of method of utilizing windy electric field operation analogue technique simulation wind energy turbine set sequential to exert oneself, this method specifically may further comprise the steps:
1) obtain scale parameter c and the form parameter k that Weibull distributes according to surveying the wind data match:
(1-1) two-parameter Weibull distribution function F W (c, k)(x) expression formula is following:
F W ( c , k ) ( x ) = 1 - exp [ - ( x c ) k ] , x ∈ [ 0 , + ∞ ) - - - ( 1 )
(1-2) the probability density function f of two-parameter Weibull distribution W (c, k)(x) as follows:
f W ( c , k ) ( x ) = k c ( x c ) k - 1 exp [ - ( x c ) k ] - - - ( 2 )
(1-3) expression formula of mean wind speed is following:
x ‾ = cΓ ( 1 + 1 / k ) - - - ( 3 )
(1-4) try to achieve form parameter k by the wind speed standard deviation sigma, expression formula is following:
σ x ‾ = [ Γ ( 1 + 2 k ) / Γ 2 ( 1 + 1 k ) ] - 1 - - - ( 4 )
Wherein, mean wind speed x is directly proportional with Weibull distribution mesoscale parameter c; Γ is a gamma function:
Γ ( a ) = ∫ 0 + ∞ y a - 1 e - y dy ) ;
2) temporal correlation of wind speed setting: according to surveying the temporal correlation characteristic quantity θ that the wind data match obtains wind speed (is the wave characteristic of wind speed; The mode that characterizes fluctuations in wind speed property is an auto-correlation function, and auto-correlation function is meant the linearly dependent coefficient of the sequence of time series and self different time displacement, and auto-correlation function is the tolerance of time series temporal correlation; The size of reflection time series fluctuation; The value of auto-correlation function increases with the time difference and decays, and time series fluctuation Shaoxing opera is strong, and the auto-correlation function decay is fast more); The auto-correlation function of wind speed is represented by negative exponential function that numerically expression formula is following:
ρ(k)=e -θk,θ>0,k=1,2,3...?(5)
In the formula (5), the speed of the size of θ decision auto-correlation function decay, and then the severe of sign fluctuations in wind speed;
3) spatial coherence of wind speed setting: adjacent wind energy turbine set is because the vicinity in geographical position; The residing meteorological condition of wind energy turbine set is similar; Therefore the wind speed of the wind energy turbine set of close together spatially often has positive correlation; The wind speed correlation is main relevant with geographic distance between the wind energy turbine set: owing to receive the influence of same weather conditions, its wind speed will show stronger correlation at a distance of nearer wind-powered electricity generation section; The wind-powered electricity generation section of apart from each other, its probability that runs into same weather conditions is less, so its wind speed correlation a little less than; There are the negative exponent relation in coefficient correlation between the windy field gas velocity and the geographic distance between the wind energy turbine set, and expression formula is following:
c = e - d M - - - ( 6 )
In the formula (6), c is the wind speed coefficient correlation; D is a geographic distance between the two wind-powered electricity generation sections; M is that the wind speed coefficient correlation is with the range attenuation factor;
4) be that base value obtains annual each monthly average wind series (be the Seasonal Characteristics of wind speed: because climate reasons, Various Seasonal wind energy turbine set location velocity wind levels is different, and has certain rule) with annual wind speed mean value, each monthly average wind series is designated as k m, k mIn element expression following:
k mi = v mi v ‾ y , i=1,2,3,...,12 (7)
In the formula (7), k MiBe k mIn i element; v MiMean wind speed for the i month in year;
Figure BDA00001650791100033
Be the average of the whole year wind speed;
5) with whole day wind speed mean value be base value obtain in a few days each constantly mean wind speed sequence (be the day internal characteristic of wind speed: in a few days; Owing to the difference of wind energy turbine set location surface temperature causes that in a few days different mean wind speeds constantly are different), in a few days each constantly mean wind speed sequence be designated as k h, k hIn element expression following:
k hj = v hj v ‾ d , j=1,2,3,...,N day (8)
In the formula (8), k HjBe k hIn j element; v HjBe the mean wind speed of j period in a few days;
Figure BDA00001650791100035
Be the whole day mean wind speed; N DayBe period sum in a few days;
6) utilize windy electric field operation analogue technique to carry out wind speed simulation:
(6-1) single wind farm wind velocity simulation:
If probability density function f (x) its domain of definition (l, in u) non-negative, continuously and variance limited, its mathematic expectaion E (x)=μ, stochastic differential equation
dX t = - θ ( X t - μ ) dt + v ( X t ) d W t , t≥0 (9)
In the formula (9), θ>=0, W tBe the standard Brownian movement, v (X t) be defined in (expression formula is following for l, the nonnegative function on u):
v ( x ) = 2 θ f ( x ) ∫ l x ( μ - y ) f ( y ) dy , x∈(l,u)(10)
Then:
Random process X is that each attitude experience (ergodic) and probability density function are f (x).
Random process X is that average returns (mean-reverting) and its auto-correlation function meets:
corr(X s+t,X s)=e -θt,s,t≥0 (11)
Utilize the time series of this method simulation wind speed; If meeting the Weibull that is respectively c and k suc as formula the scale parameter shown in (1) and the formula (2) and form parameter, wind speed distributes; Mean wind speed
Figure BDA00001650791100043
is suc as formula shown in (3), then:
v ( x ) = 2 θ f ( x ) ∫ l x ( x ‾ - y ) f ( y ) dy
= 2 θ f ( x ) ( x ‾ F ( x ) - ∫ l x yf ( y ) dy ) - - - ( 12 )
= 2 θ f ( x ) ( cΓ ( 1 k + 1 ) ( 1 - exp [ - ( x c ) k ] ) - cΓ ( ( x c ) k , 1 k + 1 ) )
According to formula (9)-(12), single wind energy turbine set sequential wind speed can be generated by the following formula iterative computation:
v ^ it * = v ^ it - 1 * + d X t - - - ( 13 )
(6-2) windy field gas velocity simulation:
At first generate the relevant Brownian movement W of multidimensional t, W tEach dimension is the standard Brownian movement, and correlation matrix equals the wind farm wind velocity correlation matrix between each dimension; Afterwards, utilize W tEach ties up component each wind farm wind velocity sequence of (6-1) middle method generation set by step.
(6-3) correction of wind energy turbine set simulation wind speed
The wind farm wind velocity sequence is not the completely random process; To because climate reasons; Various Seasonal wind energy turbine set location velocity wind levels is different; And has certain rule (little, summer is big), in a few days, owing to the difference of wind energy turbine set location surface temperature causes that in a few days different mean wind speeds constantly are different (big like evening like winter; Daytime is little), according to 4) and 5) wind series
Figure BDA00001650791100051
that generates is at random revised:
v it * = k mi k hj v ^ it * , i=1,2,...,12,j=1,2,...,m (14)
(6-4) wind energy turbine set is simulated the sequence of exerting oneself
If C i(x) be wind-powered electricity generation unit output characteristic curve, expression formula is following:
C i ( v ) = 0 , 0 &le; v < v in , v > v out v 3 - v in 3 v rated 3 - v in 3 R , v in &le; v &le; v rated R , v rated &le; v &le; v out - - - ( 15 )
In the formula (15), v In, v RatedWith v OutBe respectively incision wind speed, rated wind speed and the cut-out wind speed of wind-powered electricity generation unit.Utilize correction back wind series
Figure BDA00001650791100054
wind energy turbine set sequential power curve to generate by following formula:
P it = n it ( 1 - &eta; i ) C i ( v it * ) - - - ( 16 )
In the formula (16), η iBe wind energy turbine set wake effect coefficient, the expression wind energy turbine set is exerted oneself because of what wake effect lost, gets 5% ~ 10% usually; n ItCan use unit platform number for wind energy turbine set, be a stochastic variable, represents unit reliability level in the wind energy turbine set (if the unit fault is obeyed independently exponential distribution in the false wind electric field, then for arbitrary time t, wind energy turbine set can use unit platform number to obey the Bei Nuli distribution).
Windy electric field operation analogue technique can realize reduction, reproduction and simulation to output of wind electric field in the electric power system, for dissolve ability and consider that the power system dispatching of output of wind electric field and operation all have important meaning of the wind-powered electricity generation of analyzing wind farm grid-connected influence to electric power system, electric power system.
Summary of the invention
The objective of the invention is to overcome the dissolve deficiency of ability method of discrimination of existing power system wind-powered electricity generation; A kind of wind-powered electricity generation based on operation simulation ability method of discrimination of dissolving is provided; Whether the present invention can help power system dispatching, operation and control personnel annual, monthly and a few days ago with regard to the clear and definite electric power system expection wind-powered electricity generation ratio of dissolving, judge forecasting institute fast and get wind-powered electricity generation and can fully be dissolved by electric power system.
The invention discloses a kind of various dimensions wind-powered electricity generation ability method of discrimination of dissolving, it is characterized in that, comprising:, utilize windy electric field operation analogue technique simulation wind energy turbine set sequential to exert oneself 1) according to surveying wind data based on wind-powered electricity generation operation simulation; 2) according to simulation wind energy turbine set sequential exert oneself, the annual wind-powered electricity generation ability of dissolving is differentiated collection and peak modulation capacity, fm capacity, load-following capacity, marginal capacity and network delivery ability are carried out various dimensions to the wind-powered electricity generation ability of dissolving and differentiated as constraints fast;
1) according to surveying wind data, utilize windy electric field operation analogue technique simulation wind energy turbine set sequential to exert oneself, specifically may further comprise the steps:
1-1) obtain scale parameter c and the form parameter k that Weibull distributes according to surveying the wind data match:
(1-11) two-parameter Weibull distribution function F W (c, k)(x) expression formula is following:
F W ( c , k ) ( x ) = 1 - exp [ - ( x c ) k ] , x &Element; [ 0 , + &infin; ) - - - ( 1 )
In the formula (1), x is a wind speed;
(1-12) the probability density function f of two-parameter Weibull distribution W (c, k)(x) as follows:
f W ( c , k ) ( x ) = k c ( x c ) k - 1 exp [ - ( x c ) k ] - - - ( 2 )
(1-13) expression formula of mean wind speed
Figure BDA00001650791100063
is following:
x &OverBar; = c&Gamma; ( 1 + 1 / k ) - - - ( 3 )
(1-14) try to achieve form parameter k by the wind speed standard deviation sigma, expression formula is following:
&sigma; x &OverBar; = [ &Gamma; ( 1 + 2 k ) / &Gamma; 2 ( 1 + 1 k ) ] - 1 - - - ( 4 )
Wherein, mean wind speed is directly proportional with Weibull distribution mesoscale parameter c; Γ is a gamma function:
&Gamma; ( a ) = &Integral; 0 + &infin; y a - 1 e - y dy ) ;
1-2) the temporal correlation of wind speed setting: according to surveying the temporal correlation characteristic quantity θ that the wind data match obtains wind speed, the auto-correlation function of wind speed is represented by negative exponential function that numerically expression formula is following:
ρ(k)=e -θk,θ>0,k=1,2,3... (5)
In the formula (5), the speed of the size of θ decision auto-correlation function decay, the severe of sign fluctuations in wind speed;
1-3) the spatial coherence of wind speed setting: there are the negative exponent relation in coefficient correlation between the windy field gas velocity and the geographic distance between the wind energy turbine set, and expression formula is following:
c = e - d M - - - ( 6 )
In the formula (6), c is the wind speed coefficient correlation; D is a geographic distance between the two wind-powered electricity generation sections; M is that the wind speed coefficient correlation is with the range attenuation factor;
Be that base value obtains each monthly average wind series k 1-4) with annual wind speed mean value m, k mIn element expression following:
k mi = v mi v &OverBar; y , i=1,2,3,...,12 (7)
In the formula (7), k MiBe k mIn i element; v MiMean wind speed for the i month in year;
Figure BDA00001650791100072
Be the average of the whole year wind speed;
Be that base value obtains each moment mean wind speed sequence k in a few days 1-5) with whole day wind speed mean value h, k hIn element expression following:
k hj = v hj v &OverBar; d , j=1,2,3,...,N day (8)
In the formula (8), k HjBe k hIn j element; v HjBe the mean wind speed of j period in a few days;
Figure BDA00001650791100074
Be the whole day mean wind speed; N DayBe period sum in a few days;
1-6) utilize windy electric field operation analogue technique to carry out wind speed simulation:
(1-61) single wind farm wind velocity simulation:
If meeting the Weibull that is respectively c and k suc as formula the scale parameter shown in (1) and the formula (2) and form parameter, wind speed distributes; Mean wind speed
Figure BDA00001650791100075
is suc as formula shown in (3), then:
v ( x ) = 2 &theta; f ( x ) &Integral; l x ( x &OverBar; - y ) f ( y ) dy
= 2 &theta; f ( x ) ( x &OverBar; F ( x ) - &Integral; l x yf ( y ) dy ) - - - ( 9 )
= 2 &theta; f ( x ) ( c&Gamma; ( 1 k + 1 ) ( 1 - exp [ - ( x c ) k ] ) - c&Gamma; ( ( x c ) k , 1 k + 1 ) )
According to formula (9), single wind energy turbine set sequential wind speed
Figure BDA00001650791100079
can be generated by the following formula iterative computation:
v ^ it * = v ^ it - 1 * + d X t - - - ( 10 )
(1-62) windy field gas velocity simulation:
At first generate the relevant Brownian movement W of multidimensional t, W tEach dimension is the standard Brownian movement, and correlation matrix equals the wind farm wind velocity correlation matrix between each dimension; Afterwards, utilize W tEach ties up component each wind farm wind velocity sequence of (1-61) middle method generation set by step;
(1-63) correction of wind energy turbine set simulation wind speed
According to 1-4) and 1-5), the wind series
Figure BDA00001650791100081
that generates is at random revised:
v it * = k mi k hj v ^ it * , i=1,2,...,12,j=1,2,...,m (11)
(1-64) obtain wind energy turbine set and simulate the sequence of exerting oneself
If C i(x) be wind-powered electricity generation unit output characteristic curve, expression formula is following:
C i ( v ) = 0 , 0 &le; v < v in , v > v out v 3 - v in 3 v rated 3 - v in 3 R , v in &le; v &le; v rated R , v rated &le; v &le; v out - - - ( 12 )
In the formula (12), v In, v RatedWith v OutBe respectively incision wind speed, rated wind speed and the cut-out wind speed of wind-powered electricity generation unit;
Utilize correction back wind series
Figure BDA00001650791100084
wind energy turbine set sequential power curve to generate by following formula:
P it = n it ( 1 - &eta; i ) C i ( v it * ) - - - ( 13 )
In the formula (13), P ItBe exerting oneself of i the wind energy turbine set t moment; η iBe i wind energy turbine set wake effect coefficient; n ItBe that i wind energy turbine set can be used unit platform number;
2) ability that the wind energy turbine set sequential that obtains according to simulation is exerted oneself, annual wind-powered electricity generation is dissolved differentiation collection and peak modulation capacity, fm capacity, load-following capacity, quick marginal capacity and network delivery ability are as constraints; The wind-powered electricity generation ability of dissolving is carried out various dimensions differentiates, specifically comprise:
2-1) generate the annual wind-powered electricity generation ability of dissolving and differentiate collection Ω:
(2-11) with in monthly, 1 being divided into Unit 12, corresponding one month of unit, there is N i unit iThe bar daily load curve, i=1,2 ..., 12;
The wind energy turbine set sequential that (2-12) obtains according to simulation is exerted oneself, and presses the unit and sets up " wind-powered electricity generation power curve storehouse in a few days ", establishes " wind-powered electricity generation power curve storehouse in a few days " total N of i unit IjBar is the wind-powered electricity generation power curve in a few days, i=1, and 2 ..., 12;
(2-13) power curve of wind-powered electricity generation in a few days in " the wind-powered electricity generation power curve storehouse in a few days " of daily load curve in each unit and corresponding unit is done combination; Then 1 year total
Figure BDA00001650791100086
individual load-wind-powered electricity generation combination of exerting oneself, these the load-wind-powered electricity generations combination of exerting oneself is formed the annual wind-powered electricity generation ability of dissolving and is differentiated and collect Ω;
(2-14) the annual wind-powered electricity generation ability of dissolving is differentiated among the collection Ω, establish n load-wind-powered electricity generation exert oneself make up by the k bar in " the wind-powered electricity generation power curve storehouse in a few days " of the j bar load curve of i unit and i unit in a few days the wind-powered electricity generation power curve form i=1 wherein, 2; .., 12, j=1; 2 ..., N i, k=1,2 ..., N Ij:
The electric power system hour level wind-powered electricity generation that obtains of the simulation sequence of exerting oneself is designated as column vector
The electric power system hour stage load sequence that prediction obtains is designated as column vector
Figure BDA00001650791100092
Then an electric power system hour level equivalent load sequence is column vector
D n h = L n h - W n h - - - ( 14 )
Equivalent load hour level change sequence is designated as
Figure BDA00001650791100095
V n h ( t ) = D n h ( t + 1 ) - D n h ( t ) t=1,2,...,N h-1 (15)
In the formula (15),
Figure BDA00001650791100097
Expression
Figure BDA00001650791100098
In t element;
Figure BDA00001650791100099
Expression
Figure BDA000016507911000910
In t element; N hRepresent hourage in a few days;
The electric power system minute level wind-powered electricity generation that obtains of the simulation sequence of exerting oneself is designated as column vector
Figure BDA000016507911000911
The electric power system minute stage load sequence that prediction obtains is designated as column vector
Figure BDA000016507911000912
Then an electric power system minute level equivalent load sequence is
Figure BDA000016507911000913
D n m = L n m - W n m - - - ( 16 )
Equivalent load minute level change sequence is designated as
Figure BDA000016507911000915
V n m ( t ) = D n m ( t + 1 ) - D n m ( t ) t=1,2,...,N m-1 (17)
In the formula (17),
Figure BDA000016507911000917
Expression In t element; Expression
Figure BDA000016507911000920
In t element; N mRepresent the number of minutes in a few days;
2-2) confirm unit assembled state in a few days:
If unit adds up to N Unit, the annual wind-powered electricity generation ability of dissolving differentiate n load-wind-powered electricity generation among the collection Ω exert oneself make up in (n=1,2 ..., the open state variable of i platform unit N) is designated as u N, i(i=1,2 ..., N Unit), suppose that unit does not in a few days allow start and stop, works as u N, iRepresent this unit whole day shutdown at=0 o'clock, work as u N, iRepresented this unit whole day start at=1 o'clock; In a few days whether each unit is started shooting and is confirmed as follows: start shooting successively by the machine set type; Power-up sequence is district's external power, nuclear power, thermoelectricity, water power and pumped storage, thermoelectricity, combustion machine; Unit of the same type is by the descending start of unit capacity; Up to satisfying electric power system equivalent load demand, finally obtain electric power system unit assembled state in a few days;
2-3) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of peak regulation dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-31)
Figure BDA00001650791100101
It is the EIAJ of i unit;
Figure BDA00001650791100102
The minimum that is i unit is exerted oneself; I the minimum power factor of unit is designated as λ i(i=1,2 ..., N Unit), expression formula is following:
&lambda; i = P i max - P i min C i , i=1,2,...,N unit (18)
In the formula (18), C iThe capacity of representing i unit;
(2-32) confirm said n load-wind-powered electricity generation exert oneself the combination the adjustable minimum output of electric power system expression formula following:
P n , sys min = &Sigma; i = 1 N unit u n , i ( P i max - &lambda; i C i ) - - - ( 19 )
(2-33) confirm the exert oneself wind-powered electricity generation amount of in a few days abandoning (abandon wind and be compelled the subtracting of blower fan and exert oneself or shut down, abandon the wind-powered electricity generation amount for because the compelled loss value that subtracting the wind-powered electricity generation the sent out electric weight that caused of exerting oneself or shut down of blower fan)
Figure BDA00001650791100106
of combination of said n load-wind-powered electricity generation
P n , cut peak = &Sigma; t = 1 N h min { W n h ( t ) , g ( P n , sys min - D n h ( t ) ) } - - - ( 20 )
In the formula (20),
Figure BDA00001650791100108
is said n load-wind-powered electricity generation the exert oneself wind-powered electricity generation value of exerting oneself in t moment in the sequence of the wind-powered electricity generation in a few days that makes up of exerting oneself;
Figure BDA00001650791100109
is the exert oneself equivalent load value in t moment in the equivalent load sequence that makes up of said n load-wind-powered electricity generation; G (x) is a function of state, and expression formula is following:
g ( x ) = 0 , x < = 0 1 , x > 0 - - - ( 21 )
Then; As
Figure BDA000016507911001011
when equaling 0, represent that the combination of exerting oneself of said n load-wind-powered electricity generation passed through the peak modulation capacity constraint; Greater than 0 the time, represent that said n load-wind-powered electricity generation exert oneself combination through the peak modulation capacity constraint as
Figure BDA000016507911001012
;
(2-34) if differentiating whole load-wind-powered electricity generations among the collection Ω in ability that annual wind-powered electricity generation is dissolved exerts oneself after combination calculation accomplishes, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the peak modulation capacity constraint ratio lambda of dissolving Peak, carry out the wind-powered electricity generation ability of dissolving of frequency modulation dimension and differentiate λ PeakExpression formula is following:
&lambda; peak = &Sigma; n = 1 N g ( - P n , cut peak ) N &times; 100 % - - - ( 22 ) ;
Otherwise rotate back into (2-2);
2-4) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of frequency modulation dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-41) minute level of the i platform unit adjustment factor
Figure BDA00001650791100112
of exerting oneself
&upsi; i m = &Delta; &upsi; i m , max C i , i=1,2,...,N unit (23)
In the formula (23),
Figure BDA00001650791100114
is meant that minute level maximum adjustable of i platform unit exerts oneself;
(2-42) confirm that the annual wind-powered electricity generation ability of dissolving differentiates among the collection Ω n the load-wind-powered electricity generation adjustable EIAJ in the electric power system of making up 1 minute of exerting oneself, it is following to be designated as expression formula:
V n , sys m , max = &Sigma; i = 1 N unit u n , i &upsi; i m C i - - - ( 24 )
(2-43) followed by days of time comparing
Figure BDA00001650791100117
and
Figure BDA00001650791100118
As
Figure BDA00001650791100119
greater than 0 the time; In a few days there are indivedual fm capacity constraints of constantly running counter in expression, and said n load-wind-powered electricity generation exerted oneself combination not through the fm capacity constraint; As
Figure BDA000016507911001110
when equaling 0; In a few days all satisfy the fm capacity constraint constantly in expression, and said n load-wind-powered electricity generation exerted oneself to make up and passed through the fm capacity constraint;
(2-44) judge whether the annual wind-powered electricity generation in the 1 year ability of dissolving is differentiated whole load-wind-powered electricity generations among collection Ω combination calculation of exerting oneself accomplishes,, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the fm capacity constraint ratio lambda of dissolving if accomplish Freq, carry out the wind-powered electricity generation ability of dissolving of frequency modulation dimension and differentiate λ FreqExpression formula is following:
&lambda; freq = &Sigma; n = 1 N g ( &Sigma; t = 1 N m - 1 g ( V n m ( t ) - V n , sys m , max ) ) N &times; 100 % - - - ( 25 ) ;
Otherwise rotate back into (2-2);
2-5) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of subsequent use dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-51) define the power system load, the regular maintenance and emergency reserve reserve ratio
Figure BDA00001650791100121
and the negative reserve ratio
Figure BDA00001650791100122
expressions
As follows:
&gamma; sys + = R n , sys + L n h , max &times; 100 % - - - ( 26 )
&gamma; sys - = R n , sys - L n h , max &times; 100 % - - - ( 27 )
In formula (26) and the formula (27),
Figure BDA00001650791100125
expression day peak load;
Figure BDA00001650791100126
representes power system load, maintenance and the positive stand-by requirement capacity of accident;
Figure BDA00001650791100127
expression power system load, maintenance and the negative stand-by requirement capacity of accident;
(2-52) define the power system wind power output is alternate rate
Figure BDA00001650791100128
and the negative reserve ratio
Figure BDA00001650791100129
expression is as follows:
&gamma; wind + = R n , wind + W n h , 1 max &times; 100 % - - - ( 28 )
&gamma; wind - = R n , wind - W n h , 1 max &times; 100 % - - - ( 29 )
In formula (28) and the formula (29), the wind-powered electricity generation of
Figure BDA000016507911001212
expression peak load period is exerted oneself;
Figure BDA000016507911001213
expression electric power system wind-powered electricity generation positive stand-by requirement capacity of exerting oneself; expression electric power system wind-powered electricity generation is exerted oneself and is born the stand-by requirement capacity;
(2-53) determine the annual capacity of wind power consumptive determine the set Ω in the n-th load - a combination of wind power output of the power system is spare capacity requirements
Figure BDA000016507911001215
and the negative demand spare capacity
Figure BDA000016507911001216
expression is as follows:
R n , sys n + = &gamma; sys + &CenterDot; L n h , max + &gamma; wind + &CenterDot; W n h , 1 max - - - ( 30 )
R n , sys n - = &gamma; sys - &CenterDot; L n h , max + &gamma; wind - &CenterDot; W n h , 1 max - - - ( 31 )
(2-54) i-units are fast alternate adjustment coefficient
Figure BDA000016507911001219
and the negative adjustment coefficient
Figure BDA000016507911001220
expression is as follows:
&alpha; i + = &Delta; R i + C i - - - ( 32 )
&alpha; i - = &Delta; R i - C i - - - ( 33 )
In formula (32) and the formula (33),
Figure BDA00001650791100132
is respectively i platform unit available positive reserve capacity and negative reserve capacity under open state;
(2-55) of the n-th load - combinations of wind power output of the power system is available spare capacity
Figure BDA00001650791100133
and the negative spare capacity available expression is as follows:
R n , sys s + = &Sigma; i = 1 N unit ( 1 - u n , i ) &alpha; i + C i - - - ( 34 )
R n , sys s - = &Sigma; i = 1 N unit ( 1 - u n , i ) &alpha; i - C i - - - ( 35 )
(2-56) compare
Figure BDA00001650791100137
and
Figure BDA00001650791100138
and
Figure BDA00001650791100139
As
Figure BDA000016507911001310
greater than
Figure BDA000016507911001311
or
Figure BDA000016507911001312
during greater than
Figure BDA000016507911001313
; Expression electric power system marginal capacity is not enough, and said n load-wind-powered electricity generation exerted oneself combination not through the marginal capacity constraint; When being not more than
Figure BDA000016507911001315
or
Figure BDA000016507911001316
as
Figure BDA000016507911001314
and being not more than ; Expression electric power system marginal capacity is abundant, and said n load-wind-powered electricity generation exerted oneself to make up and passed through the marginal capacity constraint;
(2-57) judge whether the annual wind-powered electricity generation ability of dissolving is differentiated whole load-wind-powered electricity generations among collection Ω combination calculation of exerting oneself accomplishes,, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the marginal capacity constraint ratio lambda of dissolving if accomplish Rese, carry out the wind-powered electricity generation ability of dissolving of subsequent use dimension and differentiate λ ReseExpression formula is following:
&lambda; rese = &Sigma; n = 1 N g ( g ( R n , sys s + - R n , sys n + ) &CenterDot; g ( R n , sys s - - R n , sys n - ) ) N &times; 100 % - - - ( 36 ) ;
Otherwise rotate back into step (2-2);
2-6) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of load-following capacity dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-61) hour level of the i platform unit adjustment factor
Figure BDA000016507911001319
of exerting oneself
&upsi; i h = &Delta; &upsi; i h , max C i , i=1,2,...,N unit (37)
In the formula (37), is meant that hour level maximum adjustable of i platform unit exerts oneself;
(2-62) confirm that the annual wind-powered electricity generation ability of dissolving differentiates among the collection Ω n the load-wind-powered electricity generation adjustable EIAJ in the electric power system of making up 1 hour of exerting oneself, it is following to be designated as
Figure BDA00001650791100141
expression formula:
V m , sys h , max = &Sigma; i = 1 N unit u n , i &upsi; i h C i - - - ( 38 )
(2-63) confirm that can the exert oneself load-following capacity constraint of combination of said n load-wind-powered electricity generation pass through, by in a few days constantly comparing
Figure BDA00001650791100143
successively and
Figure BDA00001650791100144
As
Figure BDA00001650791100145
greater than 0 the time; In a few days there are indivedual load-following capacity constraints of constantly running counter in expression, and said n load-wind-powered electricity generation exerted oneself combination not through the load-following capacity constraint; As
Figure BDA00001650791100146
when equaling 0; In a few days all satisfy the load-following capacity constraint constantly in expression, and said n load-wind-powered electricity generation exerted oneself to make up and passed through the load-following capacity constraint;
(2-64) judge whether the annual wind-powered electricity generation ability of dissolving is differentiated whole load-wind-powered electricity generations among collection Ω combination calculation of exerting oneself accomplishes,, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the load-following capacity constraint ratio lambda of dissolving if accomplish Foll, carry out the wind-powered electricity generation ability of dissolving of load-following capacity dimension and differentiate λ FollExpression formula is following:
&lambda; foll = &Sigma; n = 1 N g ( &Sigma; t = 1 N day - 1 g ( V n h ( t ) - V n , sys h , max ) ) N &times; 100 % - - - ( 39 ) ;
Otherwise rotate back into (2-2);
2-7) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of network delivery ability dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-71) when the electric power system node existed the district to send the electricity plan outside, the note district sent an electricity hour level outside and exerts oneself sequence for
Figure BDA00001650791100148
(2-72) set of k lines of contact line transmission capacity limit is
Figure BDA00001650791100149
the outgoing power system capacity limit of
Figure BDA000016507911001410
expression is as follows:
P sys lim = &Sigma; k = 1 N line P k lim - - - ( 40 )
In the formula (40), N LineExpression electric power system interconnection sum;
(2-73) differentiate the combination of exerting oneself of n load-wind-powered electricity generation among the collection Ω to the annual wind-powered electricity generation ability of dissolving; Exert oneself when sending capacity limitation outside greater than electric power system when the district sends electricity outside, electric power system will to abandon wind
Figure BDA00001650791100151
expression formula following because of the network capacity constraint produces:
P n , cut grid = &Sigma; t = 1 24 min { W n h ( t ) , g ( | P n , out h ( t ) | - P sys lim ) &CenterDot; ( | P n , out h ( t ) | - P sys lim ) } - - - ( 41 )
In the formula (41),
Figure BDA00001650791100153
is t element in
Figure BDA00001650791100154
;
Then when the exert oneself wind-powered electricity generation amount of abandoning
Figure BDA00001650791100155
when being 0 of combination of this said n load-wind-powered electricity generation, representing that said n load-wind-powered electricity generation exerts oneself to make up has passed through the network capacity constraint; Exert oneself the wind-powered electricity generation amount of abandoning
Figure BDA00001650791100156
of combination greater than 0 the time when said n load-wind-powered electricity generation, represent that the combination of exerting oneself of said n load-wind-powered electricity generation passes through network capacity and retrain;
(2-74) judge whether the annual wind-powered electricity generation ability of dissolving is differentiated whole load-wind-powered electricity generations among collection Ω combination calculation of exerting oneself accomplishes,, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the network capacity constraint ratio lambda of dissolving if accomplish Grid, carry out the wind-powered electricity generation ability of dissolving of network delivery ability dimension and differentiate λ GridExpression formula is following:
&lambda; grid = &Sigma; n = 1 N [ 1 - g ( P n , cut grid ) ] N &times; 100 % - - - ( 42 ) ;
Otherwise rotate back into (2-2);
2-8) differentiate collection Ω, carry out with peak modulation capacity, fm capacity, marginal capacity, load-following capacity and network delivery ability be as comprehensive constraint fast, carry out the wind-powered electricity generation integration capability of dissolving and differentiate according to the annual wind-powered electricity generation ability of dissolving:
(2-81) set up power system control parameter row vector
Figure BDA00001650791100158
There are five elements that characterize the power system in identifying the wind power consumptive ability to process considering the constraints; when the element has a value of 1 indicates that discrimination wind power consumptive capacity of the process to consider the corresponding factor constraints; when the element has a value of 0 indicates that discrimination ability of wind power consumptive process does not consider the constraints of the corresponding factors;
Figure BDA00001650791100159
The correspondence between the elements: the first element corresponding peaking capacity, the second element
Figure BDA000016507911001511
corresponds FM capability The third element
Figure BDA000016507911001512
fast spare capacity corresponds to the fourth element
Figure BDA000016507911001513
corresponding load following capability, the fifth element
Figure BDA000016507911001514
corresponds to the network transmission capacity; when considering all the factors of constraint,
Figure BDA000016507911001515
(2-82) note considers that the wind-powered electricity generation of a plurality of dimension constraints ratio of dissolving is that
Figure BDA000016507911001516
expression formula is following:
&lambda; S sys con = &Sigma; n = 1 N [ &Pi; i = 1 5 h ( S sys con ( i ) &CenterDot; &lambda; i ) ] N &times; 100 % - - - ( 43 )
In the formula (43),
h ( x ) = 1 x = 0 x x &NotEqual; 0
&lambda; 1 = g ( - P n , cut peak ) ;
&lambda; 2 = g ( &Sigma; t = 1 N day - 1 g ( V n m ( t ) - V n , sys m , max ) ) ;
&lambda; 3 = g ( g ( R n , sys s + - R n , sys n + ) ) ;
&lambda; 4 = g ( &Sigma; t = 1 N day - 1 g ( V n h ( t ) - V n , sys h , max ) ) ;
&lambda; 5 = 1 - g ( P n , cut grid )
(2-83) with considering five wind-powered electricity generations under dimensions constraint ratio lambda of dissolving TotalCarry out the wind-powered electricity generation integration capability of dissolving and differentiate λ TotalExpression formula is following:
&lambda; total = &lambda; [ 1,1,1,1,1 ] = &Sigma; n = 1 N ( &Pi; i = 1 5 &lambda; i ) N &times; 100 % - - - ( 44 ) ;
2-9) differentiate collection Ω to the dissolve differentiation of ability of monthly and day degree wind-powered electricity generation according to the annual wind-powered electricity generation ability of dissolving
(2-91) differentiate collection Ω with the monthly wind-powered electricity generation ability of dissolving i, characterize the annual wind-powered electricity generation ability of dissolving and differentiate the load-wind-powered electricity generation that is in the i month among the collection Ω composite set of exerting oneself, i=1,2,3 ..., 12;
(2-92) carry out the dissolve differentiation of ability of monthly wind-powered electricity generation with the wind-powered electricity generation of the i month ratio
Figure BDA00001650791100168
of dissolving,
Figure BDA00001650791100169
expression formula is following:
&lambda; i S sys con = &Sigma; &Omega; ( n ) &Element; &Omega; i ( &Pi; i = 1 5 h ( S sys con ( i ) &CenterDot; &lambda; i ) ) N ( &Omega; i ) &times; 100 % , i=1,2,...,12(45)
In the formula (45), N (Ω i) the expression set omega iLoad-wind-powered electricity generation number of combinations of exerting oneself; The annual wind-powered electricity generation of Ω (n) the expression ability of dissolving is differentiated the combination of exerting oneself of n load-wind-powered electricity generation among the collection Ω;
(2-93) differentiate collection Ω with the day degree wind-powered electricity generation ability of dissolving I, j, characterizing the annual wind-powered electricity generation ability of dissolving, to differentiate daily load curve among the collection Ω be load-wind-powered electricity generation of j days i month composite set of exerting oneself, i=1, and 2,3 ..., 12, j=1,2,3 ... N i
(2-94) carry out the dissolve differentiation of ability of day degree wind-powered electricity generation with the wind-powered electricity generation of the i j day month ratio
Figure BDA000016507911001611
of dissolving, expression formula is following:
&lambda; i , j S sys con ( i ) = &Sigma; &Omega; ( n ) &Element; &Omega; i , j ( &Pi; i = 1 5 h ( S sys con ( i ) &CenterDot; &lambda; i ) ) N ( &Omega; i , j ) &times; 100 % , i=1,2,...,12(46)。
Technical characterstic of the present invention and beneficial effect:
The various dimensions wind-powered electricity generation that the present invention can carry out peak regulation dimension, frequency modulation dimension, subsequent use dimension, load-following capacity dimension and the network delivery ability dimension ability of dissolving is differentiated, and also can carry out monthlyly differentiating with wind-powered electricity generation day degree the ability of dissolving; Utilizing wind-powered electricity generation of the present invention to dissolve the ability method of discrimination can be to a certain wind-powered electricity generation installation scale; Can obtain the ratio of dissolving in the year under this scale, wind-powered electricity generation monthly and day degree; Annual wind-powered electricity generation installation planning be can instruct, arrange monthly wind-powered electricity generation operation strategy, day degree power system dispatching and controlling schemes optimized; Realization is to the efficient utilization of wind-powered electricity generation, and is significant to planning, operation, scheduling and the control of electric power system.
The present invention has jumped out the constraint of ability method of discrimination in flow scheme design and theoretical method aspect of dissolving of existing electric power system wind-powered electricity generation; Set up a cover based on dissolve ability method of discrimination of the various dimensions wind-powered electricity generation of wind-powered electricity generation operation simulation; Complete electric power system peak modulation capacity, fm capacity, quick marginal capacity, load-following capacity and the network delivery ability taken into account; Utilize the windy electric field operation analogue technique of considering temporal correlation; Science differentiates annual, monthly and the day degree wind-powered electricity generation ability of dissolving, for power system dispatching, operation and control personnel provide one to overlap the dissolve instrument of ability of quick differentiation wind-powered electricity generation.
The present invention can help power system dispatching, operation and control personnel precisely to estimate the admissible wind-powered electricity generation scale of Future Power System from a plurality of dimensions; And then the wind-powered electricity generation of clear and definite Future Power System under the different time yardstick scale of dissolving; Judge following wind-powered electricity generation fast and whether can fully be dissolved, each function links such as the operation of electric power system, scheduling, control are had important practical significance and good prospects for application by electric power system.
Description of drawings
Fig. 1 simulates force curve for embodiment each wind energy turbine set operation one day;
Embodiment
Below in conjunction with accompanying drawing and embodiment, the ability method of discrimination of dissolving based on the various dimensions wind-powered electricity generation of wind-powered electricity generation operation simulation is elaborated.The invention discloses a kind of various dimensions wind-powered electricity generation ability method of discrimination of dissolving, it is characterized in that, comprising:, utilize windy electric field operation analogue technique simulation wind energy turbine set sequential to exert oneself 1) according to surveying wind data based on wind-powered electricity generation operation simulation; 2) according to simulation wind energy turbine set sequential exert oneself, the annual wind-powered electricity generation ability of dissolving is differentiated collection and peak modulation capacity, fm capacity, load-following capacity, marginal capacity and network delivery ability are carried out various dimensions to the wind-powered electricity generation ability of dissolving and differentiated as constraints fast;
1) according to surveying wind data, utilize windy electric field operation analogue technique simulation wind energy turbine set sequential to exert oneself, specifically may further comprise the steps:
1-1) obtain scale parameter c and the form parameter k that Weibull distributes according to surveying the wind data match:
(1-11) two-parameter Weibull distribution function F W (c, k)(x) expression formula is following:
F W ( c , k ) ( x ) = 1 - exp [ - ( x c ) k ] , x &Element; [ 0 , + &infin; ) - - - ( 1 )
In the formula (1), x is a wind speed;
(1-12) the probability density function f of two-parameter Weibull distribution W (c, k)(x) as follows:
f W ( c , k ) ( x ) = k c ( x c ) k - 1 exp [ - ( x c ) k ] - - - ( 2 )
(1-13) expression formula of mean wind speed
Figure BDA00001650791100183
is following:
x &OverBar; = c&Gamma; ( 1 + 1 / k ) - - - ( 3 )
(1-14) try to achieve form parameter k by the wind speed standard deviation sigma, expression formula is following:
&sigma; x &OverBar; = [ &Gamma; ( 1 + 2 k ) / &Gamma; 2 ( 1 + 1 k ) ] - 1 - - - ( 4 )
Wherein, mean wind speed
Figure BDA00001650791100186
is directly proportional with Weibull distribution mesoscale parameter c; Γ is a gamma function:
&Gamma; ( a ) = &Integral; 0 + &infin; y a - 1 e - y dy ) ;
1-2) the temporal correlation of wind speed setting: according to surveying the temporal correlation characteristic quantity θ that the wind data match obtains wind speed, the auto-correlation function of wind speed is represented by negative exponential function that numerically expression formula is following:
ρ(k)=e -θk,θ>0,k=1,2,3... (5)
In the formula (5), the speed of the size of θ decision auto-correlation function decay, the severe of sign fluctuations in wind speed;
1-3) the spatial coherence of wind speed setting: there are the negative exponent relation in coefficient correlation between the windy field gas velocity and the geographic distance between the wind energy turbine set, and expression formula is following:
c = e - d M - - - ( 6 )
In the formula (6), c is the wind speed coefficient correlation; D is a geographic distance between the two wind-powered electricity generation sections; M is that the wind speed coefficient correlation is with the range attenuation factor;
Be that base value obtains each monthly average wind series k 1-4) with annual wind speed mean value m, k mIn element expression following:
k mi = v mi v &OverBar; y , i=1,2,3,...,12 (7)
In the formula (7), k MiBe k mIn i element; v MiMean wind speed for the i month in year; Be the average of the whole year wind speed;
Be that base value obtains each moment mean wind speed sequence k in a few days 1-5) with whole day wind speed mean value h, k hIn element expression following:
k hj = v hj v &OverBar; d , j=1,2,3,...,N day (8)
In the formula (8), k HjBe k hIn j element; v HjBe the mean wind speed of j period in a few days;
Figure BDA00001650791100193
Be the whole day mean wind speed; N DayBe period sum in a few days;
1-6) utilize windy electric field operation analogue technique to carry out wind speed simulation:
(1-61) single wind farm wind velocity simulation:
If meeting the Weoibull that is respectively c and k suc as formula the scale parameter shown in (1) and the formula (2) and form parameter, wind speed distributes; Mean wind speed
Figure BDA00001650791100194
is suc as formula shown in (3), then:
v ( x ) = 2 &theta; f ( x ) &Integral; l x ( x &OverBar; - y ) f ( y ) dy
= 2 &theta; f ( x ) ( x &OverBar; F ( x ) - &Integral; l x yf ( y ) dy ) - - - ( 9 )
= 2 &theta; f ( x ) ( c&Gamma; ( 1 k + 1 ) ( 1 - exp [ - ( x c ) k ] ) - c&Gamma; ( ( x c ) k , 1 k + 1 ) )
According to formula (9), single wind energy turbine set sequential wind speed
Figure BDA00001650791100198
can be generated by the following formula iterative computation:
v ^ it * = v ^ it - 1 * + d X t - - - ( 10 )
(1-62) windy field gas velocity simulation:
At first generate the relevant Brownian movement W of multidimensional t, W tEach dimension is the standard Brownian movement, and correlation matrix equals the wind farm wind velocity correlation matrix between each dimension; Afterwards, utilize W tEach ties up component each wind farm wind velocity sequence of (1-61) middle method generation set by step;
(1-63) correction of wind energy turbine set simulation wind speed
According to 1-4) and 1-5), the wind series that generates is at random revised:
v it * = k mi k hj v ^ it * , i=1,2,...,12,j=1,2,..,m (11)
(1-64) obtain wind energy turbine set and simulate the sequence of exerting oneself
If C i(x) be wind-powered electricity generation unit output characteristic curve, expression formula is following:
C i ( v ) = 0 , 0 &le; v < v in , v > v out v 3 - v in 3 v rated 3 - v in 3 R , v in &le; v &le; v rated R , v rated &le; v &le; v out - - - ( 12 )
In the formula (12), v In, v RatedWith v OutBe respectively incision wind speed, rated wind speed and the cut-out wind speed of wind-powered electricity generation unit;
Utilize correction back wind series
Figure BDA00001650791100202
wind energy turbine set sequential power curve to generate by following formula:
P it = n it ( 1 - &eta; i ) C i ( v it * ) - - - ( 13 )
In the formula (13), P ItBe exerting oneself of i the wind energy turbine set t moment; η iBe i wind energy turbine set wake effect coefficient; n ItBe that i wind energy turbine set can be used unit platform number;
2) ability that the wind energy turbine set sequential that obtains according to simulation is exerted oneself, annual wind-powered electricity generation is dissolved differentiation collection and peak modulation capacity, fm capacity, load-following capacity, quick marginal capacity and network delivery ability are as constraints; The wind-powered electricity generation ability of dissolving is carried out various dimensions differentiates, specifically comprise:
2-1) generate the annual wind-powered electricity generation ability of dissolving and differentiate collection Ω:
(2-11) with in monthly, 1 being divided into Unit 12, corresponding one month of unit, there is N i unit iThe bar daily load curve, i=1,2 ..., 12;
The wind energy turbine set sequential that (2-12) obtains according to simulation is exerted oneself, and presses the unit and sets up " wind-powered electricity generation power curve storehouse in a few days ", establishes " wind-powered electricity generation power curve storehouse in a few days " total N of i unit IjBar is the wind-powered electricity generation power curve in a few days, i=1, and 2 ..., 12;
(2-13) power curve of wind-powered electricity generation in a few days in " the wind-powered electricity generation power curve storehouse in a few days " of daily load curve in each unit and corresponding unit is done combination; Then 1 year total
Figure BDA00001650791100204
individual load-wind-powered electricity generation combination of exerting oneself, these the load-wind-powered electricity generations combination of exerting oneself is formed the annual wind-powered electricity generation ability of dissolving and is differentiated and collect Ω;
(2-14) the annual wind-powered electricity generation ability of dissolving is differentiated among the collection Ω, establish n load-wind-powered electricity generation exert oneself make up by the k bar in " the wind-powered electricity generation power curve storehouse in a few days " of the j bar load curve of i unit and i unit in a few days the wind-powered electricity generation power curve form i=1 wherein, 2; ..., 12, j=1; 2 ..., N i, k=1,2 ..., N Ij:
The electric power system hour level wind-powered electricity generation that obtains of the simulation sequence of exerting oneself is designated as column vector
Figure BDA00001650791100205
The electric power system hour stage load sequence that prediction obtains is designated as column vector
Figure BDA00001650791100206
Then an electric power system hour level equivalent load sequence is column vector
Figure BDA00001650791100211
D n h = L n h - W n h - - - ( 14 )
Equivalent load hour level change sequence is designated as
V n h ( t ) = D n h ( t + 1 ) - D n h ( t ) t=1,2,...,N h-1 (15)
In the formula (15),
Figure BDA00001650791100215
Expression In t element;
Figure BDA00001650791100217
Expression In t element; N hRepresent hourage in a few days;
The electric power system minute level wind-powered electricity generation that obtains of the simulation sequence of exerting oneself is designated as column vector
Figure BDA00001650791100219
The electric power system minute stage load sequence that prediction obtains is designated as column vector
Figure BDA000016507911002110
Then an electric power system minute level equivalent load sequence is
Figure BDA000016507911002111
D n m = L n m - W n m - - - ( 16 )
Equivalent load minute level change sequence is designated as
Figure BDA000016507911002113
V n m ( t ) = D n m ( t + 1 ) - D n m ( t ) t=1,2,...,N m-1 (17)
In the formula (17),
Figure BDA000016507911002115
Expression
Figure BDA000016507911002116
In t element;
Figure BDA000016507911002117
Expression In t element; N mRepresent the number of minutes in a few days;
2-2) confirm unit assembled state in a few days:
If unit adds up to N Unit, the annual wind-powered electricity generation ability of dissolving differentiate n load-wind-powered electricity generation among the collection Ω exert oneself make up in (n=1,2 ..., the open state variable of i platform unit N) is designated as u N, i(i=1,2 ..., N Unit), suppose that unit does not in a few days allow start and stop, works as u N, iRepresent this unit whole day shutdown at=0 o'clock, work as u N, iRepresented this unit whole day start at=1 o'clock; In a few days whether each unit is started shooting and is confirmed as follows: start shooting successively by the machine set type; Power-up sequence is district's external power, nuclear power, thermoelectricity, water power and pumped storage, thermoelectricity, combustion machine; Unit of the same type is by the descending start of unit capacity; Up to satisfying electric power system equivalent load demand, finally obtain electric power system unit assembled state in a few days;
2-3) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of peak regulation dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-31)
Figure BDA000016507911002119
It is the EIAJ of i unit;
Figure BDA000016507911002120
The minimum that is i unit is exerted oneself; I the minimum power factor of unit is designated as λ i(i=1,2 ..., N Unit), expression formula is following:
&lambda; i = P i max - P i min C i , i=1,2,...,N unit (18)
In the formula (18), C iThe capacity of representing i unit;
(2-32) confirm said n load-wind-powered electricity generation exert oneself the combination the adjustable minimum output of electric power system
Figure BDA00001650791100222
expression formula following:
P n , sys min = &Sigma; i = 1 N unit u n , i ( P i max - &lambda; i C i ) - - - ( 19 )
(2-33) confirm the exert oneself wind-powered electricity generation amount of in a few days abandoning (abandon wind and be compelled the subtracting of blower fan and exert oneself or shut down, abandon the wind-powered electricity generation amount for because the compelled loss value that subtracting the wind-powered electricity generation the sent out electric weight that caused of exerting oneself or shut down of blower fan)
Figure BDA00001650791100224
of combination of said n load-wind-powered electricity generation
P n , cut peak = &Sigma; t = 1 N h min { W n h ( t ) , g ( P n , sys min - D n h ( t ) ) } - - - ( 20 )
In the formula (20),
Figure BDA00001650791100226
is said n load-wind-powered electricity generation the exert oneself wind-powered electricity generation value of exerting oneself in t moment in the sequence of the wind-powered electricity generation in a few days that makes up of exerting oneself;
Figure BDA00001650791100227
is the exert oneself equivalent load value in t moment in the equivalent load sequence that makes up of said n load-wind-powered electricity generation; G (x) is a function of state, and expression formula is following:
g ( x ) = 0 , x < = 0 1 , x > 0 - - - ( 21 )
Then; As
Figure BDA00001650791100229
when equaling 0, represent that the combination of exerting oneself of said n load-wind-powered electricity generation passed through the peak modulation capacity constraint; Greater than 0 the time, represent that said n load-wind-powered electricity generation exert oneself combination through the peak modulation capacity constraint as
Figure BDA000016507911002210
;
(2-34) if differentiating whole load-wind-powered electricity generations among the collection Ω in ability that annual wind-powered electricity generation is dissolved exerts oneself after combination calculation accomplishes, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the peak modulation capacity constraint ratio lambda of dissolving Peak, carry out the wind-powered electricity generation ability of dissolving of frequency modulation dimension and differentiate λ PeakExpression formula is following:
&lambda; peak = &Sigma; n = 1 N g ( - P n , cut peak ) N &times; 100 % - - - ( 22 ) ;
Otherwise rotate back into (2-2);
2-4) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of frequency modulation dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-41) minute level of the i platform unit adjustment factor
Figure BDA00001650791100231
of exerting oneself
&upsi; i m = &Delta; &upsi; i m , max C i , i=1,2,...,N unit (23)
In the formula (23),
Figure BDA00001650791100233
is meant that minute level maximum adjustable of i platform unit exerts oneself;
(2-42) confirm that the annual wind-powered electricity generation ability of dissolving differentiates among the collection Ω n the load-wind-powered electricity generation adjustable EIAJ in the electric power system of making up 1 minute of exerting oneself, it is following to be designated as
Figure BDA00001650791100234
expression formula:
V n , sys m , max = &Sigma; i = 1 N unit u n , i &upsi; i m C i - - - ( 24 )
(2-43) followed by days of time comparing
Figure BDA00001650791100236
and
Figure BDA00001650791100237
As
Figure BDA00001650791100238
greater than 0 the time; In a few days there are indivedual fm capacity constraints of constantly running counter in expression, and said n load-wind-powered electricity generation exerted oneself combination not through the fm capacity constraint; As
Figure BDA00001650791100239
when equaling 0; In a few days all satisfy the fm capacity constraint constantly in expression, and said n load-wind-powered electricity generation exerted oneself to make up and passed through the fm capacity constraint;
(2-44) judge whether the annual wind-powered electricity generation in the 1 year ability of dissolving is differentiated whole load-wind-powered electricity generations among collection Ω combination calculation of exerting oneself accomplishes,, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the fm capacity constraint ratio lambda of dissolving if accomplish Freq, carry out the wind-powered electricity generation ability of dissolving of frequency modulation dimension and differentiate λ FreqExpression formula is following:
&lambda; freq = &Sigma; n = 1 N g ( &Sigma; t = 1 N m - 1 g ( V n m ( t ) - V n , sys m , max ) ) N &times; 100 % - - - ( 25 ) ;
Otherwise rotate back into (2-2);
2-5) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of subsequent use dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-51) define the power system load, the regular maintenance and emergency reserve reserve ratio
Figure BDA000016507911002311
and the negative reserve ratio
Figure BDA000016507911002312
expression is as follows:
&gamma; sys + = R n , sys + L n h , max &times; 100 % - - - ( 26 )
&gamma; sys - = R n , sys - L n h , max &times; 100 % - - - ( 27 )
In formula (26) and the formula (27),
Figure BDA00001650791100243
expression day peak load; representes power system load, maintenance and the positive stand-by requirement capacity of accident;
Figure BDA00001650791100245
expression power system load, maintenance and the negative stand-by requirement capacity of accident;
(2-52) define the power system wind power output is alternate rate
Figure BDA00001650791100246
and the negative reserve ratio expression is as follows:
&gamma; wind + = R n , wind + W n h , 1 max &times; 100 % - - - ( 28 )
&gamma; wind - = R n , wind - W n h , 1 max &times; 100 % - - - ( 29 )
In formula (28) and the formula (29), the wind-powered electricity generation of
Figure BDA000016507911002410
expression peak load period is exerted oneself;
Figure BDA000016507911002411
expression electric power system wind-powered electricity generation positive stand-by requirement capacity of exerting oneself;
Figure BDA000016507911002412
expression electric power system wind-powered electricity generation is exerted oneself and is born the stand-by requirement capacity;
(2-53) determine the annual capacity of wind power consumptive determine the set Ω in the n-th load - a combination of wind power output of the power system is spare capacity requirements
Figure BDA000016507911002413
and the negative demand spare capacity
Figure BDA000016507911002414
expression is as follows:
R n , sys n + = &gamma; sys + &CenterDot; L n h , max + &gamma; wind + &CenterDot; W n h , 1 max - - - ( 30 )
R n , sys n - = &gamma; sys - &CenterDot; L n h , max + &gamma; wind - &CenterDot; W n h , 1 max - - - ( 31 )
(2-54) i-units are fast alternate adjustment coefficient
Figure BDA000016507911002417
and the negative adjustment coefficient
Figure BDA000016507911002418
expression is as follows:
&alpha; i + = &Delta; R i + C i - - - ( 32 )
&alpha; i - = &Delta; R i - C i - - - ( 33 )
In formula (32) and the formula (33), is respectively i platform unit available positive reserve capacity and negative reserve capacity under open state;
(2-55) of the n-th load - combinations of wind power output of the power system is available spare capacity and the negative spare capacity available
Figure BDA000016507911002423
expression is as follows:
R n , sys s + = &Sigma; i = 1 N unit ( 1 - u n , i ) &alpha; i + C i - - - ( 34 )
R n , sys s - = &Sigma; i = 1 N unit ( 1 - u n , i ) &alpha; i - C i - - - ( 35 )
(2-56) compare and
Figure BDA00001650791100254
and
Figure BDA00001650791100255
As
Figure BDA00001650791100256
greater than
Figure BDA00001650791100257
or
Figure BDA00001650791100258
during greater than
Figure BDA00001650791100259
; Expression electric power system marginal capacity is not enough, and said n load-wind-powered electricity generation exerted oneself combination not through the marginal capacity constraint; When being not more than
Figure BDA000016507911002511
or
Figure BDA000016507911002512
as
Figure BDA000016507911002510
and being not more than
Figure BDA000016507911002513
; Expression electric power system marginal capacity is abundant, and said n load-wind-powered electricity generation exerted oneself to make up and passed through the marginal capacity constraint;
(2-57) judge whether the annual wind-powered electricity generation ability of dissolving is differentiated whole load-wind-powered electricity generations among collection Ω combination calculation of exerting oneself accomplishes,, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the marginal capacity constraint ratio lambda of dissolving if accomplish Rese, carry out the wind-powered electricity generation ability of dissolving of subsequent use dimension and differentiate λ ReseExpression formula is following:
&lambda; rese = &Sigma; n = 1 N g ( g ( R n , sys s + - R n , sys n + ) &CenterDot; g ( R n , sys s - - R n , sys n - ) ) N &times; 100 % - - - ( 36 ) ;
Otherwise rotate back into step (2-2);
2-6) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of load-following capacity dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-61) hour level of the i platform unit adjustment factor
Figure BDA000016507911002515
of exerting oneself
&upsi; i h = &Delta; &upsi; i h , max C i , i=1,2,...,N unit (37)
In the formula (37),
Figure BDA000016507911002517
is meant that hour level maximum adjustable of i platform unit exerts oneself;
(2-62) confirm that the annual wind-powered electricity generation ability of dissolving differentiates among the collection Ω n the load-wind-powered electricity generation adjustable EIAJ in the electric power system of making up 1 hour of exerting oneself, it is following to be designated as
Figure BDA000016507911002518
expression formula:
V m , sys h , max = &Sigma; i = 1 N unit u n , i &upsi; i h C i - - - ( 38 )
(2-63) confirm that can the exert oneself load-following capacity constraint of combination of said n load-wind-powered electricity generation pass through, by in a few days constantly comparing
Figure BDA000016507911002520
successively and
Figure BDA000016507911002521
As
Figure BDA00001650791100261
greater than 0 the time; In a few days there are indivedual load-following capacity constraints of constantly running counter in expression, and said n load-wind-powered electricity generation exerted oneself combination not through the load-following capacity constraint; As when equaling 0; In a few days all satisfy the load-following capacity constraint constantly in expression, and said n load-wind-powered electricity generation exerted oneself to make up and passed through the load-following capacity constraint;
(2-64) judge whether the annual wind-powered electricity generation ability of dissolving is differentiated whole load-wind-powered electricity generations among collection Ω combination calculation of exerting oneself accomplishes,, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the load-following capacity constraint ratio lambda of dissolving if accomplish Foll, carry out the wind-powered electricity generation ability of dissolving of load-following capacity dimension and differentiate λ FollExpression formula is following:
&lambda; foll = &Sigma; n = 1 N g ( &Sigma; t = 1 N day - 1 g ( V n h ( t ) - V n , sys h , max ) ) N &times; 100 % - - - ( 39 ) ;
Otherwise rotate back into (2-2);
2-7) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of network delivery ability dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-71) when the electric power system node existed the district to send the electricity plan outside, the note district sent an electricity hour level outside and exerts oneself sequence for
Figure BDA00001650791100264
(2-72) set of k lines of contact line transmission capacity limit is
Figure BDA00001650791100265
the outgoing power system capacity limit of
Figure BDA00001650791100266
expression is as follows:
P sys lim = &Sigma; k = 1 N line P k lim - - - ( 40 )
In the formula (40), N LineExpression electric power system interconnection sum;
(2-73) differentiate the combination of exerting oneself of n load-wind-powered electricity generation among the collection Ω to the annual wind-powered electricity generation ability of dissolving; Exert oneself when sending capacity limitation outside greater than electric power system when the district sends electricity outside, electric power system will to abandon wind
Figure BDA00001650791100268
expression formula following because of the network capacity constraint produces:
P n , cut grid = &Sigma; t = 1 24 min { W n h ( t ) , g ( | P n , out h ( t ) | - P sys lim ) &CenterDot; ( | P n , out h ( t ) | - P sys lim ) } - - - ( 41 )
In the formula (41),
Figure BDA000016507911002610
is t element in
Figure BDA000016507911002611
;
Then when the exert oneself wind-powered electricity generation amount of abandoning
Figure BDA000016507911002612
when being 0 of combination of this said n load-wind-powered electricity generation, representing that said n load-wind-powered electricity generation exerts oneself to make up has passed through the network capacity constraint; Exert oneself the wind-powered electricity generation amount of abandoning of combination greater than 0 the time when said n load-wind-powered electricity generation, represent that the combination of exerting oneself of said n load-wind-powered electricity generation passes through network capacity and retrain;
(2-74) judge whether the annual wind-powered electricity generation ability of dissolving is differentiated whole load-wind-powered electricity generations among collection Ω combination calculation of exerting oneself accomplishes,, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the network capacity constraint ratio lambda of dissolving if accomplish Grid, carry out the wind-powered electricity generation ability of dissolving of network delivery ability dimension and differentiate λ GridExpression formula is following:
&lambda; grid = &Sigma; n = 1 N [ 1 - g ( P n , cut grid ) ] N &times; 100 % - - - ( 42 ) ;
Otherwise rotate back into (2-2);
2-8) differentiate collection Ω, carry out with peak modulation capacity, fm capacity, marginal capacity, load-following capacity and network delivery ability be as comprehensive constraint fast, carry out the wind-powered electricity generation integration capability of dissolving and differentiate according to the annual wind-powered electricity generation ability of dissolving:
(2-81) set up power system control parameter row vector
Figure BDA00001650791100273
There are five elements that characterize the power system in identifying the wind power consumptive ability to process considering the constraints; when the element has a value of 1 indicates that discrimination wind power consumptive capacity of the process to consider the corresponding factor constraints; when the element has a value of 0 indicates that discrimination ability of wind power consumptive process does not consider the constraints of the corresponding factors;
Figure BDA00001650791100274
The correspondence between the elements: the first element corresponding peaking capacity, the second element
Figure BDA00001650791100276
corresponds FM capability The third element
Figure BDA00001650791100277
fast spare capacity corresponds to the fourth element corresponding load following capability, the fifth element
Figure BDA00001650791100279
corresponds to the network transmission capacity; when considering all the factors of constraint,
Figure BDA000016507911002710
(2-82) note considers that the wind-powered electricity generation of a plurality of dimension constraints ratio of dissolving is that
Figure BDA000016507911002711
expression formula is following:
&lambda; S sys con = &Sigma; n = 1 N [ &Pi; i = 1 5 h ( S sys con ( i ) &CenterDot; &lambda; i ) ] N &times; 100 % - - - ( 43 )
In the formula (43),
h ( x ) = 1 x = 0 x x &NotEqual; 0
&lambda; 1 = g ( - P n , cut peak ) ;
&lambda; 2 = g ( &Sigma; t = 1 N day - 1 g ( V n m ( t ) - V n , sys m , max ) ) ;
&lambda; 3 = g ( g ( R n , sys s + - R n , sys n + ) ) ;
&lambda; 4 = g ( &Sigma; t = 1 N day - 1 g ( V n h ( t ) - V n , sys h , max ) ) ;
&lambda; 5 = 1 - g ( P n , cut grid )
(2-83) with considering five wind-powered electricity generations under dimensions constraint ratio lambda of dissolving TotalCarry out the wind-powered electricity generation integration capability of dissolving and differentiate λ TotalExpression formula is following:
&lambda; total = &lambda; [ 1,1,1,1,1 ] = &Sigma; n = 1 N ( &Pi; i = 1 5 &lambda; i ) N &times; 100 % - - - ( 44 ) ;
2-9) differentiate collection Ω to the dissolve differentiation of ability of monthly and day degree wind-powered electricity generation according to the annual wind-powered electricity generation ability of dissolving
(2-91) differentiate collection Ω with the monthly wind-powered electricity generation ability of dissolving i, characterize the annual wind-powered electricity generation ability of dissolving and differentiate the load-wind-powered electricity generation that is in the i month among the collection Ω composite set of exerting oneself, i=1,2,3 ..., 12;
(2-92) carry out the dissolve differentiation of ability of monthly wind-powered electricity generation with the wind-powered electricity generation of the i month ratio of dissolving,
Figure BDA00001650791100286
expression formula is following:
&lambda; i S sys con = &Sigma; &Omega; ( n ) &Element; &Omega; i ( &Pi; i = 1 5 h ( S sys con ( i ) &CenterDot; &lambda; i ) ) N ( &Omega; i ) &times; 100 % , i=1,2,...,12 (45)
In the formula (45), N (Ω i) the expression set omega iLoad-wind-powered electricity generation number of combinations of exerting oneself; The annual wind-powered electricity generation of Ω (n) the expression ability of dissolving is differentiated the combination of exerting oneself of n load-wind-powered electricity generation among the collection Ω;
(2-93) differentiate collection Ω with the day degree wind-powered electricity generation ability of dissolving I, j, characterizing the annual wind-powered electricity generation ability of dissolving, to differentiate daily load curve among the collection Ω be load-wind-powered electricity generation of j days i month composite set of exerting oneself, i=1, and 2,3 ..., 12, j=1,2,3 ... N i
(2-94) carry out the dissolve differentiation of ability of day degree wind-powered electricity generation with the wind-powered electricity generation of the i j day month ratio
Figure BDA00001650791100288
of dissolving,
Figure BDA00001650791100289
expression formula is following:
&lambda; i , j S sys con ( i ) = &Sigma; &Omega; ( n ) &Element; &Omega; i , j ( &Pi; i = 1 5 h ( S sys con ( i ) &CenterDot; &lambda; i ) ) N ( &Omega; i , j ) &times; 100 % , i=1,2,..,12(46)。
Technical characterstic of the present invention and beneficial effect:
The various dimensions wind-powered electricity generation that the present invention can carry out peak regulation dimension, frequency modulation dimension, subsequent use dimension, load-following capacity dimension and the network delivery ability dimension ability of dissolving is differentiated, and also can carry out monthlyly differentiating with wind-powered electricity generation day degree the ability of dissolving; Utilizing wind-powered electricity generation of the present invention to dissolve the ability method of discrimination can be to a certain wind-powered electricity generation installation scale; Can obtain the ratio of dissolving in the year under this scale, wind-powered electricity generation monthly and day degree; Annual wind-powered electricity generation installation planning be can instruct, arrange monthly wind-powered electricity generation operation strategy, day degree power system dispatching and controlling schemes optimized; Realization is to the efficient utilization of wind-powered electricity generation, and is significant to planning, operation, scheduling and the control of electric power system.
The present invention has jumped out the constraint of ability method of discrimination in flow scheme design and theoretical method aspect of dissolving of existing electric power system wind-powered electricity generation; Set up a cover based on dissolve ability method of discrimination of the various dimensions wind-powered electricity generation of wind-powered electricity generation operation simulation; Complete electric power system peak modulation capacity, fm capacity, quick marginal capacity, load-following capacity and the network delivery ability taken into account; Utilize the windy electric field operation analogue technique of considering temporal correlation; Science differentiates annual, monthly and the day degree wind-powered electricity generation ability of dissolving, for power system dispatching, operation and control personnel provide one to overlap the dissolve instrument of ability of quick differentiation wind-powered electricity generation.
The present invention can help power system dispatching, operation and control personnel precisely to estimate the admissible wind-powered electricity generation scale of Future Power System from a plurality of dimensions; And then the wind-powered electricity generation of clear and definite Future Power System under the different time yardstick scale of dissolving; Judge following wind-powered electricity generation fast and whether can fully be dissolved, each function links such as the operation of electric power system, scheduling, control are had important practical significance and good prospects for application by electric power system.
Embodiment:
With certain provincial area is that example is set forth the various dimensions wind-powered electricity generation based on the wind-powered electricity generation operation simulation proposed by the invention ability method of discrimination of dissolving.
1), utilize the simulation of windy electric field operation analogue technique to obtain the wind energy turbine set sequential and exert oneself according to surveying wind data:
(1-1) set the wind farm wind velocity parameter value,, preestablish the wind speed basic parameter of wind-powered electricity generation operation simulation according to this area's historical wind speed statistics, as shown in table 1:
(1-2) setting of wind speed correlation between the windy electric field, getting relevant electric power system is 300 with the range attenuation factor M:
Each wind energy turbine set geographic distance between any two is as shown in table 2:
The coefficient correlation of the windy electric field that obtains according to last table is as shown in table 3:
(1-3) the day internal characteristic k of wind speed h, as shown in table 4:
(1-4) the Seasonal Characteristics k of wind speed m, as shown in table 5:
(1-5) utilize wind-powered electricity generation operation analogue technique, simulation obtains the annual wind-powered electricity generation sequential sequence of exerting oneself, and the wind energy turbine set operation of getting a certain day simulates force curve, and is as shown in Figure 1:
2) the wind energy turbine set sequential that obtains according to simulation is exerted oneself and with peak modulation capacity, fm capacity, load-following capacity, marginal capacity and network delivery ability are differentiated the wind-powered electricity generation ability of dissolving as various dimensions constraints fast, is specifically comprised:
2-1) generate the annual wind-powered electricity generation ability of dissolving and differentiate collection Ω:
(2-11) with in monthly, 1 being divided into Unit 12 (unit corresponding month), there is N i unit iThe bar daily load curve (i=1,2 ..., 12);
Then,
N 1=31,N 2=28,N 3=31,
N 4=30,N 5=31,N 6=30,
N 7=31,N 8=31,N 9=30,
N 10=31,N 11=30,N 12=31
The wind energy turbine set sequential that (2-12) obtains according to simulation is exerted oneself, and presses the unit and sets up " wind-powered electricity generation power curve storehouse in a few days ", establishes " wind-powered electricity generation power curve storehouse in a few days " total N of i unit Ij(i=1,2 ..., 12) bar wind-powered electricity generation power curve in a few days;
(2-13) power curve of wind-powered electricity generation in a few days in " the wind-powered electricity generation power curve storehouse in a few days " of daily load curve in each unit and corresponding unit is done combination; Then 1 year total
Figure BDA00001650791100301
individual load-wind-powered electricity generation combination of exerting oneself, these combinations are formed the annual wind-powered electricity generation ability of dissolving and are differentiated and collect Ω;
(2-14) the annual wind-powered electricity generation ability of dissolving is differentiated among the collection Ω, establish n load-wind-powered electricity generation exert oneself make up by the k bar in " the wind-powered electricity generation power curve storehouse in a few days " of the j bar load curve of i unit and i unit in a few days the wind-powered electricity generation power curve form i=1 wherein, 2; ..., 12, j=1; 2 ..., N i, k=1,2 ..., N Ij:
The electric power system hour level wind-powered electricity generation that obtains of the simulation sequence of exerting oneself is designated as column vector
Figure BDA00001650791100302
The electric power system hour stage load sequence that prediction obtains is designated as column vector
Figure BDA00001650791100303
Then an electric power system hour level equivalent load sequence is column vector
Figure BDA00001650791100304
D n h = L n h - W n h - - - ( 1 )
Equivalent load hour level change sequence is designated as
Figure BDA00001650791100306
V n h ( t ) = D n h ( t + 1 ) - D n h ( t ) t=1,2,...,N h-1 (2)
In the formula (15),
Figure BDA00001650791100308
Expression
Figure BDA00001650791100309
In t element;
Figure BDA000016507911003010
Expression
Figure BDA000016507911003011
In t element; N hRepresent hourage in a few days;
The electric power system minute level wind-powered electricity generation that obtains of the simulation sequence of exerting oneself is designated as column vector
Figure BDA000016507911003012
The electric power system minute stage load sequence that prediction obtains is designated as column vector
Figure BDA000016507911003013
Then an electric power system minute level equivalent load sequence is
Figure BDA000016507911003014
D n m = L n m - W n m - - - ( 3 )
Equivalent load minute level change sequence is designated as
V n m ( t ) = D n m ( t + 1 ) - D n m ( t ) t=1,2,...,N m-1 (4)
In the formula (17),
Figure BDA00001650791100314
Expression
Figure BDA00001650791100315
In t element;
Figure BDA00001650791100316
Expression
Figure BDA00001650791100317
In t element; N mRepresent the number of minutes in a few days;
2-2) confirm unit assembled state in a few days:
If unit adds up to N Unit, the annual wind-powered electricity generation ability of dissolving differentiate n load-wind-powered electricity generation among the collection Ω exert oneself make up in (n=1,2 ..., the open state variable of i platform unit N) is designated as u Ni(i=1,2 ..., N Unit), suppose that unit does not in a few days allow start and stop, works as u N, iRepresent this unit whole day shutdown at=0 o'clock, work as u N, iRepresented this unit whole day start at=1 o'clock; In a few days whether each unit is started shooting and is confirmed as follows: start shooting successively by the machine set type; Power-up sequence is district's external power, nuclear power, thermoelectricity, water power and pumped storage, thermoelectricity, combustion machine; Unit of the same type is by the descending start of unit capacity; Up to satisfying electric power system equivalent load demand, finally obtain electric power system unit assembled state in a few days;
2-3) differentiate collection Ω according to the annual wind-powered electricity generation ability of dissolving, carry out the wind-powered electricity generation ability of dissolving of peak regulation dimension and differentiate, when wind-powered electricity generation installation scale was 11561MW, the wind-powered electricity generation ratio of dissolving of peak regulation dimension was 96.8%;
2-4) differentiate collection Ω according to the annual wind-powered electricity generation ability of dissolving, carry out the wind-powered electricity generation ability of dissolving of frequency modulation dimension and differentiate, when wind-powered electricity generation installation scale was 11561MW, the wind-powered electricity generation ratio of dissolving of frequency modulation dimension was 100%;
2-5) differentiate collection Ω according to the annual wind-powered electricity generation ability of dissolving, carry out the wind-powered electricity generation ability of dissolving of subsequent use dimension and differentiate, when wind-powered electricity generation installation scale was 11561MW, the wind-powered electricity generation ratio of dissolving of subsequent use dimension was 100%;
2-6) differentiate collection Ω according to the annual wind-powered electricity generation ability of dissolving, carry out the wind-powered electricity generation ability of dissolving of load-following capacity dimension and differentiate, when wind-powered electricity generation installation scale was 11561MW, the wind-powered electricity generation ratio of dissolving of load-following capacity dimension was 100%;
2-7) differentiate collection Ω according to the annual wind-powered electricity generation ability of dissolving, carry out the wind-powered electricity generation ability of dissolving of network delivery ability dimension and differentiate, when wind-powered electricity generation installation scale was 11561MW, the wind-powered electricity generation ratio of dissolving of load-following capacity dimension was 99.6%;
2-8) differentiate collection Ω, carry out with peak modulation capacity, fm capacity, marginal capacity, load-following capacity and network delivery ability be as the wind-powered electricity generation of the comprehensive end ability method of discrimination of dissolving fast according to the annual wind-powered electricity generation ability of dissolving:
(2-81) note consider the wind-powered electricity generation of a plurality of dimensions constraints dissolve ratio for
Figure BDA00001650791100318
when simultaneously with peak regulation and network delivery ability when retraining; When wind-powered electricity generation installation scale was 11561MW, the wind-powered electricity generation ratio of dissolving was 96.5%;
(2-83) note considers that five wind-powered electricity generation ratios of dissolving under the dimension constraint are λ Total, when simultaneously with peak modulation capacity, fm capacity, when marginal capacity, load-following capacity and network delivery ability are as constraint fast, when wind-powered electricity generation installation scale was 11561MW, the wind-powered electricity generation ratio of dissolving was 96.5%;
2-9) monthly and the day degree wind-powered electricity generation ability method of discrimination of dissolving
(2-91) the monthly wind-powered electricity generation ability of dissolving is differentiated collection Ω i, characterize the annual wind-powered electricity generation ability of dissolving and differentiate the load-wind-powered electricity generation that is in the i month among the collection Ω composite set of exerting oneself, i=1,2,3 ..., 12;
(2-92) wind-powered electricity generation of the i month ratio
Figure BDA00001650791100321
of dissolving is an example with July; When simultaneously with peak modulation capacity, fm capacity, when marginal capacity, load-following capacity and network delivery ability are as constraint fast; When wind-powered electricity generation installation scale was 11561MW, the wind-powered electricity generation ratio of dissolving in July was 96.9%;
(2-93) the day degree wind-powered electricity generation of the i j day month ratio of dissolving was an example with July 1; When simultaneously with peak modulation capacity, fm capacity, when marginal capacity, load-following capacity and network delivery ability are as constraint fast; When wind-powered electricity generation installation scale was 11561MW, the wind-powered electricity generation ratio of dissolving on July 1 was 97.1%;
To a certain wind-powered electricity generation installation scale; Can obtain the ratio of dissolving in the year under this scale, wind-powered electricity generation monthly and day degree; Annual wind-powered electricity generation installation planning be can instruct, arrange monthly wind-powered electricity generation operation strategy, day degree power system dispatching and controlling schemes optimized; Realization is to the efficient utilization of wind-powered electricity generation, and is significant to planning, operation, scheduling and the control of electric power system.
Table 1
Figure BDA00001650791100323
Table 2
Figure BDA00001650791100324
Table 3
Figure BDA00001650791100341
Table 4
Figure BDA00001650791100342
Figure BDA00001650791100351
Table 5
Figure BDA00001650791100352
Above-described specific embodiment is merely explanation realization effect of the present invention, not in order to restriction the present invention.Modification, conversion and the improvement of any unsubstantiality of being done within all basic ideas and frameworks in method proposed by the invention all should be included within protection scope of the present invention.

Claims (1)

1. the various dimensions wind-powered electricity generation based on wind-powered electricity generation operation simulation ability method of discrimination of dissolving is characterized in that, comprising: 1) according to surveying wind data, utilize windy electric field operation analogue technique simulation wind energy turbine set sequential to exert oneself; 2) according to simulation wind energy turbine set sequential exert oneself, the annual wind-powered electricity generation ability of dissolving is differentiated collection and peak modulation capacity, fm capacity, load-following capacity, marginal capacity and network delivery ability are carried out various dimensions to the wind-powered electricity generation ability of dissolving and differentiated as constraints fast;
1) according to surveying wind data, utilize windy electric field operation analogue technique simulation wind energy turbine set sequential to exert oneself, specifically may further comprise the steps:
1-1) obtain scale parameter c and the form parameter k that Weibull distributes according to surveying the wind data match:
(1-11) two-parameter Weibull distribution function F W (c, k)(x) expression formula is following:
F W ( c , k ) ( x ) = 1 - exp [ - ( x c ) k ] , x∈[0,+∞) (1)
In the formula (1), x is a wind speed;
(1-12) the probability density function f of two-parameter Weibull distribution W (c, k)(x) as follows:
f W ( c , k ) ( x ) = k c ( x c ) k - 1 exp [ - ( x c ) k ] - - - ( 2 )
(1-13) expression formula of mean wind speed
Figure FDA00001650791000013
is following:
x &OverBar; = c&Gamma; ( 1 + 1 / k ) - - - ( 3 )
(1-14) try to achieve form parameter k by the wind speed standard deviation sigma, expression formula is following:
&sigma; x &OverBar; = [ &Gamma; ( 1 + 2 k ) / &Gamma; 2 ( 1 + 1 k ) ] - 1 - - - ( 4 )
Wherein, mean wind speed
Figure FDA00001650791000016
is directly proportional with Weibull distribution mesoscale parameter c; Γ is a gamma function:
&Gamma; ( a ) = &Integral; 0 + &infin; y a - 1 e - y dy ) ;
1-2) the temporal correlation of wind speed setting: according to surveying the temporal correlation characteristic quantity θ that the wind data match obtains wind speed, the auto-correlation function of wind speed is represented by negative exponential function that numerically expression formula is following:
ρ(k)=e -θk,θ>0,k=1,2,3... (5)
In the formula (5), the speed of the size of θ decision auto-correlation function decay, the severe of sign fluctuations in wind speed;
1-3) the spatial coherence of wind speed setting: there are the negative exponent relation in coefficient correlation between the windy field gas velocity and the geographic distance between the wind energy turbine set, and expression formula is following:
c = e - d M - - - ( 6 )
In the formula (6), c is the wind speed coefficient correlation; D is a geographic distance between the two wind-powered electricity generation sections; M is that the wind speed coefficient correlation is with the range attenuation factor;
Be that base value obtains each monthly average wind series k 1-4) with annual wind speed mean value m, k mIn element expression following:
k mi = v mi v &OverBar; y , i=1,2,3,...,12 (7)
In the formula (7), k MiBe k mIn i element; v MiMean wind speed for the i month in year;
Figure FDA00001650791000023
Be the average of the whole year wind speed;
Be that base value obtains each moment mean wind speed sequence k in a few days 1-5) with whole day wind speed mean value h, k hIn element expression following:
k hj = v hj v &OverBar; d , j=1,2,3,...,N day (8)
In the formula (8), k HjBe k hIn j element; v HjBe the mean wind speed of j period in a few days;
Figure FDA00001650791000025
Be the whole day mean wind speed; N DayBe period sum in a few days;
1-6) utilize windy electric field operation analogue technique to carry out wind speed simulation:
(1-61) single wind farm wind velocity simulation:
If meeting the Weibull that is respectively c and k suc as formula the scale parameter shown in (1) and the formula (2) and form parameter, wind speed distributes; Mean wind speed
Figure FDA00001650791000026
is suc as formula shown in (3), then:
v ( x ) = 2 &theta; f ( x ) &Integral; l x ( x &OverBar; - y ) f ( y ) dy
= 2 &theta; f ( x ) ( x &OverBar; F ( x ) - &Integral; l x yf ( y ) dy ) - - - ( 9 )
= 2 &theta; f ( x ) ( c&Gamma; ( 1 k + 1 ) ( 1 - exp [ - ( x c ) k ] ) - c&Gamma; ( ( x c ) k , 1 k + 1 ) )
According to formula (9), single wind energy turbine set sequential wind speed can be generated by the following formula iterative computation:
v ^ it * = v ^ it - 1 * + d X t - - - ( 10 )
(1-62) windy field gas velocity simulation:
At first generate the relevant Brownian movement W of multidimensional t, W tEach dimension is the standard Brownian movement, and correlation matrix equals the wind farm wind velocity correlation matrix between each dimension; Afterwards, utilize W tEach ties up component each wind farm wind velocity sequence of (1-61) middle method generation set by step;
(1-63) correction of wind energy turbine set simulation wind speed
According to 1-4) and 1-5), the wind series
Figure FDA00001650791000031
that generates is at random revised:
v it * = k mi k hj v ^ it * , i=1,2,...,12,j=1,2,...,m (11)
(1-64) obtain wind energy turbine set and simulate the sequence of exerting oneself
If C i(x) be wind-powered electricity generation unit output characteristic curve, expression formula is following:
C i ( v ) = 0 , 0 &le; v < v in , v > v out v 3 - v in 3 v rated 3 - v in 3 R , v in &le; v &le; v rated R , v rated &le; v &le; v out - - - ( 12 )
In the formula (12), v In, v RatedWith v OutBe respectively incision wind speed, rated wind speed and the cut-out wind speed of wind-powered electricity generation unit;
Utilize correction back wind series wind energy turbine set sequential power curve to generate by following formula:
P it = n it ( 1 - &eta; i ) C i ( v it * ) - - - ( 13 )
In the formula (13), P ItBe exerting oneself of i the wind energy turbine set t moment; η iBe i wind energy turbine set wake effect coefficient; n ItBe that i wind energy turbine set can be used unit platform number;
2) ability that the wind energy turbine set sequential that obtains according to simulation is exerted oneself, annual wind-powered electricity generation is dissolved differentiation collection and peak modulation capacity, fm capacity, load-following capacity, quick marginal capacity and network delivery ability are as constraints; The wind-powered electricity generation ability of dissolving is carried out various dimensions differentiates, specifically comprise:
2-1) generate the annual wind-powered electricity generation ability of dissolving and differentiate collection Ω:
(2-11) with in monthly, 1 being divided into Unit 12, corresponding one month of unit, there is N i unit iThe bar daily load curve, i=1,2 ..., 12;
The wind energy turbine set sequential that (2-12) obtains according to simulation is exerted oneself, and presses the unit and sets up " wind-powered electricity generation power curve storehouse in a few days ", establishes " wind-powered electricity generation power curve storehouse in a few days " total N of i unit IjBar is the wind-powered electricity generation power curve in a few days, i=1, and 2 ..., 12;
(2-13) power curve of wind-powered electricity generation in a few days in " the wind-powered electricity generation power curve storehouse in a few days " of daily load curve in each unit and corresponding unit is done combination; Then 1 year total
Figure FDA00001650791000041
individual load-wind-powered electricity generation combination of exerting oneself, these the load-wind-powered electricity generations combination of exerting oneself is formed the annual wind-powered electricity generation ability of dissolving and is differentiated and collect Ω;
(2-14) the annual wind-powered electricity generation ability of dissolving is differentiated among the collection Ω, establish n load-wind-powered electricity generation exert oneself make up by the k bar in " the wind-powered electricity generation power curve storehouse in a few days " of the j bar load curve of i unit and i unit in a few days the wind-powered electricity generation power curve form i=1 wherein, 2; ..., 12, j=1; 2 .., N i, k=1,2 ..., N Ij:
The electric power system hour level wind-powered electricity generation that obtains of the simulation sequence of exerting oneself is designated as column vector
Figure FDA00001650791000042
The electric power system hour stage load sequence that prediction obtains is designated as column vector
Figure FDA00001650791000043
Then an electric power system hour level equivalent load sequence is column vector
Figure FDA00001650791000044
D n h = L n h - W n h - - - ( 14 )
Equivalent load hour level change sequence is designated as
Figure FDA00001650791000046
V n h ( t ) = D n h ( t + 1 ) - D n h ( t ) t=1,2,...,N h-1 (15)
In the formula (15),
Figure FDA00001650791000048
Expression
Figure FDA00001650791000049
In t element; Expression In t element; N hRepresent hourage in a few days;
The electric power system minute level wind-powered electricity generation that obtains of the simulation sequence of exerting oneself is designated as column vector
Figure FDA000016507910000412
The electric power system minute stage load sequence that prediction obtains is designated as column vector
Figure FDA000016507910000413
Then an electric power system minute level equivalent load sequence is
D n m = L n m - W n m - - - ( 16 )
Equivalent load minute level change sequence is designated as
Figure FDA000016507910000416
V n m ( t ) = D n m ( t + 1 ) - D n m ( t ) t=1,2,...,N m-1 (17)
In the formula (17), Expression
Figure FDA000016507910000419
In t element;
Figure FDA000016507910000420
Expression In t element; N mRepresent the number of minutes in a few days;
2-2) confirm unit assembled state in a few days:
If unit adds up to N Unit, the annual wind-powered electricity generation ability of dissolving differentiate n load-wind-powered electricity generation among the collection Ω exert oneself make up in (n=1,2 ..., the open state variable of i platform unit N) is designated as u N, i(i=1,2 ..., N Unit), suppose that unit does not in a few days allow start and stop, works as u N, iRepresent this unit whole day shutdown at=0 o'clock, work as u N, iRepresented this unit whole day start at=1 o'clock; In a few days whether each unit is started shooting and is confirmed as follows: start shooting successively by the machine set type; Power-up sequence is district's external power, nuclear power, thermoelectricity, water power and pumped storage, thermoelectricity, combustion machine; Unit of the same type is by the descending start of unit capacity; Up to satisfying electric power system equivalent load demand, finally obtain electric power system unit assembled state in a few days;
2-3) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of peak regulation dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-31) It is the EIAJ of i unit;
Figure FDA00001650791000052
The minimum that is i unit is exerted oneself; I the minimum power factor of unit is designated as λ i(i=1,2 ..., N Unit), expression formula is following:
&lambda; i = P i max - P i min C i , i=1,2,...,N unit (18)
In the formula (18), C iThe capacity of representing i unit;
(2-32) confirm said n load-wind-powered electricity generation exert oneself the combination the adjustable minimum output of electric power system
Figure FDA00001650791000054
expression formula following:
P n , sys min = &Sigma; i = 1 N unit u n , i ( P i max - &lambda; i C i ) - - - ( 19 )
(2-33) confirm the exert oneself wind-powered electricity generation amount of in a few days abandoning (abandon wind and be compelled the subtracting of blower fan and exert oneself or shut down, abandon the wind-powered electricity generation amount for because the compelled loss value that subtracting the wind-powered electricity generation the sent out electric weight that caused of exerting oneself or shut down of blower fan)
Figure FDA00001650791000056
of combination of said n load-wind-powered electricity generation
P n , cut peak = &Sigma; t = 1 N h min { W n h ( t ) , g ( P n , sys min - D n h ( t ) ) } - - - ( 20 )
In the formula (20),
Figure FDA00001650791000058
is said n load-wind-powered electricity generation the exert oneself wind-powered electricity generation value of exerting oneself in t moment in the sequence of the wind-powered electricity generation in a few days that makes up of exerting oneself;
Figure FDA00001650791000059
is the exert oneself equivalent load value in t moment in the equivalent load sequence that makes up of said n load-wind-powered electricity generation; G (x) is a function of state, and expression formula is following:
g ( x ) = 0 , x < = 0 1 , x > 0 - - - ( 21 )
Then; As when equaling 0, represent that the combination of exerting oneself of said n load-wind-powered electricity generation passed through the peak modulation capacity constraint; Greater than 0 the time, represent that said n load-wind-powered electricity generation exert oneself combination through the peak modulation capacity constraint as
Figure FDA00001650791000061
;
(2-34) if differentiating whole load-wind-powered electricity generations among the collection Ω in ability that annual wind-powered electricity generation is dissolved exerts oneself after combination calculation accomplishes, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the peak modulation capacity constraint ratio lambda of dissolving Peak, carry out the wind-powered electricity generation ability of dissolving of frequency modulation dimension and differentiate λ PeakExpression formula is following:
&lambda; peak = &Sigma; n = 1 N g ( - P n , cut peak ) N &times; 100 % - - - ( 22 ) ;
Otherwise rotate back into (2-2);
2-4) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of frequency modulation dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-41) minute level of the i platform unit adjustment factor
Figure FDA00001650791000063
of exerting oneself
&upsi; i m = &Delta; &upsi; i m , max C i , i=1,2,...,N unit (23)
In the formula (23),
Figure FDA00001650791000065
is meant that minute level maximum adjustable of i platform unit exerts oneself;
(2-42) confirm that the annual wind-powered electricity generation ability of dissolving differentiates among the collection Ω n the load-wind-powered electricity generation adjustable EIAJ in the electric power system of making up 1 minute of exerting oneself, it is following to be designated as
Figure FDA00001650791000066
expression formula:
V n , sys m , max = &Sigma; i = 1 N unit u n , i &upsi; i m C i - - - ( 24 )
(2-43) followed by days of time comparing
Figure FDA00001650791000068
and
Figure FDA00001650791000069
As
Figure FDA000016507910000610
greater than 0 the time; In a few days there are indivedual fm capacity constraints of constantly running counter in expression, and said n load-wind-powered electricity generation exerted oneself combination not through the fm capacity constraint; As
Figure FDA000016507910000611
when equaling 0; In a few days all satisfy the fm capacity constraint constantly in expression, and said n load-wind-powered electricity generation exerted oneself to make up and passed through the fm capacity constraint;
(2-44) judge whether the annual wind-powered electricity generation in the 1 year ability of dissolving is differentiated whole load-wind-powered electricity generations among collection Ω combination calculation of exerting oneself accomplishes,, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the fm capacity constraint ratio lambda of dissolving if accomplish Freq, carry out the wind-powered electricity generation ability of dissolving of frequency modulation dimension and differentiate λ FreqExpression formula is following:
&lambda; freq = &Sigma; n = 1 N g ( &Sigma; t = 1 N m - 1 g ( V n m ( t ) - V n , sys m , max ) ) N &times; 100 % - - - ( 25 ) ;
Otherwise rotate back into (2-2);
2-5) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of subsequent use dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-51) define the power system load, the regular maintenance and emergency reserve reserve ratio
Figure FDA00001650791000072
and the negative reserve ratio
Figure FDA00001650791000073
expression is as follows:
&gamma; sys + = R n , sys + L n h , max &times; 100 % - - - ( 26 )
&gamma; sys - = R n , sys - L n h , max &times; 100 % - - - ( 27 )
In formula (26) and the formula (27),
Figure FDA00001650791000076
expression day peak load;
Figure FDA00001650791000077
representes power system load, maintenance and the positive stand-by requirement capacity of accident;
Figure FDA00001650791000078
expression power system load, maintenance and the negative stand-by requirement capacity of accident;
(2-52) define the power system wind power output is alternate rate and the negative reserve ratio
Figure FDA000016507910000710
expression is as follows:
&gamma; wind + = R n , wind + W n h , 1 max &times; 100 % - - - ( 28 )
&gamma; wind - = R n , wind - W n h , 1 max &times; 100 % - - - ( 29 )
In formula (28) and the formula (29), the wind-powered electricity generation of
Figure FDA000016507910000713
expression peak load period is exerted oneself;
Figure FDA000016507910000714
expression electric power system wind-powered electricity generation positive stand-by requirement capacity of exerting oneself;
Figure FDA000016507910000715
expression electric power system wind-powered electricity generation is exerted oneself and is born the stand-by requirement capacity;
(2-53) determine the annual capacity of wind power consumptive determine the set Ω in the n-th load - a combination of wind power output of the power system is spare capacity requirements
Figure FDA000016507910000716
and the negative demand spare capacity
Figure FDA000016507910000717
expression is as follows:
R n , sys n + = &gamma; sys + &CenterDot; L n h , max + &gamma; wind + &CenterDot; W n h , 1 max - - - ( 30 )
R n , sys n - = &gamma; sys - &CenterDot; L n h , max + &gamma; wind - &CenterDot; W n h , 1 max - - - ( 31 )
(2-54) i-units are fast alternate adjustment coefficient
Figure FDA000016507910000720
and the negative adjustment coefficient
Figure FDA000016507910000721
expression is as follows:
&alpha; i + = &Delta; R i + C i - - - ( 32 )
&alpha; i - = &Delta; R i - C i - - - ( 33 )
In formula (32) and the formula (33),
Figure FDA00001650791000083
is respectively i platform unit available positive reserve capacity and negative reserve capacity under open state;
(2-55) of the n-th load - combinations of wind power output of the power system is available spare capacity
Figure FDA00001650791000084
and the negative spare capacity available expression is as follows:
R n , sys s + = &Sigma; i = 1 N unit ( 1 - u n , i ) &alpha; i + C i - - - ( 34 )
R n , sys s - = &Sigma; i = 1 N unit ( 1 - u n , i ) &alpha; i - C i - - - ( 35 )
(2-56) compare
Figure FDA00001650791000088
and
Figure FDA00001650791000089
and
Figure FDA000016507910000810
As greater than
Figure FDA000016507910000812
or
Figure FDA000016507910000813
during greater than
Figure FDA000016507910000814
; Expression electric power system marginal capacity is not enough, and said n load-wind-powered electricity generation exerted oneself combination not through the marginal capacity constraint; When being not more than or
Figure FDA000016507910000817
as
Figure FDA000016507910000815
and being not more than
Figure FDA000016507910000818
; Expression electric power system marginal capacity is abundant, and said n load-wind-powered electricity generation exerted oneself to make up and passed through the marginal capacity constraint;
(2-57) judge whether the annual wind-powered electricity generation ability of dissolving is differentiated whole load-wind-powered electricity generations among collection Ω combination calculation of exerting oneself accomplishes,, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the marginal capacity constraint ratio lambda of dissolving if accomplish Rese, carry out the wind-powered electricity generation ability of dissolving of subsequent use dimension and differentiate λ ReseExpression formula is following:
&lambda; rese = &Sigma; n = 1 N g ( g ( R n , sys s + - R n , sys n + ) &CenterDot; g ( R n , sys s - - R n , sys n - ) ) N &times; 100 % - - - ( 36 ) ;
Otherwise rotate back into step (2-2);
2-6) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of load-following capacity dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-61) hour level of the i platform unit adjustment factor of exerting oneself
&upsi; i h = &Delta; &upsi; i h , max C i , i=1,2,...,N unit (37)
In the formula (37),
Figure FDA00001650791000092
is meant that hour level maximum adjustable of i platform unit exerts oneself;
(2-62) confirm that the annual wind-powered electricity generation ability of dissolving differentiates among the collection Ω n the load-wind-powered electricity generation adjustable EIAJ in the electric power system of making up 1 hour of exerting oneself, it is following to be designated as expression formula:
V m , sys h , max = &Sigma; i = 1 N unit u n , i &upsi; i h C i - - - ( 38 )
(2-63) confirm that can the exert oneself load-following capacity constraint of combination of said n load-wind-powered electricity generation pass through, by in a few days constantly comparing successively and
Figure FDA00001650791000096
As
Figure FDA00001650791000097
greater than 0 the time; In a few days there are indivedual load-following capacity constraints of constantly running counter in expression, and said n load-wind-powered electricity generation exerted oneself combination not through the load-following capacity constraint; As
Figure FDA00001650791000098
when equaling 0; In a few days all satisfy the load-following capacity constraint constantly in expression, and said n load-wind-powered electricity generation exerted oneself to make up and passed through the load-following capacity constraint;
(2-64) judge whether the annual wind-powered electricity generation ability of dissolving is differentiated whole load-wind-powered electricity generations among collection Ω combination calculation of exerting oneself accomplishes,, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the load-following capacity constraint ratio lambda of dissolving if accomplish Foll, carry out the wind-powered electricity generation ability of dissolving of load-following capacity dimension and differentiate λ FollExpression formula is following:
&lambda; foll = &Sigma; n = 1 N g ( &Sigma; t = 1 N day - 1 g ( V n h ( t ) - V n , sys h , max ) ) N &times; 100 % - - - ( 39 ) ;
Otherwise rotate back into (2-2);
2-7) differentiate collection Ω, carry out the wind-powered electricity generation ability of dissolving of network delivery ability dimension and differentiate, specifically comprise according to the annual wind-powered electricity generation ability of dissolving:
(2-71) when the electric power system node existed the district to send the electricity plan outside, the note district sent an electricity hour level outside and exerts oneself sequence for
Figure FDA000016507910000910
(2-72) set of k lines of contact line transmission capacity limit is
Figure FDA000016507910000911
the outgoing power system capacity limit of
Figure FDA000016507910000912
expression is as follows:
P sys lim = &Sigma; k = 1 N line P k lim - - - ( 40 )
In the formula (40), N LineExpression electric power system interconnection sum;
(2-73) differentiate the combination of exerting oneself of n load-wind-powered electricity generation among the collection Ω to the annual wind-powered electricity generation ability of dissolving; Exert oneself when sending capacity limitation outside greater than electric power system when the district sends electricity outside, electric power system will to abandon wind
Figure FDA00001650791000101
expression formula following because of the network capacity constraint produces:
P n , cut grid = &Sigma; t = 1 24 min { W n h ( t ) , g ( | P n , out h ( t ) | - P sys lim ) &CenterDot; ( | P n , out h ( t ) | - P sys lim ) } - - - ( 41 )
In the formula (41),
Figure FDA00001650791000103
is t element in
Figure FDA00001650791000104
;
Then when the exert oneself wind-powered electricity generation amount of abandoning
Figure FDA00001650791000105
when being 0 of combination of this said n load-wind-powered electricity generation, representing that said n load-wind-powered electricity generation exerts oneself to make up has passed through the network capacity constraint; Exert oneself the wind-powered electricity generation amount of abandoning
Figure FDA00001650791000106
of combination greater than 0 the time when said n load-wind-powered electricity generation, represent that the combination of exerting oneself of said n load-wind-powered electricity generation passes through network capacity and retrain;
(2-74) judge whether the annual wind-powered electricity generation ability of dissolving is differentiated whole load-wind-powered electricity generations among collection Ω combination calculation of exerting oneself accomplishes,, obtain the wind-powered electricity generation of this wind-powered electricity generation installation scale under the network capacity constraint ratio lambda of dissolving if accomplish Grid, carry out the wind-powered electricity generation ability of dissolving of network delivery ability dimension and differentiate λ GridExpression formula is following:
&lambda; grid = &Sigma; n = 1 N [ 1 - g ( P n , cut grid ) ] N &times; 100 % - - - ( 42 ) ;
Otherwise rotate back into (2-2);
2-8) differentiate collection Ω, carry out with peak modulation capacity, fm capacity, marginal capacity, load-following capacity and network delivery ability be as comprehensive constraint fast, carry out the wind-powered electricity generation integration capability of dissolving and differentiate according to the annual wind-powered electricity generation ability of dissolving:
(2-81) set up power system control parameter row vector
Figure FDA00001650791000108
There are five elements that characterize the power system in identifying the wind power consumptive ability to process considering the constraints; when the element has a value of 1 indicates that discrimination wind power consumptive Factors considered during the corresponding capacity constraints; when the element has a value of 0 indicates that determine the ability of wind power consumptive process without considering the constraints of the corresponding factors;
Figure FDA00001650791000109
The correspondence between the elements: the first element corresponding peaking capacity, the second element
Figure FDA000016507910001011
corresponding FM capabilities, the third element fast spare capacity corresponds to the fourth element
Figure FDA000016507910001013
corresponding load following capability, the first five elements
Figure FDA000016507910001014
corresponds to the network transmission capacity; when considering all the factors of constraint,
Figure FDA000016507910001015
(2-82) note considers that the wind-powered electricity generation of a plurality of dimension constraints ratio of dissolving is that
Figure FDA000016507910001016
expression formula is following:
&lambda; S sys con = &Sigma; n = 1 N [ &Pi; i = 1 5 h ( S sys con ( i ) &CenterDot; &lambda; i ) ] N &times; 100 % - - - ( 43 )
In the formula (43),
h ( x ) = 1 x = 0 x x &NotEqual; 0
&lambda; 1 = g ( - P n , cut peak ) ;
&lambda; 2 = g ( &Sigma; t = 1 N day - 1 g ( V n m ( t ) - V n , sys m , max ) ) ;
&lambda; 3 = g ( g ( R n , sys s + - R n , sys n + ) ) ;
&lambda; 4 = g ( &Sigma; t = 1 N day - 1 g ( V n h ( t ) - V n , sys h , max ) ) ;
&lambda; 5 = 1 - g ( P n , cut grid )
(2-83) with considering five wind-powered electricity generations under dimensions constraint ratio lambda of dissolving TotalCarry out the wind-powered electricity generation integration capability of dissolving and differentiate λ TotalExpression formula is following:
&lambda; total = &lambda; [ 1,1,1,1,1 ] = &Sigma; n = 1 N ( &Pi; i = 1 5 &lambda; i ) N &times; 100 % - - - ( 44 ) ;
2-9) differentiate collection Ω to the dissolve differentiation of ability of monthly and day degree wind-powered electricity generation according to the annual wind-powered electricity generation ability of dissolving
(2-91) differentiate collection Ω with the monthly wind-powered electricity generation ability of dissolving i, characterize the annual wind-powered electricity generation ability of dissolving and differentiate the load-wind-powered electricity generation that is in the i month among the collection Ω composite set of exerting oneself, i=1,2,3 ..., 12;
(2-92) carry out the dissolve differentiation of ability of monthly wind-powered electricity generation with the wind-powered electricity generation of the i month ratio
Figure FDA00001650791000119
of dissolving,
Figure FDA000016507910001110
expression formula is following:
&lambda; i S sys con = &Sigma; &Omega; ( n ) &Element; &Omega; i ( &Pi; i = 1 5 h ( S sys con ( i ) &CenterDot; &lambda; i ) ) N ( &Omega; i ) &times; 100 % , i=1,2,..,12(45)
In the formula (45), N (Ω i) the expression set omega iLoad-wind-powered electricity generation number of combinations of exerting oneself; The annual wind-powered electricity generation of Ω (n) the expression ability of dissolving is differentiated the combination of exerting oneself of n load-wind-powered electricity generation among the collection Ω;
(2-93) differentiate collection Ω with the day degree wind-powered electricity generation ability of dissolving I, j, characterizing the annual wind-powered electricity generation ability of dissolving, to differentiate daily load curve among the collection Ω be load-wind-powered electricity generation of j days i month composite set of exerting oneself, i=1, and 2,3 ..., 12, j=1,2,3 ... N i
(2-94) carry out the dissolve differentiation of ability of day degree wind-powered electricity generation with the wind-powered electricity generation of the i j day month ratio
Figure FDA00001650791000121
of dissolving, expression formula is following:
&lambda; i , j S sys con ( i ) = &Sigma; &Omega; ( n ) &Element; &Omega; i , j ( &Pi; i = 1 5 h ( S sys con ( i ) &CenterDot; &lambda; i ) ) N ( &Omega; i , j ) &times; 100 % , i=1,2,...,12(46)。
CN201210154906.XA 2012-05-17 2012-05-17 Method for discriminating wind power digestion capability from multiple dimensions based on wind power operation simulation Active CN102780219B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201210154906.XA CN102780219B (en) 2012-05-17 2012-05-17 Method for discriminating wind power digestion capability from multiple dimensions based on wind power operation simulation
HK13105713.0A HK1177990A1 (en) 2012-05-17 2013-05-14 Method for determining efficiency from converting wind power to electricity and incorporating electricity into grid based on wind power operation simulation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210154906.XA CN102780219B (en) 2012-05-17 2012-05-17 Method for discriminating wind power digestion capability from multiple dimensions based on wind power operation simulation

Publications (2)

Publication Number Publication Date
CN102780219A true CN102780219A (en) 2012-11-14
CN102780219B CN102780219B (en) 2014-01-29

Family

ID=47125028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210154906.XA Active CN102780219B (en) 2012-05-17 2012-05-17 Method for discriminating wind power digestion capability from multiple dimensions based on wind power operation simulation

Country Status (2)

Country Link
CN (1) CN102780219B (en)
HK (1) HK1177990A1 (en)

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102968747A (en) * 2012-11-29 2013-03-13 武汉华中电力电网技术有限公司 Method for determining typical sunrise force curves of wind power station
CN103268416A (en) * 2013-05-20 2013-08-28 华北电力大学(保定) Wind speed prediction method based on STCP-BP
CN103675355A (en) * 2013-11-19 2014-03-26 中国大唐集团科学技术研究院有限公司 Anemometer monitoring method and system
CN103675516A (en) * 2013-09-25 2014-03-26 中国海洋石油总公司 Simulated verification device and method for output characteristic of new energy set
CN103927592A (en) * 2014-04-09 2014-07-16 中国水利水电科学研究院 Optimization method for operation mode of hydroelectric generating set
CN104037803A (en) * 2014-06-09 2014-09-10 东北电力大学 Sequential electricity quantity counting and analyzing method for regional wind farm group
CN104092241A (en) * 2014-07-14 2014-10-08 国家电网公司 Wind power consumption ability analysis method considering standby requirement
WO2014176929A1 (en) * 2013-05-03 2014-11-06 国家电网公司 Maintenance plan optimization method for electric power system having large-scale wind power
CN104167765A (en) * 2014-07-11 2014-11-26 海南电网公司 Admitting ability distribution-based maximum wind power installed capacity calculation method
CN104537204A (en) * 2014-11-07 2015-04-22 国家电网公司 Assessment method for wind and electricity digestion capacity in heat-electricity cogeneration power grid
CN104598715A (en) * 2014-11-07 2015-05-06 国家电网公司 Prediction method for regional wind power electric quantity based on climate state wind speed prediction
CN104659780A (en) * 2015-03-10 2015-05-27 国家电网公司 Implementation method for absorbing energy source Internet of large-scale distributive power supplies
CN104794325A (en) * 2015-03-10 2015-07-22 国家电网公司 Colony wind power plant output timing sequence simulation method based on random difference equation
CN104850710A (en) * 2015-05-26 2015-08-19 河海大学 Stochastic partial differential equation based wind speed fluctuation characteristic modeling method
CN105048444A (en) * 2014-08-14 2015-11-11 国家电网公司 Method for determining wind power curtailment at wind farm based on anemometer data of anemometer tower
CN105139262A (en) * 2014-05-30 2015-12-09 清华大学 Power system annual wind power quantity consumptive ability calculation method
CN105490309A (en) * 2015-12-21 2016-04-13 国网山西省电力公司大同供电公司 Power grid peak regulation capacity-based wind power consumption evaluation method
CN105656025A (en) * 2015-12-03 2016-06-08 国网江苏省电力公司经济技术研究院 Method of increasing wind power absorption capability
CN103810535B (en) * 2014-01-07 2016-09-14 广西大学 Power system wind electricity digestion capability appraisal procedure
CN106026077A (en) * 2015-01-21 2016-10-12 南通大学 Wind power unit acceptance cost index determining method for power grid day-ahead wind power acceptance capability evaluation method based on multi-target optimization
CN106056259A (en) * 2016-07-26 2016-10-26 李明轩 Large-scale wind power capacity short-term nondeterminacy rapid discrimination method
CN106777740A (en) * 2016-12-28 2017-05-31 江苏云上电力科技有限公司 A kind of wind power output probability density characteristicses Quick method
CN104217294B (en) * 2014-09-05 2017-06-06 国家电网公司 A kind of balance of electric power and ener method comprising intermittent power supply
CN108022019A (en) * 2017-12-14 2018-05-11 西南石油大学 Wind power plant dispatching method and system based on Wind turbines classification
CN108832625A (en) * 2018-06-29 2018-11-16 云南电网有限责任公司 A kind of maximum power electricity ability to send outside calculation method and device
CN108876007A (en) * 2018-05-11 2018-11-23 国网四川省电力公司 A kind of electricity demand forecasting method
CN109614718A (en) * 2018-12-14 2019-04-12 国网山东省电力公司经济技术研究院 A kind of wind power output analogue simulation model and method
CN111415029A (en) * 2019-06-11 2020-07-14 中国电力工程顾问集团华北电力设计院有限公司 Prediction system and prediction method for large-scale new energy output characteristics
CN112186745A (en) * 2020-09-18 2021-01-05 国网辽宁省电力有限公司电力科学研究院 Power grid critical wind curtailment criterion calculation method
CN113541195A (en) * 2021-07-30 2021-10-22 国家电网公司华中分部 Method for consuming high-proportion renewable energy in future power system
CN113722939A (en) * 2021-11-02 2021-11-30 清科优能(深圳)技术有限公司 Wind power output prediction method, device, equipment and storage medium

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104933301A (en) * 2015-06-05 2015-09-23 三峡大学 Calculation method for calculating available capacity of wind power plant

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010068704A (en) * 2008-08-13 2010-03-25 National Institute Of Advanced Industrial Science & Technology Direct load control system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010068704A (en) * 2008-08-13 2010-03-25 National Institute Of Advanced Industrial Science & Technology Direct load control system

Cited By (50)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102968747A (en) * 2012-11-29 2013-03-13 武汉华中电力电网技术有限公司 Method for determining typical sunrise force curves of wind power station
US10037502B2 (en) 2013-05-03 2018-07-31 Gansu Electric Power Corporation Wind Power Technology Center Maintenance schedule optimization method for electric power system including large-scale wind power
WO2014176929A1 (en) * 2013-05-03 2014-11-06 国家电网公司 Maintenance plan optimization method for electric power system having large-scale wind power
CN103268416A (en) * 2013-05-20 2013-08-28 华北电力大学(保定) Wind speed prediction method based on STCP-BP
CN103268416B (en) * 2013-05-20 2017-02-22 华北电力大学(保定) Wind speed prediction method based on STCP-BP
CN103675516A (en) * 2013-09-25 2014-03-26 中国海洋石油总公司 Simulated verification device and method for output characteristic of new energy set
CN103675516B (en) * 2013-09-25 2016-02-24 中国海洋石油总公司 A kind of simulating, verifying devices and methods therefor of new forms of energy unit power producing characteristics
CN103675355A (en) * 2013-11-19 2014-03-26 中国大唐集团科学技术研究院有限公司 Anemometer monitoring method and system
CN103675355B (en) * 2013-11-19 2016-06-08 中国大唐集团科学技术研究院有限公司 Anemoscope monitoring method and system
CN103810535B (en) * 2014-01-07 2016-09-14 广西大学 Power system wind electricity digestion capability appraisal procedure
CN103927592A (en) * 2014-04-09 2014-07-16 中国水利水电科学研究院 Optimization method for operation mode of hydroelectric generating set
CN103927592B (en) * 2014-04-09 2016-10-05 中国水利水电科学研究院 A kind of optimization method of the Hydropower Unit method of operation
CN105139262A (en) * 2014-05-30 2015-12-09 清华大学 Power system annual wind power quantity consumptive ability calculation method
CN104037803B (en) * 2014-06-09 2018-08-07 东北电力大学 The statistics and analysis method of sequence electricity quantity when regional wind power group
CN104037803A (en) * 2014-06-09 2014-09-10 东北电力大学 Sequential electricity quantity counting and analyzing method for regional wind farm group
CN104167765A (en) * 2014-07-11 2014-11-26 海南电网公司 Admitting ability distribution-based maximum wind power installed capacity calculation method
CN104167765B (en) * 2014-07-11 2016-08-24 海南电网公司 A kind of maximum wind installed capacity computational methods based on the distribution of the ability of receiving
CN104092241A (en) * 2014-07-14 2014-10-08 国家电网公司 Wind power consumption ability analysis method considering standby requirement
CN104092241B (en) * 2014-07-14 2016-04-20 国家电网公司 A kind of wind electricity digestion capability analytical method considering stand-by requirement
CN105048444A (en) * 2014-08-14 2015-11-11 国家电网公司 Method for determining wind power curtailment at wind farm based on anemometer data of anemometer tower
CN105048444B (en) * 2014-08-14 2018-03-30 国家电网公司 A kind of wind power plant based on anemometer tower survey wind data abandons wind-powered electricity generation amount and determines method
CN104217294B (en) * 2014-09-05 2017-06-06 国家电网公司 A kind of balance of electric power and ener method comprising intermittent power supply
CN104537204B (en) * 2014-11-07 2017-11-28 国家电网公司 The appraisal procedure of cogeneration power network apoplexy power consumption digestion capability
CN104598715A (en) * 2014-11-07 2015-05-06 国家电网公司 Prediction method for regional wind power electric quantity based on climate state wind speed prediction
CN104537204A (en) * 2014-11-07 2015-04-22 国家电网公司 Assessment method for wind and electricity digestion capacity in heat-electricity cogeneration power grid
CN106026077A (en) * 2015-01-21 2016-10-12 南通大学 Wind power unit acceptance cost index determining method for power grid day-ahead wind power acceptance capability evaluation method based on multi-target optimization
CN106026077B (en) * 2015-01-21 2018-05-15 南通大学 Wind-powered electricity generation receives the wind-powered electricity generation unit of capability assessment method to receive the indicator of costs to determine method to power grid based on multiple-objection optimization a few days ago
CN104659780A (en) * 2015-03-10 2015-05-27 国家电网公司 Implementation method for absorbing energy source Internet of large-scale distributive power supplies
CN104794325A (en) * 2015-03-10 2015-07-22 国家电网公司 Colony wind power plant output timing sequence simulation method based on random difference equation
CN104659780B (en) * 2015-03-10 2018-01-19 国家电网公司 Suitable for the implementation method for the energy internet for dissolving large-scale distributed power supply
CN104850710A (en) * 2015-05-26 2015-08-19 河海大学 Stochastic partial differential equation based wind speed fluctuation characteristic modeling method
CN105656025B (en) * 2015-12-03 2018-06-15 国网江苏省电力公司经济技术研究院 The method for improving wind electricity digestion capability
CN105656025A (en) * 2015-12-03 2016-06-08 国网江苏省电力公司经济技术研究院 Method of increasing wind power absorption capability
CN105490309B (en) * 2015-12-21 2018-02-06 国网山西省电力公司大同供电公司 A kind of wind electricity digestion appraisal procedure based on peak load regulation network ability
CN105490309A (en) * 2015-12-21 2016-04-13 国网山西省电力公司大同供电公司 Power grid peak regulation capacity-based wind power consumption evaluation method
CN106056259B (en) * 2016-07-26 2019-10-11 李明轩 A kind of short-term uncertain quick discrimination method of large-scale wind power power output
CN106056259A (en) * 2016-07-26 2016-10-26 李明轩 Large-scale wind power capacity short-term nondeterminacy rapid discrimination method
CN106777740A (en) * 2016-12-28 2017-05-31 江苏云上电力科技有限公司 A kind of wind power output probability density characteristicses Quick method
CN108022019A (en) * 2017-12-14 2018-05-11 西南石油大学 Wind power plant dispatching method and system based on Wind turbines classification
CN108022019B (en) * 2017-12-14 2022-02-11 西南石油大学 Wind power plant scheduling method and system based on wind turbine generator classification
CN108876007A (en) * 2018-05-11 2018-11-23 国网四川省电力公司 A kind of electricity demand forecasting method
CN108832625A (en) * 2018-06-29 2018-11-16 云南电网有限责任公司 A kind of maximum power electricity ability to send outside calculation method and device
CN108832625B (en) * 2018-06-29 2021-06-25 云南电网有限责任公司 Maximum power and electric quantity delivery capacity calculation method and device
CN109614718A (en) * 2018-12-14 2019-04-12 国网山东省电力公司经济技术研究院 A kind of wind power output analogue simulation model and method
CN111415029A (en) * 2019-06-11 2020-07-14 中国电力工程顾问集团华北电力设计院有限公司 Prediction system and prediction method for large-scale new energy output characteristics
CN112186745A (en) * 2020-09-18 2021-01-05 国网辽宁省电力有限公司电力科学研究院 Power grid critical wind curtailment criterion calculation method
CN113541195A (en) * 2021-07-30 2021-10-22 国家电网公司华中分部 Method for consuming high-proportion renewable energy in future power system
CN113541195B (en) * 2021-07-30 2022-08-02 国家电网公司华中分部 Method for consuming high-proportion renewable energy in future power system
CN113722939A (en) * 2021-11-02 2021-11-30 清科优能(深圳)技术有限公司 Wind power output prediction method, device, equipment and storage medium
CN113722939B (en) * 2021-11-02 2022-02-22 清科优能(深圳)技术有限公司 Wind power output prediction method, device, equipment and storage medium

Also Published As

Publication number Publication date
HK1177990A1 (en) 2013-08-30
CN102780219B (en) 2014-01-29

Similar Documents

Publication Publication Date Title
CN102780219B (en) Method for discriminating wind power digestion capability from multiple dimensions based on wind power operation simulation
Ye et al. Towards a 90% renewable energy future: A case study of an island in the South China Sea
CN103545832B (en) A kind of photovoltaic system energy accumulation capacity configuration based on generating predicated error
Mišák et al. A heuristic approach to active demand side management in off-grid systems operated in a smart-grid environment
CN103904695B (en) A kind ofly close on island many microgrids dynamic dispatching method based on MCS-PSO
CN104362677A (en) Active distribution network optimal configuration structure and configuration method thereof
CN104882905A (en) New energy available capability assessment method considering transient security constraints
CN103151797A (en) Multi-objective dispatching model-based microgrid energy control method under grid-connected operation mode
CN106356902A (en) Energy management method applicable to multi-energy cooperation comprehensive energy network in Internet of energy
CN104779611A (en) Economic dispatch method for micro grid based on centralized and distributed double-layer optimization strategy
CN108390415B (en) Method and system for calculating new energy consumption capacity of regional power grid
CN102709909A (en) Active power distribution network reliability evaluation method during wind power generation access
CN103679282A (en) Prediction method for wind power ramp
CN104377693A (en) Production simulation model for power generation
Mladenov et al. Characterisation and evaluation of flexibility of electrical power system
CN102749471A (en) Short-term wind speed and wind power prediction method
CN102496962B (en) Method for identifying and controlling wind power consumption capability of power system under peak load and frequency regulation constraints
CN116599160B (en) Active sensing method and system for new energy station cluster and new energy station
CN109787217A (en) Based on the modified spare clearing method out of wind-powered electricity generation multistate model and opportunity cost
Sobon et al. Energy storage day-ahead scheduling to reduce grid energy export and increase self-consumption for micro-grid and small power park applications
Rui et al. The Research of Practicality Evaluation Index System of New Energy Combined Power Project
Deng et al. Analysis of Renewable Energy Accommodation Capability of Shanxi Power Grid Based on Operation Simulation Method
Yang et al. Multi-time scale collaborative scheduling strategy of distributed energy systems for energy Internet
Nogaret et al. A new expert system based control tool for power systems with large integration of PVs and wind power plants
Chavan Self-Consumption of Residential PV Systems in Hamburg

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1177990

Country of ref document: HK

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA STATE GRID JIBEI E

Effective date: 20140811

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xu Qianyao

Inventor after: Kang Zhongqing

Inventor after: Zhang Ning

Inventor after: Xia Qing

Inventor after: Wang Yulin

Inventor after: Yang Zhigang

Inventor after: Cui Huijun

Inventor after: Wang Jingran

Inventor before: Xu Qianyao

Inventor before: Kang Zhongqing

Inventor before: Zhang Ning

Inventor before: Xia Qing

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: XU QIANYAO KANG CHONGQING ZHANG NING XIA QING TO: XU QIANYAO KANG CHONGQING ZHANG NING XIA QING WANG YULIN YANG ZHIGANG CUI HUIJUN WANG JINGRAN

TR01 Transfer of patent right

Effective date of registration: 20140811

Address after: 100084 Haidian District 100084-82 mailbox Beijing

Patentee after: Tsinghua University

Patentee after: State Grid Corporation of China

Patentee after: State Grid Jibei Electric Power Company Limited

Address before: 100084 Haidian District Tsinghua Yuan Beijing No. 1

Patentee before: Tsinghua University

REG Reference to a national code

Ref country code: HK

Ref legal event code: GR

Ref document number: 1177990

Country of ref document: HK