CN102776881B - Recyclable post-tensioned prestressing anchor cable pile and construction method thereof - Google Patents

Recyclable post-tensioned prestressing anchor cable pile and construction method thereof Download PDF

Info

Publication number
CN102776881B
CN102776881B CN201210290137.6A CN201210290137A CN102776881B CN 102776881 B CN102776881 B CN 102776881B CN 201210290137 A CN201210290137 A CN 201210290137A CN 102776881 B CN102776881 B CN 102776881B
Authority
CN
China
Prior art keywords
anchor cable
drill bit
drilling rod
pile
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210290137.6A
Other languages
Chinese (zh)
Other versions
CN102776881A (en
Inventor
严平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Nanlian Base Foundation Engineering Co Ltd
Original Assignee
Hangzhou Nanlian Base Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Nanlian Base Foundation Engineering Co Ltd filed Critical Hangzhou Nanlian Base Foundation Engineering Co Ltd
Priority to CN201210290137.6A priority Critical patent/CN102776881B/en
Publication of CN102776881A publication Critical patent/CN102776881A/en
Application granted granted Critical
Publication of CN102776881B publication Critical patent/CN102776881B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a recyclable post-tensioned prestressing anchor cable pile and a construction method thereof. The recyclable post-tensioned prestressing anchor cable pile is characterized by comprising a cement composite earth pile body and an anchor cable stretching into the pile body, wherein one end of the anchor cable, which stretches into the pile body, is connected with a drill. The construction method comprises the steps of assembling and positioning; grouting and retreating a rod; tensioning and locking; and recycling. According to the invention, the construction method of the general recyclable post-tensioned prestressing anchor cable pile is improved, and the steps of placing the anchor cable and grouting are combined into one step, thereby reducing construction steps and improving work efficiency; cement slurry and earth body are mixed and stirred; and the consumption of materials is reduced while construction quality is ensured.

Description

Recyclable post-stressed anchored pile and construction method thereof
Technical field
The present invention relates to the bracing of foundation pit technical field in building operations, particularly relate to a kind of be applicable to go along with sb. to guard him temporarily in recyclable post-stressed anchored pile and construction method.
Background technology
Present stage, in highway, railway, urban architecture, prestressed anchor reinforcement technology is generally adopted to building deep foundation, underground concealed engineering, geotechnical engineering slope treatment.
But along with the development of society, urban built-up land is more and more nervous, foundation depth also strengthens thereupon, the construction that anchor cable intrusion building line affects next architectural planning land used is more and more serious, go along with sb. to guard him that the disposable input of facility stream line is not recyclable again causes the great wasting of resources temporarily simultaneously, therefore a large amount of researcher is at Foreign Experience, and experimental study has gone out recoverable prestressed anchor cable.Existing recoverable prestressed anchored pile is all adopt step-by-step construction, and the step such as pore-forming, placement anchor cable, grouting, anchor cable locking, recovery anchor cable, has the shortcoming such as complicated operation, long construction period.
Summary of the invention
The invention provides a kind of recyclable post-stressed anchored pile and construction method thereof, there is the advantage such as quick construction, convenience, solve the shortcoming of common recoverable prestressed anchor cable construction complexity, long construction period.
A kind of recyclable post-stressed anchored pile, comprise cementitious composite soil pile body and the anchor cable going deep into pile body, one end that anchor cable gos deep into pile body is connected with drill bit.
Anchor cable one end is connected with drill bit by safe pin, and the other end is connected with the counter-force that tensioning anchor cable and the native pile body termination of cementitious composite offset and buckles, and wherein the native pile body of cementitious composite also comprises other space enclosing structure pile bodies, and counter-force button is also referred to as anchor head; Described safe pin is connected with drill bit knot that can be undone by a pull, when drill bit rotational, safe pin can ensure that anchor cable does not follow drill bit rotational, and safe pin is also a kind of release unit simultaneously, the threshold of its breaking releasing, a suitable scope, can ensure that anchor cable comes off smoothly.
Drill bit is connected with drilling rod knot that can be undone by a pull, is rotated go deep into the soil body by rig.
Drill bit bottom surface is provided with draw-in groove; Drilling rod is stock shape, and two ends have the through hole interconnected, and cross section is annular, and one end and draw-in groove are connected together; The outer wall of two ends of drill respectively has several openings gunniting hole outwardly and injected hole, gunniting hole is communicated with injected hole.The passage be communicated with is not connected with through hole.
Before construction, drill bit and drilling rod are connected together; In construction, drilling rod needs to head on bit and advances; When moving back bar, only drilling rod need be retreated, drill bit just can be made to be separated with drilling rod.
Anchor cable is steel strand cable, also can be nonmetal high-strength carbon fiber drag-line.
A construction method for recyclable post-stressed anchored pile, construction sequence is as follows:
1), assembling and location
Described anchor cable, through the through hole on drilling rod, is connected with drill bit knot that can be undone by a pull by safe pin, and during guarantee drill bit rotational, anchor cable does not rotate; Drilling rod is connected with drill bit knot that can be undone by a pull, ensures that drilling rod can be separated with drill bit; By designing requirement with certain angle, drill bit is aimed at the position needing piling;
2), slip casting and move back bar
Rig rotarily drives drill bit by drilling rod and gos deep into the soil body, and in the process of rotation, from the injected hole of drilling rod, inject cement paste, cement paste sprays from gunniting hole, mixes with the soil body, forms cementitious composite soil pile body; After drill bit gos deep into desired depth, drilling rod is separated with drill bit, and pile body is exited on reversion limit, drilling rod limit, and drill bit and anchor cable are then stayed in pile body.
3), stretching and locking
When cementitious composite soil condenses into one with anchor cable, carry out stretch-draw to anchor cable, the pulling force of stretch-draw is less than the threshold of safe pin fracture; After stretching force reaches designing requirement, determine anchor cable by counter-force padlock, prevent anchor cable from retracting;
4), reclaim
After bracing engineering completes mission, carry out stretch-draw recovery to anchor cable, stretch-draw pulling force is greater than the threshold of safe pin fracture and the frictional resistance between anchor cable top layer and cementitious composite soil, and anchor cable and safe pin depart from, and extract out after reclaiming reusable.
Drilling rod is connected with drill bit knot that can be undone by a pull, and except being connected together, can also be threaded, during work, rig rotates according to a direction, and when moving back bar, drilling rod rotates in the opposite direction and is separated with drill bit, exits pile body along anchor cable; While exiting pile body, ejection cement paste is continued on reverse rotation limit, drilling rod limit, and fully mix cement slurry and the soil body, ensures the intensity of cementitious composite soil pile body.
The construction method of the present invention to general recoverable prestressed anchored pile is improved, and makes placement anchor cable, slip casting two steps merge into a step, save working procedure, improve operating efficiency, cement paste and soil body mix and blend, while guarantee construction quality, reduce material consumption.
Accompanying drawing explanation
Structural representation when Fig. 1 is recyclable post-stressed anchored pile construction in the invention process row 1;
Fig. 2 is the structural representation of drill bit in the invention process row 1;
Fig. 3 be in Fig. 2 A to structural representation;
Fig. 4 is the structural representation of recyclable post-stressed anchored pile in the invention process row 1.
Detailed description of the invention
Embodiment 1
As Figure 1-4, a kind of recyclable post-stressed anchored pile, comprise cementitious composite soil pile body 1 and the anchor cable 2 going deep into pile body, anchor cable 2 one end is connected with the drill bit 4 going deep into the soil body by safe pin 3, and the other end is connected with tensioning anchor cable 2 and buckles 5 with the counter-force that cementitious composite soil pile body 1 termination offsets; Safe pin 3 is connected with drill bit 4 knot that can be undone by a pull, ensure drill bit turn into time, anchor cable does not follow drill bit rotational.
Anchor cable 2 adopts steel strand cable, also can be nonmetal high-strength carbon fiber drag-line.
Drill bit 4 can cutting soil, is connected with drilling rod 6 knot that can be undone by a pull, is rotated go deep into the soil body by rig.Drilling rod 6 is stock shape, and two ends have the through hole 8 interconnected, and cross section is annular; The outer wall at drilling rod 6 two ends respectively has several gunniting hole 9 and injected holes, gunniting hole 9 is communicated with injected hole, and the passage of connection is not connected with through hole 8.
Drill bit 4 is provided with draw-in groove 7 with the safe unidirectional bottom surface of pin 3, and drilling rod 6 connects one end of drill bit 4 and draw-in groove 7 is connected together, and during work, drilling rod 6 heads on drill bit 4 and rotates according to a direction, and when moving back bar, drilling rod 6 retreats and is separated with drill bit 4; The bottom surface of certain drill bit 4 also can adopt with drilling rod 6 and be threaded, and according to being threaded, drilling rod rotates in the opposite direction and is separated with drill bit 4; After separation, drilling rod 6 is while anchor cable 2 exits pile body, and ejection cement paste is continued on reverse rotation limit, limit, and fully mix cement slurry and the soil body, ensures the intensity of cementitious composite soil pile body.
The construction method of this kind of recyclable post-stressed anchored pile comprises the steps:
1), assembling and location
Anchor cable 2, through the through hole 8 on drilling rod 6, is connected with drill bit 4 knot that can be undone by a pull by safe pin 3, and ensure that anchor cable 2 can not rotate while drill bit 4 rotates, drilling rod 6 and drill bit 4 are connected together, and needs to ensure that drilling rod 6 is not separated with drill bit 4 during punching; By designing requirement with certain angle, drill bit 4 is aimed at the position needing piling;
2), slip casting and move back bar
Rig rotarily drives drill bit 4 by drilling rod 6 and gos deep into the soil body, in the process of rotation, injects cement paste by slurry filling machine from the injected hole of drilling rod 6, cement paste sprays from gunniting hole 9, mix with the soil body, form cementitious composite soil pile body, during slip casting, through hole protection anchor cable 2 does not corrode by cement paste; After drill bit 4 gos deep into desired depth, drilling rod 6 retreats and is separated with drill bit 4, and pile body is exited on reversion limit, drilling rod 6 limit, and drill bit 4 and anchor cable 2 are stayed in pile body;
3), stretching and locking
When cementitious composite soil condenses into one with anchor cable 2, apply pulling force by electronic puller system to anchor cable 2, use anchor cable tensiometer to measure pulling force simultaneously, the pulling force of stretch-draw is less than the threshold of safe pin 3 fracture; After stretching force reaches designing requirement, lock anchor cable 2 by counter-force button 5, while preventing anchor cable 2 from retracting, play again the effect of the fixing periphery soil body, prevent from caving in;
4), reclaim
After anchored pile meets designing requirement, sealing off and covering anchorage, blocks outer for pile body unnecessary anchor cable 2, repeats the construction that above step completes other anchored piles; After bracing engineering completes mission, by electronic puller system, stretch-draw recovery is carried out to anchor cable 2, stretch-draw pulling force is greater than the threshold of safe pin 3 fracture and the frictional resistance between anchor cable 2 top layer and cementitious composite soil, and anchor cable 2 and safe pin 3 depart from, and extract out after reclaiming reusable.

Claims (3)

1. a recyclable post-stressed anchored pile, comprise cementitious composite soil pile body (1) and go deep into the anchor cable (2) of pile body, it is characterized in that: one end that described anchor cable (2) gos deep into pile body is connected with drill bit (4);
Described anchor cable (2) one end is connected with drill bit (4) by safe pin (3), and the other end is connected with tensioning anchor cable (2) and buckles (5) with the counter-force that cementitious composite soil pile body (1) termination offsets; Described safe pin (3) is connected with drill bit (4) knot that can be undone by a pull;
Described drill bit (4) is connected with drilling rod (6) knot that can be undone by a pull, is rotated go deep into the soil body by rig.
2. recyclable post-stressed anchored pile according to claim 1, is characterized in that: described drill bit (4) bottom surface is provided with draw-in groove (7); Drilling rod (6) is stock shape, and two ends have the through hole (8) interconnected, and cross section is annular, and one end and draw-in groove (7) are connected together; The outer wall at drilling rod (6) two ends respectively has several openings gunniting hole outwardly (9) and injected hole, gunniting hole (9) is communicated with injected hole.
3. a construction method for recyclable post-stressed anchored pile described in claim 1, is characterized in that:
Construction sequence is as follows:
1), assembling and location
Described anchor cable (2), through the through hole (8) on drilling rod (6), is connected with drill bit (4) knot that can be undone by a pull by safe pin (3), and drilling rod (6) is connected with drill bit (4) knot that can be undone by a pull; By designing requirement with certain angle, drill bit (4) is aimed at the position needing piling;
2), slip casting and move back bar
Rig rotarily drives drill bit (4) by drilling rod (6) and gos deep into the soil body, in the process of rotating, from the injected hole of drilling rod (6), inject cement paste, cement paste sprays from gunniting hole (9), mix with the soil body, form cementitious composite soil pile body; After drill bit gos deep into desired depth, drilling rod (6) is separated with drill bit (4), and pile body is exited on reversion limit, drilling rod (6) limit, and drill bit (4) and anchor cable (2) are stayed in pile body;
3), stretching and locking
When cementitious composite soil condenses into one with anchor cable (2), carry out stretch-draw to anchor cable (2), the pulling force of stretch-draw is less than the threshold that safe pin (3) ruptures; After stretching force reaches designing requirement, by counter-force button (5) locking anchor cable (2), prevent anchor cable (2) from retracting;
4), reclaim
After bracing engineering completes mission, stretch-draw recovery is carried out to anchor cable (2), stretch-draw pulling force is greater than threshold that safe pin (3) ruptures and the frictional resistance between anchor cable (2) top layer and cementitious composite soil, anchor cable (2) and safe pin (3) depart from, reusable after extracting out.
CN201210290137.6A 2012-08-13 2012-08-13 Recyclable post-tensioned prestressing anchor cable pile and construction method thereof Active CN102776881B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210290137.6A CN102776881B (en) 2012-08-13 2012-08-13 Recyclable post-tensioned prestressing anchor cable pile and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210290137.6A CN102776881B (en) 2012-08-13 2012-08-13 Recyclable post-tensioned prestressing anchor cable pile and construction method thereof

Publications (2)

Publication Number Publication Date
CN102776881A CN102776881A (en) 2012-11-14
CN102776881B true CN102776881B (en) 2015-02-25

Family

ID=47121977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210290137.6A Active CN102776881B (en) 2012-08-13 2012-08-13 Recyclable post-tensioned prestressing anchor cable pile and construction method thereof

Country Status (1)

Country Link
CN (1) CN102776881B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103215953A (en) * 2013-04-24 2013-07-24 启东建筑集团有限公司 Construction method of anti-floating anchor in super-large super-deep basement engineering
CN103924591B (en) * 2014-04-16 2016-08-31 中铁第四勘察设计院集团有限公司 A kind of method for designing of tension type anchor cable
CN107989063A (en) * 2017-12-01 2018-05-04 绍兴大明电力设计院有限公司 Churning anchor cable composite foundation
CN113585239A (en) * 2021-09-02 2021-11-02 中庆建设有限责任公司 Prestressed anchor pile
CN114183180A (en) * 2021-12-17 2022-03-15 辽宁有色勘察研究院有限责任公司 Down-placing tool and down-placing method for deep hole cross-fault Newton force NPR anchor cable
CN115419076A (en) * 2022-05-30 2022-12-02 中冶建工集团有限公司 Construction method for high-pressure rotary spraying recoverable anchor cable support of deep foundation pit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2206613A (en) * 1987-07-08 1989-01-11 Zuei Jse Lin Recoverable ground anchor
CN2813873Y (en) * 2005-06-22 2006-09-06 叶迎新 Drilling rod of central placing roofbolt driller
CN2926509Y (en) * 2006-05-09 2007-07-25 中国矿业大学 Roofbolt support
CN2934357Y (en) * 2006-07-26 2007-08-15 中冶沈勘工程技术有限公司 Butt-jointing device for anchor cable and borer
CN200964592Y (en) * 2006-11-01 2007-10-24 中国人民解放军总参谋部工程兵科研三所 Recoverable prestressed anchor
CN202706022U (en) * 2012-08-13 2013-01-30 杭州南联地基基础工程有限公司 Recycled post-tensioned prestressing anchor cable pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2206613A (en) * 1987-07-08 1989-01-11 Zuei Jse Lin Recoverable ground anchor
CN2813873Y (en) * 2005-06-22 2006-09-06 叶迎新 Drilling rod of central placing roofbolt driller
CN2926509Y (en) * 2006-05-09 2007-07-25 中国矿业大学 Roofbolt support
CN2934357Y (en) * 2006-07-26 2007-08-15 中冶沈勘工程技术有限公司 Butt-jointing device for anchor cable and borer
CN200964592Y (en) * 2006-11-01 2007-10-24 中国人民解放军总参谋部工程兵科研三所 Recoverable prestressed anchor
CN202706022U (en) * 2012-08-13 2013-01-30 杭州南联地基基础工程有限公司 Recycled post-tensioned prestressing anchor cable pile

Also Published As

Publication number Publication date
CN102776881A (en) 2012-11-14

Similar Documents

Publication Publication Date Title
CN102776881B (en) Recyclable post-tensioned prestressing anchor cable pile and construction method thereof
KR100820642B1 (en) Anchor-nail device for slope-reinforcement-construction and slope stabilization method
CN101570970A (en) Construction method of cement soil anchor and anchor plate combined member thereof
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN104895073B (en) Can being dismounted for multiple times anchor cable construction system and its construction method
CN105442605B (en) Extract PHC and be reused in deep foundation pit supporting construction method
CN109209392A (en) Loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN201395793Y (en) Long spiral high-pressure spraying mud injecting stirring pile-forming device
CN102080377B (en) Composite anchor rod and guide construction method thereof
CN202706022U (en) Recycled post-tensioned prestressing anchor cable pile
JP2003268767A (en) Construction method for double tube digging small diameter pile using hole excavating rod
CN110042835A (en) It is bored certainly for native, layer of sand from anchor recoverable anchor rod and its anchoring process
CN103883339B (en) A kind of cable bolting method repeating Shi Hanzhang
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN106480880A (en) Recoverable soil nailing and the construction method using recoverable soil nail
CN202164599U (en) Reinforcing pile enabling reinforcing rib body to be recycled
CN102080376B (en) Built-in composite anchor rod construction method and composite anchor rod drilling tool used by same
CN203361147U (en) Recyclable anchor rod and bearing plate type anchor pile
KR100418366B1 (en) Tunnel formation tunnel structure form of construction work and tunnel structure
CN115419076A (en) Construction method for high-pressure rotary spraying recoverable anchor cable support of deep foundation pit
CN202626979U (en) High-pressure rotary jet grouting stiffening pile construction equipment with rib drilling method
CN104480947A (en) Construction method of prestress cast-in-place pile and soil cement pile engagement support
CN105421446B (en) A kind of construction method of composite soil extruding solidification prefabricated pile for treatment of soft foundation
CN102359107B (en) Stiffening pile for reclaiming reinforcing body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Recyclable post-tensioned prestressing anchor cable pile and construction method thereof

Effective date of registration: 20181017

Granted publication date: 20150225

Pledgee: Hangzhou joint rural commercial bank Limited by Share Ltd three pier sub branch

Pledgor: Yan Ping|Hangzhou Nanlian Base Foundation Engineering Co., Ltd.

Registration number: 2018330000314