CN102759478A CN2012102268487A CN201210226848A CN102759478A CN 102759478 A CN102759478 A CN 102759478A CN 2012102268487 A CN2012102268487 A CN 2012102268487A CN 201210226848 A CN201210226848 A CN 201210226848A CN 102759478 A CN102759478 A CN 102759478A
Authority
CN
China
Prior art keywords
test fixture
cylinder
test tooling
straight line
load cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102268487A
Other languages
English (en)
Inventor
贾勇
袁吉
陈杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Tuopu Group Co Ltd
Original Assignee
Ningbo Tuopu Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Tuopu Group Co Ltd filed Critical Ningbo Tuopu Group Co Ltd
Priority to CN2012102268487A priority Critical patent/CN102759478A/zh
Publication of CN102759478A publication Critical patent/CN102759478A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明涉及一种拉杆三向疲劳测试工装,由直线加载缸(1)、扭转加载缸(2)、竖直直线加载缸(3)、被测工件(4)、A端测试工装(5)和B端测试工装(6)组成,所述的直线加载缸(1)与A端测试工装(5)一端通过螺栓水平连接,所述的竖直直线加载缸(3)竖直位于A端测试工装(5)上方且与A端测试工装(5)通过球头连接,A端测试工装(5)另一端与B端测试工装(6)以及扭转加载缸(2)的输出端连接。本发明设计合理,结构简单,制造方便,三轴刻同时加载进行测试,缩短了测试时间,降低了总的测试费用。

Description

一种拉杆三向疲劳测试工装
技术领域
本发明属汽配技术领域,特别是涉及一种拉杆三向疲劳测试工装。
背景技术
目前的拉杆测试都是基于单轴测试,无法真实的反应拉杆在整车中受到的真实载荷,随着汽车工业的迅速发展,各大主机厂更加重视整车的NVH性能。而主机厂通过道路试验采集的数据都是三轴加载数据,故如何进行零部件三轴测试就成了摆在各零部件生产厂家面前的一道难题。
发明内容
本发明所要解决的技术问题是提供一种拉杆三向疲劳测试工装,能对零部件进行三轴测试。
本发明解决其技术问题所采用的技术方案是:提供一种拉杆三向疲劳测试工装,由直线加载缸、扭转加载缸、竖直直线加载缸、被测工件、A端测试工装和B端测试工装组成,所述的直线加载缸与A端测试工装一端通过螺栓水平连接,所述的竖直直线加载缸竖直位于A端测试工装上方且与A端测试工装通过球头连接,A端测试工装另一端与B端测试工装以及扭转加载缸的输出端连接。
所述的A端测试工装与直线加载缸连接处装有滚动轴承。
所述的A端测试工装另一端通过滚动轴承与B端测试工装以及扭转加载缸的输出端连接。
有益效果
本发明设计合理,结构简单,制造方便,三轴刻同时加载进行测试,缩短了测试时间,降低了总的测试费用。
附图说明
图1为本发明主视图。
图2为本发明俯视图。
具体实施方式
下面结合具体实施例,进一步阐述本发明。应理解,这些实施例仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。
实施例1
如图1~图2所示,一种三轴同时加载载荷进行疲劳的试验工装,由直线加载缸1、扭转加载缸2、竖直直线加载缸3、被测工件4、A端测试工装5、B端测试工装6组成;所述的直线加载缸1与A端测试工装5通过螺栓连接,A端测试工装5内部装有滚动轴承,A端测试工装5可以绕直线加载缸1的轴做旋转运动,同时可以和直线加载缸1进行直线往复运动;所述的竖直直线加载缸3与A端测试工装5通过球头连接,进行直线往复运动,带动A端测试工装5绕直线加载缸1的轴线做旋转运动;所述的扭转加载缸2与B端测试工装6通过螺栓连接,B端测试工装6内部装有滚动轴承,可以实现旋转运动,同时承受直线加载缸1加载的径向力,从而实现三轴同时进行疲劳试验。

Claims (3)

1.一种拉杆三向疲劳测试工装,由直线加载缸(1)、扭转加载缸(2)、竖直直线加载缸(3)、被测工件(4)、A端测试工装(5)和B端测试工装(6)组成,其特征是:所述的直线加载缸(1)与A端测试工装(5)一端通过螺栓水平连接,所述的竖直直线加载缸(3)竖直位于A端测试工装(5)上方且与A端测试工装(5)通过球头连接,A端测试工装(5)另一端与B端测试工装(6)以及扭转加载缸(2)的输出端连接。
2.根据权利要求1所述的一种拉杆三向疲劳测试工装,其特征是:所述的A端测试工装5)与直线加载缸(1)连接处装有滚动轴承。
3.根据权利要求1所述的一种拉杆三向疲劳测试工装,其特征是:所述的A端测试工装(5)另一端通过滚动轴承与B端测试工装(6)以及扭转加载缸(2)的输出端连接。
CN2012102268487A 2012-06-29 2012-06-29 一种拉杆三向疲劳测试工装 Pending CN102759478A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102268487A CN102759478A (zh) 2012-06-29 2012-06-29 一种拉杆三向疲劳测试工装

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102268487A CN102759478A (zh) 2012-06-29 2012-06-29 一种拉杆三向疲劳测试工装

Publications (1)

Publication Number Publication Date
CN102759478A true CN102759478A (zh) 2012-10-31

Family

ID=47054009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102268487A Pending CN102759478A (zh) 2012-06-29 2012-06-29 一种拉杆三向疲劳测试工装

Country Status (1)

Country Link
CN (1) CN102759478A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109186993A (zh) * 2018-11-06 2019-01-11 宁波拓普集团股份有限公司 一种三轴球铰疲劳磨损试验工装

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1963440A (zh) * 2006-11-08 2007-05-16 株洲时代新材料科技股份有限公司 一种橡胶球铰三向加载疲劳试验方法及装置
CN201177555Y (zh) * 2008-04-08 2009-01-07 株洲时代新材料科技股份有限公司 轴箱拉杆橡胶关节四向疲劳试验工装
CN101451933A (zh) * 2008-12-18 2009-06-10 北京林业大学 六维加载材料力学试验机
CN102252920A (zh) * 2011-04-28 2011-11-23 株洲时代新材料科技股份有限公司 一种扭杆系统三向协调加载试验方法及装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1963440A (zh) * 2006-11-08 2007-05-16 株洲时代新材料科技股份有限公司 一种橡胶球铰三向加载疲劳试验方法及装置
CN201177555Y (zh) * 2008-04-08 2009-01-07 株洲时代新材料科技股份有限公司 轴箱拉杆橡胶关节四向疲劳试验工装
CN101451933A (zh) * 2008-12-18 2009-06-10 北京林业大学 六维加载材料力学试验机
CN102252920A (zh) * 2011-04-28 2011-11-23 株洲时代新材料科技股份有限公司 一种扭杆系统三向协调加载试验方法及装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109186993A (zh) * 2018-11-06 2019-01-11 宁波拓普集团股份有限公司 一种三轴球铰疲劳磨损试验工装
CN109186993B (zh) * 2018-11-06 2024-04-02 宁波拓普集团股份有限公司 一种三轴球铰疲劳磨损试验工装

Similar Documents

Publication Publication Date Title
CN103115774B (zh) 轴向与径向复合加载轴承试验装置
CN103175702B (zh) 轮轴疲劳试验装置及其方法
CN104359773A (zh) 一种用于汽车零部件的拉伸及扭转疲劳试验机
CN202002602U (zh) 凸轮轴跳动量检测装置
CN102156047A (zh) 风力发电机组试验台模拟加载装置
CN202092856U (zh) 汽车起重机车架台架试验装置
CN204086007U (zh) 用于测量控制臂刚度的试验夹具
CN207866523U (zh) 曲柄连杆传动加载交变载荷的滚动轴承疲劳寿命测试系统
CN102759478A (zh) 一种拉杆三向疲劳测试工装
CN203163969U (zh) 橡胶衬套扭转疲劳试验装置
CN204043831U (zh) 一种双轴电机马力测试系统
CN204286790U (zh) 铁路轴承试验机
CN204373901U (zh) 一种单电动轮轴荷动态加载装置
CN204788977U (zh) 一种双离合器自动变速器润滑系统试验装置
CN202886099U (zh) 航空发动机主轴轴承试验机
CN202757756U (zh) 一种汽车背门气弹簧的可靠性检验台
CN202083551U (zh) 一种风力发电机组试验台模拟加载装置
CN201740616U (zh) 一种汽车底盘测功机系统
CN203148656U (zh) 测试汽车废气再循环系统控制阀开度流量的装置
CN104316313B (zh) 变速箱壳体试验装置
CN202393885U (zh) 电动车电机疲劳测试机
CN202330016U (zh) 汽车整车试验台
CN202382948U (zh) 轮轴疲劳试验装置
CN208333886U (zh) 一种带动转向轴旋转机构
CN207866521U (zh) 齿轮齿条传动加载交变载荷的滚动轴承疲劳寿命测试系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121031